CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011 11-18-70 Construction 32944 Road Concreting at Brgy. Sallacapo 02/28/09 I 0.855 18 C 0.375 0.200 0.300 - - - 87.50 *87.50% Satisfactory 121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of 2-Storey, 2-Classroom Sch. Bldg. at Heritage ES, Loma de Gato 04/15/11 III 2.472 120 C 0.419 0.200 0.300 - - - 91.90 89.10% V. Satisfactory 121 Construction Corporation (Formerly: 121 Construction) 21686 Impvt. of MPB at Sta. Maria Agro- Industrial High School 11/26/08 III 1.717 90 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding 121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB 11/24/08 NCR 3.821 90 C 0.280 0.200 0.300 - - - 78.00 *78.00% Satisfactory 121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB, Brgy. Mabini J. Rizal 06/02/10 NCR 9.315 180 C 0.475 0.200 0.300 - - - 97.50 91.97% V. Satisfactory 2H2L Construction 16293 Const. of Two (2) Storey Sch. Bldg. Oogong E/S 04/04/11 IVA 0.999 60 C 0.382 0.200 0.300 - - - 88.20 *88.20% Satisfactory 2H2L Construction 16293 Const. of Two (2) Storey, Six (6) Classrooms Cainta E/S 04/15/11 IVA 7.848 150 C 0.389 0.200 0.300 - - - 88.90 85.75% Satisfactory 2H2L Construction 16293 Widening of Antipolo-Teresa Road 11/25/08 IV-A 19.224 180 C 0.261 0.300 0.300 - - - 86.10 80.34% V. Satisfactory 2H2L Construction 16293 Impvt. of Flood Control at So. Upper East Kamias & So. East Kamias 03/12/09 IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90 *89.90% V. Satisfactory 2H2L Construction 16293 Impvt. of Multi-Purpose Pavement at Brgy. Dela Paz & Brgy. San Isidro 03/12/09 IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory 2H2L Construction 16293 Rehab./Reconst./Upgrading of Marikina-Victoria Valley-Antipolo Road 08/26/09 IVA 19.222 180 C 0.475 0.200 0.300 - - - 97.50 91.86% V. Satisfactory 2H2L Construction 16293 Rehab./Reconst./Upgrading of Marikina-Victoria Valley-Antipolo Road 05/18/09 IV-A 19.221 180 O 0.387 0.239 0.150 0.030 0.025 0.050 88.10 - 2-R Construction & Supply 15304 Repair/Impvt. of Villasis-Malasiqui San Carlos Road 08/27/08 I 2.410 60 C 0.338 0.200 0.300 - - - 83.80 *83.80% V. Satisfactory 2-R Construction & Supply 15304 Const. of Additional Classroom @ Comprehensive Nat'l. H/S 05/21/09 I 2.417 120 C 0.496 0.072 0.300 - - - 86.80 *86.80% Satisfactory 310 Construction Specialist Corporation 4875 Estrella-Pantaleon Bridge Approaches (Across Pasig River) 11/28/08 NCR 38.627 405 C 0.376 0.200 0.300 - - - 87.60 83.22% V. Satisfactory 3FS Construction 30464 Road Upgrading (Gravel to Paved) of Bagahupi-Babatngon-Sta. Cruz- Barugo-Carigara Road 04/06/11 VIII 19.108 180 C 0.459 0.176 0.300 - - - 93.50 90.62% V. Satisfactory NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF EVALUATION FINAL RATING/ QUALITATIVE DESCRIPTION AMOUNT (Php, M) DUR (C.D.) CONTRACT ESH RDR STATUS CPES VISIT RATING WMS MTL TIME FAC *IMPL. AGENCY * 1st/Final * For DPWH, only the region and PMO office are listed 14th CPES Release Page1
433
Embed
CIAP-PDCB CONSTRUCTORS PERFORMANCE ... Report 14th...CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports-On-going and Completed Projects from January 01, 2009 to December
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
11-18-70 Construction 32944 Road Concreting at Brgy. Sallacapo 02/28/09 I 0.855 18 C 0.375 0.200 0.300 - - - 87.50 *87.50%Satisfactory
121 Construction Corporation (Formerly:
121 Construction)21686 Const. of 2-Storey, 2-Classroom Sch.
Bldg. at Heritage ES, Loma de Gato 04/15/11 III 2.472 120 C 0.419 0.200 0.300 - - - 91.90 89.10% V. Satisfactory
121 Construction Corporation (Formerly:
121 Construction)21686 Impvt. of MPB at Sta. Maria Agro-
Industrial High School 11/26/08 III 1.717 90 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding
121 Construction Corporation (Formerly:
121 Construction)21686 Const. of MPB 11/24/08 NCR 3.821 90 C 0.280 0.200 0.300 - - - 78.00 *78.00%
Satisfactory
121 Construction Corporation (Formerly:
121 Construction)21686 Const. of MPB, Brgy. Mabini J. Rizal 06/02/10 NCR 9.315 180 C 0.475 0.200 0.300 - - - 97.50 91.97%
V. Satisfactory
2H2L Construction 16293 Const. of Two (2) Storey Sch. Bldg. Oogong E/S 04/04/11 IVA 0.999 60 C 0.382 0.200 0.300 - - - 88.20 *88.20%
Satisfactory
2H2L Construction 16293 Const. of Two (2) Storey, Six (6) Classrooms Cainta E/S 04/15/11 IVA 7.848 150 C 0.389 0.200 0.300 - - - 88.90 85.75%
Satisfactory
2H2L Construction 16293 Widening of Antipolo-Teresa Road 11/25/08 IV-A 19.224 180 C 0.261 0.300 0.300 - - - 86.10 80.34% V. Satisfactory
2H2L Construction 16293 Impvt. of Flood Control at So. Upper East Kamias & So. East Kamias 03/12/09 IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90 *89.90%
V. Satisfactory
2H2L Construction 16293 Impvt. of Multi-Purpose Pavement at Brgy. Dela Paz & Brgy. San Isidro 03/12/09 IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20 *91.20%
V. Satisfactory
2H2L Construction 16293Rehab./Reconst./Upgrading of
Marikina-Victoria Valley-Antipolo Road
08/26/09 IVA 19.222 180 C 0.475 0.200 0.300 - - - 97.50 91.86% V. Satisfactory
2H2L Construction 16293Rehab./Reconst./Upgrading of
2-R Construction & Supply 15304 Repair/Impvt. of Villasis-Malasiqui
San Carlos Road 08/27/08 I 2.410 60 C 0.338 0.200 0.300 - - - 83.80 *83.80% V. Satisfactory
2-R Construction & Supply 15304 Const. of Additional Classroom @
Comprehensive Nat'l. H/S 05/21/09 I 2.417 120 C 0.496 0.072 0.300 - - - 86.80 *86.80% Satisfactory
310 Construction Specialist Corporation 4875 Estrella-Pantaleon Bridge
Approaches (Across Pasig River) 11/28/08 NCR 38.627 405 C 0.376 0.200 0.300 - - - 87.60 83.22% V. Satisfactory
3FS Construction 30464Road Upgrading (Gravel to Paved) of
Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Road
04/06/11 VIII 19.108 180 C 0.459 0.176 0.300 - - - 93.50 90.62% V. Satisfactory
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page1
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
3FS Construction 30464 Const. of Coastal Road 04/08/11 VIII 18.895 150 C 0.421 0.133 0.300 - - - 85.40 *85.40% Satisfactory
3FS Construction 30464 Upgrading of Bagahupi-Babatngon-Sta. Cruz, Barugo-Carigara Rd. 03/11/10 VIII 19.289 230 C 0.497 0.189 0.300 - - - 98.60 91.07%
V. Satisfactory
3FS Construction 30464 Const. of Grouted Riprap @ Brgy. 90 03/18/09 VIII 0.962 70 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory
3K Builders 27277Repair/Rehab. of MNR, Km.174+000 -
Km.175+000 w/ exception Villasis Section
06/10/10 I 9.996 32 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
3K Rock Engineering 27908 Const. of One Unit Classroom School Building, San Antonio I/S 04/08/11 II 0.641 45 C 0.485 0.133 0.300 - - - 91.80 *91.80%
V. Satisfactory
3K Rock Engineering 27908 Construction of Multi-Purpose Building, Magsaysay 09/03/09 II 0.572 45 C 0.407 0.200 0.300 - - - 90.70 *90.70%
V. Satisfactory
3K Rock Engineering 27908 Const./Repair of Multi-Purpose Building 02/25/10 II 1.735 60 C 0.413 0.133 0.300 - - - 84.60 84.60%
Satisfactory
3K Rock Engineering 27908 Const./Completion of MPB, Liwayway 06/05/10 II 1.445 60 C 0.441 0.133 0.300 - - - 87.40 87.40%
Satisfactory
3K Rock Engineering 27908 Const. of Flood Control, Sangbay 08/18/08 II 0.954 70 C 0.321 0.204 0.300 - - - 82.50 *82.50% V. Satisfactory
3K Rock Engineering 27908 Const. of Sch. Bldg., Bannawang Integrated School 08/18/08 II 0.578 45 C 0.375 0.218 0.300 - - - 89.30 *89.30%
V. Satisfactory
3K Rock Engineering 27908 Const. of Sch. Bldg., Victoria H/S 11/25/08 II 1.622 100 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
3K Rock Engineering 27908 Completion of Multi-Purpose Building, Gundaway 03/06/09 II 1.783 60 C 0.458 0.200 0.300 - - - 95.80 *95.80%
V.Satisfactory
3-L Construction 16745 Const. of 2 Storey Multi-Purpose Bldg. (Brgy. Hall), Brgy. San Gabriel 03/09/09 V 0.955 120 C 0.436 0.175 0.300 - - - 91.10 *91.10%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page2
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
3-L Construction 16745 Road Upgrading (Gravel to Paved), Sipocot-Cabusao Road 09/09/09 V 6.555 150 C 0.418 0.200 0.300 - - - 91.80 89.64%
V. Satisfactory
3RB Construction & Supply 19541 Const. of Sto. Cristo Seawall 05/28/10 V 2.876 150 C 0.458 0.133 0.300 - - - 89.10 89.10%
Satisfactory
3RB Construction & Supply 19541 Const./Rehab. of Water Supply,
Level 1 and II System 08/19/08 IV-A 1.921 30 C 0.288 0.200 0.300 - - - 78.80 73.94% Satisfactory
3RB Construction & Supply 19541
Road Upgrading along DM Jct.-Leg.-Sto. Domingo-Tab.-Cam. Sur Bdry.,
Tiwi-Tabaco Section02/24/09 V 19.233 150 C 0.488 0.133 0.300 - - - 92.10 84.30%
Satisfactory
3RB Construction & Supply 19541 Impvt. of San Fernando North Road,
San Jacinto Section 02/17/10 V 9.450 210 O 0.378 0.240 0.150 0.015 0.035 0.050 86.80 -
3RB Construction & Supply 19541 Road Conc. & Impvt. of Barangay
Road 02/22/10 V 0.959 160 C 0.396 0.139 0.300 - - - 83.50 86.38% Satisfactory
3RB Construction & Supply/Ajan Jaeda, Inc.
(JV) JV-08-209 Const. of Tagas-Divino Rostro
Bridge 09/01/09 V 19.179 202 O 0.384 0.240 0.150 0.030 0.033 0.050 88.70 -
3S Builders 18009 Repair and Rehab. of MPB (Municipal Hall) 04/09/11 VII 1.893 97 C 0.491 0.133 0.300 - - - 92.40 *92.40%
V. Satisfactory
4 A's Construction 9446 Construction of 1-CL (7x9) Lupigue IS 09/05/09 II 1.108 45 C 0.454 0.133 0.300 - - - 88.70 *88.70%
Satisfactory
4 A's Construction 9446 Const./Conc. of Road 02/23/10 II 4.822 330 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory
4 A's Construction 9446 Construction of Road 08/11/08 II 1.926 90 C 0.326 0.200 0.300 - - - 82.60 79.54% Satisfactory
4 A's Construction 9446 Asphalt Overlay of Daang Maharlika 03/03/09 II 1.929 30 C 0.464 0.133 0.300 - - - 89.70 *89.70% V.Satisfactory
4B Construction Corporation 23445 Upgrading and Concreting of Subic-
Philseco Road 03/03/09 III 41.616 180 C 0.407 0.163 0.300 - - - 87.00 83.76% Satisfactory
4B Construction Corporation 23445
Rehab./Reconst./Upgrading of Damaged Paved National Road,
Olongapo-Bugallon Road05/23/09 III 33.265 45 C 0.374 0.200 0.300 - - - 87.40 *87.40%
Satisfactory
4B Construction Corporation 23445
Rehab./Reconst./Upgrading of Damaged Paved National Roads at
Subic-PHILSECO Rd.04/04/11 III 41.378 163 C 0.356 0.167 0.300 - - - 82.30 80.41%
Unsatisfactory
4B Construction Corporation 23445
Repair/Rehab. of Paete-Famy Pob. Rd., Pangil-Siniloan Sect. Km.109+000 - Km.110+400
05/25/10 IVA 9.608 20 C 0.472 0.133 0.300 - - - 90.50 90.50% V. Satisfactory
525 Construction 28532 Rehab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 04/15/11 III 38.599 210 C 0.330 0.200 0.300 - - - 83.00 89.66%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page3
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
525 Construction 28532 Rahab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 09/08/09 III 19.049 120 C 0.478 0.133 0.300 - - - 91.10 *91.10%
V. Satisfactory
525 Construction / MGSCC (JV)
JV-07-095/ SLI-SN-005104
Rehabilitation/Improvement of Sta. Rita Biak na Bato Road 03/11/09 III 44.000 200 C 0.405 0.200 0.300 - - - 90.50 *90.50%
V.Satisfactory
525 Construction/MGSCC Joint Venture JV-08-235 Rehabilitation of Sta. Maria-
Norzagaray Road 09/07/09 III 46.339 180 C 0.479 0.133 0.300 - - - 91.20 86.64% Satisfactory
628 Construction Enterprises 30049 Construction of Two Classroom
School Building at Lokeb Norte 03/06/09 I 1.369 70 C 0.429 0.178 0.300 - - - 90.70 *90.70%V. Satisfactory
722 Construction 21923 Rehab./Reconst./Upgrading at Old Cagayan Valley Rd. (Baliuag Sect.) 06/10/10 III 9.547 80 C 0.460 0.133 0.300 - - - 89.30 89.30%
V. Satisfactory
722 Construction 21923 Rehab./Impvt. of Bocaue-San Jose Road, Tumana & Parada Section 08/29/08 III 3.807 60 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
722 Construction 21923Repair/Maintenance of Bigaa-Plaridel via Bulacan & Malolos Road (Barihan
Section)08/27/08 III 4.957 10 C 0.361 0.200 0.300 - - - 86.10 *86.10%
V. Satisfactory
722 Construction 21923 Const. of Water System @ Northville II 08/19/08 NCR 1.424 60 C 0.278 0.177 0.300 - - - 75.50 *75.50%
Satisfactory
722 Construction 21923Rehab/Reconst./Upgrading of Old
Cagayan Valley Road (Pulilan Section)
05/28/09 III 9.543 45 C 0.359 0.200 0.300 - - - 85.90 *85.90%Satisfactory
722 Construction 21923 Const. of Sch. Bldg., 2 Storey, 2 CL Banga E/S 03/10/09 III 2.290 100 C 0.472 0.133 0.300 - - - 90.50 89.52%
V.Satisfactory
722 Construction 21923Const. of Multi-Purpose Bldg.
Const. of Rotonda along National Highway (Zamboanga Peninsula) Cross Rd. Upgrading Project @
Poblacion Ipil
02/25/10 IX 2.829 115 O 0.319 0.300 0.000 0.020 0.042 0.033 71.40 -
A C O Construction 13105Zamboanga Peninsula Crossroads Upgrading Project (Completion of
Roundabout) Sta.1801+231.50 06/05/10 IX 1.861 60 C 0.476 0.133 0.300 - - - 90.90 90.90%
V. Satisfactory
A C O Construction 13105
Const. of Rotonda along National Highway (Zamboanga Peninsula Crossroad Upgrading Project) at
Poblacion Ipil
06/05/10 IX 2.829 115 C 0.456 0.133 0.000 - - - 58.90 66.40% Poor
A C O Construction 13105 Conc. of Liloy-Zamboanga del Norte-Ipil-Zamboanga Sibugay Rd. Ph. I 03/05/09 IX 14.306 150 C 0.425 0.147 0.300 - - - 87.20 86.90%
Satisfactory
A. De Guia Construction 18228
Preventive Maintenance along Santiago-Tuguegarao Road @ A)
KO368+620 - KO369+000, Aurora B) KO374+000 - KO375+500
04/06/11 II 6.718 90 C 0.483 0.133 0.300 - - - 91.60 *91.60% V. Satisfactory
A. De Guia Construction 18228 Restoration of Jones Revetment 04/11/11 II 4.825 90 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page6
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A. De Guia Construction 18228 Restoration of Brgy. I Revetment 04/11/11 II 4.825 90 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory
A. De Guia Construction 18228 Repair/Restoration of Flood Control, Sta.000+000 - Sta.000+120 04/11/11 II 9.650 90 C 0.400 0.133 0.300 - - - 83.30 *83.30%
Satisfactory
A. De Guia Construction 18228
Rehab./Reconst./Upgrading of Santiago-Baluarte-Quirino Bdry.
Road; KO328+100 - KO331+000 w/ exception
04/10/11 II 18.623 150 C 0.428 0.133 0.000 - - - 56.10 70.44% Poor
A. De Guia Construction 18228Rehab./Reconst./Upgrading of
Santiago-Tuguegarao Rd. Burucboc Sect.
04/06/11 II 9.647 133 C 0.456 0.133 0.000 - - - 58.90 67.42% Poor
A. De Guia Construction 18228Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road,
KO333+500 - KO334+85004/10/11 II 17.123 149 C 0.335 0.200 0.000 - - - 53.50 65.26%
Poor
A. De Guia Construction 18228Rehab./Reconst./Upgrading of
Naguilian-San Mariano Rd., Villapaz Section
08/25/09 II 19.296 104 C 0.420 0.200 0.300 - - - 92.00 92.84% V. Satisfactory
A. De Guia Construction 18228 Concreting of Junction National -Potia Road 08/27/09 II 7.043 110 C 0.410 0.200 0.300 - - - 91.00 91.42%
V. Satisfactory
A. De Guia Construction 18228 Rehab./Reconst. of Daang Maharlika Road, KO309+300-KO309+878 08/27/09 II 18.811 130 C 0.411 0.200 0.300 - - - 91.10 91.10%
V. Satisfactory
A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Gamu-Roxas Road (Roxas Section) 02/23/10 II 19.293 240 C 0.402 0.133 0.300 - - - 83.50 88.78%
Satisfactory
A. De Guia Construction 18228 Const./Completion/Continuation of Unfinished On-going Bridges 03/01/10 II 11.574 120 C 0.415 0.133 0.300 - - - 84.80 86.78%
Satisfactory
A. De Guia Construction 18228
Rehab./Reconst./Upgrading of Damaged Paved national Road,
Daang Maharlika KO 320+000 - KO 321+000
06/03/10 II 16.396 120 O 0.387 0.295 0.150 0.030 0.042 0.033 93.70 -
A. De Guia Construction 18228
Rehab./Reconst./Upgrading of Damaged Paved National Road
08/27/10 II 15.432 149 C 0.292 0.200 0.300 - - - 79.20 87.24% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page7
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A. De Guia Construction 18228
Restoration of Road Slope & Slope Protection along Naguilian-San
Mariano Road KO395+850 - KO401+800
08/25/10 II 14.471 120 C 0.389 0.150 0.300 - - - 83.90 85.28% Satisfactory
A. De Guia Construction 18228Road Upgrading (Gravel to Paved) of Jct. Ipil-Panang-Quirino Bdry. Road;
KO366+058 - KO367+11808/27/10 II 17.373 149 C 0.403 0.146 0.300 - - - 84.90 84.90%
Satisfactory
A. De Guia Construction 18228 Conc. of Pob. Burgos-Caliguian Road 11/20/08 II 9.648 180 C 0.344 0.200 0.300 - - - 84.40 82.84%
V. Satisfactory
A. Montalbo Trading and Construction 32684 Const. of Multi-Purpose Building at
Bigain 1st 03/01/10 IVA 1.135 30 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory
A.A De Vera Construction 6191 Rehab./Expansion of Waterworks System 09/02/09 VII 4.510 240 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
A.A De Vera Construction 6191 Const./Rehab. of School Bldg. at Cogon E/S 06/05/10 VII 0.591 35 C 0.415 0.200 0.000 - - - 61.50 61.50%
Poor
A.A De Vera Construction 6191 Const. of Water System Development Project 08/25/10 VII 1.413 90 C 0.497 0.133 0.300 - - - 93.00 93.00%
V. Satisfactory
A.A De Vera Construction 6191 Const. of 2 Storey, 6 CL Sch. Bldg. @ Lawis E/S 11/21/08 VII 4.175 120 C 0.367 0.300 0.300 - - - 96.70 94.18%
Outstanding
A.A De Vera Construction 6191 Const./Repair & Completion of Instructional Classroom, Corella CES 06/10/09 VII 0.504 105 C 0.492 0.200 0.300 - - - 99.20 *99.20%
Outstanding
A.A De Vera Construction 6191Completion of Tagbilaran City
Puericulture Center & Maternity House and Related Facilities
06/10/09 VII 4.575 150 C 0.500 0.169 0.300 - - - 96.90 *96.90% Outstanding
A.A De Vera Construction 6191 Const./Repair/Rehab. of Multi-Purpose Building 06/10/09 VII 0.460 105 C 0.483 0.154 0.300 - - - 93.70 95.52%
V. Satisfactory
A.A De Vera Construction 6191 Completion of Multi-Purpose Building 03/04/09 VII 0.458 60 C 0.382 0.200 0.300 - - - 88.20 *88.20%
Satisfactory
A.A. De Vera Construction 6191 Const. of Employees Quarters,
DPWH Bohol I 03/29/11 VII 4.710 210 C 0.485 0.162 0.300 - - - 94.70 *94.70% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page8
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.A. De Vera Construction 6191 Const. of MPB (School Stage) Loon
North CES 03/29/11 VII 1.318 110 C 0.469 0.133 0.300 - - - 90.20 *90.20% V. Satisfactory
A.B Aponesto Construction Parts &
Supply22998
Road Upgrading (Gravel to Paved) along Compostela-Cateel Rd.,
Osmeña Sect.06/04/10 XI 18.892 180 O 0.355 0.238 0.150 0.030 0.045 0.033 85.10 -
A.B Aponesto Construction, Parts &
Supply22998 Concreting of Montevista-DNAS
Road 03/01/10 XI 32.748 300 C 0.353 0.200 0.300 - - - 85.30 88.48% Satisfactory
A.B Taylan Construction & Development 25273 Const. of RCBC and Canal along
Manila North Road (Km. 483+040) 02/22/10 I 4.816 65 C 0.329 0.133 0.300 - - - 76.20 76.20% Unsatisfactory
A.B. Taylan Construction & Development / Fiat
Construction Services (JV)
JV-09-106
Road Opening/Const. of Missing Links of National Road, Solsona-Kabugao Road, Phase VI, Ilocos
Norte Side
04/03/11 I 192.448 540 O 0.294 0.300 0.150 0.030 0.042 0.033 84.90 -
A.C Cunanan Construction 20752
Repair/Rehabilitation of Sewer and Drainage System at Northwing and
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page26
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adimre Construction 25534 Canalate Port Development Project (Improvement of Port) 12/03/10 DOTC 1.919 60 C 0.458 0.200 0.300 - - - 95.80 95.80%
V. Satisfactory
Adimre Construction 25534Const. of Standard One Classroom
School Building (Modified) at GITMES
09/05/09 III 0.526 24 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory
Adimre Construction 25534Camiguin Ports Cluster Project
(Construction of Seawall Enclosure at Benoni Port and Repair of
02/17/11 DOTC 6.231 60 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory
ADP Const. & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 04/01/11 XI 58.261 320 C 0.135 0.200 0.000 - - - 33.50 61.25%
Poor
Adroit Construction 11169 Const. of 2-CL, Sta. Barbara E/S 04/08/11 III 1.324 60 C 0.45 0.048 0.300 - - - 79.80 *79.80% Unsatisfactory
Adroit Construction 11169 Completion of Bridge, General Luna 2nd Phase 03/02/09 III 3.026 30 C 0.332 0.200 0.300 - - - 83.20 *83.20%
Satisfactory
Adroit Construction 11169 Concreting of Brgy. Maligaya Road 03/02/09 III 1.867 25 C 0.404 0.133 0.300 - - - 83.70 *83.70%Satisfactory
Advance Foundation Const. System Corp. /
Abulug Developer Builders Const. Inc. (JV)
JV-09-289 Const. of Gov. Edgar R. Lara Bridge along Cagayan-Apayao Road 03/30/11 II 112.029 240 O 0.360 0.300 0.000 0.023 0.051 0.017 75.10 -
Advanced Foundation - IBC (JV) JV-09-265
Replacement of E. Marcos Bridge, Km.28+310 along Maasin-Cabatuan
Road (Over Tigan River)04/10/11 VI 163.350 430 O 0.360 0.240 0.150 0.030 0.056 0.050 88.60 -
Agafer Construction 7912 Const. of Cagayan River Control 11/11/08 II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -
Aguero Construction 23338 Rehab./Impvt. of Maharlika Road 04/04/11 XIII 3.766 150 O 0.400 0.239 0.150 0.030 0.045 0.033 89.70 -
Aguero Construction 23338 Impvt./Rehab. of MPB (R.M. Billanes Gym) 04/04/11 XIII 2.821 120 O 0.307 0.300 0.150 0.030 0.019 0.033 83.90 -
Aison Dominique Construction & Supply 32805 Const. of Multi-Purpose Building
(Cooperative) 02/23/10 VIII 0.473 86 C 0.399 0.200 0.300 - - - 89.90 77.79% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page27
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Aison Dominique Construction & Supply 32805 Const. of Cabucgayan MPB (Phase
III) 08/21/08 VIII 1.896 120 C 0.373 0.187 0.300 - - - 86.00 79.07% Satisfactory
Ajan Jaeda, inc. 17869 Corollary Works for Banquerohan Resettlement Project, Ph. 2 9/14-18/09 NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 -
Ajan Jeada Inc. (Formerly: Jaeda
Construction)17869 Rehab./Impv't. of Puro-Lamba Road 03/28/11 V 36.498 416 O 0.369 0.197 0.150 0.030 0.040 0.050 83.60 -
Ajan Jeada, Inc. (Formerly: Jeada
Construction)17869 Impvt. of MPB, BU College of
Engineering Campus 02/24/09 V 16.149 240 C 0.457 0.133 0.300 - - - 89.00 89.80% V. Satisfactory
04/10/11 X 18.546 150 C 0.344 0.200 0.300 - - - 84.40 85.84% Satisfactory
Al Hussein Construction 18438Road Upgrading (Gravel to Paved) of Kibawe-Kadingilan-Kalilangan Road
(Bangahan Section)04/01/11 X 18.900 267 C 0.363 0.133 0.000 - - - 49.60 *49.60%
Poor
Al Hussein Construction 18438
Road Upgrading (Gravel to Concrete) of Kalilangan-Lampanusan Road (Macaopao Section), Sta.0+000 -
Sta 0+910
04/01/11 X 18.900 267 C 0.345 0.133 0.000 - - - 47.80 *47.80% Poor
Al Hussein Construction 18438 Conc. of Kibawe-Kadingilan-Kalilangan Road, Kadilingan Sect. 06/14/10 X 73.672 330 C 0.407 0.168 0.300 - - - 87.50 88.52%
Satisfactory
Alafalfa Construction 29712
Restoration of Roadslip along Nueva Vizcaya-Ifugao-Mt. Province Bdry. Road, Km. 330+800-Km. 330+828,
Phase I
08/25/10 CAR 1.238 136 C 0.445 0.133 0.300 - - - 87.80 87.80 Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page30
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alajeno Construction and Supplies 28713 Const. of Public Market at Brgy.
Penoles, Lakewood 06/11/10 IX 0.495 45 C 0.491 0.133 0.300 - - - 92.40 92.40% V. Satisfactory
Alajeno Construction and Supplies 28713 Construction of MPB (Municipal
Building) Phase II 06/02/09 IX 2.480 120 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
Al-B Construction 11740Rehab./Reconst./Upgrading along
Angeles-Porac-Floridablanca-Dinalupihan Rd.
06/01/10 III 18.839 90 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 -
Al-B Construction 11740
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rd. along Angeles-Porac-Floridablanca-
Dinalupihan Rd.
08/16/10 III 19.175 100 C 0.438 0.160 0.300 - - - 89.80 89.26% V. Satisfactory
Alberto Uy Construction & Development 20924 Conc. of Barangay Road, Sitio K.I.,
Poblacion 04/06/11 IVB 1.905 64 C 0.476 0.133 0.300 - - - 90.90 *90.90% V. Satisfactory
Alberto Uy Construction & Development 20924 Const. of MPB at Buong Lupa 05/26/10 IVB 0.480 43 C 0.447 0.180 0.300 - - - 92.70 92.70%
V. Satisfactory
Alberto Uy Construction & Development 20924
Repair/Rehab. of Multi-Purpose Building @ Sitio Facoma, Bagong
Bayan II05/27/09 IV-B 0.476 45 C 0.424 0.170 0.300 - - - 89.40 *89.40%
V. Satisfactory
Alberto Uy Construction & Development 20924 Concreting of Cantil-Dayhagan Road 02/26/09 IV-B 0.947 69 C 0.436 0.133 0.300 - - - 86.90 *86.90%
Satisfactory
Alcel Construction 15129 Conc. of Roads at Pangil-Poblacion Road, Brgy. Pangil 04/04/11 I 1.930 120 C 0.427 0.200 0.300 - - - 92.70 *92.70%
V. Satisfactory
Alcel Construction 15129 Const. of Public Market 04/12/11 I 14.472 93 C 0.446 0.133 0.300 - - - 87.90 *87.90% Satisfactory
Alcel Construction 15129 Completion of MPB, Tagudin 04/12/11 I 1.917 90 C 0.420 0.133 0.300 - - - 85.30 *85.30% Satisfactory
Alcel Construction 15129 Const. of San Vicente-Pogo Bridge, San Vicente 03/01/10 I 22.182 380 C 0.333 0.200 0.300 - - - 83.30 83.30%
Satisfactory
Alcel Construction 15129
Repair/Rehab. along Manila North Road, Km. 445+28 - Km.484+897,
Pinili, Badoc, Currimao, Batac & San Nicolas
06/02/10 I 9.649 60 C 0.473 0.133 0.300 - - - 90.60 90.60% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page31
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alcel Construction 15129Repair/Impvt. of Agoo Processional Road, Km. 235+298-Km. 236+708 w/
exception08/25/10 I 8.652 90 C 0.405 0.133 0.300 - - - 83.80 83.80%
Satisfactory
Alcel Construction 15129 Rehab./Impvt. at Kennon Road, Km.244+000 - Km.248+138 06/09/10 CAR 9.616 60 C 0.358 0.200 0.300 - - - 85.80 85.80%
Satisfactory
Alcel Construction 15129 Construction of School Building at Cayucay NHS 03/10/09 I 0.913 75 C 0.394 0.181 0.300 - - - 87.50 *87.50%
Satisfactory
Alcel Construction 15129Rehab./Reconst./Upgrading of
Mangaldan-Manaoag-Binalonan Road
08/28/09 I 48.250 240 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
Alcel Construction 15129 Completion of MPB, PSU Bamban 08/29/08 I 0.474 60 C 0.292 0.200 0.300 - - - 79.20 *79.20% Satisfactory
Alcel Construction 15129 Conc. of FMR, Brgy. Licsi 11/27/08 I 0.568 30 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory
Alcel Construction 15129Asphalt Overlay of Sta. Barbara-
Mangaldan Road Km. 203+700-Km. 205+300 w/exception
05/26/09 I 14.473 25 C 0.458 0.133 0.300 - - - 89.10 *89.10% V.Satisfactory
Aldana Construction 21763 Construction of Perimeter Fence Gate, Slope Protection 03/2-3/10 DOST 6.363 75 C 0.491 0.20 0.30 - - - 99.10 87.13%
Satisfactory
Aldana Construction 21736 Const. of Drainage Poblacion Zone II 03/04/10 I 2.407 90 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory
Aldana Construction 31174 Road Conc. of Farm-to-Market Road, Brgy. Sallacong (San Mariano) 02/19/10 I 1.901 70 C 0.329 0.200 0.300 - - - 82.90 82.90%
Satisfactory
Aldana Construction 21736 Const. of MPB (Phase V) 06/10/10 I 7.715 125 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
ALE Builders Construction &
Development Corp.5180 Proposed Rehab. of Roads and
Alleys, San Andres Bukid 04/14/11 NCR 4.820 135 C 0.481 0.067 0.300 - - - 84.80 *84.80% Satisfactory
ALE Builders Construction &
Development Corp.5180
Proposed Repair/Rehab./Const. of MPB, San Andres Sports Complex,
San Andres St.04/14/11 NCR 4.784 398 O 0.283 0.283 0.150 0.030 0.050 0.050 84.60 -
Ale Builders Construction &
Development Corp.5180 Drainage Impvt. along Boni-Serrano
09/17/09 VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -
Alfie's Construction & Construction Supply, Inc. 17162
Rehab./Reconst./Upgrading of Jct. National Rd., Sagay-Bato-Dian-ag-
Marcelo-Balea Jct. National Rd. (Conc./Widening) Sagay Sect.
03/31/11 VI 37.883 266 C 0.478 0.136 0.300 - - - 91.40 *91.40% V. Satisfactory
Alfie's Construction & Construction Supply, Inc. 17162 Reconst. of Antulan Bridge at
Km.66+500 04/01/11 VI 13.035 265 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
Alfie's Construction & Construction Supply, Inc. 17162
Rehab. (Asphalt Overlay) of Kabankalan-Bais Road, Km.99+500 -
Km.101+00004/02/11 VI 36.585 200 O 0.388 0.240 0.150 0.030 0.037 0.033 87.80 -
Alfie's Construction & Construction Supply, Inc. 17162
Rehab. (Asphalt Overlay) of Kabankalan-Bais Road, Km.102+000 -
Km.104+100004/01/11 VI 30.717 210 O 0.386 0.239 0.150 0.030 0.037 0.033 87.50 -
Alfie's Construction & Construction Supply, Inc. 17162
Rehab. (Asphalt Overlay) of Kabankalan-Bais Road, Km.101+000 -
Km.102+00004/01/11 VI 26.099 180 O 0.382 0.240 0.150 0.030 0.037 0.033 87.20 -
Alfie's Construction & Construction Supply, Inc. 17162 Reconst. of Taburda Bridge,
Km.66+759.26 04/01/11 VI 19.700 186 O 0.353 0.235 0.150 0.018 0.046 0.033 83.50 -
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)
17162Conc. of Jct. Bearin-Salong-Tapi-
Bantayan Rd. (Salong Section), Brgy. Salong
08/25/10 VI 14.301 110 C 0.409 0.133 0.300 - - - 84.20 85.16% Satisfactory
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)
17162
Reconst. of Vallehermosa-Canlaon City, La Castellana Road, Sta. 65+665.80-Sta. 66+500.00 w/
exception
08/26/10 VI 5.600 147 C 0.350 0.200 0.300 - - - 85.00 85.00% Satisfactory
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)
17162
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Bacolod North Road, Silay City Section
08/28/10 VI 14.900 130 C 0.423 0.133 0.300 - - - 85.60 84.94% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page35
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)
17162Conc. of Kabankalan-Jct. Salong-
Tapi-Dacongcogon-Bantayan Road, Tapi Section at Brgy. Tapi
08/25/10 VI 28.917 290 O 0.355 0.240 0.150 0.030 0.037 0.033 84.50 -
Alfie's Construction & Construction Supply, Inc.
(Formerly: Alfies Construction &
Construction Supply)
17162Conc. of Kabankalan-Jct. Salong-Tapi-Dacongcogon-Bantayan Rd.,
Tapi Sect. at Brgy. Tapi06/05/10 VI 27.998 280 O 0.354 0.225 0.150 0.022 0.051 0.033 83.50 -
Alfrego Builders & Supply 19284 Construction of Mandug River
Control 03/08/10 XI 4.720 90 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory
Alfrego Builders & Supply 19284
Conc. of Road from Davao-Agusan National Road Jct. passing through
Iliong up to Purok Communal12/04/08 XI 1.882 90 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
Alfrego Builders & Supply 19284 Improvement/Riprapping of Sasa
Creek Second Congressional District 06/11/09 XI 4.720 150 O 0.343 0.300 0.150 0.030 0.047 0.050 92.00 -
Alfrego Builders & Supply 19284 Improvemant/Riprap of Sasa Creek 06/11/09 XI 4.721 160 C 0.476 0.133 0.300 - - - 90.90 91.56%
V. Satisfactory
Algamon Construction 31704 Completion of MPB (Covered Court), Brgy. Doongan 04/12/11 XIII 1.309 45 C 0.493 0.133 0.300 - - - 92.60 *92.60%
V. Satisfactory
Algamon Construction 30704 Const. of Municipal MPB, Brgy. Gamuton 04/06/11 XIII 3.302 90 O 0.289 0.300 0.150 0.020 0.032 0.033 82.40 -
Algamon Construction 30704 Const. of MPB (Covered Court) Brgy. Anticala 03/10/10 XIII 2.226 90 C 0.478 0.133 0.300 - - - 91.10 91.10%
V.Satisfactory
Algamon Construction 30704 Const. of MPB (Covered Court), Brgy. Doongan 06/16/10 XIII 1.898 90 C 0.441 0.200 0.300 - - - 94.10 94.10%
V. Satisfactory
Algamon Construction 30704 Const. of Ipil Public Market, Brgy. Ipil 06/07/10 XIII 0.733 60 C 0.407 0.133 0.300 - - - 84.00 84.00% Satisfactory
Algamon Construction 30704 Const./Widening/Gravelling of Roads from Brgy. R. Ecleo-Brgy. Del Pilar 06/01/09 XIII 1.927 209 C 0.385 0.168 0.300 - - - 85.30 84.52%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page36
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Algimar Construction 15232 Widening/Regravelling of Calatrava-San Andres Road (Calatrava Section) 04/11/11 IVB 24.124 180 C 0.434 0.144 0.300 - - - 87.80 *87.80%
Satisfactory
Algimar Construction 15232Conc. of Tablas Circ. Road (San
Agustin-Sta. Maria Road) Calatrava-San Agustin Road
Rehab. of Sumlog Bridge and Approaches along Davao-Oriental-
Surigao Coastal Road03/05/10 XI 52.988 270 C 0.485 0.133 0.300 - - - 91.80 91.80%
V. Satisfactory
Algon Engineering Construction Corporation 270
CP-5: Impvt./Conc. of Surigao Del Sur-Davao Oriental Coastal Road, (Manay-Boston) Caraga-Baganga
Section
03/04/10 XI 172.836 537 C 0.359 0.200 0.300 - - - 85.90 89.02% V. Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Impvt. of Davao-Bukidnon
Rd. at Calinan Sect. 05/31/10 XI 10.743 90 C 0.451 0.133 0.300 - - - 88.40 88.40% Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Reconst./Upgrading of Digos-
Makar Rd. 06/10/10 XI 14.465 90 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory
Algon Engineering Construction Corporation 270
Rehab. Sumlog Bridge and Approaches along Davao Oriental-
Surigao Coastal Rd.09/07/10 XI 82.031 530 C 0.467 0.133 0.300 - - - 90.00 89.94%
V. Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Impv't. of Davao-Bukidnon
Rd. at Mintal Sect. 08/24/10 XI 18.892 180 C 0.391 0.200 0.300 - - - 89.10 88.98% Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Reconst./Upgrading of Digos-
Makar Road 05/30/09 XI 31.136 180 C 0.498 0.140 0.300 - - - 93.80 *93.80% V. Satisfactory
Algon Engineering Construction Corporation 270 Construction of Laboratory Building
Phase 2 11/17/10 DOST 17.637 - C 0.465 0.20 0.30 - - - 96.50 97.08% Outstanding
Alinab Construction & Supplies 29901 Const. of Brgy. Guma Poblacion A,
FMR 04/07/11 IX 1.774 90 C 0.466 0.133 0.300 - - - 89.90 *89.90% V. Satisfactory
Aliñab Construction & Supplies 29901 Const. of Pedestrian Overpass,
Barangay Cugman 03/29/11 X 1.598 135 O 0.395 0.240 0.000 0.030 0.038 0.033 73.60 -
Allado Construction Co. Inc. / Jejor's Construction
Corporation (JV)JV-08-331 Rehab./Reconst. of CCR Magting
Section 04/02/11 X 19.059 360 C 0.374 0.133 0.300 - - - 80.70 *80.70% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page39
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Allado Construction Co., Inc. 228
Rehab./Reconst./Upgrading along Davao-Cotabato Rd. (Davao City-Jct.
