CIVIL ENGINEERING CONSTRUCTION PROJECT (ECM 317)
GROUP MEMBERS:
1) SITI HIJRAN BINTI ZAINAL 2011832518
2) NUR SAKINAH BT ABD HAMID 2011821644
3) NURUL AIMI BT MALEK 2011240844
4) NUR SYAZWANI BT JASNI 2011845836
GROUP : EC1106 B2
LECTURER : MR. KHAIRUL AMMAR BIN MUHD ALI
INTRODUCTION
In this last semester from November 2013 until April
2014, we are given a project of double storey house. We
are decided to make a rough estimation about a unit of
double storey house and 100 unit of double storey house
construction. With this, we were choosing a plan of Semi-D
residential of Timbalan Pengarah at Kolej Matrikulasi
The grand total of the material cost that we gained from the calculated taking off and the bill of quantities is RM 148,664.08. After including 11% from JKR References PulauPinang the actual material cost is RM RM 164,997.13.
The Gantt chart and S-curve shows the duration and construction cost of 100 unit of double storey house which is shows the time started the project until it finished.
CONCLUSION
In conclusion, the knowledge that we gained from doing this project really expose us the important of knowing the real specific of work. Taking off and the bill of quantity together with the Gantt chart and s-curve also be considered in the taking off in order to get estimated value for the each project. Thus, the specific cost needed for a unit of house have been estimated.