Top Banner
Williamsburg Bridge Access Presentation to Manhattan CB 3 March 2008 Clinton Street
18

Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Jun 05, 2018

Download

Documents

doanhuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Williamsburg Bridge AccessPresentation to Manhattan CB 3 March 2008

Clinton Street

Page 2: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Why are we here?Bicycle Fatality & Serious Injury Study – Improve SafetyMayor’s PlaNYC – A Greener Transportation Network 1997 Bicycle Master Plan

Page 3: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Cycling Growth in Project Area

The Williamsburg Bridge is the most heavily traveled bridge for cyclists in NYC

Bicycle traffic on the Williamsburg Bridge more than tripled from 2000 to 2007

Daily Bicyclist Volumes: Williamsburg Bridge, 2000-2007

0

500

1,000

1,500

2,000

2,500

3,000

2000 2001 2002 2003 2004 2005 2006 2007

Page 4: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Williamsburg Bridge :Current Access

Bridge path starts/ends at Clinton and Delancey Street intersection

Williamsburg Br. reconstruction -Clinton St. no longer a motor vehicle connection

There is no legal southbound route from bridge

Delancey Street: less bicycle-friendly than alternative convenient routes

Page 5: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Clinton Street:Project Overview

Bicycle Network Connections to and from Williamsburg BridgeNew Two-Way Access to Grand Street Bicycle Lanes

Clin

ton

St

Grand St

Williamsburg Br

Planned On-Street Bicycle Route

Existing On-Street Bicycle Lane/ Route

Existing Off-Street Path

Existing On-Street Bicycle Route

Page 6: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

To The South:Delancey to East Broadway

Existing ConditionsClinton is currently one-way northbound between Grand Street and Delancey Street

Planned ConditionsConvert Clinton from Delancey Street to Grand Street to two-way

Install bicycle facility markings and signs to roadway.

Page 7: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

To The South: Existing

Clinton St bet Grand St & E Broadway

Page 8: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

To The South: Proposed

Clinton St bet Grand St & E Broadway

Page 9: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

To The South: Existing

Clinton St looking south to Grand St

Page 10: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Clinton St looking south to Grand St

To The South: Proposed

Page 11: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

To The South: The Design

Convert Clinton from one-way northbound to two-way between Grand Street and Delancey Street

Change curbside regulations between Grand St and Broome St:-No Parking Anytime & No Parking 8am-6pm to No Standing Anytime

Install shared lane signs & markings from Grand St to Delancey and bicycle lane signs &markings from Grand St to East Broadway to guide cyclists to and from the bridge

Page 12: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

To The North:Delancey to East Houston

Existing ConditionsClinton is a narrow street in the Lower East Side, with one active curbside

No dedicated Cycling Space

Planned ConditionsInstall a curbside bicycle lane from Delancey to East Houston

Provides connection from the bridge to East Village and East Houston bicycle route

Clin

ton

StSt

Page 13: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Clinton St north of Delancey

To The North: Existing

Page 14: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Clinton St north of Delancey

To The North: Proposed

Page 15: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Green Bicycle Lane Markings

Adams Street: Brooklyn

Page 16: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

To The North: The Design

Curb utilization study: few vehicles loading and unloading on east side can be accommodated by available space on west side

Alter east side parking regulations from Delancey to East Houston:-No Parking Anytime becomes No Standing Anytime

Install high-visibility curbside bicycle laneGreen coating of asphaltRetroreflective white thermoplastic edge line and bicycle symbols

Edgelines define existing single motor vehicle lane

Page 17: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Next Steps

Resurfacing: Mid March-Mid AprilSigns & Markings Installation

Begin Mid-AprilCompletion Mid-May

Page 18: Clinton Street - Welcome to NYC.gov | City of New York · Williamsburg Bridge : Current Access |Bridge path starts/ends at Clinton and Delancey Street intersection |Williamsburg Br.

Thank You

More information on recent projects is available at nyc.gov/dot