Digos Sect.)06/12/10 XI 93.085 450 C 0.408 0.133 0.300 - - - 84.10 86.08%
Satisfactory
Allado Construction Co., Ins. 228
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Davao-Cotabato Road (Davao City-Jct. Digos Sect.)
04/14/11 XI 78.045 270 C 0.315 0.200 0.300 - - - 81.50 83.69% Satisfactory
Allen Construction 12584 Impvt./Rehab. of MPB (15m x 27m), 04/08/11 III 2.325 50 C 0.419 0.124 0.300 - - - 84.30 *84.30% Satisfactory
Allen Construction 12584Repair/Restoration of Damaged Pavement Daang Maharlika Rd.
Km.136+050 - Km.136+55006/08/10 III 2.809 21 C 0.433 0.133 0.300 - - - 86.60 86.60%
Satisfactory
Allen Construction 12584 Rehab./Reconst. Cabanatuan City-Carmen Rd. 06/07/10 III 14.075 60 C 0.420 0.133 0.300 - - - 85.30 85.30%
Satisfactory
Allen Construction 12584 Rehab./Reconst. of Daang Maharlika Rd. Km.137+330 - Km.137+770, Baloc 08/23/10 III 5.430 25 C 0.394 0.200 0.300 - - - 89.40 89.40%
V. Satisfactory
Allen Construction 12584 Regravelling of Various Barangays 05/26/09 III 1.875 25 C 0.340 0.200 0.300 - - - 84.00 *84.00% Satisfactory
Allen Construction 12584 Construction of MPB, Baloc Nat'l Trade School 03/02/09 III 1.892 45 C 0.479 0.178 0.300 - - - 95.70 *95.70%
V. Satisfactory
Allen Construction 12584 Rehab./Reconst. of Nueva Ecija-Pangasinan Road 09/03/09 III 12.165 61 C 0.479 0.133 0.300 - - - 91.20 *91.20%
V. Satisfactory
Allencon Development Corporation 12303
Asphalt Overlay of Iloilo-Capiz Road (Old Route) Janiuay-Lambunao
Section Km.31+398 - Km.32+198 with exceptions Janiuay-Lambunao
Section
04/12/11 VI 9.519 90 C 0.465 0.133 0.300 - - - 89.80 *89.80% V. Satisfactory
Alleyway Construction 15310 Cons. of Multi-Purpose Building, Brgy. 204, Zone 18 02/27/09 NCR 3.839 60 C 0.338 0.200 0.300 - - - 83.80 *83.80%
Satisfactory
Alleyway Construction 15310 Rehab./Reconst./Upgrading of España Boulevard 08/24/10 NCR 38.956 204 C 0.345 0.193 0.300 - - - 83.80 83.80%
Satisfactory
Allied Trade Resources 31667 Construction of Site Development Projects 8/12/09 DOST 3.065 131 C 0.475 0.182 0.300 - - - 95.70 95.70%
Outstanding
Allied Trade Resources Multi - Purpose
Cooperative31667
Balingasag Port Development Project (Construction of Seawall
Aylan Construction and Trading 11884 Completion of Academic Bldg., San
Roque Elem. School 09/10/09 NCR 9.591 90 C 0.337 0.133 0.300 - - - 77.00 *77.00% Unsatisfactory
Aylan Construction and Trading 11884 Repair/Rehab. of Camp Crame High
School, Brgy. Lipunan ng Crame 02/26/10 NCR 1.781 90 C 0.493 0.133 0.300 - - - 92.60 92.60% V.Satisfactory
Aylan Construction and Trading 11884 Const. of MPB @ Monte Vista Subd.
Brgy. Industrial Valley Complex 06/02/10 NCR 1.445 60 C 0.458 0.200 0.300 - - - 95.80 95.80% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page55
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Aylan Construction and Trading 11884 Const./Completion of School
Building @ Leodegario Victorino E/S 06/03/10 NCR 14.450 170 C 0.406 0.200 0.300 - - - 90.60 87.24% Satisfactory
Aylan Construction and Trading 11884 Repair/Rehab. of Camp Crame E/S 08/16/10 NCR 0.654 75 C 0.398 0.133 0.300 - - - 83.10 83.10%
Satisfactory
B B C Construction 16510Const. of Multi-Purpose Building (Covered Court) Agusan National
High School 06/10/09 XIII 3.737 150 C 0.478 0.200 0.300 - - - 97.80 *97.80%
Outstanding
B B C Construction (Formerly: BBC Sand and
Gravel)16510 Completion of MPB (Covered Court)
@ Brgy. Limaha 04/13/11 XIII 1.312 45 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory
B L F Construction 15829Const. of School Building (CNM)
Phase III @ Bataan, Peninsula State University
08/28/09 III 1.870 36 C 0.420 0.133 0.300 - - - 85.30 *85.30% Satisfactory
B Y A Builders and Construction Supply 24158 Const./Impvt. of MPB (Legislative
Bldg.) 04/06/11 VIII 4.816 225 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory
B. Bernardo Construction 6196 Const. of Two (2) Classroom School Bldg. (2nd Flr.) at Caypombo 08/28/10 III 2.623 100 C 0.482 0.089 0.300 - - - 87.10 87.10%
Satisfactory
B. Bernardo Construction 6196 Improvement of Farm-to-Market Road, Brgy. Catmon 06/01/09 III 3.524 90 C 0.446 0.200 0.300 - - - 94.60 *94.60%
V. Satisfactory
B. Bernardo Construction 6196 Conc. Reblocking of Pulilan-Calumpit Road 03/06/09 III 9.566 90 C 0.346 0.200 0.300 - - - 84.60 84.72%
Satisfactory
B. Bernardo Construction 6196 Completion of Riprapping along Malanday Creek, Brgy. Malanday 02/23/10 NCR 4.785 60 C 0.371 0.200 0.300 - - - 87.10 87.10%
Satisfactory
B. Valencerena Trading & Construction 22147 Const./Impvt. of Various MPB, Brgy.
Teachers Village West 09/11/09 NCR 2.861 60 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory
B. Valencerina Trading & Construction 22147 Proposed Const. of MPB (Center),
B. Valencerina Trading and Construction 22147 Conc. of Bungon Farm-to-Market
Road 02/22/10 I 1.927 75 C 0.293 0.133 0.300 - - - 72.60 72.60% POOR
B. Valencerina Trading and Construction 22147 Const. of MPB., Brgy. Rosario 02/24/10 NCR 5.271 90 C 0.427 0.200 0.300 - - - 92.70 92.70%
V.Satisfactory
B. Vicencio Construction 9687Road Upgrading along Baybay-
Abuyog and Baybay-Mahaplag Road, Abuyog-Mahaplag
04/12/11 VIII 23.199 250 C 0.452 0.133 0.300 - - - 88.50 *88.50% Satisfactory
B. Vicencio Construction 9687
Road Upgrading (Gravel to Paved) of Sambulawan Jct. - Calaguise-
Calubian Road, Km.994+679.50 - Km.995+149.50
04/09/11 VIII 18.549 240 C 0.418 0.133 0.300 - - - 85.10 86.15% Satisfactory
B. Vicencio Construction 9687 Rehab. of Flood Control and Drainage Structure (Antiao Creek) 03/29/11 VIII 24.101 260 O 0.355 0.243 0.150 0.015 0.048 0.050 86.10 -
B. Vicencio Construction 9687Rehab./Const./Upgrading along Sto.
04/04/11 VIII 38.481 359 O 0.339 0.240 0.150 0.030 0.047 0.033 83.90 -
B. Vicencio Construction 9687
Rehab./Reconst./Upgrading of Bulalacao Bridge-Naubay Sect.,
Km.961+695 - Km.983+500 w/ exception
04/04/11 VIII 48.234 406 O 0.350 0.222 0.150 0.024 0.045 0.033 82.40 -
B. Vicencio Construction 9687
Rehab./Const./Upgrading of Mantang Bridge-Brgy. San Isidro, Km.895+591
- Km.897+600 w/ exceptions, Brgy. San Isidro
04/04/11 VIII 38.190 300 O 0.349 0.240 0.150 0.015 0.032 0.033 81.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page57
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B. Vicencio Construction 9687 Concreting of Antequera-Catagbacan (Loon) Rd. 09/01/09 VII 18.313 172 O 0.375 0.246 0.150 0.030 0.042 0.050 89.30 -
B. Vicencio Construction 9687 Concreting of Calbayog Diversion Road 06/02/09 VIII 18.794 240 C 0.364 0.133 0.300 - - - 79.70 82.28%
Satisfactory
B. Vicencio Construction 9687Rehab./Reconst./Upgrading of
Damaged Paved National Roads Calbayog-Catarman Road
06/02/09 VIII 94.550 300 O 0.303 0.238 0.089 0.030 0.045 0.033 73.80 -
B. Vicencio Construction 9687
Const. (Road Opening) of Missing Link of Calbayog Diversion Road,
Cagsalaosao-Gadgaran Road Section
06/02/09 VIII 18.794 150 O 0.223 0.240 0.150 0.030 0.050 0.033 72.60 -
B. Vicencio Construction 9687 Const. of River Control of Anitao Creek 03/02/10 VIII 14.016 270 C 0.347 0.189 0.300 - - - 83.60 83.48%
Satisfactory
B. Vicencio Construction 9687 Rehab./Reconst./Upgrading of Calbayog-Catarman Road 03/03/10 VIII 94.550 300 C 0.389 0.134 0.300 - - - 82.30 82.58%
Satisfactory
B. Vicencio Construction 9687Road Opening/Const. of Sitio
Nagbuong Section along Calbayog Diversion Road
09/01/10 VIII 19.291 150 C 0.336 0.200 0.300 - - - 83.60 84.32% Satisfactory
B. Vicencio Construction 9687 Calbayog Airport Development Project 11/16/09 DOTC 19.247 120 C 0.391 0.200 0.300 - - - 89.10 89.10%
V. Satisfactory
B. Vicencio Construction 9687 Calbayog Airport Development Project 12/14/09 DOTC 9.121 150 C 0.462 0.200 0.300 - - - 96.20 -
B. Vicencio Construction 9687 Const. of Maasin Shore Protection/Seawall 08/29/08 VIII 3.809 240 O 0.300 0.100 0.100 0.000 0.022 0.200 72.20 -
B. Vicencio Construction 9687 Const. of Bachawan River Control 08/24/10 IVB 9.647 130 C 0.421 0.200 0.300 - - - 92.10 92.10% V. Satisfactory
B. Vicencio Construction 9687 Concreting of Tawid-Guadalupe Circumferential Road 05/27/09 VIII 7.517 180 C 0.432 0.200 0.300 - - - 93.20 86.54%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page58
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B. Vicencio Construction 9687 Rehab./Impvt. of Brdy. Mahaplag-Sogod Road (Dampoy) 05/27/09 VIII 9.446 310 O 0.345 0.258 0.150 0.030 0.047 0.033 86.30 -
B. Vicencio Construction 9687 Concreting of Villaba-Leyte Road Km. 1015+820-Km. 1017+420 06/02/09 VIII 31.694 330 O 0.339 0.240 0.150 0.022 0.037 0.033 82.10 -
B. Vicencio Construction 9687
Rehab. of Sambulawan-Calaguise-Calubian Road (Concreting of Calaguise Section), Tigbawan
Section
06/02/09 VIII 17.942 220 C 0.292 0.139 0.300 - - - 73.10 70.43% Poor
B. Vicencio Construction 9687 Completion of 8 CL E/S Bldg., Remedios T. Romualdez E/S 03/18/09 VIII 4.337 90 C 0.399 0.200 0.300 - - - 89.90 *89.90%
V. Satisfactory
B. Vicencio Construction 9687 Conc. of Junction Pana-awan Airport Road 03/06/09 VIII 18.897 367 C 0.379 0.173 0.300 - - - 85.20 82.44%
Satisfactory
B. Vicencio Construction 9687Conc. of Naval-Calibiran Cross-
Country Road (Mohon-Pulang Yuta Section)
03/13/09 VIII 18.920 300 C 0.317 0.032 0.300 - - - 64.90 76.66%Unsatisfactory
B. Vicencio Construction 9687 Concreting of Tawid-Guadalupe Circumferential Road 03/06/09 VIII 7.517 180 O 0.338 0.238 0.150 0.015 0.030 0.050 82.10 -
B. Vicencio Construction 9687 Construction of Maasin Shore Protection/Seawall 03/06/09 VIII 3.809 270 C 0.250 0.200 0.300 - - - 75.00 73.32%
Poor
B. Vicencio Construction 9687 Rehab./Impv't of Brgy. Mahaplag-Sogod Road (Dampoy) 03/06/09 VIII 9.446 310 O 0.300 0.180 0.150 0.015 0.033 0.050 72.80 -
B. Vicencio Construction 9867 Road Upgrading of Junction Himay-Angan-Silago-Abuyog Road 09/08/09 VIII 53.210 365 O 0.350 0.300 0.150 0.008 0.035 0.050 89.30 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page59
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B. Vicencio Construction 9867 Rehab./Reconst./Upgrading of Calbayog-Catarman Road 09/10/09 VIII 94.551 300 O 0.320 0.300 0.150 0.023 0.050 0.050 89.30 -
B. Vicencio Construction 9687 Conc. of Villaba-Leyte Road, Km. 1015+820-Km. 1017+420 09/05/09 VIII 31.695 330 O 0.354 0.248 0.150 0.018 0.045 0.050 86.50 -
B. Vicencio Construction 9687 Rehab./Impvt. of Boundary Mahaplag-Sogod Road (Dampoy Sect.) 09/08/09 VIII 9.446 280 C 0.401 0.200 0.300 - - - 90.10 83.77%
Satisfactory
B. Vicencio Construction 9687Const. (Road Opening) of Missing Link of Calbayog Diversion Road,
Cagsalaosao-Gadgaran Sect.09/10/09 VIII 18.795 120 C 0.395 0.200 0.300 - - - 89.50 79.36%
Unsatisfactory
B. Vicencio Construction 9687 Siargao Airport Development Project 08/10/11 DOTC 16.333 90 C 0.444 0.200 0.300 - - - 94.40 94.40% V. Satisfactory
B. Vicencio Construction 9687Cotabato Airport Development
Project (Rehabilitation of Terminal Buildings)
08/26/10 DOTC 14.385 120 C 0.422 0.200 0.300 - - - 92.20 92.20% V. Satisfactory
B.E Construction 2730Conc. of Oton-Buray-Sta. Rita-Sta.
Monica-Rizal-Sta. Clara-San Antonio-San Miguel Road
09/07/10 VI 15.338 600 C 0.069 0.133 0.300 - - - 50.20 50.50% Poor
B.G Giron Construction & Supply 15197
Channel Rehab./Imprv't. of Rio Chico River (Guevarra-San Roque Sect.)
Sta.0+000 - Sta.1+27006/02/10 III 4.766 90 C 0.438 - 0.500 - - - 93.80 93.80%
V. Satisfactory
B.G Giron Construction & Supply 15197
Conc. of Shoulder of Concepcion-La Paz Rd. w/ Reinforced Concrete Slope Protection, Km.116+222 -
Km.136+020 w/ exception
08/28/10 III 9.557 60 C 0.394 0.200 0.300 - - - 89.40 89.40% V. Satisfactory
B.G Giron Construction & Supply 15197 Rehab./Reconst. & Impvt. of
Concepcion-Capas Road 05/20/09 III 9.561 45 C 0.492 0.199 0.300 - - - 99.10 *99.10% Outstanding
B.G Giron Construction & Supply 15197 Const. of FMR, Purok Sampaguita,
Brgy. San Agustin 05/22/09 III 1.505 60 C 0.415 0.139 0.300 - - - 85.40 *85.40% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page60
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B.G. Giron Construction & Supply 15197 Const. of MPB @ Brgy. Calaluan 04/06/11 III 1.855 90 C 0.487 0.154 0.300 - - - 94.10 *94.10%
V. Satisfactory
B.L. Jadulco Construction & Supply 33684 Const. of Drainage in Municipality of
Naval 04/07/11 VIII 1.926 100 C 0.436 0.133 0.000 - - - 56.90 76.28% Unsatisfactory
B.M Marketing 9852 Rehab./Reconst. of Damaged Pavement @ Burgos St. 09/08/10 VIII 4.830 90 C 0.398 0.133 0.300 - - - 83.10 83.10%
B.M Marketing 9852 Tacloban Airport Development project 07/07/10 DOTC 77.038 210 C 0.455 0.200 0.300 - - - 95.50 95.50
V. Satisfactory
B.M Marketing 9852
Tacloban Airport Development Project (Construction of Passenger Terminal Building/Foundation and
Sub-Grade Devlopment)
11/25/10 DOTC 149.388 210 C 0.460 0.200 0.300 - - - 96.00 95.50% V. Satisfactory
B.M. Marketing 9852Rehab./Reconst./Upgrading of Daang Maharlika, Palo-Tolosa Road Sect.,
Km.932+100 - Km.934+35803/28/11 VIII 24.049 200 C 0.438 0.133 0.300 - - - 87.10 87.34%
Satisfactory
B.M.K Construction 8292 Rehab./Reconst./Upgrading of Dagupan-Bonuan-San Fabian Rd. 08/28/09 I 46.320 240 C 0.395 0.200 0.300 - - - 89.50 *89.50%
V. Satisfactory
B.M.K Construction 8292 Impvt. of Lingayen-Binmaley (via Matalava), Lingayen-Binmaley 08/28/09 I 23.809 359 O 0.349 0.300 0.077 0.030 0.055 0.033 84.40 -
B.M.K Construction 8292Widening/Conc. of McArthur
Highway (MNR) including Traffic Mgt.
03/05/10 I 28.947 211 C 0.307 0.200 0.300 - - - 80.70 82.20% Satisfactory
B.M.K Construction 8292Rehab./Reconst./Upgrading of
Villasis-Malasiqui-San Carlos Road, Villasis Section
08/26/10 I 7.766 120 C 0.395 0.200 0.300 - - - 89.50 87.40% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page61
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B.M.K Construction 8292 Repair of Various Brgy. Roads 08/25/10 I 1.898 60 C 0.260 0.200 0.300 - - - 76.00 76.00% Unsatisfactory
B.M.K Construction / R.R. Ricafort Construction
and Supplies (JV)JV-09-079
Rehab. of Daang Maharlika Highway, Package 1, Section 6, Allen-Malaga
Road Section, Km.680+366.55 - Km.683+866.55, with exceptions
09/10/10 VIII 96.434 230 C 0.429 0.196 0.300 - - - 92.50 92.80% V. Satisfactory
B.M.K Construction / R.R. Ricafort Construction
and Supplies (JV)JV-09-079
Rehab. of Daang Maharlika Highway, Package 1, Section 9, Allen-Malaga
Road Section, Km.690+866.55 - Km.694+500, with exceptions (inc. completion of asphalt overlay from
Section 1-5, Km.658+804.55 - Km.680+366.55)
09/10/10 VIII 192.901 360 C 0.448 0.194 0.300 - - - 94.20 92.76% V. Satisfactory
B.M.K Construction / R.V. Laborte Builders (JV) JV-08-046
Const. of Canda Bridge Phase I, Quezon Eco-Tourism Road (Lucena
City Batangas Coastal Road) inc. RROW Acquisition & Other Related Activities, Guisguis-Talaan Section
09/01/09 IVA 47.445 300 C 0.419 0.200 0.300 - - - 91.90 91.00% V. Satisfactory
B.M.K Construction / Royal Crown Monarch
Const. & Supplies Corporation (JV)
JV-07-093Impvt./Widening/Conc. of McArthur
Highway (MNR) Tarlac Section Phase IV, Package III, San Manuel Section
02/27/09 III 95.033 210 C 0.450 0.200 0.300 - - - 95.00 *95.00%V. Satisfactory
B.M.K Construction/Valley
Construction and Aggregates (JV)
JV-09-209
Raod Upgrading (Gravel to Concrete) Acop-Kapangan-Kibungan-Bakun Road (Km. 263+500-Km. 283+600)
(Intermittent Sections)
08/31/10 CAR 62.256 360 O 0.362 0.241 0.150 0.030 0.047 0.033 86.30 -
B.M.K. Construction 8292Rehab./Reconst./Upgrading of
Carmen Jct. Manat Rd. w/ exceptions Bautista-Alcala Sect.
04/14/11 I 22.413 160 C 0.435 0.130 0.300 - - - 86.50 86.02% Satisfactory
B.M.K. Construction / A.I.P. Construction (JV) JV-09-207 Rehab. of Cervantes-Sabangan Road 04/09/11 CAR 57.601 365 C 0.440 0.133 0.300 - - - 87.30 *87.30%
SatisfactoryB.M.K. Construction / Royal Crown Monarch
Construction & Supplies Corporation (JV)
JV-09-084
Widening/Conc. of McArthur Highway (MNR), Tarlac Province-Phase VI (Package I), Tarlac 1st
Congressional District (Paniqui and
04/07/11 III 164.060 210 C 0.464 0.146 0.300 - - - 91.00 90.64% V. Satisfactory
B.P. Cruz Builders and Trading 33272 Rehab./Impvt. of Road, Brgy. Tulo 06/02/10 IVA 4.766 60 C 0.391 0.133 0.300 - - - 82.40 82.40%
Satisfactory
B.R. Ramos Construction 3304 Impv't./Conc. Of Maligaya-Garchitorena Road 04/07/11 V 14.679 165 C 0.349 0.200 0.300 - - - 84.90 83.52%
Satisfactory
B.R.G Construction 21931 Conc. of Aritao-Quirino Road, Bua Section 03/04/10 II 9.650 104 C 0.343 0.200 0.300 - - - 84.30 87.24%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page62
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B.R.G. Construction 21931 Conc. of Aritao-Quirino Road, Pudi Sect. 04/15/11 II 9.650 225 C 0.410 0.133 0.300 - - - 84.30 86.64%
Satisfactory
B.R.G. Construction 21931 Conc. of Bambang-Kasibu-Quezon-Solano Road, Alloy Sect. 04/15/11 II 11.812 210 C 0.412 0.133 0.300 - - - 84.50 84.68%
Satisfactory
B.R.G. Construction 21931 Concreting of Aritao-Quirino Road, Bua Section 06/04/09 II 9.650 104 O 0.375 0.240 0.150 0.030 0.047 0.050 89.20 -
Baby Santiago Construction & Supply 31662 Const. of 2-Storey 4-CL @ San
Antonio Elem. School 02/24/10 IVA 4.103 80 C 0.420 0.200 0.300 - - - 92.00 92.00% V. Satisfactory
Badoc Builders & Supply 31564 Concreting of Farm-to-Market Road, Brgy. Balioeg 03/02/09 I 1.442 45 C 0.371 0.200 0.300 - - - 87.10 *87.10%
BCT Trading and Construction 15199 Const./Completion of MPB Brgy.
Bagong Sikat 03/31/11 IVB 1.001 90 O 0.343 0.225 0.150 0.030 0.040 0.050 83.80 -
BCT Trading and Construction 15199 Conc. of Irawan-Tagburos Road 03/31/11 IVB 19.049 180 C 0.293 0.200 0.300 - - - 79.30 80.23%
Unsatisfactory
BCT Trading and Construction 15199 Impvt. of Quezon-Punta Baja Road,
Km. 171+400-Km. 175+200 09/10/09 IVB 18.985 282 C 0.398 0.200 0.000 - - - 59.80 *59.80%Poor
BCT Trading and Construction 15199 Construction Of MPB, Brgy. Princesa 03/05/10 IVB 0.329 75 C 0.481 0.133 0.300 - - - 91.40 85.45%
Satisfactory
BCT Trading and Construction 15199 Const. of MPB, Brgy. Model 03/05/10 IVB 1.425 90 C 0.477 0.133 0.300 - - - 91.00 84.98%
Satisfactory
BCT Trading and Construction 15199 San Vicente Airport Development
Project 08/12/09 DOTC 96.293 300 C 0.455 0.200 0.300 - - - 95.50 95.50% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page65
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
BCT Trading and Construction 15199 San Vicente Airport Development
Project 03/14/09 DOTC 48.138 210 C 0.451 0.200 0.300 - - - 95.10 95.10% V. Satisfactory
BDL Santos Construction and Supply 17535 Opening/Impvt. of Guiamon-San
Ramon Road Phase I 09/03/10 VI 19.296 180 C 0.496 0.199 0.300 - - - 99.50 99.50% Outstanding
Bedun Construction 15130 Const./Rehab. of Road, Brgy. Nagtoctoc 02/27/10 IVA 0.399 30 C 0.466 0.133 0.300 - - - 89.90 89.90%
V. Satisfactory
Bell Construction 27851 Const. of Gate and Stage @ Mambugan NHS 02/15/10 IVA 1.352 150 C 0.474 0.200 0.300 - - - 97.40 97.40%
Outstanding
Bell Construction 27851 Conc. of Roads (Dely St.) Brgy. Munting Dilaw 06/08/10 IVA 1.928 120 C 0.341 0.200 0.300 - - - 84.10 84.10%
Satisfactory
Bell Construction 27851 Conc. of Road, Sitio Pagrai, Brgy. Mayamot 08/19/10 IVA 2.886 120 C 0.468 0.133 0.300 - - - 90.10 90.10%
V. Satisfactory
Bemkar Construction 33047 Const. of Multi-Purpose Building Daet E/S, Brgy. VII 04/03/11 V 0.965 45 C 0.438 0.133 0.300 - - - 87.10 *87.10%
Satisfactory
Bemkar Construction 33047
Restoration of Damaged Embankment and Slope Protection
along Bagong Silang-Capalonga Road, Km.328+800 - Km.328+850,
Talagpucao
06/10/10 V 4.780 60 C 0.467 0.133 0.300 - - - 90.00 90.00% V. Satisfactory
Bemkar Construction 33047 Conc. of Talobatib-Jose Panganiban Pob. Port Road, Dalnac Section 09/12/09 V 4.361 150 C 0.371 0.200 0.300 - - - 87.10 86.74%
Satisfactory
Bemkar Construction 33047
Repair/Rehab. of Bagong Silang-Capalonga Road, Bagong Silang
Section, Km. 300+342-Km.300+414 with Intermittent Section
09/12/09 V 1.810 80 C 0.434 0.133 0.300 - - - 86.70 *86.70% Satisfactory
Bemkar Construction 33047 Const. of Slope Protection Sitio Paraiso Bulala Section 03/05/10 V 9.526 150 C 0.464 0.133 0.300 - - - 89.70 89.70%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page66
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Bemkar Construction 33047 Impvt. of Daang Maharlika Road Sitio Paraiso Maharlika Road 03/05/10 V 14.114 120 C 0.456 0.133 0.300 - - - 88.90 88.90%
Beron DC Construction 33896 Completion/Const./Rehab. of MPB at Brgy. M. Roxas 09/02/10 CAR 1.909 60 C 0.474 0.186 0.300 - - - 96.00 96.00%
V. Satisfactory
Berson's Construction & Trading 31181
Rehab./Recosnt./Upgrading of Camiling-Wawa-Bayambang-Malasiqui-Sta. Barbara Road,
Km.172+729 - Km.176+165 with exceptions, Wawa & Buayaaen Sect.
04/08/11 I 19.295 150 O 0.337 0.300 0.150 0.030 0.028 0.033 87.80 -
Berson's Construction & Trading 31181
Rehab./Reconst./Upgrading of Damaged Road, Villasis-Malasiqui-San Carlos Road (Km. 182+422-Km.
199+527 w/ exception)
08/27/09 I 9.647 120 C 0.461 0.200 0.300 - - - 96.10 91.06% V. Satisfactory
Berson's Construction & Trading 31181
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Urdaneta Jct. - Dagupan Road, Km.197+881 - Km.198+448 with
exception
06/03/10 I 4.824 15 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory
Berson's Construction & Trading 31181 Rehab. of Agno River Control Dike at
Brgy. Zone I to IV & Poblacion 06/04/10 I 3.858 120 C 0.404 0.133 0.300 - - - 83.70 83.70% Satisfactory
Berson's Construction & Trading 31181 Widening & Dredging of Banaoang
Creek 08/31/10 I 9.648 168 C 0.337 0.200 0.300 - - - 83.70 83.70% Satisfactory
Berson's Construction & Trading 31181
Asphalt Overlay of Pangasinan-La Union Road Km. 381+300-Km.
302+50005/23/09 I 19.297 30 C 0.451 0.200 0.300 - - - 95.10 *95.10%
V.Satisfactory
Berson's Construction & Trading 31181 Const. of One (1) Classroom @ Sta.
Maria E/S 03/04/10 I 0.484 45 C 0.427 0.133 0.300 - - - 86.00 86.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page67
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Berson's Construction & Trading / Jasa Builders
(JV)JV-09-048 Const./Rehab. of Infanta Seawall 09/02/10 I 9.648 120 C 0.400 0.200 0.300 - - - 90.00 86.88%
Satisfactory
Besao Unltd Enterprises 33007 Construction of Shaded Walk from KA to HKA Bldg. 01/20-22/2010 UP - Baguio 0.209 60 C 0.411 0.133 0.300 - - - 84.40 84.40%
Satisfactory
Besao Unltd Enterprises 33007Construction of Proposed Studio at
the College of Arts and Communication
01/20-22/2010 UP - Baguio 0.247 30 C 0.462 0.200 0.300 - - - 96.20 96.20% Outstanding
Bestech Construction & Development &
Development Corporation
17725
Emergency Repair of Tigaon-Goa-San Jose Lagonoy via San Vicente
Rd. KO 498+500-KO 505+800 w/ exceptions
05/30/09 V 1.316 60 C 0.429 0.200 0.300 - - - 92.90 83.84% Satisfactory
Bestech Construction & Development Corporation
17725 Repair/Impv't. of Comun-Peñafrancia Road 03/29/11 V 5.430 120 C 0.346 0.200 0.300 - - - 84.60 83.88%
Satisfactory
Bestech Construction & Development Corporation
17725 Rehab. of Maharlika National Rd., Rizal Ave. 08/18/10 V 2.655 24 C 0.350 0.200 0.300 - - - 85.00 85.00%
Satisfactory
Bet Construction & Supply 31764 Const.of MPB, Brgy. Salaan 04/12/11 I 1.254 30 C 0.442 0.133 0.300 - - - 87.50 *87.50%
Satisfactory
Bet Construction & Supply 31764 Const. of MPB (Mangaldan Public
Market Vegetable Sect.) 08/28/09 I 2.894 103 C 0.366 0.200 0.300 - - - 86.60 84.78% Satisfactory
Bet Construction & Supply 31764 Asphalt Overlay along Pangasinan-
La Union Road 03/02/10 I 4.823 8 C 0.407 0.133 0.300 - - - 84.00 84.00% Satisfactory
Bet Construction & Supply 31764 Rehab. of Urdaneta Junction-
Lingayen Road, Perez Blvd Section 06/07/10 I 10.118 21 C 0.448 0.133 0.300 - - - 88.10 88.10% Satisfactory
Beta Construction 9829 Const. of MPB, Minalabac Central School 08/31/10 V 0.985 120 C 0.359 0.200 0.300 - - - 85.90 85.90%
Satisfactory
Beta Construction 9829 Road Concreting of Lidong-Hibago Road 03/12/09 V 2.837 75 C 0.443 0.200 0.300 - - - 94.30 *94.30%
V. Satisfactory
Better Work Construction 24432Restoration/Protection Works of
Scoured Abutment A of Glan Jumbo Bridge
09/16/09 XII 9.642 110 C 0.352 0.200 0.300 - - - 85.20 *85.20% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page68
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Better Work Construction 24432 Construction of School Building, Tantangan National High School 06/06/09 R-XII 0.476 63 C 0.456 0.200 0.300 - - - 95.60 *95.60%
V. Satisfactory
Bext Enterprises 30392 Conc. of Road, Tonton to Bliss 04/11/11 I 0.491 30 C 0.410 0.133 0.300 - - - 84.30 *84.30% Satisfactory
Bicol Goldrock Construction Corporation 32376
Repair./Rehab. of Slope Protection along Daang Maharlika, La Medalla-
San Nicolas Sect.06/02/10 V 0.943 60 C 0.447 0.133 0.300 - - - 88.00 88.00%
Satisfactory
Bicol Goldrock Construction Corporation 32376 Conc. of FMR at Brgy. GRS 08/30/10 V 2.822 120 C 0.420 0.200 0.300 - - - 92.00 92.00%
V. Satisfactory
Bicol Goldrock Construction Corporation 32376 Conc. of National Road, Bato-Baras
Section 03/04/09 V 4.787 241 C 0.442 0.200 0.300 - - - 94.20 88.68% Satisfactory
Bicol Goldrock Construction Corporation 32376 Concreting of San Lucas-Sabang
Road 03/02/10 V 4.774 150 C 0.426 0.133 0.300 - - - 85.90 85.90% Satisfactory
Bigfoot Construction and Supply 24769
Rehab./Recons./Upgrading of Damaged National Rds. HDM-4,
Dumaguete North Rd, San Jose Rd. Sect.
09/13/09 VII 7.667 100 C 0.436 0.133 0.300 - - - 86.90 *86.90% Satisfactory
Bigfoot Construction and Supply 24769 Impv't. of Water System 03/05/10 VII 6.427 190 C 0.489 0.067 0.300 - - - 85.60 83.86%
Satisfactory
Bigfoot Construction and Supply 24769 Const. of River Control Dike along
Siaton River, Barangay San Jose 09/08/10 VII 4.536 190 C 0.370 0.200 0.300 - - - 87.00 83.28% Satisfactory
Bigfoot Construction and Supply 24769 Const./Impvt. of Bulado Section
(DNR) 09/06/10 VII 9.112 124 C 0.448 0.133 0.000 - - - 58.10 69.80% Poor
Bigfoot Construction and Supply 24769 Impvt. of Water Works System, Brgy.
Milagrosa 05/30/09 VII 1.918 138 C 0.494 0.133 0.300 - - - 92.70 *92.70% V. Satisfactory
Bigfoot Construction and Supply 24769 Repair/Rehabilitation of Farm-to-
Market Road, Mayabon-Najandig 03/13/09 VII 0.889 40 C 0.500 0.133 0.300 - - - 93.30 *93.30%V. Satisfactory
Bigfoot Construction and Supply 24769
Road Upgrading (gravel to concrete) at Masulog (missing link) Section
(VLCR) (Sta. 171+541.00-Sta.172+208.10)
03/18/09 VII 7.920 157 C 0.415 0.130 0.300 - - - 84.50 *84.50%Satisfactory
Bill Hill Construction and Supply 10846 Conc. of Capalayan-Mapawa-Quezon
Road (Phase 38) 03/10/09 XIII 11.814 650 C 0.443 0.200 0.000 - - - 64.30 74.98% Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page69
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Billena Construction/D.M. House Construction, Inc.
(JV)JV-08-145 Conc. of Bantayan-San Pedro-Cubay
Road, San Jose and Sibalom 09/02/09 VI 27.016 360 O 0.356 0.239 0.150 0.015 0.025 0.033 81.80 -
Bilrey Construction 32877Construction of Livelihood,
BL Jadulco Construction & Supply 33684 Const. of Sto. Niño Seawall, Brgy.
Sto.Niño 06/02/10 VIII 0.482 90 C 0.367 0.200 0.300 - - - 86.70 86.70% Satisfactory
BL Jadulco Construction & Supply 33684 Const. of Dainage in the Municipality
of Naval 08/26/10 VIII 1.926 100 O 0.397 0.240 0.150 0.030 0.042 0.033 89.20 -
BLF Construction 15829Const. of Proposed CNM Laboratory
Bldg. Phase I at Bataan Peninsula State University
02/25/09 III 1.869 60 C 0.433 0.200 0.300 - - - 93.30 *93.30% V. Satisfactory
Blimex Construction and Supply 27259 Construction of MPB at Bai-
Saripinang 06/03/09 R-XII 0.479 84 C 0.406 0.200 0.300 - - - 90.60 *90.60% V. Satisfactory
Blue Eagle Construction 10915 San Roque Port Development Project (Construction of Fishport) 06/14/10 DOTC 1.919 30 C 0.411 0.200 0.300 - - 0.00 91.10 91.10
V.Satisfactory
Blue Eagle Construction Company 10915
Masbate Airport Dev't Project (Continuation of Concrete Paving of
05/10/10 III 9.839 45 C 0.483 0.133 0.300 - - - 91.60 91.60% V. Satisfactory
C & F Construction & Development Corporation
3509 Repair/Rehab./Asphalt Overlay of Roman Expressway (Phase XXIII) 05/26/10 III 9.945 60 C 0.461 0.133 0.300 - - - 89.40 89.40%
V. Satisfactory
C & F Construction & Development Corporation
3509 Rehab./Impvt. of Paradise Farm, FMR, Tungkong Mangga, Phase I 09/07/09 III 9.528 150 C 0.439 0.133 0.300 - - - 87.20 83.30%
Satisfactory
C A Miguel Construction Incorporated (Formerly:
C.A. Miguel Construction)
10221 Widening/Concrete Blocking of North Avenue 06/01/09 NCR 4.797 90 C 0.438 0.200 0.300 - - - 93.80 *93.80%
V. Satisfactory
C D U Construction 13915Rehab./Reconst./Upgrading of Allen Old Road, Km.697+147 - Km.700+679
with exceptions03/31/11 VIII 12.917 135 C 0.411 0.133 0.300 - - - 84.40 85.84%
Satisfactory
C D U Construction 13915Conc. of Laoang-Lapinig-Arteche-
San Policarpio Road, Mapanas-Manaybanay Sect. w/ exception
04/01/11 VIII 18.820 200 C 0.393 0.133 0.300 - - - 82.60 85.60% Satisfactory
C D U Construction 13915Rehab./Reconst./Upgrading of
Damaged Road along Poblacion Allen-Cabacungan National Road
03/31/11 VIII 9.537 155 C 0.445 0.133 0.000 - - - 57.80 76.16% Unsatisfactory
C D U Construction 13915 Upgrading of Poblacion Allen-Brgy. Cabacungan National Road 03/31/11 VIII 19.277 148 C 0.433 0.133 0.000 - - - 56.60 74.30%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page78
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C D U Construction 13915 Const./Impvt. of Talisay Bridge (Phase I), Brgy. Talisay 03/06/10 VIII 2.398 180 C 0.500 0.133 0.300 - - - 93.30 93.30%
V. Satisfactory
C D U Construction 13915 Const. of Shoreline Protection Brgy. Tomaligues 03/03/10 VIII 0.963 60 C 0.357 0.200 0.300 - - - 85.70 85.70%
Satisfactory
C D U Construction 13915 Upgrading of Allen-Cabacungan National Road 03/05/10 VIII 19.231 180 C 0.330 0.193 0.300 - - - 82.30 83.05%
Satisfactory
C D U Construction 13915Const. of One (1) Classroom School
Building Gadgaran Elementary School
03/03/10 VIII 0.544 60 C 0.392 0.133 0.300 - - - 82.50 82.50% Satisfactory
C D U Construction 13915 Road Opening/Const. of Nijaga Sect. along Calbayog Diversion Rd. 06/12/10 VIII 19.295 150 O 0.353 0.238 0.150 0.030 0.037 0.033 84.10 -
C D U Construction 13915 Rehab./Reconst./Upgrading of Catarman-Calbayog Rd., 06/14/10 VIII 19.275 130 O 0.325 0.240 0.150 0.030 0.042 0.050 83.70 -
C D U Construction 13915 Conc. of Palapag-Simora Road, Jangtud-Lanobe Section 08/24/10 VIII 18.808 200 C 0.407 0.200 0.300 - - - 90.70 90.70%
V. Satisfactory
C D U Construction 13915 Conc. of Palapag-Simora Road, Magsaysay-Jangtud Section 08/24/10 VIII 18.815 200 C 0.387 0.200 0.300 - - - 88.70 88.70%
Satisfactory
C D U Construction 13915 Conc. of Palapag-Simora Road, Lanobe-Rombang Section 08/24/10 VIII 18.793 200 C 0.386 0.200 0.300 - - - 88.60 88.60%
Satisfactory
C D U Construction 13915Conc. of Laoang-Lapinig-Arteche-
San Policarpio Road Mapanas-Manaybanay Section, with exception
08/25/10 VIII 18.820 200 O 0.321 0.300 0.150 0.030 0.025 0.050 87.60 -
C D U Construction 13915 Rehab./Reconst./Upgrading of Catarman-Calbayog Road 08/27/10 VIII 19.276 130 C 0.405 0.200 0.300 - - - 90.50 86.42%
Satisfactory
C D U Construction 13915Road Opening/Const. of Nijaga
Section along Calbayog Diversion Road
09/01/10 VIII 19.295 150 C 0.386 0.200 0.300 - - - 88.60 85.90% Satisfactory
C D U Construction 13915Road Opening/Const. of Dagum
Section along Calbayog Diversion Road
09/01/10 VIII 19.295 150 C 0.396 0.133 0.300 - - - 82.90 82.78% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page79
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C D U Construction 13915Road Opening/Const. of Pagbalican Section along Calbayog Diversion
Road09/01/10 VIII 19.295 150 C 0.414 0.133 0.300 - - - 84.70 82.66%
Satisfactory
C D U Construction 13915Rehab./Reconst./Upgrading of
Damaged Paved National Roads, along Catarman-Calbayog Road
05/27/09 VIII 19.010 210 C 0.395 0.133 0.300 - - - 82.80 *82.80% Satisfactory
C D U Construction 13915 Conc. of Laoang-Calomotan Road 11/29/08 VIII 19.065 180 O 0.358 0.240 0.100 0.015 0.025 0.100 83.80 -
C D U Construction 13915 Const. of 1 CL Sch. Bldg. @ Brgy. Bansud 03/10/09 VIII 0.454 60 C 0.372 0.200 0.300 - - - 87.20 *87.20%
Satisfactory
C D U Construction 13915 Const. of MPB @ Brgy. Carayman 03/10/09 VIII 0.963 90 C 0.429 0.200 0.300 - - - 92.90 *92.90% V. Satisfactory
C D U Construction 13915Const./Rehab./Replacement/Completion and Repair of Elem. & Secondary
Sch. Bldg., Bliss Primary School03/10/09 VIII 0.433 60 C 0.379 0.200 0.300 - - - 87.90 *87.90%
Satisfactory
C D U Construction 13915
Road Upgrading (Gravel to Paved) Pangpang-Palapag-Mapanas-Gamay-
Lapinig Road, Pangpang-Tinampo Section
09/12/09 VIII 18.900 200 C 0.425 0.144 0.300 - - - 86.90 87.02% Satisfactory
C D U Construction 13915 Upgrading of Allen-Frederick National Road 09/14/09 VIII 8.652 120 O 0.337 0.240 0.150 0.030 0.050 0.050 85.70 -
C D U Construction 13915 Conc. of Laoang-Lapinig-Arteche (SONA), Laoang-Binaticlan Sect. 09/12/09 VIII 18.756 200 O 0.331 0.240 0.150 0.030 0.050 0.050 85.10 -
C D U Construction 13915 Upgrading of Allen-Cabacungan National Road 09/14/09 VIII 19.231 150 O 0.334 0.240 0.150 0.015 0.050 0.050 83.90 -
C D U Construction 13915 Conc. of Laoang-Lapinig-Arteche (SONA), Magsaysay-Calomotan Sect. 09/12/09 VIII 18.788 200 C 0.395 0.144 0.300 - - - 83.90 *83.90%
Satisfactory
C E K Construction and Water Supply 13713
Const. of 2-CL School Building, Cebuano National High School,
Brgy. Cebuano09/15/09 XII 1.144 60 C 0.466 0.133 0.300 - - - 89.90 *89.90%
V. Satisfactory
C E K Construction and Water Supply 13713 Const. of Multi-Purpose Building @
Aplaya (Madrasha) 02/25/10 XI 0.494 45 C 0.427 0.133 0.300 - - - 86.00 86.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page80
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C E K Construction and Water Supply 13713 Const. of MPB 06/17/10 XII 2.832 133 C 0.383 0.133 0.300 - - - 81.60 84.68%
Satisfactory
C E K Construction and Water Supply 13713 Construction of Hanging Bridge at
04/02/11 CAR 14.081 360 C 0.481 0.200 0.000 - - - 68.10 78.18% Unsatisfactory
Camia Construction 20506
Road Upgrading (Gravel to Concrete) along Kabugao-Pudtol-Luna-
Cagayan Bdry. Road, Lenneng Section
04/02/11 CAR 23.076 388 O 0.382 0.300 0.000 0.030 0.043 0.000 75.50 -
Camia Construction 20506
Road Opening/Const. of Missing Links of National Roads along Kabugao-Pudtol-MNA Rd. Paco
Section
04/02/11 CAR 18.454 388 O 0.374 0.300 0.000 0.020 0.043 0.000 73.70 -
Camia Construction 20506 New Const./Completion/Continuation of On-going Namunit Bridge 05/26/10 II 12.888 270 O 0.333 0.300 0.150 0.024 0.033 0.033 87.30 -
Camia Construction 20506 New Const./Completion/Continuation of On-going Namunit Bridge 08/17/10 II 12.888 270 O 0.312 0.270 0.150 0.030 0.040 0.033 83.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page89
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Camia Construction 20506 Concreting along Kabugao-Pudtol-Luna Road, Nagsungbatan Section 06/01/09 CAR 14.117 277 O 0.400 0.300 0.150 0.030 0.045 0.033 95.80 -
Camia Construction 20506 Conc. along Kabugao-Pudtol-Luna Road, Swan Section 06/01/09 CAR 18.862 277 O 0.357 0.240 0.150 0.030 0.056 0.033 86.60 -
Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Lenning Section 05/30/09 CAR 13.870 366 O 0.294 0.300 0.150 0.030 0.035 0.033 84.20 -
Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Capitol Poblacion Section 05/30/09 CAR 18.562 391 O 0.288 0.300 0.150 0.030 0.040 0.033 84.10 -
Camia Construction 20506 Maintenance/Rehab. Along Apayao-Calanasan Road 02/26/09 CAR 4.588 241 C 0.363 0.200 0.300 - - - 86.30 82.64%
Satisfactory
Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Capitol-Poblacion Section 02/28/09 CAR 18.563 390 O 0.351 0.300 0.150 0.030 0.035 0.033 89.90 -
Camia Construction 20506 Upgrading of Kabugao-Pudtol-Luna Road (Lenneng Sect.) 09/04/09 CAR 13.870 402 O 0.331 0.240 0.150 0.024 0.056 0.033 83.40 -
Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Capitol Poblacion Section 02/20/10 CAR 18.922 421 C 0.400 0.200 0.300 - - - 0.00 88.20%
Satisfactory
Camia Construction 20506Road Upgrading of Abbut-Conner-
Kabugao Road (Gravel to Concrete), Manag-Guina-ang Section
02/20/10 CAR 9.358 360 O 0.381 0.234 0.150 0.030 0.040 0.033 0.00 -
Camia Construction 20506 Conc. along Kabugao-Pudtol-Luna Road, Swan Section 02/18/10 CAR 18.862 277 C 0.417 0.133 0.300 - - - 0.00 85.96%
Satisfactory
Camia Construction 20506 Upgrading of Kabugao-Pudtol-Luna Road (Lenneng Sect.) 02/20/10 CAR 13.870 402 C 0.423 0.133 0.300 - - - 0.00 85.78%
Satisfactory
Camia Construction 20506 Conc. along Kabugao-Pudtol-Luna Road, Nagsungbatan Section 05/27/10 CAR 14.352 337 C 0.398 0.200 0.300 - - - 89.80 91.18%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page90
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Camia Construction 20506 Road Upgrading of Kabugao-Pudtol-Luna Road (Lenneng Section) 05/28/10 CAR 15.879 420 C 0.399 0.200 0.300 - - - 89.90 89.90%
V. Satisfactory
Camia Construction 20506Road Upgrading of Abbut-Conner-
Kabugao Road (Gravel to Concrete), Manag-Guina-ang Section
05/28/10 CAR 9.358 390 C 0.396 0.200 0.300 - - - 89.60 87.92% Satisfactory
Camia Construction 20506Conc. of Roads along Apayao (Calanasan)-Ilocos Norte Road
Tanglagan Section08/19/10 CAR 18.871 360 O 0.382 0.263 0.150 0.023 0.027 0.033 87.80 -
Camori Builders & Supply 30084 Impvt.Widening of Cainta-Kaytickling-
Antipolo-Teresa Road 08/26/09 IVA 4.801 120 C 0.484 0.200 0.300 - - - 98.40 92.58% V. Satisfactory
Carlo Joseph / Omicron Construction (JV) JV-09-276
Const./Repair/Rehab. of Slope Protection along Porac River, Valdez
Sect.08/16/10 III 14.333 90 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
Carlo Joseph Construction 21017
Drainage Canal along San Antonio-Floridablanca Road, Mabical-Valdez
Section02/17/10 III 4.774 60 C 0.446 0.142 0.300 - - - 88.80 88.80%
Satisfactory
Carlo Joseph Construction 21017
Const. of School Building at Mawaque Resettlement Elementary
School06/04/09 III 0.952 30 C 0.469 0.200 0.300 - - - 96.90 *96.90%
Outstanding
Carlo Joseph Construction 21017 Repair of Brgy. Roads @ Magnolia
St. 02/26/09 III 0.462 15 C 0.448 0.133 0.300 - - - 88.10 *88.10%Satisfactory
Carlo Joseph Construction 21017 Const. of 2-CL at Culubasa PS
Floridablanca East 08/24/09 III 0.958 60 C 0.465 0.133 0.300 - - - 89.80 *89.80% V. Satisfactory
Carlo Joseph Construction 21017 Dredging of Balagtas River and
Creeks 09/04/09 III 4.774 45 C 0.375 - 0.500 - - - 87.50 *87.50% Satisfactory
Carlyz Construction 19776Road Upgrading along Banaue-
Purpose Cooperative23697 Const. of MPB @ Pilot Provincial
Science and Technology H/S 03/02/09 XII 1.907 79 C 0.427 0.133 0.300 - - - 86.00 76.48% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page97
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Cesar T. Carpio Construction 20833
Const./Rehab./Impvt. of Pambujan Circ. Road , Cababtoan-Cabarian-
Canjumadal Road08/31/08 VIII 9.295 180 O 0.288 0.225 0.100 0.030 0.040 0.100 78.30 -
Cesar T. Carpio Construction 20833 Repair/Rehab. of Catarman-Calbayog
Road 08/26/08 VIII 9.594 150 O 0.364 0.240 0.100 0.030 0.032 0.100 86.60 -
Cesar T. Carpio Construction 20833 Concreting of Naval-Caibiran Cross
County Road, So. Cansceso Section 06/04/09 VIII 4.815 150 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
CGGA Builders & Enterprises 23762 Const. of 1-CL @ Esperansa E/S 02/27/10 VIII 0.486 90 C 0.477 0.133 0.300 - - - 91.00 91.00%
V. Satisfactory
CGGA Builders & Enterprises 23762 Const. of FMR 09/02/10 VIII 0.908 40 O 0.460 0.133 0.300 - - - 89.30 89.30%
V. Satisfactory
Cha Construction & Supply 28120 Conc. of San Jose Road 04/06/11 V 0.716 60 C 0.436 0.133 0.300 - - - 86.90 *86.90%
Satisfactory
Cha Construction & Supply 28120 Conc. of Tibgao Road 04/06/11 V 0.995 60 C 0.395 0.133 0.300 - - - 82.80 *82.80%
Satisfactory
Cha Construction & Supply 28420 Conc. of Bancao-Sto. Niño Rd. 08/28/10 V 4.725 120 C 0.377 0.200 0.300 - - - 87.70 87.70%
Satisfactory
Cha Construction & Supply 28420 Construction of San Francisco-San
Vicente 03/02/10 V 3.820 120 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
Cha Construction and Supply 28420 Const. of Roads, San Antonio-
Siembre Road 03/12/09 V 11.347 90 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
Charlz Construction 8709
Rehab./Reconst./Upgrading of Jct. S.H. Manolo Fortich-Libona-Indahag
Road, Gango Sect., (Gravel to Concrete)
03/31/11 X 28.417 230 C 0.401 0.133 0.300 - - - 83.40 85.44% Satisfactory
Charlz Construction 8709 Construction of Tagbao Road, Brgy. Tagbao 06/10/09 VII 2.831 60 C 0.350 0.134 0.300 - - - 78.40 *78.40%
Unsatisfactory
Charlz Construction 8709
Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-
Binuangan Sect.)
08/24/08 X 38.527 379 O 0.316 0.300 0.100 0.015 0.041 0.100 87.20 -
Charlz Construction 8709 Const. of 2 Units, 2 Storey, 10 CL @ Taptap E/S Bldg. 03/03/09 VII 13.360 195 C 0.281 0.177 0.300 - - - 75.80 83.29%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page98
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Charlz Construction 8709 Const. of DPWH Bukidnon 3rd DEO Building (Phase III), Diklum 05/29/09 X 4.795 90 O 0.350 0.263 0.150 0.030 0.011 0.033 83.70 -
Charlz Construction 8709 Const. of Two (2) Storey DPWH Office Building 03/06/09 X 2.888 180 C 0.373 0.133 0.300 - - - 80.60 82.84%
Satisfactory
Charlz Construction 8709 Const. of DPWH 1st DEO Building 09/03/09 X 4.812 150 C 0.455 0.172 0.300 - - - 92.70 *92.70% V. Satisfactory
Charlz Construction 8709Rehab./Reconst. (Asphalt to
Concrete) of Jct. S.H. Manolo Fortich Libona-Indahag Rd., (Kiliog Section)
09/04/09 X 19.210 150 O 0.394 0.236 0.150 0.030 0.047 0.033 89.00 -
Charlz Construction 8709 Const. of DPWH Bukidnon 3rd DEO Building (Phase III), Dicklum 09/04/09 X 4.795 90 C 0.499 0.165 0.300 - - - 96.40 87.51%
Satisfactory
Charlz Construction 8709
Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-
Binuangan Section w/ exceptions)
09/17/09 X 38.527 379 C 0.372 0.133 0.300 - - - 80.50 80.56% Unsatisfactory
Che-riss Construction & Trading 26557 Repair/Maintenance of Public School
Teachers Association, Catalina St. 09/09/09 NCR 0.720 45 C 0.428 0.133 0.300 - - - 86.10 *86.10% Satisfactory
Chiara Construction 8736 Const. of 18 LM RCDG Bridge along San Fernando Bypass Road 02/24/09 I 9.399 270 C 0.366 0.200 0.300 - - - 86.60 82.58%
Satisfactory
Chiara Construction 8736 Construction of 2-Storey Building / Library at Tarlac State University 02/27/09 III 14.399 270 C 0.439 0.176 0.300 - - - 91.50 84.85%
Satisfactory
Chiara Construction 8736Const. of Two (2) Storey Building / Library at Tarlac State University,
Lucinda Campus11/13/08 III 14.416 270 O 0.388 0.180 0.100 0.030 0.022 0.100 82.00 -
Chico Engineering and Construction 32395 Const. of Multi-Purpose Building,
Sitio Pospos, Brgy. Caluttit 02/26/10 CAR 1.445 246 C 0.392 0.200 0.300 - - - 89.20 83.92% Satisfactory
China CAMC Engineeing Co., LTD.
Const. of Agno River Integrated Irrigation Project (ARIIP) 08/15-20/11 NIA 93.846 900 O 0.370 0.290 0.150 0.030 0.070 0.050 95.97 -
China Harbour Engineering Company
SL1-SN-005059/FC-
07-005
CP5, Cervantes-Mankayan-Abatan, Phase V 03/11/09 PJHL 682.076 812 O 0.365 0.300 0.150 0.030 0.070 0.050 96.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page99
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
China Harbour Engineering Company FC-98-264 CP5, Cervantes-Mankayan-Abatan,
Phase V 11/14/08 PJHL 682.000 812 O 0.369 0.300 0.100 0.030 0.051 0.100 95.00 -
China Harbour Engineering Company FC-07-005
Contract Package 5, Cervantes-Mankayan-Abatan under Arterial Road Links Development Project,
Clifford Construction Corporation 3724 Road Upgrading (Gravel to Concrete)
Altavas-Jamindan Road 06/06/09 VI 3.849 150 O 0.362 0.246 0.150 0.023 0.045 0.033 85.90 -
Clifford Construction Corporation 3724 Road Upgrading / Concreting along
Altavas-Jamindan Road 03/14/09 VI 21.841 210 O 0.330 0.294 0.150 0.030 0.055 0.033 89.20 -
Clifford Construction Corporation 3724 Road Upgrading of Altavas-
Jamindan Road 09/05/09 VI 3.849 150 C 0.438 0.139 0.300 - - - 87.70 86.62% Satisfactory
Clifford Construction Corporation 3724 Road Upgrading/Conc. along Altavas-
Jamindan Road 09/05/09 VI 22.278 349 O 0.336 0.287 0.110 0.023 0.040 0.017 81.30 -
Clifford Construction Corporation 3724 Road Upgrading (Gravel to Paved),
Altavas-Jamindan Road 09/04/10 VI 11.559 150 C 0.458 0.133 0.300 - - - 89.10 89.10% V. Satisfactory
Clinton Builders Construction of Police Station (Building) 12/07/10 NHA 6.729 132 C 0.492 0.200 0.300 - - - 99.20 94.37%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page102
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
CLTG Builders 16852 Conc. of Road @ Countryhomes to Emilia Homes Section 04/13/11 XI 1.875 108 C 0.452 0.200 0.300 - - - 95.20 *95.20%
V. Satisfactory
CLTG Builders 16852 Const. of Multi-Purpose Building at Bunawan Aplaya E/S 03/10/10 XI 2.358 112 C 0.345 0.200 0.300 - - - 84.50 84.50%
Satisfactory
CLTG Builders 16852 Construction of Mandug River Control 06/11/09 XI 9.442 180 C 0.438 0.200 0.300 - - - 93.80 *93.80%
V. Satisfactory
CLTG Builders 16852Rehab./Reconst. of Damaged Paved National Roads at Daang Maharlika,
Bunawan Section, Davao City09/16/09 XI 9.642 180 C 0.488 0.133 0.300 - - - 92.10 *92.10%
V. Satisfactory
CLTG Builders 16852
Rehab./Reconst./Uograding of Damaged Road National Roads @
Daang Maharlika (MN), Ilang Tibungco Sec.
09/16/09 XI 9.652 180 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory
CLV Enterprises 18512 Const. of Multi-Purpose Bldg. Cawayan 02/24/10 X 0.939 119 C 0.403 0.133 0.300 - - - 83.60 83.04%
Satisfactory
CMSEL Construction and Developer 19610 Const. of MPB at Brgy. San Agustin 05/28/10 IVB 0.498 30 C 0.500 0.133 0.300 - - - 93.30 93.30%
V. Satisfactory
Coastland Construction and Development Corp. 11487 Mati Airport Development Project 06/19/09 DOTC 13.459 120 C 0.418 0.200 0.300 - - - 91.80 91.80%
V. Satisfactory
Coastland Construction and Development Corp. 11487
Mati Airport Development Project (Completion of Construction of
Access Road and Drainage Canal)09/17/10 DOTC 9.598 120 C 0.452 0.200 0.300 - - - 95.20 95.20%
V. Satisfactory
Coastland Construction and Development Corp. 11487 Conc. of Mati-Maragusan Road
(Tawas-Taguibo Section) 03/11/09 XI 14.021 145 C 0.361 0.200 0.300 - - - 86.10 86.40% Satisfactory
Coastland Construction and Development
Corporation11487
Maintenance and Rehab. of Davao Oriental-Surigao del Sur Coastal Rd.,
Km. 718.057-Km. 722+100 w/ exception)
03/02/10 XI 4.921 45 C 0.466 0.133 0.300 - - - 89.90 89.90% V. Satisfactory
Coastland Construction and Development
Corporation11487
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Davao Oriental-Surigao del Sur Coastal Rd., Pintatagan Sect.
09/03/10 XI 19.237 120 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page103
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Coastland Construction and Development
Corporation11487
Rehab./Reconst./Upgrading of Damaged Paved National Rds. Section, Junction Manikling-
Governor Generoso Rd.
09/03/10 XI 5.340 75 C 0.440 0.133 0.300 - - - 87.30 87.30% Satisfactory
Coastland Construction and Development
Corporation11487
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Davao Oriental Surigao Del Sur Coastal Road (Pintatagan-Puntalinao
Road)
09/14/09 XI 14.465 100 C 0.421 0.133 0.300 - - - 85.40 89.30% V. Satisfactory
Cofejok Construction and Supply 27493 Const./Rehab. of Roads, Arradaza
St., Diaz Subd. 04/14/11 XII 0.950 60 C 0.429 0.173 0.300 - - - 90.20 *90.20% V. Satisfactory
Cofejok Construction and Supply 27493 Completion of MPB, Brgy. Sulit 04/13/11 XII 0.978 85 C 0.467 0.133 0.300 - - - 90.00 *90.00%
V. Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB, Brgy. Liwanay 04/08/11 XII 0.805 84 O 0.366 0.240 0.150 0.030 0.041 0.050 87.70 -
Cofejok Construction and Supply 27493 Repair/Impvt./Const. of Office
Building 04/05/11 XII 4.780 250 C 0.464 0.133 0.300 - - - 89.70 86.41% Satisfactory
Cofejok Construction and Supply 27493 Repair/Rehab. of One (1) Unit Three
(3) CL Academic S/B at Arsenio E/S 09/09/09 XII 0.464 45 C 0.445 0.200 0.300 - - - 94.50 *94.50% V. Satisfactory
Cofejok Construction and Supply 27493 Const. of One (1) Unit Two (2) CL
Academic S/B at Pres. Quirino NHS 06/02/09 R-XII 0.929 100 C 0.456 0.200 0.300 - - - 95.60 *95.60% V. Satisfactory
Cofejok Construction and Supply 27493 Impvt. of MPB, Poblacion 03/15/09 XII 1.882 84 C 0.457 0.200 0.300 - - - 95.70 83.45%
Satisfactory
Cofejok Construction and Supply 27493 Repair of MPB @ Municipal Trial
Court Poblacion 03/13/09 XII 0.288 55 C 0.485 0.133 0.300 - - - 91.80 86.48% Satisfactory
Collera's Construction 13246 Construction/Impvt. of Liloan-San Ricardo-Bahay Circumferential Road 05/26/09 VIII 18.680 300 C 0.354 0.200 0.300 - - - 85.40 *85.40%
Satisfactory
Columbian Construction Services 27865 Impvt. of Camalog FMR 05/28/09 CAR 0.276 70 C 0.341 0.066 0.300 - - - 70.70 *70.70%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page104
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Compact Builders, Inc 14492 Const. of 1 unit 3-Storey, 15-Classroom School Building 12/10/09 NHA 21.491 210 O 0.291 0.300 0.121 0.030 0.038 0.050 83.00 -
Compact Builders, Inc 14492 Construction of Livehood, Productivity & Training Center 02/09/10 NHA 4.992 120 O 0.334 0.300 0.150 0.030 0.059 0.923 92.30 -
Compact Builders, Inc. 14492 Construction of Livehood, Productivity & Training Center 5/4/2010 NHA 5.481 120 C 0.4731 0.2000 0.3000 - - - 93.00 94.05
V.Satisfactory
Compact Construction & Development, Inc. 2358
Const. of Multi-Purpose Building (Cancer Care Institute), Cotabato
Regional Medical Center Compound05/26/09 R-XII 9.539 145 C 0.417 0.200 0.300 - - - 91.70 88.76%
Satisifactory
Compass Rose Builders 27024 Repair/Rehab. along Kennon Road 08/29/10 CAR 5.027 70 C 0.328 0.200 0.300 - - - 82.80 82.80% Satisfactory
Concepcion Basic Builders Incorporated 5255 Const. of Bislig Bridge (Completion)
along Surigao-Davao Coastal Road 06/11/10 XIII 92.432 425 C 0.473 0.175 0.300 - - - 94.80 90.18% V. Satisfactory
Concepcion Basic Builders, Incorporated 5255 Const. of Tago-Lapaz Bridge along
SDCR (Alternate Road) 04/04/11 XIII 144.549 375 O 0.352 0.262 0.150 0.030 0.054 0.050 89.80 -
Concepcion Basic Builders, Incorporated 5255 Conc. of Jct. Lingig-Trento Road
Section 04/02/11 XIII 18.618 393 O 0.234 0.300 0.150 0.030 0.060 0.050 82.40 -
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge (Completion)
along Surigao-Davao Coastal Rd. 03/03/10 XIII 92.432 340 O 0.373 0.235 0.150 0.030 0.050 0.033 87.10 -
Concepcion Basic Builders, Incorporated 5255 Const. of Tago-Lapaz Bridge 03/04/10 XIII 92.639 285 C 0.426 0.133 0.300 - - - 85.90 85.90%
Satisfactory
Concepcion Basic Builders, Incorporated 5255 Const. of Tago-Lapaz Bridge along
SDCR (Alternate Road) 08/25/10 XIII 144.549 330 O 0.369 0.240 0.150 0.030 0.061 0.050 90.00 -
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge along
Surigao-Davao Coastal Road 11/27/08 XIII 81.615 365 O 0.286 0.300 0.100 0.030 0.059 0.100 87.50 -
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge along
Surigao-Davao Coastal Road 06/06/09 XIII 81.615 365 O 0.400 0.300 0.097 0.030 0.056 0.050 93.30 -
Congimar Mechanical Services 31490 Const. of Multi-Purpose Building @
Bacnono 05/22/09 I 0.957 96 C 0.489 0.122 0.300 - - - 91.10 *91.10% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page105
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Conrado B. Bautista Construction 11411 Conc. of Road, Purok 1 & 2, Brgy.
Buhangin 08/21/10 III 4.722 150 C 0.384 0.200 0.300 - - - 88.40 86.36% Satisfactory
Constructicon's Inc. 31632 Partial Completion of Multi-Purpose (Covered Court) Building 08/24/09 IVA 6.740 150 C 0.370 0.200 0.300 - - - 87.00 83.85%
Satisfactory
Constructors Development Multi-
Purpose Cooperative31538
Const. of 1-Unit, 4-CL, 2-Storey Building Phase I at M'lang Central
District03/02/10 XII 2.813 120 C 0.487 0.137 0.300 - - - 92.40 92.40%
V. Satisfactory
Constructors Development Multi-
Purpose Cooperative31538 Construction of Bual River Flood
Control 06/01/09 R-XII 8.611 180 C 0.385 0.157 0.300 - - - 84.20 *84.20% Satisfactory
Constructor's Development Multi-
Purpose Cooperative31538 Const. of Bual River Control 03/10/09 XII 4.741 288 C 0.445 0.200 0.300 - - - 94.50 83.58%
Satisfactory
CR Domingo Construction, Inc.
(Formerly: C.R. Domingo Construction)
2992Asphalt Overlay along Jct, Potia-Mt. Province Bdry. Road, Km. 432+767-
Km. 432+00408/24/10 CAR 4.769 20 C 0.428 0.135 0.300 - - - 86.30 86.30%
Satisfactory
Crest Construction 15240Rehab./Reconst./Upgrading of
Cagayan-Apayao Road, Sampaguita-Warat Sect.
03/28/11 II 6.747 90 C 0.480 0.133 0.300 - - - 91.30 *91.30% V. Satisfactory
Crest Construction 15240Rehab./Reconst./Upgrading of
Cagayan-Apayao Road, Sta. Barbara Section
03/28/11 II 6.090 120 C 0.458 0.133 0.300 - - - 89.10 *89.10% V. Satisfactory
Crest Construction 15240Rehab./Reconst./Upgrading of Cagayan-Apayao Road, Sto.
Domingo Sect.03/28/11 II 9.190 120 C 0.452 0.133 0.300 - - - 88.50 *88.50%
Satisfactory
Crest Construction 15240 Rehab./Reconst./Upgrading of Tuao-Abbut Road 03/28/11 II 4.819 137 C 0.434 0.133 0.300 - - - 86.70 *86.70%
Satisfactory
Crest Construction 15240 Conc. of Cagayan-Apayao Road, Tuao-Rizal Section 03/28/11 II 7.714 142 C 0.427 0.133 0.300 - - - 86.00 *86.00%
Satisfactory
Crest Construction 15240
Rehab./Reconst./Upgrading of Damaged Paved National Roads
CAR, Villa Rey-Piat Section KO507+000-KO508+600
09/10/09 II 19.289 120 C 0.432 0.200 0.300 - - - 93.20 91.88% V. Satisfactory
Crest Construction 15240
Rehab./Reconst./Upgrading of Damaged Paved National Roads KO523+000-KO524+180, Alabug-
Tuao Section
09/10/09 II 14.223 120 C 0.429 0.133 0.300 - - - 86.20 *86.20% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page106
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Crest Construction 15240Const./Completion/Continuation of Unfinished On-going Bridges San
Pedro Bridge02/25/10 II 16.394 215 C 0.474 0.133 0.300 - - - 90.70 88.78%
Satisfactory
Crest Construction 15240Asphalt Overlay along Cagayan Apayao Road Iguig Section, KO
496+798-KO 497+00002/15/10 II 2.889 45 C 0.439 0.133 0.300 - - - 87.20 87.20%
Satisfactory
Crest Construction 15240Asphalt Overlay along Cagayan
Apayao Road Alimanao Section, KO 480+127-KO 481+000
02/15/10 II 4.818 45 C 0.435 0.133 0.300 - - - 86.80 86.80% Satisfactory
Crest Construction 15240Asphalt Overlay along Cagayan
Apayao Road Tuguegarao Section, KO 482+1512-KO 482+430
02/15/10 II 6.995 90 C 0.421 0.133 0.300 - - - 85.40 85.40% Satisfactory
Crest Construction 15240 Conc. of Cagayan Valley Agricultural College (CVAC) Road 02/19/10 II 17.367 203 C 0.420 0.133 0.300 - - - 85.30 84.52%
Satisfactory
Crest Construction 15240 Asphalt overlay of Cagayan-Apayao Road, Ugac-Buntun Section 02/27/09 II 4.782 45 C 0.475 0.200 0.300 - - - 97.50 *97.50%
Outstanding
Crest Construction 15240 Retrofitting of Caraycaray Bridge, Biliran-Naval Road 08/25/10 VIII 14.298 240 C 0.402 0.133 0.300 - - - 83.50 84.28%
Satisfactory
Crishelle Construction 17108 Const. of Multi-Purpose Pavement, Brgy. Iwahig 03/05/10 IVB 0.291 70 C 0.357 0.200 0.300 - - - 85.70 83.84%
Satisfactory
Crishelle Construction 17108 Rehab. of Sitio Bitas & Sitio Capisaan FMR 03/03/10 IVB 0.834 90 C 0.402 0.133 0.300 - - - 83.50 83.50%
Satisfactory
Crishelle Construction 17108 Impvt./Regravelling of Sitio Balintang to Amili Isugod FMR 03/03/10 IVB 0.816 90 C 0.401 0.133 0.300 - - - 83.40 83.40%
Satisfactory
Crishelle Construction 17108 Rehabilitation of Road Section, Brgy, Magkakaibigan 06/05/09 IV-B 0.201 70 C 0.427 0.200 0.300 - - - 92.70 *92.70%
V. Satisfactory
Crishelle Construction 17108 Impvt. of Quezon-Punta Baja Road 03/03/09 IV-B 18.990 252 C 0.385 0.133 0.300 - - - 81.80 75.44% Unsatisfactory
CS Construction and Supply (Formerly: CS
Construction)24237 Const. of MPB at Brgy. Alegria 04/12/11 XII 1.927 100 C 0.409 0.133 0.300 - - - 84.20 *84.20%
Satisfactory
CS Construction and Supply (Formerly: CS
Construction)24237
Road Upgrading (Gravel to Concrete) along Isulan Hwy. Jct., Dukay-
Bagumbayan-Sen. Ninoy Aquino Rd. (Masiag Sect.)
08/31/10 XII 14.275 139 C 0.424 0.133 0.300 - - - 85.70 85.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page107
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
CS Construction and Supply (Formerly: CS
Construction)24237 Road Upgrading (Gravel to Concrete)
Panyalam, Sultan Kudarat 06/03/09 R-XII 14.036 267 C 0.394 0.200 0.300 - - - 89.40 86.13% Satisfactory
CTC Builder and Supplies Inc./Sunwest
Const. & Dev. Corp. (JV)JV-06-070 Const. of Dancalan Bridge 02/25/09 V 57.031 720 O 0.352 0.240 0.150 0.030 0.061 0.033 86.60 -
CTC Builder and Supplies Incorporated
(Formerly: CTC Builder)12088 Concreting of Malbog-Siuton Road 05/22/09 V 4.704 120 C 0.401 0.133 0.300 - - - 83.40 *83.40%
Satisfactory
CTC Builder and Supplies Incorporated
(Formerly: CTC Builder)12088 Repair/Impv't. of Pawa River Control 04/14/11 V 1.829 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
CTC Builder and Supplies Incorporated
(Formerly: CTC Builder)12088 Repair/Impv't. of Tawog River
Control, Barangay Tawog 04/14/11 V 1.829 60 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
CTC Builder and Supplies Incorporated
(Formerly: CTC Builder)12088 Road Upgrading (Conc.) of Banuang-
Albay Bdry. Rd. 08/30/10 V 10.460 120 C 0.385 0.200 0.300 - - - 88.50 87.24% Satisfactory
CTC Builders & Supplies, Inc./Sunwest
Construction and Development
JV-06-070 Construction of Dancalan Bridge 02/15/10 V 57.031 720 C 0.441 0.133 0.300 - - - 87.40 86.03% Satisfactory
Currimao Integrated Builders and Const. 8738 Conc. of Pangil-Poblacion Farm-to-
Market Road, Brgy. Pangil 02/22/10 I 1.734 35 C 0.353 0.133 0.300 - - - 78.60 78.60% Unsatisfactory
D. C. E. Construction 29347 Conc. along Apayao-Ilocos Norte Road, Salongsong Sect. 04/01/11 CAR 18.565 436 C 0.453 0.133 0.300 - - - 88.60 89.02%
V. Satisfactory
D. C. E. Construction 29347 Conc. along Apayao-Ilocos Norte Road, Tanglagan Sect. 04/01/11 CAR 23.236 436 C 0.406 0.133 0.300 - - - 83.90 87.26%
Satisfactory
D.C.E Construction 29347Proposed Concreting along
Calanasan-Claveria Road, Poblacion Section
02/27/09 CAR 14.879 414 O 0.356 0.300 0.150 0.030 0.043 0.033 91.20 -
D.C.E Construction 29347Proposed Concreting along
Calanasan-Ilocos Norte Road, Tanglagan Section
02/18/10 CAR 14.116 418 C 0.457 0.133 0.300 - - - 89.00 89.96% V. Satisfactory
D.C.E Construction 29347 Const./Road Opening of Kabugao-Pudtol-Luna Road, Tawit Section 05/28/10 CAR 14.063 355 C 0.323 0.200 0.300 - - - 82.30 82.30%
Satisfactory
D.C.E. Construction 29347Road Upgrading of Rizal National
Road (Liwan-West Babalag-Macutay Section)
04/05/11 CAR 8.996 150 C 0.382 0.200 0.300 - - - 88.20 85.74% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page108
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
D.C.M Construction 5641
Completion of the Const. of Agus II Bridge (Pumping Bridge) &
Approaches, Phase II Raya Madaya-Pumping Road
09/13/09 X 22.952 2,868 O 0.383 0.185 0.150 0.030 0.051 0.033 83.20 -
D.C.M. Construction 5641Const. of Agus III (Pumping) Bridge & Approaches along Raya-Madaya
Pumping Road04/11/11 X 32.933 180 O 0.401 0.240 0.150 0.030 0.042 0.033 89.60 -
D.G Sarmenta Construction 13024 Rehab./Reconst. of Daang Maharlika
KO312+000-KO313+000 08/27/09 II 14.468 125 C 0.416 0.200 0.300 - - - 91.60 91.24% V. Satisfactory
D.G Sarmenta Construction 13024 Const. of Rural Health Center, Gen.
M. Natividad 02/25/10 III 1.427 90 C 0.480 0.133 0.300 - - - 91.30 87.52% Satisfactory
D.G Sarmenta Construction 13024 Road Conc. of Various Barangays 03/01/10 III 0.468 30 C 0.358 0.200 0.300 - - - 85.80 85.80%
Satisfactory
D.G Sarmenta Construction 13024 Const. of Drainage System at Gomez-
San Marcelino 06/04/10 III 3.907 90 C 0.389 0.133 0.300 - - - 82.20 82.20% Satisfactory
D.G Sarmenta Construction 13024
Asphalt Overlay of Marbel-Allah Valley-Cotabato Road, Km. 1781+000-
Km. 1784+000 w/ exception03/04/10 XII 14.371 110 C 0.414 0.200 0.300 - - - 91.40 91.40%
V. Satisfactory
D.G Sarmenta Construction 13024 Sumacab-San Josef-Bonifacio Road 06/01/09 III 22.195 43 C 0.373 0.200 0.300 - - - 87.30 *87.30%
Satisfactory
D.G Sarmenta Construction 13024 Const. of Multi-Purpose Bldg. at
Palayan Central School 03/04/09 III 3.121 90 C 0.425 0.174 0.300 - - - 89.90 *89.90%V. Satisfactory
D.G Sarmenta Construction 13024 Const. of Valdefuente-Fortaleza Rd.,
Km. 121+300 to Km. 125=750 03/04/09 III 28.378 300 C 0.096 0.200 0.300 - - - 59.60 *59.60%Poor
D.G Sarmenta Construction 13024 Const. of two (2) CL School Building
at Cabu E/S 09/05/09 III 1.240 60 C 0.472 0.133 0.300 - - - 90.50 *90.50% V. Satisfactory
D.G Sarmenta Construction 13024 Jct. Tablang-Gabaldon Road 09/10/09 III 38.600 120 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V. Satisfactory
D.G Sarmenta Construction 13024 Digmata Flood Control Pilot Project 09/07/09 III 8.170 90 C 0.333 0.200 0.300 - - - 83.30 *83.30%
Satisfactory
D.G. Chico Trading & Construction Corporation 8748 Const. of 4-Storey Sch. Bldg. at
Bagong Ilog E/S. Brgy. Bagong Ilog 04/05/11 NCR 11.374 180 C 0.477 0.095 0.300 - - - 87.20 *87.20% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page109
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
D.G.O Construction 6788 Reconst. along Baguio-Bontoc Road Km.252+414 - Km.262+000 04/13/11 CAR 5.537 120 C 0.445 0.133 0.300 - - - 87.80 *87.80%
Satisfactory
D.J.D. Construction 32217Rehab./Reconst./Upgrading of
Cagayan Valley Road (Magapit-Jct. Aparri Airport Sect.)
04/04/11 II 9.647 150 O 0.388 0.300 0.042 0.030 0.045 0.033 83.80 -
D.K Jocson Construction / TSD Builders Const.
and Supply JVJV-08-024 Conc. of Road along Bacolod North
Road (Toboso Section) 03/09/09 VIII 18.174 281 O 0.333 0.297 0.150 0.030 0.050 0.033 89.30 -
D.K Jocson Construction/TSD
Builders Construction and Supply Joint Venture
JV-09-120Conc. of Road along Bacolod North Road (Toboso Section) Km.110+620-
Km.112+097.5008/28/10 VI 18.174 281 C 0.317 0.200 0.300 - - - 81.70 86.26%
Satisfactory
D.K. Jocson Construction 6896
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Bacolod-San Carlos Road03/29/11 VI 18.893 205 C 0.429 0.133 0.300 - - - 86.20 86.68%
Satisfactory
D.K. Jocson Construction / TSD
Builders Construction and Supply (JV)
JV-09-120
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Bacolod North Road, Toboso Section
03/29/11 VI 37.696 220 C 0.417 0.135 0.300 - - - 85.20 86.82% Satisfactory
D.L Aureo Construction 24894 Const. of 1CL School Building @ Manlurip Primary School 03/01/10 VIII 0.623 45 C 0.475 0.092 0.300 - - - 86.70 86.70%
Satisfactory
D.L Aureo Construction 24894Rehab./Road Upgrading from Gravel to Concrete Pavement @ Tigbao-Sta.
Fe San Miguel Road09/08/10 VIII 5.505 90 C 0.353 0.200 0.300 - - - 85.30 85.30%
Satisfactory
D.L Aureo Construction 24894 Const. of River Control 08/23/10 VIII 0.482 60 C 0.414 0.133 0.300 - - - 84.70 84.70% Satisfactory
D.M Consunji, Inc. 101Opening/Conc. of Taguig Diversion Rd. (Linking Maestrang Pinang Gen.
Luna St. to C-5)02/25/10 NCR 9.271 1,081 C 0.410 0.133 0.300 - - - 84.30 84.30%
Satisfactory
D.M House Const. Inc. 25810Impvt./Rehab. of Roman Expressway, Bataan 1st Congressional District
05/28/10 III 53.666 90 O 0.386 0.240 0.150 0.030 0.043 0.033 88.20 -
D.M House Const. Inc. 25810Impv't. and Rehab. of Roman
Expressway, Bataan 1st Congressional Dist.
08/17/10 III 53.666 90 C 0.436 0.128 0.300 - - - 86.40 87.48% Satisfactory
D.M House Const. Inc. 25810
Asphalt Overlay/Concrete Reblocking along Manila North Road Intermittent Section (Km.
465+000-Km. 482+800
06/03/09 I 4.884 55 C 0.470 0.133 0.300 - - - 90.30 *90.30% V.Satisfactory
D.M House Const. Inc. 25810 Asphalt Overlay along Olongapo-Bungallon Road (100mm thickness) 03/02/09 III 6.945 30 C 0.423 0.133 0.300 - - - 85.60 *85.60%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page110
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
D.M House Const. Inc. 25810 Asphalt Overlay along Olongapo-Bungallon Road (80 mm thickness) 03/02/09 III 7.385 30 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
D.M House Const. Inc. 25810 Const. of Mulawin Tala Farm-to-Market Road 02/25/09 III 2.391 70 C 0.329 0.200 0.300 - - - 82.90 *82.90%
Satisfactory
D.M House Const. Inc. 25810 Improvement/Rehabilitation of Roman Expressway 05/21/09 III 71.955 150 O 0.378 0.300 0.150 0.030 0.037 0.050 94.50 -
D.M House Const. Inc. 25810 Imprvt./Rehab. of Roman Expressway 08/29/09 III 100.263 150 C 0.446 0.200 0.300 - - - 94.60 94.54%
V. Satisfactory
D.M House Const. Inc. 25810 Const./Completion of DPWH-Bataan 1st District Eng'g Office Bldg. 08/27/09 III 12.143 120 C 0.486 0.133 0.300 - - - 91.90 *91.90%
V. Satisfactory
D.M. House Construction, Inc. 25810 Const./Completion of DPWH-Bataan
1st DEO Bldg. 04/01/11 III 4.767 120 O 0.341 0.300 0.150 0.030 0.023 0.033 87.70 -
D.M. House Construction, Inc. 25810
Conc. Of Odiong Sibalom on Remegio Leon Rd., Km.114+220 -
Km.117+01604/06/11 VI 42.701 313 C 0.417 0.154 0.300 - - - 87.10 85.12%
Satisfactory
D.R Robles Construction 28559 Impvt. of Baybay Sapa Creek, Brgy. Mayamot 06/08/10 IVA 9.632 150 C 0.428 0.200 0.300 - - - 92.80 92.80%
V. Satisfactory
D.R Robles Construction 28559 Impvt. of Flood Control, So. Labangan, Brgy. Matambugan 03/13/09 IVA 1.730 120 C 0.472 0.133 0.300 - - - 90.50 *90.50%
V. Satisfactory
D.R Robles Construction 28559 Repair of Sch. Bldg. @ University of Rizal System 03/13/09 IVA 0.962 45 C 0.423 0.200 0.300 - - - 92.30 *92.30%
V. Satisfactory
D.R Robles Construction 28559 Rehab./Reconst./Upgrading of Antipolo-Teresa Road 08/26/09 IVA 19.207 180 C 0.460 0.200 0.300 - - - 96.00 91.68%
V. Satisfactory
D.R Robles Construction 28559 Repair & Impvt. of Brgy. San Guillermo Road 02/17/10 IVA 9.612 45 C 0.337 0.200 0.300 - - - 83.70 83.70%
Satisfactory
D.R Robles Construction 28559 Repair/Rehab. of MPB, Brgy. Western Bicutan 06/03/10 NCR 4.798 90 C 0.452 0.200 0.300 - - - 95.20 95.20%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page111
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
D.R Robles Construction 28559 Repair/Rehab. of Masambong H/S 08/31/10 NCR 2.503 90 C 0.462 0.133 0.300 - - - 89.50 89.50% V. Satisfactory
D.R. Robles Construction 28559 Widening of Angono Diversion Road 04/15/11 IVA 19.228 209 C 0.396 0.200 0.300 - - - 89.60 87.62% Satisfactory
Dalebo Construction & General Merchandise 32699 Repair/Rehab. of Academic and TLE
Building at Cavite Nat'l High School 03/01/10 IVA 1.169 60 C 0.404 0.200 0.300 - - - 90.40 90.40% V. Satisfactory
Damico Builders & Supplies 30355 Conc. of Road, Brgy. San Rafael 04/07/11 III 1.843 60 C 0.344 0.200 0.300 - - - 84.40 *84.40%
Satisfactory
Damico Builders & Supplies 30355 Rehab. of FMR at San Juan De
Valdez 02/24/10 III 0.477 30 C 0.363 0.200 0.300 - - - 86.30 86.30% Satisfactory
Damico Builders & Supplies 30355 Rehab. of FMR at San Agustin 02/24/10 III 0.716 45 C 0.359 0.200 0.300 - - - 85.90 85.90%
Satisfactory
Damico Builders & Supplies 30355 Conc. of Brgy. Rd., Brgy. Balibago II
(Phase I) 08/27/10 III 1.418 70 C 0.342 0.200 0.300 - - - 84.20 84.20% Satisfactory
Damico Builders & Supplies 30355 Concreting of Brgy. Road from Brgy.
San Agustin to Brgy. Bantog 09/02/09 III 1.687 87 O 0.365 0.240 0.150 0.030 0.047 0.033 86.50 -
Danvic Construction 24439Rehab./Impvt. of DPWH Davao City
1st DEO Bldg. inc. Employees Quarters
03/18/09 XI 7.560 198 C 0.493 0.200 0.300 - - 99.30 98.46% Outstanding
Danvic Construction 24439Improvement/ Rehab. for Package 1-
D Catalunan Grande Rd., Brgy. Catalunan Grande
09/17/09 XI 4.718 115 C 0.442 0.200 0.300 - - - 94.20 *94.20% V. Satisfactory
Danysons Construction 25452Road Upgrading of Ilagan-Delfin,
Albano-Mallig Road, Olango Manano Section
04/06/11 II 15.338 120 C 0.443 0.133 0.300 - - - 87.60 86.16% Satisfactory
Danysons Construction 25452 Rehab./Reconst./Upgrading of Gamu-Roxas Road, Roxas Section 04/06/11 II 9.646 180 O 0.358 0.244 0.150 0.030 0.042 0.033 85.70 -
Danysons Construction 25452Rehab./Reconst./ Upgrading of
Ilagan-Delfin Albano-Malig Road (Olango Sect.)
08/25/10 II 2.890 75 C 0.357 0.200 0.300 - - - 85.70 86.00% Satisfactory
Darynn Construction & Supply 22322 Const. of Hospital Building,
Provincial Hospital 04/02/11 XI 1.423 90 O 0.374 0.300 0.150 0.022 0.041 0.050 93.70 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page113
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Darynn Construction & Supply 22322
Construction of Drainage at R. Castillo National Road, Brgy. R.
Castillo03/08/10 XI 1.883 105 C 0.422 0.200 0.300 - - - 92.20 92.20%
V. Satisfactory
Darynn Construction & Supply 22322 Const. of Multi-Purpose Building @
Brgy. San Isidro 02/25/10 XI 2.861 110 C 0.463 0.133 0.300 - - - 89.60 89.60% V. Satisfactory
Darynn Construction & Supply 22322 Rehab./Impv't. of DPWH Davao del
Sur 1st DEO 08/27/10 XI 2.885 110 C 0.500 0.133 0.300 - - - 93.30 90.36% V. Satisfactory
Darynn Construction & Supply 22322 Const. of MPB at Bitaug 03/06/09 XI 1.714 110 C 0.450 0.200 0.300 - - - 95.00 86.46%
Satisfactory
Davao Concrete Products 12090 Const. of Drainage from Public Market to Municipal Road, Brgy. Pob. 04/07/11 XI 0.800 75 C 0.415 0.197 0.300 - - - 91.20 *91.20%
V. Satisfactory
Davao Concrete Products 12090Const./Rehab. of Sch. Bldg. (Const. of two (2) Storey Sch. Bldg.) Brgy.
Southern Davao04/11/11 XI 7.086 120 C 0.436 0.200 0.300 - - - 93.60 87.02%
Satisfactory
Davao Concrete Products 12090 Impvt./Conc. of Babak-Samal-Kaputian 02/27/10 XI 34.266 121 C 0.317 0.200 0.300 - - - 81.70 88.66%
Satisfactory
Davao Concrete Products 12090 Impvt./Conc. of Babak-Samal-Kaputian, Island Garden 06/02/09 XI 33.719 90 O 0.366 0.300 0.150 0.030 0.037 0.050 93.30 -
Davao Concrete Products 12090 Const. of Multi-Purpose Building, Muslim, Jama-a Brgy. Maputi 06/05/09 XI 0.352 60 C 0.497 0.121 0.300 - - - 91.80 *91.80%
V. Satisfactory
Davao Concrete Products 12090 Impvt./Conc. of Babak-Samal-Katipunan Road, Katipunan Section 03/13/09 XI 34.712 286 O 0.327 0.274 0.150 0.022 0.060 0.050 88.30 -
Davao Concrete Products 12090 Impv't/Conc. of Inawayan-Baracatan Road 03/02/09 XI 14.922 210 C 0.314 0.200 0.300 - - - 81.40 84.46%
Satisfactory
Davao Concrete Products 12090 Repair/Rehab. of MPB at Brgy. 76-A 03/18/09 XI 18.908 225 C 0.418 0.170 0.300 - - - 88.80 94.19% V. Satisfactory
Davao Concrete Products 12090
Road Upgrading ( Gravel to Paved) of Babak-Samal-Kaputian Road
Anonang Section Island Garden City of Samal
09/07/09 XI 5.775 60 C 0.476 0.151 0.300 - - - 92.70 93.48% V. Satisfactory
Davao Concrete Products 12090 Const. of Speech Laboratory Building Digos City NHS 09/05/09 XI 1.632 60 C 0.488 0.133 0.300 - - - 92.10 *92.10%
V. Satisfactory
Davao Concrete Products 12090
Impvt./Widening of Agusan-Davao Road (Daang Maharlika), Poblacion
Carmen and Poblacion Panabo Sections
09/08/09 XI 14.459 120 C 0.433 0.200 0.300 - - - 93.30 90.96% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page114
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Davao Concrete Products 12090Impvt./Conc. of Babak-Samal-
Katipunan Road (Km. 1522+100) Katipunan Section
09/08/09 XI 34.712 286 C 0.461 0.151 0.300 - - - 91.20 84.69% Satisfactory
Davao Contractor Development Cooperative
28542 Completion of unfinished work in the multi-purpose gynasium 08/12/09 DOST 2.374 - C 0.500 0.200 0.00 - - - 70.00 70.00%
Poor
Davao Contractors Development Cooperative
(DACODECO)
28542 Completion of Multi-Purpose Building @ Brgy. Limbaan 02/27/10 XI 1.082 60 C 0.434 0.200 0.300 - - - 93.40 93.40%
V. Satisfactory
Davao Contractors Development Cooperative
(DACODECO)
28542 Const. of MPB @ Purok 4, Bliss, Brgy. San Miguel 02/27/10 XI 2.359 90 C 0.470 0.133 0.300 - - - 90.30 90.30%
V. Satisfactory
Davao Contractors Development Cooperative
(DACODECO)
28542 Completion of Multi-Purpose Building, Brgy. Calumpang 03/11/10 XII 1.410 60 C 0.403 0.165 0.300 - - - 86.80 86.80%
Satisfactory
Davao Contractors Development Cooperative
(DACODECO)
28542 Const. of MPB Brgy. Linintian 03/02/10 XIII 0.369 88 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory
Davao Contractors Development Cooperative
(DACODECO)
28542Rehab./Impvt. of DPWH Davao del Norte DEO Bldg. inc. Employees
Quarters03/12/09 XI 9.642 280 C 0.478 0.146 0.300 - - - 92.40 90.44%
V. Satisfactory
Davao Contractors Development Cooperative
(DACODECO)
28542 Const. of MPB, Brgy. Mabini 03/14/09 XII 0.667 70 C 0.475 0.133 0.300 - - - 90.80 83.52% Satisfactory
Davao Engineers Contractors Cooperative
(DECC)30944 Concreting of Road @ Brgy. Tawan-
Tawan 05/25/09 XI 0.940 90 C 0.456 0.133 0.300 - - - 88.90 *88.90% Satisfactory
Davao Engineers Contractors Cooperative
(DECC)30944 Concreting of Road @ Brgy.
Balengaeng, Tugbok District 05/25/09 XI 0.938 90 C 0.422 0.133 0.300 - - - 85.50 *85.50% Satisfactory
Davao Engineers Contractors Cooperative
(DECC)30944 Completion of 4-CL, 2-Storey SB, @
E.B. Lopez NHS 09/01/09 XI 1.141 120 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory
Davao Engineers Contractors Cooperative
(DECC)30944 Const. of DPWH-DCSDEO Bldg.
including Employees Quarter, Mintal 09/01/09 XI 4.810 180 C 0.481 0.187 0.300 - - - 96.80 88.75% Satisfactory
Davao Engineers Contractors Cooperative
(DECK)30944 Construction of 3CL, 3-Storey at
Bangoy NHS 03/10/10 XI 3.362 115 C 0.470 0.133 0.300 - - - 90.30 92.54% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page115
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Davao Engineers Contractors Cooperative
(DECK)30944 Package C - Const. of Multi-Purpose
Building @ Brgy. Los Amigos 02/23/10 XI 0.975 150 C 0.436 0.133 0.300 - - - 86.90 86.90% Satisfactory
Davao Engineers Contractors Cooperative
(DECK)30944 Package B-Const. of Multi-Purpose
Building @ Brgy. Suawan 02/23/10 XI 2.263 150 C 0.414 0.133 0.300 - - - 84.70 84.70% Satisfactory
Davao Engineers Contractors Cooperative
(DECK)30944
Package 1) Installation of Transmission Pipes (WS) at Brgy. Marilog Proper, Marilog District
05/31/10 XI 1.411 120 C 0.488 0.133 0.300 - - - 92.10 92.10% V. Satisfactory
Davao Engineers Contractors Cooperative
(DECK)30944 Rehab./Impv't. of Davao-Cotabato
Rd. 08/23/10 XI 5.090 180 C 0.476 0.133 0.300 - - - 90.90 90.36% V. Satisfactory
Const. of Three (3) Storey, Nine (9) CL Sch. Bldg., Las Piñas Science
High School09/04/09 NCR 10.049 140 O 0.331 0.225 0.150 0.020 0.058 0.033 81.70 -
Davhez Trading and Construction 9833 Const. of MPB at Brgy. Ilaya and
Waste Management Facilities 09/02/10 NCR 0.970 206 C 0.465 0.133 0.300 - - - 89.80 89.80% V. Satisfactory
DCE Construction 29347 Conc. along Calanasan-Claveria Road, Poblacion Section 02/19/10 CAR 14.875 538 O 0.353 0.240 0.150 0.030 0.035 0.033 84.10 -
De Jesus Construction 11452 Const. of MPB at Carbon E/S (Phase I) 08/19/10 III 1.882 55 C 0.460 0.106 0.300 - - - 86.60 86.60%
Satisfactory
De Jesus Construction 11452 Concreting of Road, Sitio Bato-Bato and Malimatac, Brgy. Mabuco 08/27/09 III 0.475 60 C 0.394 0.133 0.300 - - - 82.70 *82.70%
Satisfactory
De La Cruz Construction and Supply 20775 Const. of Multi-Purpose Building at
Hibago Elementary School 03/02/10 V 3.342 120 C 0.459 0.154 0.300 - - - 91.30 91.30% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page116
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Deabsres Construction & Supply (Formerly:
Deabsres Sand & Gravel & Gen. Contr.)
10392 Rehab. of FMR @ Brgy. Diket to Brgy. Justo Abalos 04/14/11 I 0.699 36 C 0.428 0.133 0.300 - - - 86.10 *86.10%
Satisfactory
Dellosa Design-Build Services 11533 Additional Conc. of Road, Lagao-
Conel Rd. 04/14/11 XII 1.383 95 C 0.394 0.145 0.300 - - - 83.90 *83.90% Satisfactory
Digos Tesston Construction & Supplies 8921
Rehab./Reconst. of Damaged Paved National at Lipata, Surigao Del Norte-Davao City Highway through Marlika,
Daang Maharlika Rd. (Agusan to Davao Rd.) Ilang-Tibungco Sect.
06/17/10 XI 19.290 113 O 0.361 0.240 0.150 0.030 0.047 0.050 87.80 -
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921 Const. of Additional 2 Lanes along Davao-Cotabato Road (Bato Section) 04/02/11 XI 19.284 210 O 0.334 0.300 0.150 0.030 0.045 0.033 89.20 -
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921Conc. of Bansalan-Mt. Apo National
Park Road Mabunga-Buenavista Sect.
04/02/11 XI 9.907 237 C 0.354 0.200 0.300 - - - 85.40 86.42% Satisfactory
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921 Conc. of Bansalan-Mt. Apo National Park Road Managa-Pananag Sect. 04/02/11 XI 16.655 237 C 0.275 0.200 0.300 - - - 77.50 84.76%
Satisfactory
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921
Rehab./Reconst. Of Damaged Paved National Rd. at Lipata (Surigao del
Norte-Davao City) Highway Through Daang Maharlika Rd. (Agusan to Davao Rd.) Ilang-Tibungco Sect.
09/08/10 XI 19.290 128 C 0.392 0.200 0.300 - - - 89.20 88.36% Satisfactory
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921Rehab./Reconst. Of Damaged Paved
National Rds. at Davao Diversion Rd., Pangi Bangkal Sect.
09/09/10 XI 19.280 120 C 0.392 0.200 0.300 - - - 89.20 88.00% Satisfactory
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921Conc. Of Bansalan-Mt.Apo National
Park Road, Managa-Buenavista Section
08/27/10 XI 9.907 210 O 0.333 0.290 0.150 0.030 0.043 0.033 87.90 -
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921 Concreting of Roads at Package B-1 Brgy. 76-A, Candelaria St. 03/18/09 XI 0.956 120 C 0.380 0.200 0.300 - - - 88.00 *88.00%
Satisfactory
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921 Const./Completion of DPWH-DCSDEO Bldg., Tugbok District 03/02/09 XI 9.635 210 C 0.414 0.200 0.300 - - - 91.40 89.16%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page117
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Digos Tesston Construction & Supplies
(Formerly: ACT Constructuion)
8921 Raod Upgrading of Bansalan-Mt. Apo National Park Road 09/05/09 XI 24.104 175 C 0.482 0.133 0.300 - - - 91.50 90.78%
V. Satisfactory
Diplahan Commercial & Construction 32037 Rehab. of MPB (Covered Court) at
Poblacion, Diplahan 04/03/11 IX 0.934 120 C 0.473 0.133 0.300 - - - 90.60 *90.60% V. Satisfactory
Diplahan Commercial & Construction 32037 Rehab. of MPB at Poblacion
Malangas 09/06/10 IX 2.803 120 C 0.408 0.133 0.300 - - - 84.10 85.78% Satisfactory
E F C Enterprises 11795 Rehab./Reconstruction/Upgrading of Sen. Gil Puyat Avenue 06/03/09 NCR 9.593 45 C 0.492 0.200 0.300 - - - 99.20 *99.20%
Outstanding
E F C Enterprises 11795Rehab./Restoration of McKinley
Road (EDSA towards Global City) w/ exception
06/07/10 NCR 9.591 30 C 0.413 0.200 0.300 - - - 91.30 91.30% V. Satisfactory
E F C Enterprises 11795 Rehab./Reconst./Upgrading of Dr. A. Santos Ave. 09/01/10 NCR 19.147 40 C 0.409 0.133 0.300 - - - 84.20 84.20%
Satisfactory
E M L Construction & Trading 10151 Channel Impvt. @ Cataning River 04/02/11 III 9.480 115 O 0.338 0.240 0.150 0.030 0.029 0.050 83.70 -
E M L Construction & Trading 10151 Const. of FMR at Brgy. San Vicente 05/18/09 III 0.950 30 C 0.402 0.200 0.300 - - - 90.20 *90.20%
V. Satisfactory
E M L Construction & Trading 10151 Rehab/Improvement of Brgy. San
Matias 02/24/09 III 4.753 60 C 0.366 0.200 0.300 - - - 86.60 *86.60%Satisfactory
E M L Construction & Trading 10151 Rehab. of Angeles-Porac-
Floridablanca-Dinalupihan Road 08/24/09 III 19.053 100 C 0.463 0.123 0.300 - - - 88.60 86.08% Satisfactory
E M L Construction & Trading 10151 Rehab. of Gapan-San Fernando-
Olongapo Road 08/24/09 III 19.189 104 C 0.430 0.133 0.300 - - - 86.30 83.96% Satisfactory
E S De Guzman Construction 17494 Const. of San Pablo, Multi-Purpose
Building 03/03/10 II 0.469 40 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory
E S De Guzman Construction 17494 Construction of Multipurpose Bldg. 04/16/09 DOST 30.986 120 O 0.361 0.264 0.150 0.030 0.052 0.050 90.70 -
E, G & I Construction Corporation 16225 Const. of Female Dormitory
(Building) 07/28/11 DOST 14.072 270 C 0.470 0.200 0.300 - - - 97.00 94.27% V. Satisfactory
E,G & I Construction 16225 Constrution of Perimeter Fence 04/07/10 DOST 10.230 300 C 0.4952 0.20 0.30 - - - 99.52 97.05% Outstanding
E. Garcia Construction & E. Garcia Gravel & Sand 7243
Impv't./Conc. of Digdigon (GOA)-Tinambac Road (Balynan-Payatan-
Lupi-Tierra Nevada-Binalay Section)04/09/11 V 47.382 310 C 0.441 0.133 0.300 - - - 87.40 89.23%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page128
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Conc. of Road, Dalipay-
Mayaopayawan San Antonio Road 04/04/10 V 9.187 240 C 0.445 0.133 0.300 - - - 87.80 *87.80% Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Conc. of Sagrada to San Jose Rd. 08/31/10 V 9.430 210 C 0.397 0.200 0.300 - - - 89.70 89.70%
V. Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Road Concreting of Zone 3 and Zone
4, Brgy. Malinao 03/09/09 V 0.946 120 C 0.432 0.200 0.300 - - - 93.20 *93.20% V. Satisfactory
E. Garcia Construction & E. Garcia Gravel &
Sand/HGG Builders & Supply (J.V.)
JV-08-311 Conc. of San Isidro-Bahao Road 06/08/10 V 37.827 385 C 0.368 0.200 0.300 - - - 86.80 86.44% Satisfactory
E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 11/06/09 DOTC 43.333 150 C 0.404 0.200 0.300 - - - 90.40 90.40%
V. Satisfactory
E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 11/06/09 DOTC 67.456 180 C 0.470 0.200 0.300 - - - 97.00 97.00%
Outstanding
E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 11/06/09 DOTC 14.421 90 C 0.478 0.200 0.300 - - - 97.80 97.80%
Outstanding
E. Garcia Construction and E. Garcia Gravel 7243
Naga Airport Development Project (Asphalt Overlay of Runway, Two-
Stub Taxiway and Vehicular Parking Area)
6/30/2010 DOTC 28.830 120 C 0.448 0.200 0.300 - - - 94.80 94.80% V. Satisfactory
E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 03/07/09 PMS 43.333 150 O 0.373 0.300 0.150 0.020 0.063 0.050 95.60 -
E. Gardiola Construction 17542Rehab. of Calbayog-Catbalogan Road, Km.751+400 - Km.753+500
with exception04/02/11 VIII 19.290 30 C 0.472 0.133 0.300 - - - 90.50 *90.50%
V. Satisfactory
E. Gardiola Construction 17542Rehab. of Calbayog-Catbalogan Road, Km.753+510 - Km.755+500
with exception04/02/11 VIII 14.467 30 C 0.442 0.133 0.300 - - - 87.50 *87.50%
Satisfactory
E. Gardiola Construction 17542
Impvt./Rehab. (Asphalt Overlay) along Jct. MSR, Daang Maharlika Rd.
Km.121+896 - Km.124+650, with exception
05/28/10 IVA 19.299 40 C 0.477 0.133 0.300 - - - 91.00 91.00% V. Satisfactory
E. Gardiola Construction 17542Impvt./Rehab. of Tayabas-Mainit-
E.A Sancho Construction 5648 Road Opening/Impvt. of Gov. Felix O. Alfelor Highway 06/03/10 V 9.554 80 C 0.480 0.133 0.300 - - - 91.30 91.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page131
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.A Sancho Construction 5648 Impvt./Conc. Of Tabgon-Maysalay Road KO 502+400 - KO 504+476 06/04/10 V 14.142 150 O 0.301 0.293 0.150 0.030 0.035 0.033 84.20 -
E.A Sancho Construction 5648 Impv't./Conc. of Maysalay-Lamon Rd. 08/25/10 V 14.147 168 O 0.345 0.300 0.150 0.030 0.055 0.033 91.30 -
E.A Sancho Construction 5648 Impvt.(Conc.) of Cagliling-Matang-Buenavista-Union-Salvacion Road 03/10/09 V 3.791 151 C 0.444 0.133 0.300 - - - 87.70 83.08%
Satisfactory
E.A Sancho Construction 5648
Impvt. of Jct. Binalay (Tinambac)-Tamban Road (Olag-Pequeno-
Antipolo-Bataan-Banga Section) Km. 514+255-Km. 526+024 w/ exceptions
09/10/09 V 18.817 210 C 0.394 0.192 0.300 - - - 88.60 88.06% Satisfactory
E.A Sancho Construction 5648
Impvt. of Tinambac-Siruma Road (Salvacion-San Roque-San Ramon Section) Km. 515+615-Km. 550+510
w/ exception
03/01/10 V 18.817 210 C 0.403 0.133 0.300 - - - 83.60 87.32% Satisfactory
E.A. Sancho Construction 5648 Impv't./Conc. Of Maysalay-Lamon
Road 04/09/11 V 14.147 168 C 0.424 0.133 0.300 - - - 85.70 89.06% V. Satisfactory
E.A. Sancho Construction 5648 Impv't./Conc. Of Lamon-Pinamihagan
Road 04/09/11 V 14.146 168 C 0.374 0.200 0.300 - - - 87.40 87.55% Satisfactory
E.A. Sancho Construction 5648 Impv't./Conc. Of Tabgon-Maysalay
Road 04/09/11 V 14.142 168 C 0.426 0.133 0.300 - - - 85.90 86.50% Satisfactory
E.A. Sancho Construction 5648 Conc. of Iriga City-Masoli Road 04/06/11 V 24.651 215 C 0.389 0.133 0.300 - - - 82.20 83.88%
Satisfactory
E.A. Unabia Construction 29305 Const. of MPB Malama 04/02/11 CAR 2.841 180 C 0.491 0.200 0.000 - - - 69.10 80.93% Unsatisfactory
E.B.A Construction 6210 UP OU Centennial Center for Digital Learning 07/20/09 U.P. 12.948 60 O 0.361 0.261 0.150 0.020 0.020 0.050 86.20 -
E.B.J.R. Construction / PBO Construction (JV) JV-09-131 Road Upgrading (Gravel to Concrete)
Abbut-Conner Kabugao 04/04/11 CAR 22.951 388 C 0.409 0.133 0.300 - - - 84.20 86.30% Satisfactory
E.C De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906 CP IV, Gatanguit-Calbiga Road Sect.
Phase VI 12/03/08 PJHL 1,466.751 1,080 O 0.350 0.300 0.100 0.030 0.065 0.100 94.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page132
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.C De Luna Construction Corporation 11906
Marikina-Infanta Road Project, Km. 91+910-Km. 120+925 under SONA
Projects in Luzon Beltway03/05/10 PJHL 1,915.106 720 O 0.368 0.300 0.150 0.030 0.056 0.050 95.40 -
E.C De Luna Construction Corporation (Formerly: E.C De Luna
Const.)
11906
Const. of El Nido-Bataraza Rd. CP-3B-1 Puerto Prinsesa-Aborlan Abo-abo
E.D Angas Construction 32106Const./Cont. of 2 Classroom, 2
Storey (7mx8m) School Building At Junob National High School
09/13/09 VII 1.199 85 C 0.485 0.133 0.300 - - - 91.80 *91.80% V. Satisfactory
E.D Angas Construction 32106 Const. of 1 unit, 1-CL School Building at Candigum P/S 09/07/09 VII 0.507 60 C 0.461 0.142 0.300 - - - 90.30 *90.30%
V. Satisfactory
E.D Angas Construction 32106 Const./Completion of MPB (Phase II) Parian 06/07/10 VII 1.230 150 C 0.406 0.200 0.300 - - - 90.60 90.60%
V. Satisfactory
E.D Angas Construction 32106Rehab./Impvt. of Sitio Ilihan
Simacolong Lazi to Sitio Tunga Minalulan Rd.
06/07/10 VII 1.928 180 C 0.368 0.188 0.300 - - - 85.60 85.60% Satisfactory
E.D Angas Construction 32106Const. of 7m x 18m (2CL) SB @ Jose
B. Cardenas MHS (Canlaon City NHS)
09/06/10 VII 1.040 90 C 0.469 0.133 0.300 - - - 90.20 90.20% V. Satisfactory
E.D Angas Construction 32106 Completion of Multi-Purpose Building (Phase II) 03/10/09 VII 0.703 75 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V. Satisfactory
E.D Angas Construction 32106 Const. of Drainage Facility along Siquijor Circumferential Road 03/10/09 VII 3.816 227 C 0.429 0.200 0.300 - - - 92.90 78.06%
Unsatisfactory
E.D Denosta Construction & Supply 28166 Const. of 2-CL Building at Villafont
E/S 09/02/09 VI 1.039 90 C 0.494 0.109 0.300 - - - 90.30 *90.30% V. Satisfactory
E.D Solano Construction & Engineering Services 14758 Construction of Multi-Purpose
Building 03/09/09 I 0.723 30 C 0.477 0.133 0.300 - - - 91.00 *91.00%V. Satisfactory
E.D Tabangay Consruction 31978 Const. of 1-School Building @
E.M Angeles Enterprises 10150 Widening of CAA Road Including Installation of Drainage System 09/04/09 NCR 19.089 100 C 0.446 0.133 0.300 - - - 87.90 88.98%
Satisfactory
E.M Angeles Enterprises 10150 Const. of Multi-Purpose Pavement at Lakeview E/S 02/18/10 NCR 4.762 60 C 0.495 0.133 0.300 - - - 92.80 88.66%
Satisfactory
E.M Angeles Enterprises 10150 Const. of Multi-Purpose Pavement @ Bayanan Elem. School Main 06/08/10 NCR 5.239 86 C 0.494 0.133 0.300 - - - 92.70 86.52%
Satisfactory
E.M Angeles Enterprises 10150Reconst./Upgrading of MSR-Quirino from Alido Bridge towards Zapote-
Alabang Roads at Brgy. Zapote09/02/10 NCR 9.649 75 C 0.409 0.133 0.300 - - - 84.20 84.20%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page135
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.M Aragon Enterprises 3314Const. (Conc.) /Widening of
EA-EC Construction 15737 Const. of 2-Classroom S/B San Antonio HS 04/06/11 V 1.015 45 C 0.415 0.133 0.300 - - - 84.80 84.10%
Satisfactory
EA-EC Construction 15737 Road Conc., Sta. Cruz-Maliban 06/02/10 V 0.483 60 C 0.419 0.133 0.300 - - - 85.20 85.20% Satisfactory
EA-EC Construction 15737 Const. of Classroom S/B Catasan E/S 08/23/10 V 0.540 90 O 0.337 0.300 0.150 0.030 0.029 0.033 87.90 -
EA-EC Construction 15737 Rehabilitation of Santiago-Sagrada Road 05/29/09 V 0.382 60 C 0.357 0.200 0.300 - - - 85.70 *85.70%
Satisfactory
EA-EC Constuction 15737 Construction of Camp Elias Angeles MPB 03/09/09 V 2.405 90 C 0.483 0.133 0.300 - - - 91.60 *91.60%
V. Satisfactory
Earl Construction 8461 Const./Impvt. of MPB II 08/19/10 IVA 19.237 180 C 0.466 0.145 0.300 - - - 91.10 93.69% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page141
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Early Riser Construction 33960 Rehailitation of Jalaur Proper River Irrigation System 01/10-15/2011 NIA 1.991 120 C 0.4220 0.1333 0.3000 - - - 85.53 85.53%
Satisfactory
Earth Movers Construction 27145 San Antonio Airport Development
Project 05/29/09 DOTC 2.870 90 C 0.413 0.200 0.300 - - - 91.30 91.30% V. Satisfactory
East Asia Construction Inc. 4904 Const./Rehab./Repair of Zaldivar
Road @ Brgy. Zaldivar 03/11/09 VI 1.525 60 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
East Asia Construction, Inc. 1904
Rehab. (Impvt./Asphalt Overlay) along Bacolod-Granada City Bdry.
Rd., Burgos St.03/29/11 VI 9.498 20 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
East Asia Construction, Inc. 1904
Repair/Rehab. of Guimaras Circumferential Rd., Nueva Valencia
to Jordan Rd. Km. 108+759 with exception
02/22/10 VI 10.273 120 C 0.458 0.200 0.300 - - - 95.80 95.80% V. Satisfactory
East Asia Construction, Inc. 1904 Completion of Multi-Purpose
Building (Justice Hall) 02/22/10 VI 3.748 200 C 0.423 0.200 0.300 - - - 92.30 84.53% Satisfactory
East Asia Construction, Inc. 1904 Construction of Guimaras District
Engineering Office, San Miguel 06/01/09 VI 2.846 90 C 0.440 0.200 0.300 - - - 94.00 *94.00% V. Satisfactory
East Asia Construction, Inc. 1904 Rehab./Reconst. of Balasan-Carles
Road (Asphalt Overlay) 09/06/10 VI 28.318 90 C 0.482 0.133 0.300 - - - 91.50 91.50% V. Satisfactory
East Asia Construction, Inc. 1904
Conc. of Barotac Nuevo-Dumangas-Dacutan Wharf Road, Barotac Nuevo-
Dumangas, Km. 273+237 - Km. 286+602 with exception
09/05/10 VI 8.685 150 C 0.408 0.133 0.300 - - - 84.10 84.10% Satisfactory
Eastern Pacific Construction 32157 Repair/Rehab. of Lawaan River
Control, Brgy. Lawaan 06/11/10 VIII 4.670 120 C 0.434 0.186 0.300 - - - 92.00 92.00% V. Satisfactory
EC Samonte Construction 31019 Proposed Road/Upgrading (Gravel to
Concrete) Lamao Port 04/01/11 IX 2.876 46 C 0.454 0.135 0.300 - - - 88.90 *88.90% Satisfactory
EC Samonte Construction 31019 Const. of MPB (Phase II) at JRMSU 04/01/11 IX 1.680 166 C 0.444 0.133 0.300 - - - 87.70 *87.70%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page142
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
EC Samonte Construction 31019 Const. of MPB (Three Storey Multi-
Purpose Cooperative Bldg.) 04/01/11 IX 1.675 150 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
EC Samonte Construction 7040 Const. of Break Water at
Malintuboan 04/01/11 IX 2.646 188 C 0.366 0.200 0.300 - - - 86.60 *86.60% Satisfactory
EC Samonte Construction 31019 Const. of Tilubog E/S 1 unit (2)
Classroom School Building 03/03/10 IX 0.929 60 C 0.367 0.200 0.300 - - - 86.70 86.70% Satisfactory
EC Samonte Construction 31019 Rehab. of Brgy. Rd./Spillway at Brgy.
Panganuran 06/04/10 IX 1.844 130 C 0.444 0.133 0.300 - - - 87.70 87.70% Satisfactory
EC Samonte Construction 31019
Proposed Const. of MPB for National Commission on Indigenous People
(NCIP)09/02/10 IX 1.445 90 C 0.447 0.133 0.300 - - - 88.00 85.13%
Satisfactory
EC Samonte Construction 31019 Concreting of Pathway Liloy Central
School 06/01/09 IX 0.962 88 O 0.387 0.240 0.150 0.030 0.047 0.050 90.40 -
EC Samonte Construction 31019
Const. of Liloy-Siocon Dansalan-Lopoc, Km. 1982+123.50-
Km.1983+39006/01/09 IX 28.654 314 C 0.495 0.133 0.300 - - - 92.80 87.49%
Satisfactory
EC Samonte Construction 31019 Const. of Liloy-Siocon Road,
Dansalan-Lopoc 03/09/09 IX 28.654 311 O 0.369 0.281 0.150 0.030 0.035 0.050 91.50 -
EC Samonte Construction 31019 Proposed/Impvt. of Multi-Purpose
Building (Gym), Kalawit 09/08/09 IX 1.445 70 C 0.457 0.200 0.300 - - - 95.70 *95.70% V. Satisfactory
EC Samonte Construction 31019
Const. of MPB at Jose Rizal Memorial State College (Covered
Court)09/08/09 IX 1.927 100 C 0.435 0.200 0.300 - - - 93.50 *93.50%
V. Satisfactory
EC Samonte Construction 31019 Concreting of Pathway Liloy Central
School 09/08/09 IX 0.962 98 C 0.429 0.200 0.300 - - - 92.90 91.40% V. Satisfactory
EC Samonte Construction 31019
Impvt./Rehab. of Farm-to-Market Road at Sarawagan Godod
(Guisapong-Rambon-Dipopor Road)09/08/09 IX 4.815 110 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
ECS Const. & Traffic Supply Enterprises, Inc. 33620
Rehab. (Slope Protection) along Teresa-Morong Rd. Teresa Bridge,
Ed Fabro Construction 18726 Const. of Sch. Bldg. at North Central School DepEd, Brgy. Tanqui 03/29/11 I 0.968 90 C 0.451 0.163 0.300 - - - 91.40 *91.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page143
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ed Fabro Construction 18726 Const. of Women's Center at Camp Diego Silang 03/29/11 I 0.488 80 C 0.416 0.200 0.300 - - - 91.60 86.56%
Satisfactory
Ed Fabro Construction 18726 Conc. of Poblacion Drainage Canal 03/29/11 I 0.922 60 C 0.333 0.200 0.300 - - - 83.30 *83.30% Satisfactory
Ed Fabro Construction 18726 Construction of Multi-Purpose Building 09/02/09 I 1.882 90 C 0.474 0.200 0.300 - - - 97.40 87.81%
Satisfactory
Ed Fabro Construction 18726 Improvement of MPB 02/26/10 I 0.976 90 C 0.469 0.133 0.300 - - - 90.20 90.20% V. Satisfactory
Ed Fabro Construction 18726 Rehab. of Rizal Avenue 05/25/10 I 0.973 58 C 0.356 0.200 0.300 - - - 85.60 85.60% Satisfactory
Ed Fabro Construction 18726 Const. of 2-Classroom @ La Union National High School 05/27/09 I 1.143 80 C 0.492 0.163 0.300 - - - 95.50 *95.50%
V.Satisfactory
Ed Fabro Construction 18726Rehabilitation of Multi-Purpose
Pavement at PNR Biday-Mameltac and Bangbangolan
02/24/09 I 1.882 120 C 0.345 0.200 0.300 - - - 84.50 83.48%Satisfactory
Edanna Construction 25492 Road Upgrading (Gravel to Paved) Cebu Transcentral (Road Slip) 04/14/11 VII 19.287 200 C 0.421 0.133 0.300 - - - 85.40 88.46%
Satisfactory
Edanna Construction 25492 Road Conc. from Brgy. Guba to Brgy. Sirao 04/14/11 VII 6.180 119 C 0.353 0.200 0.300 - - - 85.30 *85.30%
Satisfactory
Edanna Construction 25492 Completion of MPB, Oac, Canhayupon and Malijao, Dimiao 06/02/10 VII 0.488 93 C 0.345 0.200 0.300 - - - 84.50 84.50%
Satisfactory
Eddie G. Guillen Builders 14174 Const. of Regional Center Road Network 04/03/11 II 42.446 322 C 0.480 0.133 0.300 - - - 91.30 90.37%
V. Satisfactory
Eddie G. Guillen Builders 14174 Reblocking of Cagayan Valley Road (Magupit Junction Aparri Section) 09/09/09 II 16.402 180 C 0.411 0.200 0.300 - - - 91.10 88.76%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page144
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Eddie G. Guillen Builders 14174 Restoration of Collapsed Revetment at Sapping River Control 05/26/10 II 13.356 360 C 0.431 0.133 0.300 - - - 86.40 86.40%
Satisfactory
Eddie G. Guillen Builders 14174 Conc. along Kabugao-Pudtol-Luna Road, Kapanikian Section 02/18/10 CAR 9.338 277 C 0.383 0.139 0.300 - - - 82.20 84.54%
Satisfactory
Eddie G. Guillen Builders 14174Concrete Reblocking at KO 571+000 -
KO 585+000, along Dugo-San Vicente Road
05/20/09 II 14.215 210 C 0.482 0.133 0.300 - - - 91.50 87.51% Satisfactory
Eddmari Const. & Trading / Cholo Const. &
Trading (JV) JV-07-091 Candaba-San Miguel Road 02/24/09 III 25.964 234 O 0.335 0.300 0.150 0.030 0.042 0.050 90.70 -
Eddmari Const./Christian Ian Corp. Joint Venture JV-07-133 Upgrading/Concreting of Tulaoc-Sto.
Domingo Road (San Simon Section) 06/05/09 III 91.773 230 C 0.307 0.200 0.300 - - - 80.70 87.48% Satisfactory
Eddmari Construction & Trading 20301
Construction of 4 Units Health/Day Care Center and 2 Units Police
Center, NV 3, 4A,4B and 5A06/04/10 NHA 8.989 90 O 0.40 0.30 0.15 0.026 0.051 0.05 97.70 -
Eddmari Construction & Trading 20301 Construction of 1-Unit Health/Day
Care Center 06/04/10 NHA 1.998 90 O 0.40 0.30 0.150 0.024 0.049 0.05 97.30 -
Eddmari Construction & Trading 20301 Construction of 1-Unit Police Center 06/04/10 NHA 0.498 90 O 0.40 0.30 0.15 0.024 0.049 0.050 97.30 -
Eddmari Construction and Trading 20301
Rehab./Reconst./Upgrading of Damaged Paved along Baliwag-
Candaba-Sta. Ana Road03/28/11 III 14.293 120 C 0.351 0.174 0.300 - - - 82.50 83.46%
Satisfactory
Eddmari Construction and Trading 20301
Rehab./Reconst./Upgrading of Damaged Pavement at Candaba-San
Miguel Road02/15/10 III 19.030 104 C 0.423 0.200 0.300 - - - 92.30 92.30%
V. Satisfactory
Eddmari Construction and Trading 20301 Slope Protection Works along Sta.
Ana-Candaba Road 02/15/10 III 4.777 30 C 0.470 0.133 0.300 - - - 90.30 90.30% V. Satisfactory
Eddmari Construction and Trading 20301
Rehab./Reconst./Upgrading of Damaged Paved along Apalit-
Macabebe-Masantol Rd.08/31/10 III 14.295 120 C 0.382 0.200 0.300 - - - 88.20 88.20%
Satisfactory
Eddmari Construction and Trading 20301 Conc. of Brgy. Road at Sta. Monica 08/31/10 III 0.951 45 C 0.347 0.200 0.300 - - - 84.70 84.70%
Satisfactory
Eddmari Construction and Trading 20301
Rehab./Reconst./Upgrading of Damaged Paved along San Vicente
Rd.08/31/10 III 14.286 120 C 0.371 0.200 0.300 - - - 87.10 84.16%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page145
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Eddmari Construction and Trading 20301 Const./Repair/Completion of Multi-
Purpose Building, Bebe Anac 05/19/09 III 0.571 40 C 0.477 0.200 0.300 - - - 97.70 *97.70% Outstanding
Eddmari Construction and Trading 20301 Candaba-San Miguel Road 02/24/09 III 45.764 193 O 0.379 0.299 0.150 0.030 0.037 0.050 94.50 -
Eddmari Construction and Trading 20301 Const/Conc./Rehab/Completion of
San Gabriel Multi-Purpose Bldg. 08/24/09 III 0.667 45 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory
Eddmari Construction and Trading/Cholo
Const. & Trading (JV) JV-07-091 Candaba-San Miguel Road 02/15/10 III 25.794 234 C 0.427 0.200 0.300 - - - 92.70 91.50%
V. Satisfactory
Edelsons Builders, Inc. 24826 Conc. of Purok 4 Rd. Brgy. Ithan 06/07/10 IVA 2.400 90 C 0.377 0.200 0.300 - - - 87.70 87.70% Satisfactory
Edelsons Builders, Inc. 24826 Asphalting/Concrete Blocking of Del Monte Avenue 06/01/09 NCR 9.550 90 C 0.489 0.133 0.300 - - - 92.20 *92.20%
V. Satisfactory
Edelsons Builders, Inc. 24826 Asphalt Overlay/Conc. Reblocking at Tandang Sora Ave. 03/09/09 NCR 9.600 60 C 0.345 0.200 0.300 - - - 84.50 *84.50%
Satisfactory
Edelsons Builders, Inc. 24826Rehab./Reconst./Upgrading of
Damaged Paved National Roads, General Luis Street
06/04/10 NCR 9.549 60 C 0.457 0.200 0.300 - - - 95.70 95.70% V. Satisfactory
Eden Construction 13072 Const. of Drainage System at Brgy. Aguinaldo 06/04/10 III 1.897 90 C 0.444 0.133 0.300 - - - 87.70 95.70%
V. Satisfactory
EDT Construction 10225 Restoration of Slope Protection at Pentor Balsik River 02/24/09 III 0.951 60 C 0.350 0.200 0.300 - - - 85.00 *85.00%
Satisfactory
EFC Enterprises 11795 Const. of Bridge at Brgy. Talon 1 (Phase I) 09/04/09 NCR 3.841 61 C 0.409 0.133 0.300 - - - 84.20 *84.20%
Satisfactory
EFC Enterprises 11795Asphalt Overlay along Gil Puyat Ave. East Bound (Phase II) EDSA to Ayala
with exception02/17/10 NCR 9.591 30 C 0.445 0.133 0.300 - - - 87.80 87.80%
Satisfactory
EFC Enterprises / B.M.K. Construction (JV) JV-08-321 Const./Widening of Katihan/NBP
Bridge SLEX, Brgy. Poblacion 09/02/10 NCR 21.229 104 C 0.465 0.133 0.300 - - - 89.80 89.80% V. Satisfactory
EGB Construction 13722Rehab./Reconst./Upgrading of
Santiago-Tuguegarao Road, Roma Norte Section
03/28/11 II 38.630 210 C 0.402 0.185 0.300 - - - 88.70 *88.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page146
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
EGB Construction 13722
Rehab./Reconst./Upgrading of Damaged Paved National Roads, CAR, Sampaguita-Solano Section
KO502+000-KO503+600
09/10/09 II 19.285 146 C 0.471 0.200 0.300 - - - 97.10 93.68% V. Satisfactory
EGB Construction 13722 Concreting of Jct. National to Sta. Victoria Road 09/05/09 II 22.144 120 C 0.434 0.200 0.300 - - - 93.40 91.84%
V. Satisfactory
EGB Construction 13722 Conc. of Jct. National to Sta.Victoria Rd. 05/29/10 II 3.276 60 C 0.464 0.143 0.300 - - - 90.70 90.70%
V. Satisfactory
EGB Construction 13722 Conc. of Ilagan-Bigao-Palanan Rd. 05/29/10 II 14.475 110 O 0.380 0.240 0.150 0.030 0.056 0.033 88.90 -
EGB Construction 13722 Const./Impvt. of Public Market 05/28/10 II 2.406 120 O 0.378 0.240 0.150 0.030 0.051 0.033 88.20 -
EGB Construction 13722 Conc. of Ilagan-Bigao-Palanan Road 08/22/10 II 14.475 110 C 0.398 0.200 0.300 - - - 89.80 89.26% V. Satisfactory
EGB Construction 13722 Const./Impv't. of Public Market 08/20/10 II 2.406 140 C 0.430 0.150 0.300 - - - 88.00 88.12% Satisfactory
EGB Construction 13722 Const. of Aggasian Flood Control along Pinacanauan River (Phase II) 08/22/10 II 14.469 120 C 0.400 0.150 0.300 - - - 85.00 85.00%
Satisfactory
EGB Construction 13722 Rehab./Concreting of San Antonio-Cabisera Road 05/22/09 II 4.673 120 C 0.439 0.200 0.300 - - - 93.90 91.92%
V. Satisfactory
EGB Construction 13722 Rehab/Recons. of Damaged National Road 02/27/09 II 19.132 288 C 0.429 0.200 0.300 - - - 92.90 85.58%
Satisfactory
EGB Construction 13722 Conc. of Jct. Nat'l to Sta. Victoria Road 08/13/08 II 13.098 90 C 0.306 0.294 0.300 - - - 90.00 88.68%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page147
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
EGB Construction 13722 Const. of MPB 08/26/08 II 1.923 200 C 0.378 0.248 0.300 - - - 92.60 87.56% V. Satisfactory
Eirish Builders & Supply Co. 33656
Const. of MP Bldg. Nabaong Garlang Elementary School, Brgy. Nabaong
Garlang08/27/10 III 1.272 70 C 0.481 0.121 0.300 - - - 90.20 90.20%
V. Satisfactory
EJR Builders & Construction Supply 24255 Construction of School Building
(Phase I) at Ranao NHS 03/11/09 I 0.507 40 C 0.389 0.200 0.300 - - - 88.90 *88.90%Satisfactory
EJR Builders and Construction Supply 24255 Const. of MPB @ Maliga E/S 03/04/10 I 0.387 37 C 0.466 0.133 0.300 - - - 89.90 89.90%
V. Satisfactory
EJR Builders and Construction Supply 24255 Const. of MPB at Inerangan NHS 06/09/10 I 0.436 30 C 0.389 0.133 0.300 - - - 82.20 82.20%
Satisfactory
El Kapitan Construction Service 33123 Const./Conc./Rehab./Completion of
Sto. Tomas Multi-purpose Bldg. 08/24/09 III 0.475 35 O 0.356 0.240 0.150 0.030 0.051 0.050 87.70 -
El Kapitan Construction Services 33123 Rehab./Impvt. of San Agustin Road 08/24/09 III 3.327 40 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
El Nido Construction And Trading 25814 Basey Irrigation Project 09/05/10 NIA 8.673 105 C 0.458 0.165 0.300 - - - 92.30 92.30%
V. Satisfactory
Eldico Builders 26601 Improvement/Rehab. of Anao-San Pablo FMR 02/24/09 III 2.852 25 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
Eleazar V. Adlawan Construction 576 Rehab., Reconst. of Natalio Bacalso
Avenue, Carcar-Sibonga Section 06/01/09 VII 9.647 35 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Elkankonstrak Development
Corporation (Formerly: Elkan Konstrak &
Aggregates)
26220 Const. of 1 unit-CL SB (7.0 x 9.0) at Maysua High School 03/30/11 V 0.579 90 C 0.425 0.133 0.300 - - - 85.80 *85.80%
Satisfactory
Enrique A. Flores Contractor 2421 Rehab./Conc. Of Road of SLU-SVP
Brgy. 03/03/10 CAR 1.446 30 C 0.357 0.200 0.300 - - - 85.70 85.70% Satisfactory
EPN Builders & Developers 30341 Const. of One (1) CL SB, Gomez
Primary School 09/03/09 II 0.484 60 C 0.358 0.200 0.300 - - - 85.80 *85.80% Satisfactory
EPN Builders & Developers 30341 Const. of One (1) CL School Building
(7m x 7m) at Maligaya E/S 02/22/10 II 0.499 60 C 0.441 0.123 0.300 - - - 86.40 86.40% Satisfactory
EPN Builders & Developers 30341 Const./Repair of Multi-Purpose
Building 02/25/10 II 1.350 60 C 0.430 0.133 0.300 - - - 86.30 86.30% Satisfactory
EPN Builders and Developers 30341 Completion of Multi-Purpose
Building 03/06/09 II 1.491 60 C 0.417 0.200 0.300 - - - 91.70 *91.70% V.Satisfactory
Equilibrium Engineering 13606 Concreting of Access Road (Shouldering) Daet-Mercedes Road 06/04/09 V 2.820 150 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page148
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Equi-Parco / Adfil Joint Venture JV-09-023 Conc.-Impvt. of Tiniwisan-Maguinda
Road (Lemon-Pigdaulan Sect.) 04/15/11 XIII 335.031 540 C 0.401 0.200 0.300 - - - 90.10 90.43% V. Satisfactory
Equi-Parco Construction 14332Rehab./Reconst. of Butuan City-Cagayan de Oro City-Iligan City
(BCIR) Road09/08/10 X 474.723 360 C 0.426 0.200 0.300 - - - 92.60 92.60%
V. Satisfactory
Equi-Parco Construction 14332 Asphalt Overlay along Butuan City-Masao Port Rd. 03/10/10 XIII 8.640 90 C 0.488 0.133 0.300 - - - 92.10 92.10%
V.Satisfactory
Equi-Parco Construction 14332Asphalt Overlay along Agusan-Misamis Rd. Carmen-Tagcatong
Section02/22/10 XIII 18.528 75 C 0.479 0.133 0.300 - - - 91.20 91.20%
V.Satisfactory
Equi-Parco Construction 14332 Const. of Butuan City By Pass Road 02/23/10 XIII 143.662 375 C 0.340 0.200 0.300 - - - 84.00 89.70% V.Satisfactory
Equi-Parco Construction 14332Asphalt Overlay of Butuan City-
Masao Port Road, Balbarino-Holy Redeemer Section
06/16/10 XIII 19.255 150 C 0.457 0.200 0.300 - - - 95.70 95.70% V. Satisfactory
Equi-Parco Construction 14332Asphalt Overlay along Daang
Maharlika, Surigao-Agusan Section (50 mm thk.), Tagbayucan Section
06/01/10 XIII 13.896 60 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory
Equi-Parco Construction 14332 Conc. of Butuan City-Masao Port Road 06/16/10 XIII 18.855 240 C 0.421 0.200 0.300 - - - 92.10 92.10%
V. Satisfactory
Equi-Parco Construction 14332
Const./Conc. of Surigao-Davao Coastal Road (Lingig Boundary-
Boston Sect.) along Bislig-Boston Section
06/11/10 XIII 322.527 585 C 0.391 0.200 0.300 - - - 89.10 89.82% V. Satisfactory
Equi-Parco Construction 14332 Asphalt Overlay of Agustin-Mis. Or. Rd., Butuan Airport-Dumalagan Sect. 09/09/10 XIII 19.256 150 C 0.414 0.200 0.300 - - - 91.40 91.40%
V. Satisfactory
Equi-Parco Construction 14332Asphalt Overlay of Agusan-Misamis
Or. Rd., NIA Substation-Bancasi Section
09/09/10 XIII 19.256 150 C 0.408 0.200 0.300 - - - 90.80 90.80% V. Satisfactory
Equi-Parco Construction 14332 Asphalt Overlay of Agusan-Misamis Or. Rd., Libertad-NIA Substation 09/09/10 XIII 19.256 150 C 0.407 0.200 0.300 - - - 90.70 90.70%
V. Satisfactory
Equi-Parco Construction 14332 Impvt./Rechanneling of Jaliobong River 08/24/10 XIII 48.212 180 C 0.407 - 0.500 - - - 90.70 90.70%
V. Satisfactory
Equi-Parco Construction 14332Asphalt Overlay of Agusan-Misamis
Or. Rd.,, Bancasi-Butuan Airport Section
09/09/10 XIII 19.256 150 C 0.403 0.200 0.300 - - - 90.30 90.30% V. Satisfactory
Equi-Parco Construction JV-08-062Conc. of Dinagat Island Road Network, Dinagat-Loreto Road
(Basilisa-Albor Section)08/26/10 XIII 161.113 447 C 0.434 0.185 0.300 - - - 91.90 90.19%
V. Satisfactory
Equi-Parco Construction 14332Asphalt Overlay of Butuan-Cagayan
de Oro-Iligan Road, Otis Mall-Arujville
09/09/10 XIII 14.415 120 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory
Equi-Parco Construction 14332 Impvt./Rechanneling of Jaliobong River (Phase 2) 08/24/10 XIII 48.211 180 C 0.397 - 0.500 - - - 89.70 89.70%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page149
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Equi-Parco Construction 14332 Repair/Rehab. of NRJ Bahbah-Talacogon Road, (Asphalt Overlay) 06/15/10 XIII 9.243 120 C 0.443 0.200 0.300 - - - 94.30 94.30%
V. Satisfactory
Equi-Parco Construction 14332 Conc. of Misamis Oriental-Bukidnon-Agusan Road 03/19/09 X 91.466 330 O 0.347 0.300 0.100 0.030 0.045 0.050 87.20 -
Equi-Parco Construction 14332 Conc. of Misamis Oriental-Bukidnon-Agusan Road 06/10/09 X 91.466 330 O 0.271 0.300 0.150 0.030 0.043 0.050 84.40 -
Equi-Parco Construction 14332 Conc. of Gingoog-Calveria-Villanueva Road, Samay Section 09/08/09 X 13.721 180 C 0.484 0.180 0.300 - - - 96.40 *96.40%
Outstanding
Equi-Parco Construction 14332 Rehab./Reconst. of Butuan City-Cagayan De Oro City- Iligan Road 09/09/09 X 145.175 405 O 0.357 0.300 0.150 0.030 0.056 0.050 94.30 -
Equi-Parco Construction 14332Rehab./Reconst. of Butuan City-Cagayan de Oro City-Iligan City
(BCIR) Road09/07/09 X 474.722 360 O 0.378 0.248 0.150 0.030 0.070 0.050 92.60 -
Equi-Parco Construction 14332 Conc. of Misamis Oriental-Bukidnon-Agusan Rd. 03/11/10 X 96.040 330 C 0.410 0.200 0.000 - - - 61.00 75.88%
Unsatisfactory
Equi-Parco Construction 14332 Asphalt Overlay of Agusan-Misamis Oriental Road 03/18/09 XIII 14.446 90 C 0.460 0.200 0.300 - - - 96.00 *96.00%
V.Satisfactory
Equi-Parco Construction 14332Conc. of Agusan del Norte-Surigao del Sur (Cabadbaran-Puting Bato
Section)03/03/09 XIII 95.698 540 O 0.335 0.300 0.150 0.030 0.056 0.050 92.10 -
Equi-Parco Construction 14332 Conc. of Kinabjangan By-Pass National Secondary Road 03/02/09 XIII 13.876 180 C 0.398 0.200 0.300 - - - 89.80 85.96%
Satisfactory
Equi-Parco Construction 14332 Conc.of Agusan-Bukidnon National Road 03/02/09 XIII 15.034 207 C 0.435 0.200 0.300 - - - 93.50 90.14%
V.Satisfactory
Equi-Parco Construction 14332 Construction of Butuan City By-Pass Road, Bonbon-Kinamlutan Section 03/19/09 XIII 24.594 195 O 0.353 0.300 0.150 0.030 0.042 0.050 92.50 -
Equi-Parco Construction 14332 Rechanneling of Cabadbaran River, Putting Bato, Phase 1 03/03/09 XIII 19.280 180 O 0.334 0.000 0.200 0.050 0.067 0.250 90.10 -
Equi-Parco Construction 14332 Upgrading of Agusan-Bukidnon National Road 05/25/09 XIII 14.326 210 O 0.393 0.300 0.150 0.030 0.047 0.050 97.00 -
Equi-Parco Construction 14332 Construction of Camingawan-Canticol Road, Phase VI 05/26/09 XIII 19.278 180 C 0.459 - 0.500 - - - 95.90 *95.90%
V. Satisfactory
Equi-Parco Construction 14332 Rehab./Reconst. of Buenavista-Bunaguit Road Section 05/25/09 XIII 7.572 180 O 0.376 0.300 0.150 0.030 0.047 0.050 95.30 -
Equi-Parco Construction 14332 Const. of Butuan City Bypass Road (Bon-bon) Kinamlutan Section 06/11/09 XIII 24.594 195 C 0.478 0.200 0.300 - - - 97.80 94.62%
V. Satisfactory
Equi-Parco Construction 14332 Const. of Camingawan-Canticol Road Phase V 05/26/09 XIII 19.280 180 C 0.445 0.000 0.500 - - - 94.50 *94.50%
V. Satisfactory
Equi-Parco Construction 14332Conc. of Agusan Del Norte-Surigao Del Sur (Cabadbaran-Puting Bato
Sect.) 05/26/09 XIII 95.698 540 C 0.487 0.170 0.300 - - - 95.70 94.26%
V. Satisfactory
Equi-Parco Construction 14332 Rechanneling of Cabadbran River Puting Bato, Phase I 05/26/09 XIII 19.279 180 C 0.445 0.000 0.500 - - - 94.50 91.86%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page150
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Equi-Parco Construction 14332
Rehab./Asphalt Overlay along Butuan-Cagayan de Oro-Iligan Rd. along Brgy. Ampayon-Brgy. Baan
Sec.
09/16/09 XIII 48.164 250 C 0.457 0.200 0.300 - - - 95.70 *95.70% V.Satisfactory
Equi-Parco Construction 14332 Upgrading of Buenavista-Bunaguit Rd.(Malpoc-Rizal Sect.) 09/01/09 XIII 14.326 210 C 0.409 0.189 0.300 - - - 89.80 92.56%
V.Satisfactory
Equi-Parco Construction 14332Rehab./Reconst. of Damaged Paved National Rd.,Buenavista-Bunaguit
Rd. Sect.09/01/09 XIII 7.572 160 C 0.400 0.174 0.300 - - - 87.40 92.14%
V.Satisfactory
Equi-Parco Construction 14332 Concreting of Butuan City-Masao Port Rd., Jct. Doongan Bridge 09/16/09 XIII 14.213 195 O 0.378 0.240 0.150 0.030 0.060 0.050 90.80 -
Equi-Parco Construction 14332Const./Conc. of SDCR(Lingig
Boundary-Boston Sect.) along Bislig-Boston Sect.
09/11/09 XIII 325.527 585 O 0.383 0.225 0.150 0.030 0.065 0.050 90.30 -
Equi-Parco Construction 14332 Upgrading of Agusan-Bukidnon National Rd. 09/01/09 XIII 14.326 210 O 0.394 0.216 0.150 0.030 0.050 0.050 89.00 -
Equi-Parco Construction 14332Asphalt overlay-Daang Maharlika
(cracks & joints Sealing) Sibagat and Bayugan Sect.
09/13/09 XIII 14.292 97 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory
Equi-Parco Construction Co. 14332 Siargao Airport Development Project 08/09/11 DOTC 75.112 210 C 0.455 0.300 0.200 - - - 95.50 95.30%
V. Satisfactory
Equi-Parco Construction Company 14332
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads, Butuan City-Cagayan de Oro City-Iligan City Road (BCIR) Alubijid-Lugait Sect. w/
exception
04/13/11 X 101.251 240 C 0.492 0.133 0.300 - - - 92.50 92.56% V. Satisfactory
Equi-Parco Construction Company 14332
Rehab./Reconst./Upgrading of Damged Paved Nat'l. Roads along
Sayre Highway, Mambatangan Section
03/30/11 X 19.235 300 C 0.391 0.200 0.300 - - - 89.10 91.14% V. Satisfactory
Equi-Parco Construction Company 14332
Completion/Continuation of Cagayan de Oro City Third (3rd) Bridge &
Access Road04/14/11 X 58.169 390 O 0.305 0.300 0.150 0.030 0.042 0.033 86.00 -
Equi-Parco Construction Company 14332
Const. of Butuan City By-Pass Road (Bonbon-Bancasi Airport & Lemon-
NRJ-Antongalon Sect.)04/15/11 XIII 177.960 405 C 0.439 0.200 0.300 - - - 93.90 *93.90%
V. Satisfactory
Equi-Parco Construction Company 14332 Conc. of Dinagat-Loreto Road
(Basilisa-Albor Section) 04/07/11 XIII 161.660 420 C 0.388 0.200 0.300 - - - 88.80 91.50% V. Satisfactory
Equi-Parco Construction Company 14332
Rehab./Impvt. (Conc.) along Surigao-Davao Coastal Road, Bislig-Manay
Sect. (Bislig-Lingig Sect.)04/03/11 XIII 296.620 390 C 0.414 0.200 0.300 - - - 91.40 *91.40%
V. Satisfactory
Equi-Parco Construction Company 14332
Rehab./Impvt. (Conc.) along Surigao-Davao Coastal Road, Bislig-Manay (Lingig-Region XIII Boundary Sect.)
04/03/11 XIII 308.286 390 C 0.401 0.200 0.300 - - - 90.10 *90.10% V. Satisfactory
Equi-Parco Construction Construction / Gicar
Construction (JV)JV-08-062
Conc. of Dinagat Island Road Network, Dinagat-Loreto Road
(Basilisa-Albor Section)06/02/10 XIII 161.113 447 O 0.283 0.300 0.150 0.030 0.055 0.033 85.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page151
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Equi-Parco Construction Corp. 14332
Butuan Airport Development Project (Construction of Asphalt Overlay of
Runway, Slope Protection for Runway Extension, Construction of Pedestrian Gate and Improvement of
Terminal Building)
02/18/11 DOTC 160.730 360 C 0.442 0.200 0.300 - - - 94.20 95.80% V. Satisfactory
Equi-Parco Construction Corp. 14332 Butuan Airport Development Project 03/17/09 DOTC 48.145 240 C 0.451 0.200 0.300 - - - 95.10 95.10%
V. Satisfactory
Equi-Parco Construction Corp. 14332
M'lang, Airport Development Project (Concreting of Runway, Taxiway &
Apron and Construction of Vehicular Parking Area)
10/11-12/2010 DOTC 96.366 270 C 0.462 0.200 0.300 0.000 0.000 0.000 96.20 92.60% V. Satisfactory
Equi-Parco Construction Corp. 14332 Butuan Airport Development Project 07/31/09 DOTC 9.606 120 C 0.459 0.200 0.300 - - - 95.90 95.90%
V. Satisfactory
Equi-Parco/Adfil Joint Venture JV-09-023
Conc./Impv't. of Tiniwisan-Maguinwall Rd. (Lemon-Pigdanlan
Section)02/23/10 XIII 335.031 51 O 0.370 0.240 0.150 0.030 0.050 0.050 89.00 -
Eric Van P. Sesbreno Construction 26243 Conc. Of Nueva Vizcaya-Pangasinan
Road, Imugan Section 04/15/11 II 9.635 180 C 0.442 0.133 0.300 - - - 87.50 86.78% Satisfactory
Eric Van P. Sesbreno Construction 26243 Construction of Mabasa Flood
Control 09/01/09 II 0.473 30 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory
Ermy Construction and Trading 15741 Rehab/Improvement of Sta. Lucia
Farm to Market Road 02/23/09 III 4.753 50 C 0.406 0.200 0.300 - - - 90.60 *90.60%V. Satisfactory
Ermy Construction and Trading (Formerly: Ermy
Construction)15741 Conc. of FMR @ Brgy. San Felipe 03/28/11 III 0.945 30 C 0.415 0.133 0.300 - - - 84.80 *84.80%
Satisfactory
ES De Guzman Construction 17494 Const. of NVGCHS, 6CL,3-Storey
Building, Bontal Annex 08/28/09 II 1.604 90 O 0.325 0.240 0.150 0.030 0.018 0.050 81.30 -
ESD Cruz Construction & Supply 32368
Conc. of Palapag-Mapanas-Gamay-Lapinig Road, Pangpang-Mapno
Section, w/ exception04/01/11 VIII 18.809 200 C 0.412 0.133 0.300 - - - 84.50 85.28%
Satisfactory
ESD Cruz Construction & Supply 32368
Conc. of Palapag-Mapanas-Gamay-Lapinig Road, Cabatuan-Magtaon
Section w/ exception04/01/11 VIII 18.818 200 C 0.416 0.133 0.300 - - - 84.90 84.90%
Satisfactory
ESD Cruz Construction & Supply 32368
Conc. of Palapag-Mapanas-Gamay-Lapinig Road, Nipa-Cabatuan
Section, w/ exception04/01/11 VIII 18.789 200 C 0.411 0.133 0.300 - - - 84.40 83.92%
Satisfactory
ESD Cruz Construction & Supply 32368
Conc. of Palapag-Simora Road, Palapag-Magsaysay Section with
exception04/01/11 VIII 18.789 200 C 0.405 0.200 0.300 - - - 90.50 83.12%
Satisfactory
ESD Cruz Construction & Supply 32368 Asphalt Overlay of Catarman-Laoang
Road, Pambujan-Rawis Sect. 05/25/09 VIII 14.719 120 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory
ESD Cruz Construction & Supply 32368 Const. of Multi-Purpose Pavement
Brgy. Dale 03/06/10 VIII 0.968 180 C 0.389 0.200 0.300 - - - 88.90 88.90% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page152
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ESD Cruz Construction & Supply 32368
Repair/Rehab. of National Road (Pangpang-Mapanas-Gamay-Lapinig
Road03/04/09 VIII 9.789 120 C 0.465 0.133 0.300 - - - 89.80 84.22%
Satisfactory
ESD Cruz Construction & Supply 32368 Concrete Paving along Brgy. San
Roque-Balud-Coroconog FMR 09/12/09 VIII 9.618 90 C 0.387 0.200 0.300 - - - 88.70 *88.70% Satisfactory
Eser Enterprises-Burot 23902 Const./Repair of Multi-Purpose Building at Brgy. Oloybuaya 05/22/09 III 1.229 60 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V. SatisfactoryESN Construction &
Trading 32720 Const. of One Classroom School Bldg., Taal E/S 08/27/10 III 0.602 24 C 0.480 0.167 0.300 - - - 94.70 94.70%
V. SatisfactoryESN Construction &
Trading 32720 Repair/Rehab. of School Bldg., San Marcos E/S 08/27/10 III 0.315 25 C 0.484 0.156 0.300 - - - 94.00 94.00%
V. Satisfactory
ESR Construction and Supplies 10451
Const. of Multi-Purpose Pavement (Phase I) at Jose Rizal Memorial
State University (JRMSU) Complex04/14/11 IX 9.629 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
ESR Construction and Supplies 10451
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Liloy-Ipil Road04/01/11 IX 41.534 182 C 0.473 0.133 0.300 - - - 90.60 90.06%
V. Satisfactory
ESR Construction and Supplies 10451
Rehab./Impvt. of Dipolog-Punta-Dansulian-Sergio Osmeña Rd. (Dilawa-De Venta Perla Sect.)
04/08/11 IX 94.138 570 C 0.413 0.195 0.300 - - - 90.80 89.82% V. Satisfactory
ESR Construction and Supplies 10451 Road Upgrading (Gravel to Concrete)
Dumalinao-Margosatubig Road 04/06/11 IX 18.392 240 C 0.459 0.200 0.300 - - - 95.90 89.78% V. Satisfactory
ESR Construction and Supplies 10451
Asphalt Overlay along Pagadian City-Zamboanga City Road (Using
Everlast Construction 2364 Const. of MPB (Covered Court 5-Bay) 03/28/11 IX 2.894 114 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory
Everlast Construction 2364Const. of 2-Storey 4-Classroom
School Bldg. (Partial) at Southcom NHS
05/31/10 IX 3.628 120 C 0.477 0.133 0.300 - - - 91.00 90.93% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page155
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Everlast Construction 2364 Const. of Zamboanga City Schools Division Office 09/01/09 IX 14.182 305 O 0.370 0.300 0.150 0.030 0.035 0.033 91.80 -
Excel C'S Builders 24445 Const./Rehab. of Laray Multi-Purpose Pavement (MPP) Javier 02/26/10 VIII 0.944 70 C 0.363 0.200 0.300 - - - 86.30 87.14%
Satisfactory
Excel C's Builders 24445 Repair of Brgy. Roads, Brgy. Poblacion-Odiong 05/28/09 VIII 1.909 20 C 0.250 0.200 0.300 - - - 75.00 -
Express Construction 29649 Repair/Rehab. of MPB, Brgy. Milagros 03/31/11 NCR 1.433 103 C 0.493 0.104 0.300 - - - 89.70 *89.70%
V. Satisfactory
Express Construction 29649 Repair of School Bldg. at General Roxas E/S, Brgy. Roxas 02/26/10 NCR 1.412 15 C 0.472 0.133 0.300 - - - 90.50 90.50%
V.Satisfactory
Express Construction 29649 Repair/Rehab. of MPB at La Mesa Dam 08/16/10 NCR 1.464 15 C 0.460 0.133 0.300 - - - 89.30 89.30%
V. Satisfactory
F. A. Asper Construction 21579Const. of Dipolog Airport
Development Project (Building and Industrial Plant)
05/16/11 DOTC 12.977 180 C 0.457 0.200 0.300 - - - 95.70 90.50% V. Satisfactory
F. Alarcon Construction Corporation 17612 Inabangan Port Development Project 06/19/09 DOTC 2.888 90 C 0.473 0.200 0.300 - - - 97.30 97.30%
Outstanding
F. Alarcon Construction Corporation 17612 Sagay Port Development Project
(Extension of Causeway) 02/05/10 DOTC 4.798 120 C 0.468 0.200 0.300 - - - 96.80 96.80% Outstanding
F. Gurrea Construction Incorporated 6695 Rehab./Reconst./Upgrading of Iloilo
East Coast Estancia Wharf Road 04/13/11 VI 45.327 120 C 0.441 0.133 0.300 - - - 87.40 *87.40% Satisfactory
F. Gurrea Construction, Incorporated 6995 Conc. of Oton-Mambog Rd. 06/08/10 VI 28.673 270 C 0.357 0.200 0.300 - - - 85.70 85.70%
Satisfactory
F. Gurrea Construction, Incorporated 6995
Rehab./Reconst./Upgrading of Roxas City Bdry.-Panitan-Bailan Rd. Km.116+262 - Km.177+775 w/
exception
06/15/10 VI 19.086 254 C 0.330 0.200 0.300 - - - 83.00 83.00% Satisfactory
F. Gurrea Construction, Incorporated 6995
Conc. of Bantayan-San Pedro-Cubay Rd. (Magcalon-San Pedro Sect. and
Lugutan-Igbonglo Sect.)06/10/10 VI 30.068 300 C 0.381 0.200 0.300 - - - 88.10 82.28%
Satisfactory
F. Gurrea Construction, Incorporated 6995 Completion of Anahawon 12/01/08 VI 9.423 180 O 0.381 0.223 0.000 0.022 0.043 0.067 73.60 -
F. Gurrea Construction, Incorporated 6995
Conc. of Oton-Mambog-Caboloan-Abilay-SanJose-San Miguel Road
leading to Iloilo International Airport05/25/09 VI 57.850 462 O 0.295 0.300 0.150 0.030 0.065 0.050 89.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page156
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
F. Gurrea Construction, Incorporated 6995 Asphalt Paving of Lambunao-
Pototan Road 03/18/09 VI 9.525 120 C 0.444 0.200 0.300 - - - 94.40 89.96% V. Satisfactory
F. Gurrea Construction, Incorporated 6995
Rehab./Reconst. of Damaged Paved Nat'l Road, Jct. Bancal-Leon-Antique
Bdry. Road03/19/09 VI 9.577 195 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995 Repair/Rehab. of Iloilo-Antique Road 03/13/09 VI 9.642 50 C 0.424 0.200 0.300 - - - 92.40 *92.40%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995
Conc. of Oton-Mambog-Caboloan-Abilay-San Jose-San Miguel Road
leading to Iloilo International Airport Km. 11+436.25-Km.15+96.25 w/
exception
09/10/09 VI 57.894 467 O 0.314 0.300 0.150 0.030 0.060 0.050 90.40 -
F. Gurrea Construction, Incorporated 6995 Completion of Valderrama Bridge
and Approaches 09/02/10 VI 53.073 200 O 0.396 0.240 0.150 0.030 0.042 0.050 90.80 -
F. Gurrea Construction, Incorporated 6995 Conc. of Iloilo East West Road, San
Rafael-Passi Section 09/06/10 VI 18.915 210 O 0.375 0.240 0.150 0.030 0.037 0.033 86.50 -
F. Gutirrez Const./Gener R. Flancia and
Associates4572 Design and Const. of Cagayan De
Oro Convention and Civic Center 03/12/10 X 337.982 3,020 C 0.427 0.200 0.000 - - - 62.70 75.13% Unsatisfactory
F. R Ignacio Construction and Incorporated 687 Pasay City LTO District Office
Building Project 11/14/09 DOTC 11.937 255 C 0.395 0.200 0.300 - - - 89.50 89.50% V. Satisfactory
F.A Asprer Construction 21579 Camiguin Airport Development Project (Extension of Runway) 02/16/11 DOTC 9.596 60 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
F.A Asprer Construction 21579 Conc. Of Brgy. Road with Drainage Canal at Block 5 02/24/10 III 1.473 70 C 0.425 0.200 0.300 - - - 92.50 92.50%
V. Satisfactory
F.A Asprer Construction 21579 Dipolog Airport Development Project (Construction o Terminal Building) 11/10/10 DOTC 12.977 180 O 0.361 0.300 0.150 0.020 0.035 0.017 88.30 -
F.A Asprer Construction 21579 Construction/Repair of Multi-Purpose Building at Brgy. Caturay 05/22/09 III 1.227 60 C 0.389 0.200 0.300 - - - 88.90 *88.90%
V. Satisfactory
F.A Asprer Construction 21579 Const. of Flood Control (Drainage System) Villa Aglipay E/S 05/23/09 III 0.489 45 C 0.358 0.200 0.300 - - - 85.80 *85.80%
Satisfactory
F.A Sison Trading and Construction 27150
Rehab./Upgrading of Damaged National Roads (PMS/HDM-4)
FFJJ Construction 16712 Rehab./Conc. of Road Junction Mana-Ticulon Lagumit Little Baguio Road 05/28/09 XI 19.293 262 C 0.425 0.200 0.300 - - - 92.50 82.12%
Satisfactory
FFJJ Construction 16712
Rehab./Recons/Upgrading of Digos-Makar Road, Baluyan-Tagansule
Section, Km. 1587+500-Km. 1589+000
05/28/09 XI 19.289 210 O 0.320 0.225 0.150 0.030 0.046 0.050 82.10 -
FFJJ Construction 16712 Rehab/Conc. of Road Jct. Mana-Ticulon Lagumit Little Baguio Road 03/04/09 XI 19.293 262 O 0.279 0.252 0.110 0.030 0.048 0.033 75.20 -
FFJJ Construction 16712
Rehab./Reconst./Upgrading of Damaged Paved National Road, Digos-Makar Road Tagansule Section, Km. 1587+500-Km.
1589+000
09/03/09 XI 19.289 210 C 0.434 0.133 0.300 - - - 86.70 83.94% Satisfactory
FFJJ Construction 16712 Conc. of Davao del Sur-Sarangani Coastal Kitayo-Balangonan Section 09/03/09 XI 28.906 360 C 0.401 0.133 0.000 - - - 53.40 65.70%
Poor
FFJJ Construction 16712 Conc. of Paco-Roxas-Arakan Rd. (New Ponteverdra Section) 03/10/09 XII 15.095 150 O 0.378 0.300 0.000 0.030 0.060 0.033 80.10 -
FFJJ Construction 16712Rehab./Reconst. of Damaged Paved
National Rd along NRJ-Bahbah-Talacogon Rd.
09/15/09 XIII 4.753 160 C 0.390 0.150 0.300 - - - 84.00 *84.00% Satisfactory
FGM Builders Resources & Development
Corporation31807
Const. of 2CL-1 Storey Academic Bldg. @ Marilog NHS, Marilog
District 03/29/11 XI 1.718 90 C 0.461 0.182 0.300 - - - 94.30 *94.30%
V. Satisfactory
FGM Builders Resources & Development
Corporation31807 Const. of MPB, Bago Aplaya 04/13/11 XI 0.980 90 C 0.434 0.200 0.300 - - - 93.40 *93.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page162
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
FGM Builders Resources & Development
Corporation31807 Completion of MPB at Brgy. T.
Monteverde Package 2-D 06/16/10 XI 1.228 150 C 0.496 0.133 0.300 - - - 92.90 94.51% V. Satisfactory
FGW Construction Corp. 7436 Conc. of Brgy. Rd. Purok 8, Brgy. Del Monte 09/14/09 XIII 2.791 135 C 0.427 0.125 0.300 - - - 85.20 89.40%
V.Satisfactory
FGW Construction Corporation 7436 Conc. of Road, Brgy. Zamora 03/09/10 XIII 1.880 120 C 0.421 0.133 0.300 - - - 85.40 85.40%
SatisfactoryFGW Construction
Corporation 7436 Const./Rehab. of MPB, PNP Headquarters 06/13/10 XIII 1.883 170 C 0.443 0.200 0.300 - - - 94.30 89.19%
V. Satisfactory
FGW Construction Corporation 7436
Conc. of Road at Barangay San Isidro along Bayugan-Bucac-
Marcelina Road09/05/10 XIII 4.700 150 O 0.325 0.300 0.150 0.030 0.045 0.033 88.30 -
FGW Construction Corporation (Formerly:
FGW Construction)7436 Completion of 2-Storey 4 CL, East
City CS 04/13/11 X 2.334 90 C 0.463 0.133 0.300 - - - 89.60 *89.60% V. Satisfactory
FGW Construction Corporation (Formerly:
FGW Construction)7436 Rehab. of Flood Controls, Brgy.
Patin-ay 03/30/11 XIII 1.403 90 O 0.400 0.180 0.150 0.022 0.038 0.050 84.00 -
FGW Construction Corporation (Formerly:
FWG Construction)7436 Road/Upgrading (Gravel to Paved),
Loguilo-Alubijid By-Pass Road 06/03/09 X 7.353 150 C 0.404 0.148 0.300 - - - 85.20 *85.20% Satisfactory
Fiat Construction Services 5463 Conc. of Dinagat-Loreto Road (San
Jose-Basilisa Sect) 04/07/11 XIII 190.877 450 O 0.374 0.247 0.138 0.030 0.055 0.050 89.40 -
Fiat Construction Services 5463 Repair/Rehab. of Dinagat-Loreto
Road 03/07/11 XIII 9.253 180 C 0.407 0.133 0.300 - - - 84.00 *84.00% Satisfactory
Fiat Construction Services 5463
Conc. of Surigao-Davao Coastal Rd. : Cortes-Tandag-Marihatag Rd. (Unaban-Sumo-sumo Section)
03/03/10 XIII 130.968 435 C 0.437 0.133 0.300 - - - 87.00 86.18% Satisfactory
Fiat Construction Services 5463 Conc. of Butuan City-Paining-Tandag
Road 06/12/10 XIII 26.285 195 O 0.343 0.300 0.150 0.030 0.040 0.033 89.60 -
Fiat Construction Services 5463 Repair/Restoration of Dinagat-Loreto
Road 08/26/10 XIII 9.253 190 O 0.327 0.282 0.150 0.030 0.045 0.050 88.40 -
Fiat Construction Services 5463 Conc. of Dinagat-Loreto Road (San
Jose Basilisa Section) 08/26/10 XIII 190.878 420 O 0.360 0.262 0.150 0.030 0.047 0.033 88.20 -
Fiat Construction Services 5463
Conc. of Dinagat Island Road Network (San Jose-Basilisa Section with One (1) Bridge and One (1) Box
Culvert
08/26/10 XIII 188.939 525 O 0.380 0.287 0.064 0.030 0.047 0.017 82.50 -
Fiat Construction Services 5463
Conc. of Dinagat Island Rd. Network(San Jose-Basilisa Sect. with 1 Bridge and 1 Box Culvert)
09/05/09 XIII 188.939 465 O 0.382 0.253 0.150 0.030 0.047 0.033 89.50 -
Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with Roof
Deck for DBM Building 11/26/08 Sp. Bldgs. 445.429 710 O 0.372 0.300 0.100 0.030 0.061 0.067 93.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page163
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Firmabuilt Construction / Marcbilt Construction,
Inc. Joint VentureJV-09-256
Road Upgrading at Abre de Ilog-San Jose Road (Marilao-Bagong Silang
Sect.), Brgy. New Dagupan08/27/10 IVB 19.192 180 O 0.355 0.054 0.150 0.030 0.025 0.033 64.70 -
First Northway Development and
Construction Corporation11645
Rehab./Reconst./Upgrading of Damaged Paved National Road
Candon City & Santiago03/30/11 I 23.980 70 C 0.442 0.197 0.300 - - - 93.90 *93.90%
V. Satisfactory
First Northway Development and
Construction Corporation11645
Rehab./Reconst./Upgrading of Damaged Paved National Roads,
Candon Section09/05/09 I 19.095 265 C 0.355 0.200 0.300 - - - 85.50 83.28%
Satisfactory
First Northway Development and
Construction Corporation11645 Const. of Lubong Road 02/17/10 I 0.956 32 C 0.458 0.133 0.300 - - - 89.10 89.10%
V. Satisfactory
First Northway Development and
Construction Corporation11645 Completion of Candon-Salcedo Road 02/18/10 I 14.320 225 O 0.279 0.129 0.150 0.030 0.051 0.050 68.90 -
First Northway Development and
Construction Corporation11645
Rehab./Reconst./Upgrading of Damaged paved National Road along
MNR, Sta. Lucia Section05/28/10 I 19.102 60 C 0.478 0.133 0.300 - - - 91.10 91.10%
V. Satisfactory
First Northway Development and
Construction Corporation11645 Const. of Oaig-Daya-Sn. Nicolas
Flood Control 08/18/10 I 9.650 123 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
First Northway Development and
Construction Corporation11645 Repair/Rehabilitation of Candon City
Road 02/27/09 I 0.942 31 C 0.380 0.193 0.300 - - - 87.30 *87.30%Satisfactory
First Northway Development and
Construction Corporation11645 Sulvec Port Road 02/27/09 I 6.358 149 C 0.340 0.200 0.300 - - - 84.00 82.14%
Satisfactory
Flordale Construction 31683Installation of Traffic Signs at Manila
South Road-Daang Maharlika (Tiaong Section)
05/25/09 IV-A 4.777 65 C 0.482 0.133 0.300 - - - 91.50 *91.50% V. Satisfactory
Flordes Construction & Trading 16916
Const./Rehab./Replacement/ Completion and Repair of Andres
Flordes Construction & Trading 16916 Rehab./Upgrading of Felix Huertas
St. and vicinity 05/25/10 NCR 11.521 90 C 0.416 0.200 0.300 - - - 91.60 91.60% V. Satisfactory
Floriane Construction and Supply 12261 Construction of Multi-Purpose
Building, North Pob. 06/01/09 X 0.938 105 C 0.395 0.061 0.300 - - - 75.60 79.66% Unsatisfactory
FLT Enterprises 23039Const. of Hospital Building, Angel Salazar Memorial General Hospital
(Phase I)04/06/11 VI 4.817 270 C 0.487 0.133 0.300 - - - 92.00 85.28%
Satisfactory
Footprints Construction 16713 Conc. of FMR, Manaol, Lagonglong 09/08/10 X 0.978 160 C 0.429 0.133 0.300 - - - 86.20 86.56% Satisfactory
Footprints Construction 16713 Const. of Road with Drainage, Vicmar Circumferential Road, Zone 7 02/22/10 X 3.735 120 C 0.367 0.200 0.300 - - - 86.70 86.70%
Satisfactory
Foremost Builders 23774 Completion of MPB at Brgy. Angliongto 04/13/11 XI 1.779 120 O 0.389 0.300 0.150 0.030 0.052 0.050 97.10 -
Foretop Construction 32813 Construction of Boton River Control 05/19/09 IV-B 2.845 108 C 0.389 0.200 0.300 - - - 88.90 *88.90% Satisfactory
Foretop Construction 32813Concreting of Marinduque
04/11/11 VIII 38.192 300 O 0.312 0.240 0.150 0.030 0.043 0.033 80.80 -
FRD Construction 10227Upgrading (Conc.) of Wright-Taft-Borongan Road, Km. 870+000-Km.
880+000 (w/ exceptions)03/09/10 VIII 33.775 360 C 0.345 0.200 0.300 - - - 84.50 84.11%
Satisfactory
FRD Construction 10227 Const. of 1 Unit 1 CL Sch. Bldg. @ Malinao HS 03/16/09 VIII 0.496 75 C 0.430 0.200 0.000 - - - 63.00 68.74%
Poor
FRD Construction 10227 Rehab./Impvt. of Liloan-Himay-Angan-Libagon Road 09/08/09 VIII 18.692 360 C 0.438 0.133 0.300 - - - 87.10 88.60%
Satisfactory
Freden Construction 22665 Const. of MPB, Brgy. Cannery Site 04/13/11 XII 1.407 75 C 0.499 0.178 0.300 - - - 97.70 *97.70% Outstanding
Freden Construction 22665 Const. of MPB at Hermogenes, Cahilsot E/S, Brgy. Calumpang 04/13/11 XII 1.880 90 C 0.498 0.177 0.300 - - - 97.50 *97.50%
Outstanding
Freden Construction 22665 Const. of Lined Canal 03/20/09 XII 1.864 117 C 0.445 0.200 0.300 - - - 94.50 *88.56% Satisfactory
Freden Construction 22665
Repair & Maintenance of National Roads & Bridges Makar-Marbel Road (going to Makar) and Makar-Kiamba
Road
03/20/09 XII 1.238 60 C 0.425 0.200 0.300 - - - 92.50 *92.50% V. Satisfactory
FVCS Construction & Supply 32518 Const. of MPB Brgy. Poblacion I 06/01/10 IVB 1.318 90 C 0.430 0.101 0.300 - - - 83.10 84.71%
Satisfactory
G M Pajarillaga Construction & Supply 21760 Conc. of Bambang-Kaibu-Quezon-
Solano Road, Kongkong Section 04/14/11 II 9.646 120 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory
G. Uymatiao Jr. Construction 6663
Conc./Widening of Dumaguete North Rd. (Jct. Kabankalan-Negros
Occidental Bdry.) Mambid Sect. to San Jose Sect.
06/10/10 VII 15.440 110 C 0.329 0.133 0.000 - - - 46.20 46.20% Poor
G. Uymatiao, Jr. Construction 6663 Const./Impvt. of Dayoyo Section
(DNR) Km. 95.720-Km.96.880 05/29/09 VII 9.094 147 C 0.459 0.141 0.300 - - - 90.00 *90.00% V. Satisfactory
G. Uymatiao, Jr. Construction 6663
Const./Impvt. of San Jose-Cantupa Section DNR (Km. 101.980-Km.
104.12235)05/29/09 VII 18.384 292 C 0.371 0.200 0.300 - - - 87.10 83.14%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page167
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
G.B. Construction Supply of Labor and Materials for Completion of UPV High School
Building 07/27/11 UP 9.957 163 O 0.339 0.300 0.150 0.030 0.047 0.050 91.60 -
G.C.I Construction 11346 Const. of San Vicente-Gutan Lubak-Anguib Road, Phase V 09/09/09 II 20.642 415 C 0.426 0.030 0.300 - - - 75.60 80.16%
Unsatisfactory
G.C.I Construction 11346 Rehab./Reconst. of Naga Carolina-Panicuason Road 06/08/10 V 37.449 90 C 0.431 0.133 0.300 - - - 86.40 86.40%
Satisfactory
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Jct. Bato-Baras Rd. 08/17/10 V 76.800 285 C 0.438 0.200 0.300 - - - 93.80 92.30%
V. Satisfactory
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Gigmoto-Viga Rd., Phase II 08/17/10 V 74.100 285 O 0.334 0.300 0.150 0.022 0.042 0.050 89.80 -
G.C.I Construction 11346
Upgrading (Gravel to Concrete) along Jct. CCR Panganiban-
08/17/10 V 48.170 269 O 0.337 0.300 0.150 0.022 0.035 0.050 89.40 -
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Viga-Panganiban-Bagamanoc Rd. 08/18/10 V 19.192 190 C 0.417 0.188 0.300 - - - 90.50 88.46%
Satisfactory
G.C.I Construction 11346Quinali-Talisay River Flood Control
Embankment & Channelization,Talisay
08/21/10 V 38.599 506 C 0.500 0.133 0.300 - - - 93.30 90.00% V. Satisfactory
G.C.I Construction 11346Quinali-Talisay River Flood Control
Embankment & Channelization (Phase II),Talisay
08/21/10 V 17.285 220 C 0.500 0.133 0.300 - - - 93.30 88.50% Satisfactory
G.C.I Construction 11346 Const. of San Vicente-Gutan-Lubak-Anguib Road,Phase V 02/25/09 II 20.259 330 O 0.267 0.300 0.150 0.030 0.035 0.050 83.20 -
G.C.I Construction 11346 Libmanan-Cabusao Embankment (Poblacion Revetment) 08/26/08 V 10.523 270 O 0.282 0.200 0.100 0.030 0.028 0.200 84.00 -
G.C.I Construction 11346 Concreting of Baao-Iriga City, San Nicolas, Baao Section 05/29/09 V 1.433 87 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
G.C.I Construction 11346 Road Upgrading of Libon-Bacolod-San Vicente-Marocmoc-Buga Road 05/28/09 V 19.230 134 O 0.326 0.240 0.150 0.030 0.040 0.050 83.60 -
G.C.I Construction 11346Const. of San Fernando-Oas By-Pass Road, Brgy. Bonbon, Libon to Brgy.
Calzada03/02/09 V 19.160 300 C 0.432 0.133 0.300 - - - 86.50 84.48%
Satisfactory
G.C.I Construction 11346 Construction of 2 Storey Multi-Purpose Building 03/09/09 V 0.945 120 C 0.431 0.200 0.300 - - - 93.10 *93.10%
V. Satisfactory
G.C.I Construction 11346 Construction of Roads 03/12/09 V 3.821 120 C 0.438 0.200 0.300 - - - 93.80 *93.80% V.Satisfactory
G.C.I Construction 11346 Rehab./Impv't of Talongog-Busac River Control 03/06/09 V 19.269 90 C 0.469 0.133 0.300 - - - 90.20 *90.20%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page168
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
G.C.I Construction 11346
Rehab./Reconst. of Damaged National Road and Generated from Pavement Mgt. System (Highway
Dev't & Mgt. HDM-4) Jct. Bato-Baras Road
03/04/09 V 19.180 301 O 0.361 0.300 0.150 0.030 0.061 0.050 95.20 -
G.C.I Construction 11346 Repair/Restoration of Damaged Dike Maipon R.C. 03/06/09 V 14.385 180 C 0.445 0.200 0.300 - - - 94.50 84.54%
Satisfactory
G.C.I Construction 11346
Rehab./Reconst./Upgrading of Damaged National Roads, Daang
Maharlika, Km. 395+000-Km. 426+000 with exception
09/09/09 V 28.084 180 C 0.479 0.154 0.300 - - - 93.30 *93.30% V. Satisfactory
G.C.I Construction 11346Rehab./Reconst. of Damaged
National Roads, Jct. Bato-Baras Road
09/05/09 V 19.180 390 C 0.386 0.200 0.300 - - - 88.60 92.56% V. Satisfactory
G.C.I Construction 11346 Rehab./Reconst. of Naga City Bdry,. Calabanga-Balongay Road 09/10/09 V 47.763 120 C 0.476 0.148 0.300 - - - 92.40 *92.40%
V. Satisfactory
G.C.I Construction 11346 Rehabilitation of Danao-Pasacao Road 09/11/09 V 47.955 318 C 0.416 0.200 0.300 - - - 91.60 *91.60%
V. Satisfactory
G.C.I Construction 11346 Road Opening of Pararapo-Pulang Daga Road 09/09/09 V 19.107 100 C 0.400 - 0.500 - - - 90.00 *90.00%
V. Satisfactory
G.C.I Construction 11346 Rehab./Dredging of Bato River Control 09/04/09 V 14.390 180 C 0.384 - 0.500 - - - 88.40 *88.40%
Satisfactory
G.C.I Construction 11346 Reconst. of Cabangan River Control, Ubaliw 09/02/09 V 19.269 90 C 0.375 - 0.500 - - - 87.50 *87.50%
Satisfactory
G.C.I Construction 11346Road Opening/Const. of Missing
Links of Malinao-Buhi Road, (Buhi Side)
09/08/09 V 19.107 179 O 0.311 0.300 0.150 0.030 0.047 0.033 87.10 -
G.C.I Construction 11346 Const. of Salvacion-Baybay, Zone 7 Road 09/10/09 V 3.061 120 C 0.362 0.200 0.300 - - - 86.20 *86.20%
Satisfactory
G.C.I Construction 11346 Road Upgrading of Libon-Bacolod-San Vicente-Marocmoc-Buga Road 09/02/09 V 19.230 134 C 0.424 0.154 0.300 - - - 87.80 85.20%
Satisfactory
G.C.I Construction 11346Completion of Minaili Bridge and Approaches along Panganiban-
Bagamanoc Road02/25/10 V 13.891 275 C 0.492 0.133 0.300 - - - 92.50 92.50%
V. Satisfactory
G.C.I Construction 11346 Quinali-Talisay River Flood Control Embankment & Channelization 02/26/10 V 38.400 417 O 0.360 0.300 0.105 0.030 0.050 0.033 87.80 -
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Gigmoto-Viga Road, Phase II 02/25/10 V 74.100 270 O 0.349 0.245 0.150 0.030 0.050 0.050 87.40 -
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Viga Panganiban-Bagamanoc Road 02/25/10 V 19.192 180 O 0.366 0.247 0.133 0.030 0.045 0.050 87.10 -
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Baras-Gigmoto-Viga Road 02/25/10 V 75.850 343 C 0.424 0.133 0.300 - - - 85.70 85.70%
Satisfactory
G.C.I. Construction 11346Const. of Poblacion-Marede-Sta. Clara-Patunungan-Sinago Brgy.
Road04/02/11 II 48.240 353 C 0.392 0.133 0.000 - - - 52.50 77.88%
Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page169
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
G.D.L Construction 22796 Rehab. of San Miguel-Sibul Road 09/08/09 III 19.043 120 C 0.414 0.133 0.300 - - - 84.70 *84.70% Satisfactory
G.D.L. Construction / Persan Construction, Inc.
(JV) JV-07-165 Norzagaray-Bigte Road Including of
Replacement of Kay Uwak Bridge 06/01/09 III 29.494 180 C 0.270 0.200 0.300 - - - 77.00 84.02%Satisfactory
G.D.L. Construction/E.C. De Luna Constructio
Corporation (JV)JV-07-094
Rehab./Reconst. of Damaged Paved National Road at Gen,. Alejo Santos
Highway, Plaridel-Bustos09/04/09 III 150.985 310 C 0.402 0.133 0.300 - - - 83.50 84.16%
Satisfactory
G.E.A Construction Corp. 10163Road Upgrading at Abre de Ilog-San
Jose Road (San Pedro-Mangat Section) Brgy. San Pedro
Goldfin Construction 21343Const. of 4 Storey-8 Classroom Sch.
Bldg. at Basak Community Elementary School
03/08/10 VII 5.220 120 C 0.425 0.139 0.300 - - - 86.40 89.83% V. Satisfactory
Goldrich Construction 16489 Masantol River Wharf (Phase 2) Improvement Project 7/1-4/08 PPA 16.879 120 O 0.362 0.240 0.100 0.015 0.035 0.067 81.84 -
Goldrich Construction 31884 Repair of retaining Wall, Mooring and Fendering System 10/25-27/11 PPA 17.960 240 O 0.374 0.254 0.093 0.030 0.047 0.050 84.75 -
Goldrich Construction 16489 Repair/Rehab. Multi-Purpose Building, San Jose St. 02/27/09 NCR 2.879 127 C 0.494 0.166 0.300 - - - 96.00 *96.00%
V.Satisfactory
Goldrich Construction & Trading (Formerly Gold
Rich Construction)16489
Rehab., Reconst. of Damaged National Roads along Kennon Road,
Loakan Road09/10/09 CAR 19.279 88 C 0.455 0.133 0.300 - - - 88.80 *88.80%
Satisfactory
Goldrock Construction & Development Corp. 5389
Road Upgrading (Conc.) of El Nido-Jct. New Ibajay Road, Sta.276+960 -
H C M Construction Corporation 19382 Rehab. of MSR-Quirino Brgy.
Manuyo to Brgy. Aldana 06/04/09 NCR 14.320 60 C 0.485 0.133 0.300 - - - 91.80 *91.80% V. Satisfactory
H C M Construction Corporation 19382 Rehab./Reconst. of CAA Road 06/08/10 NCR 4.762 60 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page183
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
H R B Construction 10528 Concrete Pedestrian Bridge, San Francisco 03/12/09 V 0.946 94 C 0.422 0.200 0.300 - - - 92.20 *92.00%
V. Satisfactory
H R B Construction 10528 Const. of Multi-Purpose Building (Phase III) San Ramon Pilot H/S 03/10/09 V 0.473 90 C 0.457 0.133 0.300 - - - 89.00 *89.00%
Satisfactory
H.D de Castro Construction 33146
Repair/Rehab. along Baguio-Bua-Itogon Road, Km. 263+600-Km.
263+62608/29/10 CAR 2.611 120 C 0.434 0.186 0.300 - - - 92.00 92.00%
V. Satisfactory
H.G Lopez Construction 17691 Construction of 2-CL School Building @ Ayaoan Elem. School 09/02/09 I 1.241 85 C 0.453 0.189 0.300 - - - 94.20 *94.20%
V. Satisfactory
H.G Lopez Construction 17691Repair/Rehab. of Damaged Flood
Control Structures at San Juan River Control, Brgy. Carcarabasa
05/25/10 I 2.852 75 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
H.G Lopez Construction 17691 Const. of MPB Phase IV at Central East No. 2 05/26/10 I 0.929 108 C 0.398 0.133 0.300 - - - 83.10 83.10%
Satisfactory
H.G Lopez Construction 17691Construction of Road leading to
Christ the Redeemer, Brgy. 1 (Lubrin Hts.)
02/24/09 I 1.099 88 C 0.409 0.172 0.300 - - - 88.10 83.60%Satisfactory
H.G. Lopez Construction 17691
Road Upgrading (Gravel to Paved) of San Fernando - Bagulin Road at
Km.269+000 - 279+000 with exceptions
03/29/11 I 16.071 280 C 0.368 0.200 0.300 - - - 86.80 84.94% Satisfactory
H.L.J Construction & Enterprises 18080
Conc. of Dancalan-Candoni-Damutan Valley Rd., Caningay Section, Brgy.
Caningay03/08/10 VI 16.235 280 C 0.339 0.187 0.300 - - - 82.60 87.82%
Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Anilao-Banate Rd., Km.
250+660 - Km. 256+000 02/24/10 VI 5.788 120 C 0.415 0.193 0.300 - - - 90.80 86.66% Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Tiwi-Talisay Rd., Buri
Section Km. 274+173 - Km. 274+560 02/04/10 VI 4.823 120 C 0.374 0.190 0.300 - - - 86.40 86.40% Satisfactory
H.L.J Construction & Enterprises 18080
Conc. of Rosario-Cansilayan Rd., Km. 280+300 - Km. 281+395.50 w/
exception02/24/10 VI 6.753 130 C 0.406 0.200 0.300 - - - 90.60 83.58%
Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Boracay Rd. (Lapus-Lapus,
Fairways Section) 02/28/10 VI 19.686 452 C 0.374 0.200 0.300 - - - 87.40 82.03% Satisfactory
H.L.J Construction & Enterprises 18080
Conc. of Barotac-Nuevo-Dumangas-Dacutan Wharf National Rd. (Conc. of Coastal Rd., Beach Bum Portion)
06/17/10 VI 4.823 120 C 0.363 0.200 0.300 - - - 86.30 86.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page184
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
H.L.J Construction & Enterprises 18080
Rehab./Recons./Upgrading of Dumaguete North Rd., Polo-Tugas
Rd. Sect.09/12/09 VII 23.022 210 O 0.372 0.240 0.150 0.030 0.037 0.033 86.20 -
H.L.J Construction & Enterprises 18080
Rehab./Reconst./Upgrading of Dumaguete North Road, Polo-Tugas
Road Section03/01/10 VII 23.040 245 C 0.366 0.200 0.300 - - - 86.60 85.79%
Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Barangay Tampi-San Roque-
Siapo Road 09/02/10 VII 5.740 100 C 0.357 0.200 0.300 - - - 85.70 85.70% Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Farm-to-Market Road, Brgy.
Panub-tuban 06/08/10 VII 0.852 120 C 0.349 0.180 0.300 - - - 82.90 82.90% Satisfactory
H.L.J Construction & Enterprises 18080
Impvt. of Roads leading to the Twin Springs Project, Brgy. Bunga to
Brgy. Baslay Road11/25/08 VII 9.311 145 O 0.323 0.236 0.100 0.030 0.027 0.067 78.30 -
H.L.J Construction & Enterprises 18080
Conc. of Dancalan-Candoni-Damutan Valley Road, Caningay Section,
Brgy. Caningay05/30/09 VI 16.235 280 O 0.380 0.268 0.150 0.023 0.045 0.033 89.90 -
H.L.J Construction & Enterprises 18080
Conc. of Dancalan-Candoni-Damutan Valley Road, Tabu Section, Brgy.
Tabu05/30/09 VI 18.335 280 O 0.366 0.251 0.150 0.023 0.050 0.033 87.30 -
H.L.J Construction & Enterprises 18080 Reconstruction of Bacolod South
Kabankalan Road 06/01/09 VI 16.997 180 C 0.375 0.200 0.300 - - - 87.50 84.26% Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Boracay Road (Lapus-
Lapus, Fairways Sect.) 03/15/09 VI 19.686 289 O 0.312 0.296 0.150 0.018 0.050 0.033 85.90 -
H.L.J Construction & Enterprises 18080
Conc. Paving of National Road along Dancalan-Candoni Road, km. 104+058 - km. 104+372, Brgy.
Dancalan
03/07/09 VI 2.957 182 C 0.392 0.200 0.300 - - - 89.20 85.66% Satisfactory
H.L.J Construction & Enterprises 18080
Conc. Paving of National Road along Dancalan-Candoni Road, km. 105+447 - km. 105+777, Brgy.
Dancalan
03/07/09 VI 3.047 120 C 0.436 0.200 0.300 - - - 93.60 82.20% Satisfactory
H.L.J Construction & Enterprises 18080 Reconst. of Bacolod South
Kabankalan Road 03/03/09 VI 16.997 180 O 0.261 0.292 0.150 0.030 0.055 0.033 82.10 -
H.L.J Construction & Enterprises 18080 Conc. of Dancalan-Candoni-Damutan
Valley Road, Tabu Sect., Brgy. Tabu 09/17/09 VI 18.335 280 C 0.394 0.200 0.300 - - - 89.40 88.14% Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Road, Capalla Avenue
Barangay Poblacion 09/10/09 VI 0.959 60 C 0.490 0.067 0.300 - - - 85.70 *85.70% Satisfactory
H.L.J Construction & Enterprises 18080
Rehab. of Sigma-Ivisan Road Section Km.88+352-Km.93+090 with
exception08/31/10 VI 14.340 180 C 0.448 0.133 0.300 - - - 88.10 86.72%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page185
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
H.L.J Construction & Enterprises 18080 Conc. of National Road @ Barangay
Sangke 08/25/10 VI 4.737 100 C 0.366 0.200 0.300 - - - 86.60 84.02% Satisfactory
H.L.J Construction & Enterprises 18080
Rehab./Reconst./Upgrading of Damaged Paved Roads Digos-Makar Rd., Tagansule Proper Section, Km.
1586+100-Km. 1587+000
09/03/09 XI 11.575 180 C 0.423 0.133 0.300 - - - 85.60 86.44% Satisfactory
H.L.J. Construction & Enterprises 18080 Road Upgrading of Ajuy-Jamul-Awon-
Concepcion Road 04/13/11 VI 9.454 238 C 0.452 0.133 0.300 - - - 88.50 *88.50% Satisfactory
H.L.J. Construction & Enterprises 18080
Conc. of Balabag-Marquina-Cayos Patlad Road, Km.283+018 -
Km.284+022.25 w/ exception04/12/11 VI 14.448 210 C 0.438 0.133 0.300 - - - 87.10 88.00%
Satisfactory
H.L.J. Construction & Enterprises 18080
Road Upgrading of Jct. Bancal-Leon-Antique Bdry. Road Sta.43+740 -
Sta.43+940 and Sta.47+360 - Sta.47+885
04/14/11 VI 17.761 210 C 0.480 0.133 0.300 - - - 91.30 87.88% Satisfactory
H.L.J. Construction & Enterprises 18080
Concrete Paving of National Road along Bacolod South Road,
Km.195+516 - Km.196+463 with exception Brgy. Asia
04/02/11 VI 9.232 230 O 0.376 0.215 0.150 0.030 0.047 0.033 85.10 -
H.L.J. Construction & Enterprises 18080 Conc. of Bacolod South Road,
Sangke Section Brgy. Sangke 04/02/11 VI 28.170 280 O 0.367 0.237 0.150 0.030 0.004 0.050 83.80 -
H.L.J. Construction & Enterprises 18080
Rehab. of Polo Sect., Tanjay-Dumaguete North Rd., Tanjay City-existing pavement (w/ exceptions),
Km. 26.378 - Km. 27.294
04/05/11 VII 19.249 240 O 0.332 0.300 0.150 0.030 0.050 0.050 91.20 -
H.S Oaminal Construction & Gen.
Merchandising10578 Completion of Dormitory Building I
Phase I 12/2/09 DOST 5.829 155 C 0.446 0.191 0.300 - - - 93.70 93.70% V. Satisfactory
H.T.L - OQC Sta. Fe Road Project (JV) JV-09-122
Rehab./Reconst./Upgrading of Damaged Paved Nat'l Road,
KO209+(896) - KO(-236) Dalton Section
09/01/10 II 19.296 120 C 0.000 0.200 0.300 - - - 50.00 50.00% Poor
H.T.L Construction 3962 Conc. of Burgos-Gen. Aguinaldo Road 03/14/09 II 14.459 120 C 0.415 0.200 0.300 - - - 91.50 82.38%
Satisfactory
H.T.L Construction 3962 Redecking of Ipil Bridge along Daang Maharlika 03/05/09 II 11.560 90 C 0.438 0.200 0.300 - - - 93.80 84.08%
Satisfactory
H2 Landmark Builders, Inc. (Formerly: Landmark
Builders)7400
Road Upgrading of Mati-Maragusan Rd. Menzi-Don Martin Maragusan
Sect.06/07/10 XI 19.296 120 C 0.464 0.133 0.300 - - - 89.70 89.70%
V. Satisfactory
H2 Landmark Builders, Inc. (Formerly: Landmark
Builders)7400 Road Upgrading of Mati-Maragusan
Rd. Taguibo-Calapagan Sect. 06/07/10 XI 17.052 100 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
Haidee Construction - AL B. Construction (JV) JV-07-081
Impvt./Widening/Conc. of McArthur Highway (MNR) Package IV, Apalit-
San Simon-Minalin-Sto. Tomas Section
03/10/09 III 64.127 180 C 0.443 0.200 0.300 - - - 94.30 *94.30%V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page186
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Haidee Construction & Dev't. Corp. / Northern
Builders (JV)JV-09-272
Widening/Conc. of McArthur Highway (MNR), Meycauayan
(Bulacan) to Mabalacat (Pampanga), Pampanga 1st Congressional District
(Angeles to Mabalacat Sect.)
03/30/11 III 82.007 210 C 0.436 0.200 0.300 - - - 93.60 91.62% V. Satisfactory
Haidee Construction and Development Corp. 10365
Impvt./Widening/Conc. of Manila North Road (MNR) Phase V,
Meycauayan (Bulacan) to Mabalacat (Pampanga), Pampanga Section, Completion of Dalaquitan Bridge,
Contract Package VII
02/22/10 III 46.389 150 C 0.447 0.200 0.300 - - - 94.70 91.52% V. Satisfactory
Haidee Construction and Development Corp. 10365 Replacement of Dalaquitan Bridge &
Approaches, Package VI 03/10/09 III 82.045 180 C 0.443 0.200 0.300 - - - 94.30 *94.30%V. Satisfactory
Hakkatan Konstruk & General Merchandise 31610
Const./Impvt. of DPWH Office Bldg., 3rd Negros Occidental District
Engineering & Sitio Mojon, Brgy. I06/05/10 VI 4.308 220 O 0.356 0.266 0.150 0.022 0.041 0.033 86.80 -
Hakkatan Konstruk & General Merchandise 31610
Const./Impvt. of DPWH Bldg., 3rd Negros Occidental DEO at Sitio
Mojon, Brgy. 108/24/10 VI 4.474 220 O 0.369 0.240 0.150 0.030 0.035 0.033 85.70 -
Halrey Construction Inc. 3267 Rehab. of Muzon-Tungkong Mangga Road, City of San Jose del Monte 03/04/10 III 14.282 110 C 0.421 0.133 0.300 - - - 85.40 85.40%
Satisfactory
Halrey Construction Inc. 2267Rehab./Reconst./Upgrading of
Damaged National Roads at San Juan-Laiya Rd.
06/07/10 IVA 46.279 284 C 0.448 0.136 0.300 - - - 88.40 89.69% V. Satisfactory
Halrey Construction Inc. 2267Const. (Opening/Widening/Conc.) of
CALA-Daang Hari Road Boundary (Pasong Buwaya 1 Section)
Homefixmix Builders Center 29997 Conc. of Pagudpud Barangay road,
Purok 5 03/29/11 I 0.944 38 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory
Homefixmix Builders Center 29997 Conc. of FTMR at Talogtog-
Sinapangan 03/29/11 I 0.969 48 C 0.361 0.200 0.300 - - - 86.10 *86.10% Satisfactory
Homefixmix Builders Center 29997 Rehab. of Ilocanos Sur Bridge 03/29/11 I 2.164 140 C 0.357 0.200 0.300 - - - 85.70 *85.70%
SatisfactoryHomefixmix Builders
Center 29997 Const. of 2CL Building at Cabaroan E/S 08/23/10 I 0.494 77 C 0.489 0.133 0.300 - - - 92.20 92.20%
V. SatisrfactoryHomefixmix Builders
Center 29997 Construction of Multi-Purpose Building 05/27/09 I 1.880 120 C 0.494 0.142 0.300 - - - 93.60 86.46%
SatisfactoryHomefixmix Builders
Center 29997 Concreting of Bugbugcao Barangay Road 02/24/09 I 0.191 18 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
Homefixmix Builders Center 29997 Concreting of Pagdildilan Barangay
Road, Brgy. Pagdildilan 02/24/09 I 0.099 25 C 0.446 0.133 0.300 - - - 87.90 *87.90%Satisfactory
Homeworld Construction Corporation 14725
Rehab./Reconst./Upgrading of Damaged Paved national Road along
Bacolod North Road Calatrava Section
03/31/11 VI 37.703 238 C 0.450 0.134 0.300 - - - 88.40 *88.40% Satisfactory
Homeworld Construction Corporation 14725 Const./Rehab./Widening of Concrete
Pavement along Bacolod North Road 03/30/11 VI 47.869 273 C 0.393 0.200 0.300 - - - 89.30 87.98% Satisfactory
Homeworld Construction Corporation 14725 Rehab. (Asphalt Overlay) of Bacolod
South Road 04/01/11 VI 28.475 245 C 0.470 0.133 0.300 - - - 90.30 86.04% Satisfactory
Homeworld Construction Corporation 14725 Rehab./Reconst. of Sum-ag-
Abuanan Road 05/27/09 VI 31.087 564 C 0.397 0.186 0.300 - - - 88.30 89.83% Satisfactory
Homeworld Construction Corporation 14725
Rehab./Reconst./Upgrading of Bacolod South Road (San Enrique-
Tibsok Section)09/18/09 VI 19.095 185 C 0.395 0.133 0.300 - - - 82.80 86.88%
Satisfactory
Homeworld Construction Corporation 14725 Conc. of Bacolod South Road (Brgy.
4 Section) 09/16/09 VI 7.750 121 C 0.440 0.124 0.300 - - - 86.40 85.44% Satisfactory
Homeworld Construction Corporation (Formerly:
Homeworld Engineering)14725 Asphalt Overlay of Existing Asphalt
Pavement along Bacolod North Rd. 03/11/10 VI 13.946 80 C 0.435 0.200 0.300 - - - 93.50 93.50% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page192
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Homeworld Construction Corporation (Formerly:
Homeworld Engineering)14725
Rehab./Impvt. (Asphalt Overlay) of Bacolod North Road, Km. 1+904-Km.
3+704 (with exceptions)08/24/10 VI 23.619 60 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
Homeworld Engineering 14725Rehab./Reconst. of Damaged Paved
Nat'l Roads Generated from PMS/HDM-4, Sum-ag-Abuanan Road
03/05/09 VI 31.087 471 O 0.266 0.281 0.150 0.030 0.060 0.050 83.70 -
Honexson Builders 22288 Completion of MPB at Brgy. Paciano Bangoy 04/13/11 XI 0.970 85 C 0.431 0.200 0.300 - - - 93.10 *93.10%
V. Satisfactory
Honexson Builders 22288 Package 2-A: Concreting of Road at Brgy. Panacan 03/10/10 XI 1.888 180 C 0.388 0.200 0.300 - - - 88.80 88.80%
Satisfactory
Honeyville Construction 32160 Impv't./Conc. Of Presentacion-Maligaya Road 04/08/11 V 18.835 210 C 0.447 0.133 0.300 - - - 88.00 85.90%
Satisfactory
Honeyville Construction 32160 Impv't./Conc. Of San Rafael-Mampirao-Calalahan-San Jose Road 04/09/11 V 43.725 240 C 0.451 0.133 0.300 - - - 88.40 84.95%
Satisfactory
Honeyville Construction 32160Impvt. of San Rafael-Mampirao-San
Jose Road, (Pugay-Mampirao Section)
05/30/09 V 18.817 215 O 0.335 0.300 0.150 0.030 0.040 0.050 90.50 -
Honeyville Construction 32160 Impvt. of Goa-Digdigon-San Isidro Road, San Isidro Section 09/09/09 V 18.788 195 O 0.313 0.278 0.150 0.030 0.047 0.050 86.80 -
Hony Trading and Construction 26898 Completion of MPB at Brgy. Palatiw 09/10/09 NCR 1.433 80 C 0.482 0.133 0.300 - - - 91.50 *91.50%
V. Satisfactory
Hony Trading and Construction 26898
Rehab./Reconst./Upgrading of Damage Paved National Road, Baay-
Suba Road08/20/10 I 19.288 180 C 0.423 0.139 0.300 - - - 86.20 86.20%
Satisfactory
Hony Trading and Construction 26898 Const. of R.P. Cruz E/S MPB, R.P.
Cruz E/S, Brgy. Lower Bicutan 06/03/10 NCR 3.849 146 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfactory
Horamabi Builders 24129 Const. of Two (2) CL Units, Three (3) CL Sch. Bldg. @ Payangan E/S 04/01/11 III 4.473 150 O 0.369 0.300 0.150 0.030 0.029 0.033 91.10 -
Horamabi Builders 24129 Channel Impvt. at Tenejero River 04/02/11 III 9.475 115 O 0.352 0.240 0.150 0.030 0.029 0.033 83.40 -
Horamabi Builders 24129 Rehab./Reconst./Upgrading of Mt.Samat Rd. 05/27/10 III 18.996 28 C 0.458 0.129 0.300 - - - 88.70 88.70%
Satisfactory
Horamabi Builders 24129 Rehab./Reconst./Upgrading of Roman Expressway 05/27/10 III 10.553 20 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
Horamabi Builders 24129 Rehab./Reconst./Upgrading of Gov. J.J. Linao Rd. 05/27/10 III 9.507 20 C 0.406 0.133 0.300 - - - 83.90 83.90%
Satisfactory
Horamabi Builders 24129 Rehab of Flood Control Dike, Brgy. Tenejero 08/19/10 III 4.720 50 C 0.450 0.133 0.300 - - - 88.30 88.30%
Satisfactory
Horamabi Builders 24129 Improvement/Rehabilitation of Roman Expressway 05/21/09 III 39.329 90 O 0.348 0.300 0.150 0.030 0.037 0.050 91.50 -
Horamabi Builders 24129 Road Upgrading (Gravel to Paved) @ 5th Street, Mariveles 05/22/09 III 2.895 36 C 0.382 0.200 0.300 - - - 88.20 *88.20%
Satisfactory
Horamabi Builders 24129 Rehab/Reconstruction/Upgrading of Lamao Access Road 05/22/09 III 10.615 42 C 0.413 0.133 0.300 - - - 84.60 *84.60%
Satisfactory
Horamabi Builders 24129 Const. of Two (2) Classroom Sch. Bldg. @ E.C. Bernabe National HS 02/26/09 III 0.887 58 C 0.366 0.187 0.300 - - - 85.30 89.64%
V.Satisfactory
Horamabi Builders 24129 Impvt./Rehab. of Roman Expressway 08/29/09 III 39.564 90 C 0.434 0.200 0.300 - - - 93.40 92.26% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page193
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Horamabi Builders 24129 Rehab./Reconst./Upgrading of Jct. Layac-Balanga-Mariveles Port Road 08/28/09 III 48.250 81 C 0.469 0.133 0.300 - - - 90.20 86.78%
Satisfactory
Horomabi Builders 24129 Rehab. of Road at Brgy. Talisay 02/19/10 III 1.402 32 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory
Houserock Builders & Trading 18822
Const./Repair & Rehab. of Multi-Purpose Bldg., Calabash St., (Phase
I & E Construction 10410Widening of Road inc. RROW
acquisition Old Manila South Rd. (San Pedro Sect.)
05/27/10 IVA 19.259 50 C 0.401 0.200 0.300 - - - 90.10 90.10% V. Satisfactory
I & E Construction 10410 Const./Repair/Impvt. of Farm-to-Market Road, Brgy. Tamlong 09/03/09 IVA 9.641 129 C 0.347 0.200 0.300 - - - 84.70 *84.70%
Satisfactory
I & E Construction 10410 Const./Repair/Improvement of Brgy. Del Carmen FMR 09/03/09 IVA 9.643 129 C 0.340 0.200 0.300 - - - 84.00 *84.00%
Satisfactory
I & E Construction 10410 Impvt. of Manila East Road, Cardona-Pililla Section (with exception) 02/17/10 IVA 14.395 60 C 0.387 0.200 0.300 - - - 88.70 88.70%
Satisfactory
I & E Construction 10410Rehab/Repair of CSCFJ Road, Km. 51+880-Km. 53+955 (w/ exception)
Interior-Philoworks Construction (JV) JV-06-036 Const./Impvt. of Libon-Marocmoc-
Pantao Road 02/28/10 RRNDP 223.130 616 C 0.460 0.133 0.300 - - - 89.30 91.88% V. Satisfactory
IRA Construction 33159 Construction of Drainage System, Brgy. Buhangin 05/27/09 III 0.936 90 C 0.482 0.200 0.300 - - - 98.20 *98.20%
Outstanding
IRA Construction 33159 Concreting of Road Sitio Setan, Calabuanan 03/03/09 III 0.934 75 C 0.425 0.133 0.300 - - - 85.80 *85.80%
SatisfactoryIRA Construction / ZF
Construction (JV) JV-08-197 Concreting of Road from PCA to Cabitukulan, Brgy. Reserva 09/08/09 III 9.441 150 C 0.431 0.133 0.300 - - - 86.40 *86.40%
SatisfactoryIsabela EBC Builders &
Construction 26089 Restoration of Dammang West Revetment 04/11/11 II 5.790 90 C 0.400 0.133 0.300 - - - 83.30 *83.30%
Satisfactory
Isaga Builders 8652
Rehab./Reconst. of Damaged Paved National Road Abbut-Conner-
Kabugao Road (Gangat-Calafug Sect.)
04/02/11 CAR 9.814 388 O 0.378 0.237 0.150 0.030 0.048 0.050 89.30 -
Isaga Builders 8652Proposed Rehab./Impvt. along
Calanasan-Claveria Road, Magnas Section
02/27/09 CAR 9.272 416 O 0.282 0.287 0.150 0.030 0.043 0.033 82.50 -
Isaga Builders 8652Rehab. of National Road along Abbut-Conner-Kabugao Road (KO539+000 -
KO564+532)09/05/09 CAR 9.344 359 C 0.482 0.133 0.300 - - - 91.50 90.00%
V. Satisfactory
Isaga Builders 8652 Rehab. / Impvt. along of Calanasan-Claveria Road, Magnas Section 09/05/09 CAR 9.120 438 O 0.368 0.240 0.150 0.030 0.056 0.033 87.70 -
Isaga Builders 8652 Rehab. of Abbut-Conner-Kabugao Road (Calafug-Mabubua Section) 05/28/10 CAR 7.290 330 C 0.430 0.200 0.300 - - - 93.00 87.06%
Satisfactory
Isaga Builders 8652
Rehab./Reconst. of Damaged National Road Abbut-Conner-
Kabugao Road (Gangat-Calafug Section)
08/20/10 CAR 9.788 360 O 0.380 0.240 0.150 0.030 0.040 0.033 87.30 -
ISH Construction Construction of Three (3) Storey 15-Classroom School Bldg. (Building) 11/12/10 NHA 21.887 150 O 0.388 0.166 0.093 0.020 0.044 0.050 76.14 -
ISH Construction 30407 Construction of 3-Storey, 15-Classroom School Building 06/08/09 NHA 18.108 150 O 0.391 0.300 0.150 0.015 0.000 0.050 90.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page199
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ISH Construction 30407Const. of Multi-Purpose Covered
ISH Construction 15757 Construction of One (1) Unit, Three Storey 15 Classroom School 09/22/10 NHA 19.906 195 C 0.48 0.20 0.30 - - - 98.00 92.80%
V. Satisfactory
ISH Construction Inc. 30407 Construction of Three-Storey School Building (12 Classrooms) 07/10/08 SLB 17.201 150 O 0.400 0.246 0.100 0.020 0.053 0.100 91.80 -
ISH Construction, Inc. 30407 San Isidro Resettlement Project 03/2-4/2010 NHA 13.266 150 O 0.3787 0.3000 0.1058 0.03 0.05 0.05 91.45 -
ISH Construction, Inc. 30407Const. of Multi-Purpose Covered
Court, Functional Hall and Day Care Center Building
Italian-Thai Development Public Company, Ltd. FC-05-009 Contract Package IV-A Suyo
Cervantes Road, ARLDP, Phase V 08/18/10 PJHL 1,184.170 1,268 C 0.408 0.200 0.300 - - - 90.80 94.22% V. Satisfactory
ITP Construction Inc. 9392 Const. of 3-Storey 15-Classroom School Building 07/30/09 NHA 18.111 150 O 0.400 0.299 0.150 0.030 0.058 0.050 98.70 -
ITP Construction Inc. 9392 Const. of one (1) Three-Storey School Building 12/11/09 NHA 19.920 195 C 0.500 0.200 0.300 - - - 99.09 99.09%
Outstanding
ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building 09/24/08 NHA 17.202 150 O 0.395 0.286 0.030 0.020 0.053 0.033 81.62 -
Ivahrick Contractors 13688 Riprapping of Creek along Tripa De Gallina, Brgy. 158 04/14/11 NCR 2.063 116 O 0.360 0.240 0.150 0.030 0.023 0.033 83.60 -
Ivahrick Contractors 13688 Const. of Flood Control 02/25/09 NCR 2.858 94 C 0.340 0.200 0.300 - - - 84.00 77.64% Unsatisfactory
Ivy Michelle Trading & Construction 24093
Road Upgrading (Conc.) of Jct. Paglaum-Bato Road, Sta.195+060 -
J. Cordon Construction & Supply 32982 Repair of School Bldg. at Leon
National High School 03/05/10 VI 1.440 90 O 0.296 0.300 0.150 0.015 0.027 0.033 82.10 -
J. Cordon Construction & Supply 32982 Repair of School Bldg., Leon
National High School 06/18/10 VI 1.440 90 C 0.450 0.133 0.300 - - - 88.30 83.96% Satisfactory
J. Cordon Construction & Supply 32982 Const. of 2-CL School Building, Leon
National High School 09/10/09 VI 0.925 60 C 0.441 0.099 0.300 - - - 84.00 *84.00% Satisfactory
J. Custorio Construction 16237 Const. of Catarman Bridge along Catarman-Laoang Road 05/26/09 VIII 9.419 150 O 0.360 0.240 0.150 0.030 0.050 0.033 86.30 -
J. Custorio Construction 16237Rehab./Reconst./Upgrading of
Damaged Paved National Roads, along Catarman-Calbayog Road
05/26/09 VIII 9.425 120 O 0.331 0.233 0.150 0.030 0.050 0.033 82.70 -
J. Custorio Construction 16237 Impvt./Rehab. of Dagansa-Libjo Road 03/07/09 VIII 4.797 60 O 0.314 0.300 0.050 0.020 0.037 0.050 77.10 -
J. Custorio Construction 16237 Const. of Catarman Bridge along Catarman-Laoang Road 09/14/09 VIII 9.419 172 O 0.345 0.240 0.150 0.030 0.045 0.033 84.30 -
J. Marbela Construction & Supply 24268 Construction of Administration
Building Ph.I 11/11/10 DOST 9.134 270 C 0.47 0.20 0.30 - - - 97.00 97.00% Outstanding
J. Simeon Construction 31867 Repair of Sch. Bldg. at Cayetano Arellano Elementary School 08/19/10 NCR 0.579 120 C 0.492 0.133 0.300 - - - 92.50 92.50%
V. Satisfactory
J.C Baac Construction Corporation 25974
Impvt./Rehab. of Larion Alto-Cabbo-Baliuag Peñablanca Road (going to
Callao Alternate Route)02/16/10 II 19.131 346 C 0.365 0.200 0.300 - - - 86.50 86.80%
Satisfactory
J.C Baac Construction Corporation 25974 Improvement/Rehabilitation of
Balbalan-Pinukpuk Road 05/28/09 CAR 26.052 260 C 0.376 0.200 0.300 - - - 87.60 81.48% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page201
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
J.C Baac Construction Corporation 25974
Impvt./Rehab. of Kalinga-Abra Road Km. 469+000-476+000 (with
exception)09/02/09 CAR 9.392 308 C 0.416 0.133 0.030 - - - 57.90 *84.90%
Satisfactory
J.C Baac Construction Corporation 25974
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase II,
Suyo-Tangadan Section02/23/10 CAR 47.214 437 C 0.438 0.140 0.300 - - - 87.80 90.68%
V. Satisfactory
J.C Baac Construction Corporation 25974
Impvt./Rehab. Larion Alto-Cabbo-Baliuag Road (Going to Callao
alternate Route)05/18/09 II 19.134 281 O 0.371 0.247 0.150 0.030 0.047 0.033 87.80 -
J.C. Ferrer Construction 11657 Const. of Sch. Bldg., Basista Central School 04/11/11 I 1.157 30 C 0.452 0.133 0.300 - - - 88.50 *88.50%
Satisfactory
J.D Legaspi Construction 9608 Const. of 616 L.M. Manukan Seawall 09/01/10 IX 47.732 511 O 0.228 0.300 0.150 0.030 0.047 0.050 80.50 -
J.D Legaspi Construction 9608
Rehab. of Daang Maharlika Highway, Package I, Section 4 (Allen-Malaga
Section) Km. 669+364.55-Km.674+560.55 with exceptions
03/04/10 VIII 120.582 175 C 0.437 0.133 0.300 - - - 87.00 87.00% Satisfactory
J.D Legaspi Construction 9608
CP-7: Impvt./Conc. of Surigao Del Sur-Davao Oriental Coastal Road, (Manay-Boston) Baganga Section,
Phase II
03/04/10 XI 191.766 597 C 0.351 0.200 0.300 - - - 85.10 86.03% Satisfactory
J.D Legaspi Construction 9608 Construction of Solano-Quezon Road 03/12/09 II 62.893 540 O 0.365 0.300 0.150 0.030 0.055 0.050 95.00 -
J.D Legaspi Construction 9608
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road, (Manay-
Boston) Baganga Section PhaseII, C P No 7
09/06/09 XI 191.035 597 O 0.380 0.300 0.150 0.030 0.042 0.033 93.50 -
J.D Legaspi Construction/VUC Engineering Joint
Venture
JV-08-148
Conc. of Bontoc-Tabuk-Tuguegarao Road (Package BLT-15a), Tinglayan Boundary-Lubuagan-Tabuk Sect. II,
Km. 475.719 - Km.483+500, Gawidan-Balani Sect.
05/30/10 CAR 175.945 427 C 0.357 0.200 0.300 - - - 85.70 85.16% Satisfactory
J.D Legazpi Construction 9608 Construction of Solano-Quezon Road 06/02/09 II 62.893 540 O 0.373 0.300 0.150 0.030 0.051 0.050 95.40 -
J.D. Legaspi Construction 9608 Const. of Sto. Tomas - Manabo
Bridge 04/14/11 CAR 96.009 380 C 0.440 0.196 0.300 - - - 93.60 *93.60% V. Satisfactory
J.D. Legaspi Construction 9608 Rehab./Upgrading along Laoag-
Sarrat-Piddig-Solsona Road 04/03/11 I 42.714 191 O 0.312 0.294 0.150 0.030 0.033 0.033 85.20 -
J.D. Legaspi Construction 9608 Const. of 616 L.M. Manukan Seawall 04/14/11 IX 47.732 542 O 0.393 0.240 0.150 0.024 0.029 0.033 86.90 -
J.D. Legaspi Construction / BHM Construction (JV)
JV-08-152
Conc. of Bontoc-Tabuk-Tuguegarao Rd. (Package BLT-13a) Tinglayan Bdry. Lubuagan-Tabuk Section II
Km.467+000 - Km.471+838 Cagaluan-Gaogao Section
04/04/11 CAR 94.203 484 C 0.456 0.133 0.300 - - - 88.90 83.90% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page202
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
J.D. Legaspi/Unitec (JV) JV-08-187
Const./Road Opening of Zamboanga West Coast Road, Sibuco-Sirawai Road (Phase II), Anongan-Cawit-
Cawit Section, Sta.19+000.00-Sta.25+320.00
03/31/11 IX 179.772 720 C 0.440 0.200 0.300 - - - 94.00 *94.00% V. Satisfactory
J.E Arradaza Construction and Supply 33256 Const. of Drainage System, Nasipit
Main Road going to Family Park 09/18/09 VII 1.152 89 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory
J.E Arradaza Construction and Suppy 33256 Const. /Repair/Impvt. of MPB at Brgy.
Pardo 09/02/10 VII 1.155 65 O 0.376 0.268 0.119 0.015 0.023 0.033 83.40 -
J.E Manalo and Company, Inc. 422 New Port of San Jose 05/04-06/11 PPA 148.337 514 O 0.365 0.292 0.150 0.030 0.070 0.050 95.70 -
J.E Manalo and Company, Inc. 422 New Port of San Jose 10/04-06/11 PPA 148.337 514 O 0.499 0.200 0.300 - - - 99.89 97.24%
OutstandingJ.E Manalo and Company, Inc. 422 Const. of Proposed New Port of San
Jose (Ports & Harbor) 02/8-10/11 PPA 148.336 514 O 0.353 0.300 0.150 0.030 0.070 0.050 95.24 -
J.E. Arradaza Construction and Supply 33256 Const./Repair/Impvt. of MPB at Brgy.
Pardo 04/14/11 VII 1.155 65 C 0.428 0.200 0.300 - - - 92.80 86.22% Satisfactory
J.G Garcia Construction 21054 Opening/Rehab of Farm to Market Road at Two Brgys. 03/09/09 I 0.964 30 C 0.418 0.200 0.300 - - - 91.80 *91.80%
V. Satisfactory
J.G Oranza Construction 33370 Const. of Multi-Purpose Building (Additional), Brgy. Poblacion 03/12/10 XII 1.412 60 C 0.483 0.144 0.300 - - - 92.70 92.70%
V. Satisfactory
J.G Oranza Construction 33370 Completion of Various MPB @ TESDA, Brgy. Lagao 06/17/10 XII 3.527 120 C 0.407 0.133 0.300 - - - 84.00 84.00%
Satisfactory
J.G Oranza Construction 33370 Construction of Multi-Purpose Building, Brgy. Poblacion 03/20/09 XII 0.847 60 C 0.475 0.200 0.300 - - - 97.50 *97.50%
Outstanding
J.G. Garcia Construction 21054 Const. of Sch. Bldg. @ Two (2) Brgy. Dagupan City, Bonuan Boquig NHS 04/12/11 I 1.184 30 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
J.G. Oranza Construction 33370 Const. of 4 CL School Bldg., Dadiangas North H/S, Brgy. North 04/14/11 XII 2.668 120 C 0.471 0.171 0.300 - - - 94.20 *94.20%
V. Satisfactory
J.G. Oranza Construction 33370 Const. of 4 CL School Building, Lanton E/S, Brgy. Apopong 04/14/11 XII 2.668 120 C 0.460 0.164 0.300 - - - 92.40 *92.40%
V. Satisfactory
J.H Pajara Construction Corp. 1890
CP 6, Restoration of Patapat Viaduct under the Arterial Road Links Dev.
Jadestress Builders 9753 Impvt. of Talobatib-Jose Panganiban Road, Brgy. Osmeña 06/04/09 V 9.390 200 C 0.360 0.200 0.300 - - - 86.00 86.48%
Satisfactory
Jadestress Builders 9753 Rehab./Impvt. of Inascan-Bubulusan Barangay Road 09/03/09 V 2.394 75 C 0.410 0.200 0.300 - - - 91.00 92.20%
V. Satisfactory
Jagon Builders 24748 Conc. of Roads with Drainage Impvt. P. Aquino St. Brgy. San Agustin 03/30/11 NCR 4.668 90 O 0.396 0.206 0.150 0.030 0.050 0.033 86.50 -
Jagon Builders 24748 Repair/Rehab./Reconst./Upgrading of North Bay Boulevard 03/30/11 NCR 15.342 181 C 0.442 0.133 0.300 - - - 87.50 82.28%
Jaime B. Ching Enterprises 4256 Rehab. of Bacolod South Road (Pilar-
Marina Section) 05/28/09 VI 9.484 116 O 0.373 0.240 0.150 0.015 0.045 0.033 85.60 -
Jaime B. Ching Enterprises 4256 Rehab. of Bacolod South Road (Pilar-
Marina Section) 09/15/09 VI 9.574 136 C 0.367 0.133 0.300 - - - 80.00 83.36% Satisfactory
Jaime B. Ching Enterprises 4256
Reconst. of Jct. Bagonawa-La Castellana-Isabela Road, Sta.
64+877.90 - Sta. 65+703.60 with exception
08/26/10 VI 9.453 96 C 0.442 0.133 0.300 - - - 87.50 86.84% Satisfactory
Jaime B. Ching Enterprises 4256
Road Upgrading of Isabela-Libas-Negros Occidental Bdry. Road, Km.85+500-Km.87+734.89 with
exception
08/26/10 VI 18.930 216 C 0.437 0.133 0.300 - - - 87.00 85.68% Satisfactory
Jakboa Builders 31563 Repair/Renovation of PTRI Main Building 06/09/09 DOST 2.964 85 C 0.414 0.200 0.000 - - - 61.40 *61.40%
Poor
Jam-C Builders 32870 Widening of Olongapo-Bugallon Rd., San Marcelino Sect. 05/29/10 III 4.725 30 C 0.449 0.133 0.300 - - - 88.20 88.20%
Satisfactory
Jam-C Builders 32870Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Rd. at Apo Rotonda
08/23/10 III 1.890 45 C 0.464 0.133 0.300 - - - 89.70 89.70% V. Satisfactory
Jameetrix Construction 19176 Road Upgrading/Conc. of Inawayan-Baracatan Rd. 08/29/10 XI 11.880 180 C 0.454 0.133 0.300 - - - 88.70 87.92%
Satisfactory
Jameetrix Construction 19176
Rehab./Reconst. Of Damaged Paved National Rds. At Davao City
Diversion Rd., Buhangin NHA-Davao River Bridge Sect.
09/08/10 XI 17.123 115 C 0.442 0.133 0.300 - - - 87.50 87.14% Satisfactory
Jameetrix Construction 19176 Completion of Two Storey Sch. Bldg. at Kabacan E/S, Brgy. Maa 09/17/09 XI 2.892 180 C 0.471 0.133 0.300 - - - 90.40 *90.40%
V. Satisfactory
Jann-Norris Construction and Supplies 31814 Const. of Careb Farm-to-Market Road 04/12/11 II 0.990 24 C 0.474 0.133 0.300 - - - 90.70 *90.70%
V. Satisfactory
Jann-Norris Construction and Supplies 31814 Conc. Of Pantabangan-Canili-Basal-
Baler Road, Lublub 04/15/11 II 10.518 180 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory
Jann-Norris Construction and Supplies 31814 Const. of Drainage Canal (L.B. Perez
St.) 04/11/11 II 0.495 24 C 0.451 0.133 0.300 - - - 88.40 *88.40% Satisfactory
Jann-Norris Construction and Supplies 31814 Sta. Cruz River Control, Barat
Section 04/13/11 II 4.330 60 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory
Jann-Norris Construction and Supplies 31814 Sta. Cruz River Control, Salinas
Section 04/13/11 II 4.330 60 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page207
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Jann-Norris Construction and Supplies 31814 Sta. Cruz River Control, San
Leonardo 04/13/11 II 6.743 60 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory
Jann-Norris Construction and Supplies 31814 Const. of Bonfal Multi-Purpose
Building 03/03/10 II 0.660 44 C 0.429 0.133 0.300 - - - 86.20 86.20% Satisfactory
Jann-Norris Construction and Supplies 31814 Const. of Flood Control Sta. Fe River
(Sabo Pilot Project) 09/01/10 II 14.473 180 C 0.437 0.200 0.300 - - - 93.70 89.74% V. Satisfactory
Japuz-Jansol Enterprises 22869 Const./Completion of MPB Lawigan (Phase II) 04/02/11 X 1.874 110 C 0.438 0.133 0.300 - - - 87.10 *87.10%
Satisfactory
Japuz-Jansol Enterprises 22869 Construction of Teruvian Dam & Canal System 04/13-18/09 NIA 4.178 90 O 0.352 0.180 0.150 0.030 0.064 0.050 82.55 -
Japuz-Jansol Enterprises 22869Completion of Two (2) Storey School
Building, Camiguin National High School
05/31/09 X 1.891 95 C 0.389 0.186 0.300 - - - 87.50 *87.50% Satisfactory
Japuz-Jansol Enterprises 22869 Concreting of Lagoon Road, Brgy. Benoni 05/31/09 X 1.887 199 C 0.440 0.102 0.300 - - - 84.20 *84.20%
Satisfactory
Japuz-Jansol Enterprises 22869 Const. of Soro-Soro MPB 03/07/09 X 2.383 130 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory
Japuz-Jansol Enterprises 22869 Const./Rehab. of MPB Catarman C/S 03/07/09 X 1.902 80 C 0.326 0.200 0.300 - - - 82.60 *82.60% Satisfactory
Japuz-Jansol Enterprises 22869 Construction of Multi-Purpose Building Mambajao-Phase IIB 09/05/09 X 5.240 130 C 0.410 0.200 0.300 - - - 91.00 *91.00%
V. SatisfactoryJapuz-Jansol Enterprises
/Angel & Sam Construction & General
Merchandise Joint Venture
SLI-SN-005401
Const./Completion of Multi-Purpose Building Phase II, Poblacion
Mambajao09/05/09 X 9.541 180 C 0.429 0.200 0.300 - - - 92.90 *92.90%
V. Satisfactory
Jargon Construction & Supply 23474 Const. of Additional Building of
DPWH Regional Office 09/12/09 XII 9.549 150 C 0.431 0.147 0.300 - - - 87.80 *87.80% Satisfactory
Jargon Construction & Supply 23474 Sarangani-Davao del Sur Coastal
Road, Bigwaay Section 09/17/09 XII 7.548 150 C 0.378 0.184 0.300 - - - 86.20 86.92% Satisfactory
Jargon Construction & Supply 23474 Const. of 2-CL School Building at
Maan NHS 03/06/10 XII 1.328 105 C 0.486 0.138 0.300 - - - 92.40 92.40% V. Satisfactory
JFAP Construction 21706 Improvement (Concreting) of Access Road to Ormoc Port 05/30/09 VIII 1.817 90 C 0.493 0.133 0.300 - - - 92.60 *92.60%
V. Satisfactory
JFAP Construction 21706Repair & Rehabilitation of Palo-
Carigara-Ormoc Road, Km 984+753-Km 985+503 w/ exceptions
03/10/09 VIII 4.819 150 C 0.355 0.191 0.300 - - - 84.60 *84.60%Satisfactory
JFJ Construction 32107 Rehabilitation of Sibud Main Drainage 8/10-18/09 NIA 6.446 381 C 0.420 0.200 0.300 - - - 92.01 *92.01%
V. Satisfactory
JGC Construction 29157 Const. of MPB, Sampaloc Site 2 Barangay B.F. Homes 06/02/09 NCR 3.815 75 C 0.473 0.133 0.300 - - - 90.60 *90.60%
V. SatisfactoryJhall Marketing &
Services 15760 Upgrading/Conc. of Capinang-San Dionisio Road 03/17/09 VI 9.545 180 C 0.390 0.187 0.300 - - - 87.70 86.02%
SatisfactoryJHI Construction and
Supply 19317 Construction of 2CL @ Torres NHS (7x9) 08/27/09 I 0.972 65 C 0.407 0.200 0.300 - - - 90.70 *90.70%
V. Satisfactory
JHI Construction and Supply 19317 Const. of Calasiao MPB (Municipal
Hall, Pedestrian Overpass) 06/03/10 I 3.858 180 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
JHJ Construction 3781 Road Upgrading of Passi-San Rafael-Lemery-Sara Road Bagacay Section 04/13/11 VI 14.324 240 C 0.433 0.133 0.300 - - - 86.60 84.98%
Satisfactory
JHJ Construction 3781Conc. of Passi-San Enrique Road,
Passi City, Km. 49+740 - Km. 52+659.60 with exception
09/05/10 VI 24.945 240 C 0.391 0.133 0.300 - - - 82.40 84.32% Satisfactory
Jimwen Construction & General Merchandise 33066 Talakag Irrigation Project 09/26-10/01/11 NIA 12.473 270 C 0.389 0.200 0.300 - - - 88.94 *88.94%
Satisfactory
Jirk Construction 29918
Rehab./Reconst./Upgrading of Cagayan Valley Road (Magapit-Jct.
Aparri Airport Section), Lal-lo, Cagayan Sect.
04/02/11 II 6.697 120 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfactory
Jits Construction Corp. 13232 Construction of 3-Storey, 15-Classroom School Building 07/29/10 NHA 19.912 195 C 0.475 0.147 0.30 - - - 92.20 79.64%
Unsatisfactory
Jits Construction Corp. 13232 Construction of 3-Storey 15-Classroom School Building 07/31/09 NHA 18.108 150 O 0.340 0.171 0.150 0.020 0.051 0.050 78.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page214
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
JJ & J Construction and General Supply 30231 Repair/Rehabilitation of Road 03/03/09 VII 0.711 60 C 0.257 0.182 0.300 - - - 73.90 *73.90%
PoorJJ & J Construction and
General Supply 30231 Impvt .of Multi-Purpose Building, Brgy. Carreta 09/16/09 VII 0.482 65 C 0.475 0.200 0.300 - - - 97.50 *97.50%
OutstandingJJA Construction and
Supply 22676 Completion of Bulanao Flood Control 05/27/09 CAR 5.739 120 C 0.401 0.200 0.300 - - - 90.10 *90.10%
V. Satisfactory
JL Construction 31720Const./Rehab./Replacement,
Completion & Repair of Holy Ghost Ext. PS
04/13/11 CAR 0.989 60 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
JLA Construction and Supplies 24503 Conc.of Roads at Abella Road 04/02/11 XI 1.881 120 C 0.360 0.200 0.300 - - - 86.00 *86.00%
SatisfactoryJLA Construction and
Supplies 24503 Conc./Impvt. of Calinan-Baguio-Cadalian Road 09/02/09 XI 4.795 120 C 0.409 0.200 0.300 - - - 90.90 89.88%
V. Satisfactory
JLP Construction & Supply 26983 Road Upgrading (Gravel to Paved),
Batac-Espiritu (Banna) Road 08/20/10 I 10.010 95 C 0.476 0.178 0.300 - - - 95.40 95.40% V. Satisfactory
JLP Construction & Supply 26983 Academic Building 3 05/14-15/09 DOST 8.294 120 O 0.383 0.295 0.150 0.030 0.062 0.050 97.00 -
JLP Construction & Supply 26983 Completion of Dormitory Building 03/2-3/10 DOST 23.192 425 C 0.4464 0.20 0.30 - - - 94.64 93.77%
V. SatisfactoryJLP Construction &
Supply 26983 Completion of Alaremil Building III 03/2-3/10 DOST 2.294 135 C 0.487 0.20 0.30 - - - 98.70 97.51% V. Satisfactory
JLP Construction & Supply 26983 Const. of Retro Fitting of Perimeter
Fence 03/8-9/11 DOST 2.226 135 C 0.467 0.200 0.300 - - - 96.69 96.69% Outstanding
JLP Construction & Supply 26983 Const. of Water Reservoir 03/8-9/11 DOST 4.006 225 C 0.426 0.168 0.300 - - - 89.40 89.40%
V. Satisfactory JLV Construction &
Supply 9953 Const. of Taliba-Tejero FMR 11/21/08 IV-A 0.949 80 C 0.250 0.300 0.300 - - - 85.00 *85.00% V. Satisfactory
JLV Construction and Supply (Formerly: JLV
Construction)9953
Conc. of Brgy. Road at Natunuan North, Natunuan South, Kaingin and
Restoration of Damaged Embankment and Slope Protection
along Bagong Silang-Capalonga Road, Km.302+300 - Km.302+385 (B.
Silang II, Labo Section)
06/10/10 V 4.814 60 C 0.472 0.133 0.300 - - - 90.50 90.50% V. Satisfactory
Jomarcann General Construction 30599 Construction of Multi-Purpose
Building 03/13/09 CAR 9.631 897 C 0.299 0.200 0.300 - - - 79.90 *79.90% Unsatisfactory
Jomarcann General Construction 30599 Repair and Rehab. of DBM
Secretary's Cottage 09/10/09 CAR 6.229 90 C 0.499 0.133 0.300 - - - 93.20 *93.20% V. Satisfactory
Jomarcann General Construction 30599
Impvt. of Protection Works along Kennon Road Km.215+500 -
Km.215+850 (vs)06/10/10 CAR 9.650 169 C 0.410 0.200 0.300 - - - 91.00 89.56%
V. Satisfactory
Jomarcann General Construction 30599 Construction of Farm-to-Market
Road, Ambaracao Norte 02/25/09 I 1.924 60 C 0.279 0.200 0.300 - - - 77.90 *77.90%Unsatisfactory
Jometron Engineering & Construction 23147 Concreting of San Vicente Farm-to-
Market Road 05/22/09 V 0.936 90 C 0.420 0.133 0.300 - - - 85.30 *85.30% Satisfactory
Joni Construction 26023 Const./Impvt. of MPB @ Brgy. 45 04/14/11 VIII 0.959 60 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory
Joni Construction 26023 Construction of Brgy. Cagbonga-Brgy. Maypangdan, Brgy. Cagbonga 06/09/09 VIII 4.759 238 C 0.304 0.133 0.300 - - - 73.70 79.64%
Unsatisfactory
Jorviv's Construction 6527Road Upgrading (Gravel to Concrete)
Barandias-Dominorog Road (Nabaliwa Sect.)
04/01/11 X 9.490 135 O 0.324 0.236 0.003 0.030 0.042 0.033 66.80 -
Joselle Construction 16243Const./Compl. Of Northwest
Cabadbaran District Administrative Bldg., Tolosa E/S, Brgy. Tolosa
03/29/10 XIII 0.997 60 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory
Joselle Construction 16243 Concreting of Barangay Osmena-Magkiangkang Road 03/16/09 XIII 2.821 150 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V.Satisfactory
Joselle Construction 16243 Const. of Multi-Purpose Building (Covered Court), Brgy. Bit-os 09/16/09 XIII 2.242 120 C 0.480 0.133 0.300 - - - 91.30 93.12%
V.Satisfactory
JR Contractor 9638 Const./Rehab. of Water Supply 03/04/09 V 1.665 90 C 0.474 0.133 0.300 - - - 90.70 85.84% Satisfactory
JR Contractor 9638 Conc. of Batalay Bato Road leading to National Shrine 08/04/09 V 4.780 180 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
JR Contractor 9638 Const./Completion of 1-CL 7.0m x 9.0m Buyo Integrated School Bldg. 02/24/10 V 0.293 60 C 0.437 0.133 0.300 - - - 87.00 87.00%
Satisfactory
Jrald Construction and Trading 33079 Slope Protection along Porac River 02/16/10 III 4.786 44 C 0.375 0.200 0.300 - - - 87.50 87.50%
SatisfactoryJrald Construction and
Trading 33079 Const./Completion of Pampanga 2nd DEO Bldg. 08/18/10 III 1.911 60 C 0.481 0.112 0.300 - - - 89.30 89.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page217
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
JRALD Construction and Trading 33079
Const. of School Building at Floridablanca Integrated School, San
Antonio08/24/09 III 0.573 60 C 0.457 0.133 0.300 - - - 89.00 87.04%
Satisfactory
JRY Construction 10943 Repair of RoRo Ramp, Pavement , Gate and Port Ligthing System 05/23-27/11 PPA 18.700 360 O 0.396 0.287 0.150 0.030 0.070 0.050 98.30 -
JTA Builders 1801 Const. of 2-CL 7.0m x 1.0 m Dulong E/S 09/09/09 X 1.033 60 O 0.379 0.191 0.150 0.030 0.043 0.033 82.60 -
JUF Construction 17987Road Opening/Const. of
Cabangbang-Naga Section along Calbayog Diversion Road
09/01/10 VIII 19.296 150 C 0.311 0.200 0.300 - - - 81.10 85.72% Satisfactory
JUF Construction 17987 Const. of Calbayog Diversion Road, Sta. 9+960-Sta. 10+960 03/10/09 VIII 19.089 240 C 0.496 0.196 0.300 - - - 99.20 *99.20%
Outstanding
Juldan Builders 22810 Const. of MPB Army Reservist, Camp Tinio 02/26/10 III 0.983 45 C 0.490 0.133 0.300 - - - 92.30 92.30%
V.Satisfactory
Julita Builders 13936 Road Conc. of Brgy. Poblacion to Brgy. Patoc 02/22/10 VIII 1.888 120 C 0.395 0.200 0.300 - - - 89.50 89.50%
V. Satisfactory
Julita Builders 13936Impvt. of Multi-Purpose Building
(Student Center), College of Fisheries
06/09/09 VIII 4.823 150 C 0.419 0.133 0.300 - - - 85.20 *85.20% Satisfactory
Julita Builders 13936 Rehab./Impvt. of DPWH 2nd Leyte DEO Bldg. 08/23/10 VIII 4.747 120 C 0.454 0.133 0.300 - - - 88.70 86.39%
SatisfactoryJuncynth Const. & General Services 18385 Concreting of San Roque-San Isidro
Road 03/06/09 VIII 0.939 114 C 0.414 0.141 0.300 - - - 85.50 *85.50%Satisfactory
Impvt./Widening of Bacolod -Murcia-D.S. Benedicto-San Carlos City Road
(Wawa Section)05/26/09 VI 4.520 104 C 0.383 0.200 0.300 - - - 88.30 86.98%
Satisfactory
KJC Construction & Supply 33041 Agana RIS (Rejabilitation of Aganan
RIS Lateral A Bench Flume) 01/10-15/11 NIA 4.469 120 O 0.2529 0.2400 - 0.0300 0.0445 0.0500 61.74 -
KLDS Trading & Construction 28091 Const. of MP Building in the
Municipality of General Trias 09/08/09 IVA 5.747 116 C 0.360 0.166 0.300 - - - 82.60 *82.60% Satisfactory
KLDS Trading & Construction 28091 Const. of MPB at Brgy. Salawag 08/26/10 IVA 4.819 90 C 0.449 0.155 0.300 - - - 90.40 92.57%
V. SatisfactoryKoronadal V & E Builders
& Construction Supply 22187 Const. of MPB, Brgy. Lambingi 04/08/11 XII 2.697 105 O 0.345 0.240 0.150 0.030 0.041 0.033 83.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page223
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Koronadal V & E Builders & Construction Supply 22187 Const. of MPB, Brgy. Moloy 04/08/11 XII 2.697 105 O 0.334 0.240 0.150 0.030 0.035 0.033 82.20 -
Koronadal V & E Builders & Construction Supply 22187 Const. of MPB, Traffic Management
Group (TMG) Building 04/08/11 XII 0.964 173 C 0.463 0.193 0.000 - - - 65.60 75.75% Unsatisfactory
Koronadal V & E Builders & Construction Supply 22187 Widening of Marbel-Makar Road,
Saravia-Carpenter Hill Sect. 04/08/11 XII 7.629 297 C 0.361 0.200 0.000 - - - 56.10 69.30% Poor
Koronadal V & E Builders and Construction Supply 22187
Rehab./Reconst. of Damaged Paved Road along Marbel-Makar Road Saravia-Carpenter Hill Section
06/06/09 XII 13.209 252 C 0.391 0.140 0.300 - - - 83.10 86.10% Satisfactory
Koronadal V & E Builders and Construction Supply 22187 Construction of Multi-Purpose
Building, Brgy. Lapuz (Bo.6) 06/05/09 XII 0.795 98 C 0.331 0.194 0.300 - - - 82.50 *82.50% Satisfactory
Krys-Jon Construction 24624 Construction of Classroom/School Bldg. at NEUST, Sumacab Este 03/04/09 III 0.567 45 C 0.407 0.133 0.300 - - - 84.00 *84.00%
Satisfactory
Krys-Jon Construction 24624 Agno River Integrated Irrigation Project 7/13-18/09 NIA 4.067 90 C 0.392 0.200 0.300 - - - 89.18 *89.18%
V. Satisfactory
KSS Hardware Consttruction and Supply 31239 Const. of Multi-Purpose Building at
Poblacion 03/13/09 XII 0.960 104 C 0.451 0.086 0.300 - - - 83.70 *83.70% Satisfactory
Kuntel Construction 10234Rehab./Reconst./Upgrading of
Bacolod North Rd., Km. 1+904 to Km. 4+293 with exceptions
03/06/10 VI 27.434 275 C 0.394 0.200 0.300 - - - 89.40 87.18% Satisfactory
KVC Construction 28959 Conc. of Acop Road, Kaponga 04/12/11 CAR 0.983 59 O 0.350 0.240 0.150 0.010 0.038 0.050 83.80 -
KVC Construction 28959 Conc. of Baguio-Itogon Road 03/12/09 CAR 14.308 195 C 0.370 0.192 0.300 - - - 86.20 80.26% Unsatisfactory
KVC Construction 28959 Construction of Upper Mesh Footpath 08/26/09 CAR 0.230 30 C 0.460 0.133 0.300 - - - 89.30 *89.30%
V. SatisfactoryKVC Construction /
Valley Construction & Aggregates (JV)
JV-09-247 Impvt. along Baguio City Limit - Sto. Tomas Rd. 04/12/11 CAR 28.248 292 C 0.443 0.186 0.300 - - - 92.90 *92.90%
V. Satisfactory
KVCC Construction 27179 Rehab. of Brgy. Imelda-Brgy. Poblacion Road 03/18/09 VIII 1.906 101 C 0.394 0.194 0.300 - - - 88.80 85.08%
Satisfactory
KVCC Construction 27179 Const./Rehab./Impvt. of DPWH Biliran DEO 08/26/10 VIII 2.882 120 O 0.361 0.240 0.150 0.030 0.042 0.033 85.60 -
Kwikbuilt Construction 24577 Const. of Cabatuan-New Lucena-Bga. Bante Road 04/12/11 VI 9.645 170 C 0.401 0.133 0.300 - - - 83.40 85.32%
Satisfactory
Kyro Builders 19567
Rehab./Reconst./Upgrading of Damaged Paved National road, Pias-Currimao-Balacad Road, Currimao-
Paoay
08/20/10 I 18.977 180 O 0.374 0.240 0.150 0.030 0.048 0.033 87.50 -
Kyro Builders 19567 Rehab./Reconst. Of San Jose-Lupao Road 03/01/10 III 28.087 90 C 0.381 0.200 0.300 - - - 88.10 88.10%
Satisfactory
Kyro Builders 19567 Rehab./Reconst. of Jct. Pinagpanaan-Rizal-Pantabangan Road 06/01/09 III 19.297 63 C 0.456 0.198 0.300 - - - 95.40 *95.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page224
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Kyro Builders 19567 Concreting of Bantug-Sapang Cawayan FMR 06/01/09 III 4.709 60 C 0.328 0.185 0.300 - - - 81.30 82.08%
Satisfactory
Kyro Builders 19567 Road Upgrading (Rehab./Impvt) of Munoz-Lupao Road 09/04/09 III 14.467 40 C 0.473 0.133 0.300 - - - 90.60 *90.60%
V. Satisfactory
L & L Construction 15108 Completion of MPB, Brgy. Lumbo 04/04/11 X 1.171 150 C 0.485 0.133 0.300 - - - 91.80 *91.80% V. Satisfactory
L & L Construction 15108 Conc. of FMR, Casulog, Salay 09/08/10 X 0.992 130 C 0.446 0.133 0.300 - - - 87.90 84.60% Satisfactory
L M D Construction 9410 Construction of Multi-Purpose Building at Dumalinao Pilot School 06/20/09 IX 4.595 180 O 0.380 0.240 0.150 0.020 0.042 0.050 88.20 -
L. Baltonado Const. & Development Corporation
25250 Const. of MPB (Covered Court) Phase I 06/05/10 VIII 1.779 60 C 0.389 0.200 0.300 - - - 88.90 88.90%
Satisfactory
L. C Ting Construction 23666 Repair/Rehab. of Sabang Steel Bridge 06/11/10 XIII 9.234 75 C 0.464 0.133 0.300 - - - 89.70 89.70%
V. Satisfactory
L. C Ting Construction 23666Rehab. of Gamut Steel Bridge along
Surigao-Davao Coastal Road (Alternate Road)
06/09/10 XIII 9.617 60 O 0.352 0.300 0.109 0.030 0.040 0.033 86.40 -
L. C Ting Construction 23666 Rehab. of Paypay Twin Bridge 06/01/10 XIII 19.266 270 O 0.400 0.180 0.150 0.030 0.045 0.033 83.80 -
L. C Ting Construction 23666
Rehab./Reconst. of Damaged Paved National Road (Asphalt Overlay) Daang Maharlika Road (Surigao-
Agusan Road)
06/07/10 XIII 14.077 90 O 0.355 0.240 0.150 0.023 0.035 0.033 83.60 -
L.A Arizola Construction & Supply 31060
Conc. of Kidapawan-Magpet-Pangao-an Rd., (Km. 1625+680.86-
Km.1625+977.30)09/04/09 XII 4.007 65 C 0.462 0.200 0.300 - - - 96.20 *96.20%
V. Satisfactory
L.A Arizola Construction & Supply 31060
Conc. of Kidapawan Magnet-Pangaon-an Road inc. Marbel Bridge
and Approaches03/09/09 XII 9.485 90 O 0.328 0.240 0.150 0.030 0.035 0.033 81.60 -
L.A Clamor Construction 26413 Const. of Multi-Purpose Building at Bukal Sur National High School 02/17/10 IVA 0.671 60 C 0.499 0.141 0.300 - - - 94.00 94.00%
V. Satisfactory
L.A Clamor Construction 26413 Const. of Spillway at Kinatihan II 02/17/10 IVA 0.479 45 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory
L.A Clamor Construction 26413 Const. of MPB at Tiaong Public Market 08/31/10 IVA 0.958 56 C 0.492 0.133 0.300 - - - 92.50 92.50%
V. Satisfactory
L.A Clamor Construction 26413 Const. of One Classroom Academic Building at Manuel Macasaet NHS 08/27/09 IVA 0.598 90 C 0.456 0.200 0.300 - - - 95.60 *95.60%
V. Satisfactory
L.A Digao Construction 15371 Conc. of Road, Brgy. Poblacion 03/01/10 XIII 0.942 90 C 0.491 0.133 0.300 - - - 92.40 92.40% V.Satisfactory
L.A Digao Construction 15371 Const. of MPB Brgy. Capayahan 03/01/09 XIII 0.877 90 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
L.A Digao Construction 15371 Const. of MPB Brgy. Motorpool, Tubod 03/01/10 XIII 2.352 104 C 0.479 0.133 0.300 - - - 91.20 86.23%
Satisfactory
L.A Digao Construction 15371 Const./Impvt./Renovation of Public Market 08/29/10 XIII 3.775 120 O 0.356 0.240 0.150 0.030 0.035 0.033 84.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page225
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.A Digao Construction 15371 Conc. of San Pablo - Songkoy Road 08/29/10 XIII 0.968 90 C 0.369 0.157 0.300 - - - 82.60 82.60% Satisfactory
L.A Digao Construction 15371 Const. of Multi-Purpose Bldg. Brgy. Capayahan 05/28/09 XIII 1.685 118 C 0.448 0.133 0.300 - - - 88.10 *88.10%
Satisfactory
L.A. Digao Construction 15371 Const./Impvt./Renovation of Public Market 04/06/11 XIII 3.774 150 C 0.474 0.144 0.300 - - - 91.80 86.62%
Satisfactory
L.C Construction 7024 Widening of Lanao-Zamboanga City Rd., Tiguma-Lumbia Sect. (Phase II) 06/08/10 IX 18.675 210 C 0.388 0.200 0.300 - - - 88.80 80.76%
Unsatisfactory
L.C Construction 7024
Repair/Rehab. along Dumalinao-Margosatubig Rd., K1685+200 -
K1686+500, Balongating-Dagohoy Sect. w/ exception
08/26/10 IX 4.820 160 C 0.426 0.133 0.300 - - - 85.90 85.90% Satisfactory
L.C Construction 7024 Construction/Rehabilitation/Repair of Multi-Purpose Building 06/05/09 IX 0.464 30 C 0.457 0.133 0.300 - - - 89.00 88.79%
Satisfactory
L.C Construction 7024 Improvement of Access Road, Pagadian City Airport (Lumbia Sect.) 06/05/09 IX 15.346 195 O 0.375 0.238 0.150 0.020 0.042 0.050 87.50 -
L.C Construction 7024 Const. of 1CL Modified Standard School Building 03/11/09 IX 0.476 40 C 0.462 0.175 0.300 - - - 93.70 *93.70%
V. Satisfactory
L.C Construction 7024 Const. of One (1) unit Modified Sch. Bldg., Lantian Elem. Sch. 11/29/08 IX 0.490 45 C 0.356 0.156 0.300 - - - 81.20 *81.20%
V. Satisfactory
L.C Construction 7024 Rehab. of Cagayan de Oro Port Road 03/03/09 X 0.490 14 O 0.275 0.240 0.042 0.020 0.027 0.050 65.40 -
L.C Construction 7024
Rehab./Reconst./Upgrading of Damaged Paved National Roads at
03/05/10 XI 47.218 332 C 0.384 0.200 0.000 - - - 58.40 70.28% POOR
L.C Ting Construction / Davao L.A. Parts &
Hardware Corporation JV-07-102
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-
Boston) Manay Section11/25/08 XI 47.225 166 O 0.272 0.298 0.100 0.030 0.055 0.067 82.20 -
L.C. Construction 7024Road Upgrading (Gravel to Paved), Lanao-Pagadian, Zamboanga City
Road04/08/11 IX 18.448 210 C 0.393 0.133 0.300 - - - 82.60 84.64%
Satisfactory
L.C. Ting Construction 23666 Rehab. of Patin-ay Bridge II, Patin-ay 04/01/11 XIII 18.246 280 C 0.452 0.200 0.300 - - - 95.20 93.64% V. Satisfactory
L.C. Ting Construction 23666 Rehab. of Paypay Twin Bridge 03/29/11 XIII 19.104 270 C 0.389 0.133 0.300 - - - 82.20 83.58% Satisfactory
L.D Barcelona Construction and Supply 20963
Conc. of Road along Prosperidad-Quezon-Cabaron Road, Cabaron
Section08/09/10 VI 14.234 135 C 0.430 0.133 0.300 - - - 86.30 86.30%
Satisfactory
L.G Lasacar Construction 11960 Const. of Road, Sitio Maubog, Balbagon 03/07/09 X 0.949 65 C 0.401 0.133 0.300 - - - 83.40 *83.34%
Satisfactory
L.G Lasacar Construction 11960 Const./Rehab. of Protection Works / Seawall, Looc Catarman 09/05/09 X 9.358 270 O 0.318 0.226 0.150 0.020 0.047 0.033 79.40 -
L.G Lasacar Construction 11960Const./Impvt. of Mambajao-Catarman-
Cross County Road (Phase 4) Mambajao-Catarman Section
09/05/09 X 9.483 225 O 0.296 0.236 0.000 0.030 0.037 0.017 61.60 -
L.G Lasacar Construction 11960Impvt./Rehab. of Camiguin
Circumferential Road Tangub Section
09/06/09 X 19.004 352 O 0.368 0.012 0.150 0.020 0.037 0.017 60.40 -
L.G Lasacar Construction 11960 Const./Rehab. of Protection Works/Seawall, Looc, Catarman 03/01/10 X 9.358 280 C 0.481 0.200 0.300 - - - 98.10 86.88%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page227
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.G Lasacar Construction 11960Const. of Std. Modified School Bldg. One (1) Classroom (7m x 9m) Brgy.
18A Primary School03/03/10 X 0.696 60 C 0.433 0.133 0.300 - - - 86.60 86.60%
Satisfactory
L.G. Lasacar Construction 11960 Continuation of Const. of MPB
(KPMFI), Brgy. 23 04/04/11 X 3.852 280 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory
L.G. Lasacar Construction 11960
Const./Impvt. of CCR Slope Protection Works Alangilan (Km.30+400 - Km.30+900)
04/02/11 X 8.687 155 O 0.390 0.240 0.150 0.030 0.032 0.033 87.50 -
L.M.G Construction 5719
Impvt. of Gumaca-Pitogo-Mulanay-San Narciso National Rd.,
Km.249+500 - Km.271+000, Intermittent Sect.
05/26/10 IVA 19.259 35 C 0.474 0.133 0.300 - - - 90.70 90.70% V. Satisfactory
L.M.G Construction 5719Sarangani-Davao Del Sur Coastal Road-Glan Padidu-Glan Poblacion
Section09/16/09 XII 7.039 90 C 0.319 0.133 0.300 - - - 75.20 *75.20%
Unsatisfactory
L.M.G Construction 5719 Construction of Multi-Purpose Building (Health Center) 06/01/09 III 2.171 75 C 0.471 0.200 0.300 - - - 97.10 *97.10%
Outstanding
L.M.G Construction 5719 Daang Maharlika (LZ), Sta. 98+700 to Sta. 101+800 w/ exception 03/04/09 III 18.916 300 C 0.423 0.200 0.300 - - - 92.30 82.64%
Satisfactory
L.M.G Construction 5719 Completion of MPB, Brgy. Signal Village 05/29/09 NCR 7.675 120 C 0.448 0.200 0.300 - - - 94.80 85.28%
Satisfactory
L.M.G. Construction 5719 Const. of MPB at Old Balara E/S Annex, Laura Area, Brgy. Old Balara 03/31/11 NCR 4.773 120 O 0.394 0.192 0.150 0.030 0.052 0.050 86.80 -
L.M.G. Construction 5719 Const. of Pedestrian Overpass, Old Manila South Road, Km. 39+000 04/06/11 IVA 9.636 192 C 0.381 0.109 0.300 - - - 79.00 76.66%
Unsatisfactory
L.N Salvador Construction 16661 Conc. of Road at Barangay San Jose 02/16/10 IVB 3.857 75 C 0.321 0.200 0.300 - - - 82.10 82.10%
Satisfactory
L.N Salvador Construction 16661 Const. of Drainage at Brgy. Libis 09/01/10 IVB 1.635 75 C 0.469 0.099 0.300 - - - 86.80 86.80%
Satisfactory
L.N Salvador Construction 16661 Improvement (Concreting) of Access
Road, Calapan Airport Road 05/25/09 IV-B 0.979 45 C 0.411 0.200 0.300 - - - 91.10 *92.70% V. Satisfactory
L.N. Salvador Construction 1661 Rehab. of Calapan South Road, Sta.
L.P.O Enterprises 20730 Completion of 2-Storey 4-Classroom School Building @ Bugarin E/S 08/25/09 IVA 2.984 60 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
L.P.O Enterprises 20730 Const. of Two (2) Storey, 2-L School Building Pedro Guevarra MHHS 09/01/09 IVA 2.310 84 C 0.467 0.128 0.300 - - - 89.50 *89.50%
V. Satisfactory
L.P.O Enterprises 20730 Partial Const. of 2-Storey, 4-CL at Dr. Jose Tamayo MES 09/03/09 IVA 0.931 50 C 0.438 0.133 0.300 - - - 87.10 *87.10%
Satisfactory
L.P.O Enterprises 20730 Const. of MPB (Phase III) 02/23/10 IVA 0.985 50 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory
L.P.O Enterprises 20730 Construction of Road Brgy. Pinagbayanan 02/23/10 IVA 0.995 57 C 0.347 0.200 0.300 - - - 84.70 84.70%
Satisfactory
L.P.O Enterprises 20730 Const. of MPB (Phase II) 02/28/09 IV-A 1.442 75 C 0.472 0.133 0.300 - - - 90.50 *90.50% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page228
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.P.O Enterprises 20730 Const. of Sch. Bldg. At Santolan E/S Brgy. Santolan 06/02/10 NCR 7.513 148 C 0.417 0.200 0.300 - - - 91.70 91.70%
V. Satisfactory
L.P.O. Enterprises 20730 Const. of Academic Bldg. at Santolan E/S 04/05/11 NCR 15.325 180 C 0.479 0.101 0.300 - - - 88.00 87.16%
SatisfactoryL.R De Guzman
Construction 10264 Const. of MPB @ Brgy. Sto. Domingo 02/19/10 III 4.677 70 C 0.489 0.158 0.300 - - - 94.70 94.70%
V. Satisfactory
L.R De Guzman Construction 10264 Rehab./Impv't. of DPWH Bataan 2nd
DEO 08/20/10 III 4.763 58 C 0.456 0.126 0.300 - - - 88.20 88.20% Satisfactory
L.R Tiqui Builders, Inc. 13810
Asphalt Overlay along Daang Maharlika Rd., Km.236+611 -
06/10/10 II 24.000 90 C 0.463 0.133 0.300 - - - 89.60 89.60% V. Satisfactory
L.R Tiqui Builders, Inc. 13810 Const. of Palilihan Bridge and Approaches (Phase IV) 02/18/10 III 24.992 150 O 0.368 0.300 0.150 0.030 0.042 0.050 94.00 -
L.R Tiqui Builders, Inc. 13810Rehab./Reconst./Upgrading of
Damaged Paved National Road at Pulilan-Calumpit Rd.
03/02/10 III 47.735 120 O 0.353 0.300 0.150 0.030 0.051 0.033 91.70 -
L.R Tiqui Builders, Inc. 13810
Rehab./Reconst./Upgrading of Damaged Paved National Road at
Bigaa-Plaridel via Bulacan & Malolos Rd.
06/09/10 III 28.694 110 O 0.389 0.300 0.150 0.015 0.032 0.033 91.90 -
L.R Tiqui Builders, Inc. 13810Rehab./Reconst. of Damaged Paved
National Roads, Pulilan-Calumpit Sect.
06/10/10 III 47.735 120 C 0.440 0.133 0.300 - - - 87.30 89.94% V. Satisfactory
L.R Tiqui Builders, Inc. 13810 Const. of Revetment along Angat River Baliuag & Bustos Sect. 06/09/10 III 9.563 140 C 0.455 0.133 0.300 - - - 88.80 88.80%
Satisfactory
L.R Tiqui Builders, Inc. 13810Rehab./Reconst./Upgrading of
Damaged Paved National Roads at Gen.Alejo Santos Highway
06/10/10 III 40.605 275 O 0.357 0.240 0.150 0.018 0.043 0.033 84.10 -
L.R Tiqui Builders, Inc. 13810Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Rd. at Bigaa-Plaridel via Bulacan and Malolos Rd.
08/26/10 III 28.694 110 C 0.496 0.123 0.300 - - - 91.90 91.90% V. Satisfactory
L.R Tiqui Builders, Inc. 13810 Const. of Palilihan Bridge and Approaches (Phase IV) 08/17/10 III 24.992 187 C 0.427 0.133 0.300 - - - 86.00 90.80%
V. Satisfactory
L.R Tiqui Builders, Inc. 13810Asphalt Overlay of Daang Maharlika (Poblacion Aritao-Darapirap Section
and Darapidap-Gabut Section)06/02/09 II 39.996 80 C 0.461 0.133 0.300 - - - 89.40 89.88%
V.Satisfactory
L.R Tiqui Builders, Inc. 13810 Asphalt overlay of Daang Maharlika 03/13/09 II 39.996 80 O 0.388 0.225 0.150 0.030 0.059 0.050 90.20 -
L.R Tiqui Builders, Inc. 13810
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan to
Mabalacat, Pampanga, Phase IV, Package I, Meycauayan-Marilao-
Bocaue Section
05/30/09 III 188.051 270 C 0.416 0.200 0.300 - - - 91.60 94.60%V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page229
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.R Tiqui Builders, Inc. 13810
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan to
Mabalacat, Pampanga, Phase IV, Package II, Balagtas-Guiguinto
Section
05/30/09 III 70.394 180 C 0.349 0.200 0.300 - - - 84.90 90.96%V. Satisfactory
L.R Tiqui Builders, Inc. 13810
Traffic Management along Manila North Road from Meycauayan, Bulacan-Mabalacat, Pampanga
(Package II)
06/02/09 III 138.317 269 O 0.315 0.300 0.150 0.030 0.060 0.050 90.50 -
L.R Tiqui Builders, Inc. 13810NCR-Bulacan Boundary-Bigte-Ipo
Dam Road Including Replacement of Kay Tialo Bridge
06/01/09 III 47.641 210 C 0.331 0.200 0.300 - - - 83.10 89.34%V. Satisfactory
L.R Tiqui Builders, Inc. 13810Impvt./Rehab. of Norzagaray-Bigte Road, Bulacan 3rd Congressional
District06/03/09 III 57.822 180 O 0.249 0.300 0.150 0.030 0.055 0.050 83.40 -
L.R Tiqui Builders, Inc. 13810Construction of Palihan Bridge #1
inc. Approaches and Road Right-of-Way along Roman Expressway
08/29/09 III 90.178 270 C 0.452 0.200 0.300 - - - 95.20 94.75% V.Satisfactory
L.R Tiqui Builders, Inc. 13810
Impvt./Widening of McArthur Highway (MNR)-Phase V,
Meycauayan (Bulacan) to Mabalacat (Pampanga)-Bocaue-Balgatas-
Guiguinto Sect.)-CP II
09/05/09 III 88.724 180 O 0.371 0.300 0.150 0.030 0.056 0.033 94.00 -
L.R Tiqui Builders, Inc. 13810Impvt./Widening/Concreting of
Manila North Road (MNR)-Phase V (Malolos-Calumpit Section)-CP I
09/05/09 III 110.823 240 O 0.361 0.300 0.150 0.030 0.056 0.033 93.00 -
L.R Tiqui Builders, Inc. 13810Impvt./Rehab. of General Alejo
Santos Highway inc. Niugan Bridge No. 3
09/09/09 III 62.146 230 O 0.358 0.300 0.150 0.030 0.056 0.033 92.70 -
L.R Tiqui Builders, Inc. 13810 Impvt./Rehab. of Norzagaray-Bigte Road 09/09/09 III 57.900 200 O 0.345 0.300 0.150 0.030 0.056 0.033 91.40 -
L.R Tiqui Builders, Inc. 13810 Rehab. of Meycauayan-Camalig Road 09/09/09 III 19.044 169 C 0.467 0.133 0.300 - - - 90.00 *90.00%
V.Satisfactory
L.R Tiqui Builders, Inc. 13810 Rehab. of Bocaue-San Jose Road 09/07/09 III 1.905 73 O 0.379 0.240 0.150 0.030 0.042 0.033 87.40 -
L.R Tiqui Builders, Inc. 13810
Const. of Palilihan Bridge # 1 including approaches and Road
Right-of-Way along Roman Expressway
02/27/09 III 90.181 240 O 0.351 0.300 0.150 0.030 0.056 0.050 93.70 -
L.R Tiqui Builders, Inc. 13810 Impv't. & Rehab. of Gen. Alejo Santos Highway 03/12/09 III 82.002 210 C 0.389 0.200 0.300 - - - 88.90 *88.90%
Satisfactory
L.R Tiqui Builders, Inc. 13810Impvt. (Widening/Conc.) of Mc Arthur
Highway (MNR) Meycauayan to Mabalacat Pampanga (Phase IV)
03/06/09 III 70.394 180 O 0.366 0.300 0.150 0.030 0.047 0.050 94.30 -
L.R Tiqui Builders, Inc. 13810NCR/Bulacan Bdry.-Bigte-Ipo Dam
Road inc. Replacement of Kay Tialo Bridge
03/10/09 III 47.641 210 O 0.366 0.300 0.150 0.030 0.038 0.050 93.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page230
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.R Tiqui Builders, Inc. 13810Const./Widening of San Marcelino
Bridge and Paredes Bridge Carmona-Dasmariñas Section
09/11/09 IVA 46.748 390 C 0.449 0.200 0.300 - - - 94.90 *94.90% V. Satisfactory
L.R Tiqui Builders, Inc. 13810Impvt./Widening of Aguinaldo
La Prueba Construction 9923Repair of Road Slipped at
Transcentral Highway, Km.18+091 (Phase I & II)
04/14/11 VII 4.445 119 C 0.463 0.133 0.300 - - - 89.60 84.20% Satisfactory
La Prueba Construction 9923 Construction of Flood Control and Drainage Facilities, Brgy. Tisa 06/09/09 VII 0.946 45 C 0.355 0.133 0.300 - - - 78.80 *78.80%
Unsatisfactory
La Prueba Construction 9923 Construction of Multi-Purpose Building at Brgy. Baliwagan 05/26/09 VII 4.766 120 C 0.302 0.133 0.300 - - - 73.50 61.88%
Poor
La Prueba Construction 9923 Const. of Footbridge at Brgy. Capt. Claudio 09/04/09 VII 2.958 144 C 0.408 0.195 0.300 - - - 90.30 79.26%
Unsatisfactory
LABB Construction 13524 Widening of Causeway, Jct. TER, Dauis-Panglao Rd. 03/29/11 VII 10.265 204 O 0.375 0.240 0.150 0.030 0.050 0.050 89.50 -
LABB Construction 13524Concreting of La Union-Candijay-
Mabini Rd. (sta. 166+670 Sta 166+840)
09/04/09 VII 2.636 130 C 0.432 0.192 0.300 - - - 92.40 90.66% V. Satisfactory
LABB Construction 13524 Const. of Bridge along Concepcion-Danao-Buenavista-Carmen Rd. 09/09/09 VII 13.914 559 C 0.448 0.200 0.300 - - - 94.80 89.32%
V. Satisfactory
Labb Construction 13524 Const. of Bridges along Concepcion-Danao-Buenavista Carmen Road 11/19/08 VII 9.564 350 O 0.343 0.238 0.100 0.030 0.037 0.100 84.80 -
Labb Construction 13524Concreting of La Union, Candijay-
Mabini Road (Sta. 166+670-Sta. 166+846)
06/05/09 VII 2.636 125 O 0.359 0.300 0.131 0.030 0.042 0.033 89.50 -
Labb Construction 13524 Const. of Bridge along Concepcion, Danao-Buenavista Carmen Road 06/06/09 VII 13.914 504 O 0.344 0.263 0.150 0.030 0.047 0.050 88.40 -
Labb Construction 13524 Completion of MPB/Completion of Municipal Hall 02/25/10 VII 0.929 240 C 0.400 0.133 0.300 - - - 83.30 84.70%
SatisfactoryLady of Assumption
Enterprises 25360 Const./Impvt. of MPB at Poblacion Tomas Oppus 02/28/10 VIII 1.888 120 C 0.468 0.133 0.300 - - - 90.10 90.10%
V. SatisfactoryLady of Assumption
Enterprises 25360 Const./Impvt. of Multi-Purpose Building at Tomas Oppus 05/26/09 VIII 1.876 240 C 0.437 0.133 0.300 - - - 87.00 84.93%
Satisfactory
Lakewood Construction Company 5294 Rehab. of DPWH Engineering Office 09/06/10 IX 3.817 150 C 0.429 0.133 0.300 - - - 86.20 87.53%
Satisfactory
Lakewood Construction Company 5294 Construction of Flood Control at
Brgy. Sanito 09/04/09 IX 9.495 572 C 0.431 0.200 0.300 - - - 93.10 76.40% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page232
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
Getafe Rd. 06/01/10 VII 13.216 390 C 0.341 0.200 0.300 - - - 84.10 86.18% Satisfactory
Leda Construction Incorporated (Formerly:
Leda Construction)12229
Upgrading of Tubigon-Jagna via Carmen-Sierra Bullones Rd.,
Sta.84+460 - Sta.86+46006/03/10 VII 48.170 210 O 0.279 0.254 0.150 0.030 0.050 0.050 81.30 -
Leda Construction Incorporated (Formerly:
Leda Construction)12229 Upgrading of Tubigon-Jagna Road
Via Carmen-Sierra Bullones 08/26/10 VII 48.170 210 O 0.370 0.243 0.150 0.030 0.047 0.050 89.00 -
Leda Construction Incorporated (Formerly:
Leda Construction)12229
Rehab./Reconst. of Palo-Carigara-Ormoc Rd., Palo-Carigara-Ormoc Rd.
Sect.05/31/10 VIII 11.194 120 O 0.400 0.300 0.069 0.030 0.037 0.033 86.90 -
Leda Construction Incorporated (Formerly:
Leda Construction)12229
Const. of Jaro-Dagani-Burauen-La Paz Road Jaro-Dagami-Burauen-La
Paz Section08/23/10 VIII 18.888 150 C 0.481 0.133 0.300 - - - 91.40 89.12%
V. Satisfactory
Leda Construction Incorporated (Formerly:
Leda Construction)12229 Road Upgrading (Gravel to Paved) to
Tigbao-Pulak-Sta. Fe Road 09/07/10 VIII 18.991 120 C 0.480 0.133 0.300 - - - 91.30 88.24% Satisfactory
Leda Construction Incorporated (Formerly:
Leda Construction)12229
Rehab./Reconst. of Palo-Carigara-Ormoc Road, Palo-Carigara-Ormoc
Road Section08/23/10 VIII 11.194 120 C 0.442 0.133 0.300 - - - 87.50 87.14%
Satisfactory
Leda Construction, Incorporated 12229 Road Reblocking Real St., Poblacion 02/22/10 VIII 0.944 75 C 0.379 0.200 0.300 - - - 87.90 87.90%
Satisfactory
Legacy Construction 22465 Conc. of Bacolod South Road, Culipapa Section Brgy. Culipapa 04/02/11 VI 9.398 184 O 0.382 0.246 0.150 0.030 0.042 0.050 90.00 -
Legacy Construction 22465Conc./Rehab. of National Road along Bacolod North Road, Victorias City
Sect.03/30/11 VI 18.903 145 C 0.325 0.200 0.000 - - - 52.50 67.74%
Poor
Legacy Construction 22465 Rehab./Recons./Upgrading of Dumaguete North Rd. (Calo Rd. Sec.) 09/12/09 VII 26.856 200 O 0.386 0.240 0.150 0.030 0.037 0.033 87.60 -
Legacy Construction 22465
Rehab./Reconst./Upgrading of Damaged National Roads,
Dumaguete North Rd., Calo Road Sect.
06/10/10 VII 26.880 260 C 0.422 0.153 0.300 - - - 87.50 82.55% Satisfactory
Legacy Construction 22465 Construction and Improvement of Punta Taytay Main Drainage 8/10-18/09 NIA 5.936 421 C 0.366 0.200 0.300 - - - 86.57 *86.57%
Satisfactory
Legacy Construction 22465 Rehabilitation and Improvement of Sibud Main Drainage 04/16-18/09 NIA 6.636 231 C 0.468 0.247 0.200 - - - 91.50 91.50%
V. SatisfactoryLegaspi Premium
Development Corporation
20701 Const. of the Extension of Tabaco City Public Market 05/28/10 V 11.568 159 C 0.488 0.133 0.300 - - - 92.10 89.93%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page235
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Legazpi Premium Development Corporation
20701 Const. of Pedestrian Overpass Sorsogon Pilot E/S 04/11/11 V 4.772 180 C 0.487 0.133 0.300 - - - 92.00 *92.00%
V. Satisfactory
Legazpi Premium Development Corporation
20701 Const. of Lamba Bridge 03/28/11 V 28.822 402 O 0.329 0.300 0.150 0.022 0.040 0.050 89.10 -
Legazpi Premium Development Corporation
20701
Upgrading of Aroroy (Masbate)-Masbate City-Cawayan port Road (Conc. of Aroroy-Baleno-Lagta-Masbate-Jct. Buenavista Road)
04/13/11 V 49.970 200 C 0.242 0.200 0.300 - - - 74.20 85.78% Satisfactory
Legazpi Premium Development Corporation
20701 Rehab./Impvt. of Tunga-Pajo Brgy. Road 04/03/11 V 19.285 120 O 0.313 0.300 0.150 0.022 0.033 0.033 85.10 -
Legazpi Premium Development Corporation
20701 Opening/Impv't./Const. of Guiamon-San Ramon Road, Phase XII 04/07/11 VI 44.384 420 C 0.497 0.189 0.300 - - - 98.60 *98.60%
Outstanding
Legazpi Premium Development Corporation
20701 Opening/Impv't./Const. of Bigaa-Lumbuyan Road, Phase III 04/07/11 VI 40.524 300 C 0.494 0.182 0.300 - - - 97.60 *97.60%
Outstanding
Legazpi Premium Development Corporation
20701 Opening/Impv't./Const. of Bigaa-Lumbuyan Road, Phase I 04/07/11 VI 33.768 360 C 0.487 0.082 0.300 - - - 86.90 *86.90%
Satisfactory
Legazpi Premium Development Corporation
20701 Opening/Impv't./Const. of Biga-a-Lumbuyan Road, Phase II 04/06/11 VI 43.419 420 C 0.485 0.069 0.300 - - - 85.40 *85.40%
Satisfactory
Legazpi Premium Development Corporation
20701 Opening/ Impvt. of Sitio Tina-Sitio Nauasan Rd. (Phase I) 02/27/10 VI 40.515 310 O 0.382 0.300 0.129 0.020 0.028 0.017 87.60 -
Legazpi Premium Development Corporation
20701 Widening/Imprv't. of Brgy. Luctoga- Brgy. Manika Rd. 02/27/10 VI 36.660 340 C 0.388 0.175 0.300 - - - 86.30 86.30%
Satisfactory
Legazpi Premium Development Corporation
20701 Widening/Imprv't. of Lupaan-Tigunhao rd., Sta. 6+140 - 7+800 02/26/10 VI 19.297 270 C 0.360 0.168 0.300 - - - 82.80 82.80%
Satisfactory
Legazpi Premium Development Corporation
20701 Desilting/Deepening of Cagboaya River 08/24/10 IVB 14.473 90 C 0.490 0.186 0.300 - - - 97.60 97.60%
Outstanding
Legazpi Premium Development Corporation
20701 Opening/Construction of Taladong-Caguiba Road (Phase II) 05/18/09 V 14.250 171 C 0.437 0.183 0.300 - - - 92.00 83.15%
Satisfactory
Legazpi Premium Development Corporation
20701 Viga Pilot Bridge and Approaches along Viga-Panganiban Road 09/05/09 V 17.346 820 C 0.476 0.172 0.300 - - - 94.80 83.39%
Satisfactory
Legazpi Premium Development Corporation
20701 Const. of the Extension of Tabaco City Public Market 02/22/10 V 11.568 159 O 0.380 0.240 0.150 0.030 0.040 0.050 89.00 -
Legazpi Premium Development Corporation
20701 Opening/Impvt. of Sitio Tina-Sitio Nausan Road (Phase I) 09/04/10 VI 40.515 360 C 0.489 0.192 0.300 - - - 98.10 91.80%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page236
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Lehci Construction 24196 Const. of Riprap Seawall, Brgy. West Visoria 02/23/10 VIII 1.889 120 C 0.331 0.200 0.300 - - - 83.10 83.10%
Satisfactory
Lehci Construction 24196 Const./Repair of 2-CL School Building, San Isidro E/S 06/09/09 VIII 1.249 90 C 0.491 0.184 0.300 - - - 97.50 *97.50%
Oustanding
Lehci Construction 24196 Impvt. (Conc.) of Access Road to Airport, Tacloban Airport Road 09/18/09 VIII 19.300 208 C 0.403 0.200 0.300 - - - 90.30 *90.30%
V. Satisfactory
Lehci Construction 24196 Construction of Flood Control (Seawall) 09/01/09 VIII 2.833 120 C 0.418 0.200 0.300 - - - 91.80 87.00%
Satisfactory
Leo-J Construction Services 27248
Asphalt Overlay along Olongapo-Bugallon Rd., Km.259+000 -
Km.259+34005/29/10 III 4.476 10 C 0.449 0.133 0.300 - - - 88.20 88.20%
Satisfactory
Leo-J Construction Services 27248
Const./Rehab./Replacement/Completion and Repair of Elementary & Secondary School Bldg., La Paz
08/02/09 III 9.506 120 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory
Leza Construction and Supply 25563 Const. of MPB at Magtaking (Phase
II) 03/01/10 I 1.526 150 C 0.408 0.200 0.300 - - - 90.80 90.80% V. Satisfactory
Leza Construction and Supply 25563 Const. of MPB Lilimasan (Phase II) 03/01/09 I 1.000 150 C 0.365 0.200 0.300 - - - 86.50 86.50%
SatisfactoryLeza Construction and
Supply 25563 Const. of MPB at Tandoc (Phase II) 03/01/10 I 1.526 150 C 0.364 0.200 0.300 - - - 86.40 86.40% Satisfactory
Leza Construction and Supply 25565 Construction of Drainage System at
Tuliao 03/06/09 I 4.822 120 C 0.434 0.200 0.300 - - - 93.40 82.24%Satisfactory
Leza Construction and Supply 25565 Construction/Completion/Repair of 1
Classroom, Doyong Malabago E/S 03/06/09 I 0.482 150 C 0.438 0.180 0.300 - - - 91.80 *91.80%V. Satisfactory
Leza Construction and Supply 25565 Const. of Drainage Canal System at
Tuliao 11/26/08 I 4.822 120 O 0.267 0.200 0.100 0.020 0.028 0.133 74.80 -
LGC Trucking and Construction 14464 Conc. of Sampaguita-Veruela Road 04/04/11 XIII 4.699 145 O 0.293 0.300 0.150 0.030 0.048 0.050 87.10 -
LGC Trucking and Construction 14464 Repair of Academic Classroom at
Mintabon E/S 06/17/10 X 0.588 120 C 0.419 0.133 0.300 - - - 85.20 84.15% Satisfactory
LGC Trucking and Construction 14464 Const. of MPB (SURSECO-1 Gym),
Brgy. San Fernando 03/04/10 XIII 1.903 165 O 0.387 0.240 0.150 0.030 0.047 0.033 88.70 -
LGC Trucking and Construction 14464 Rehab./Const. of Manapa Footbridge 02/22/10 XIII 1.925 105 C 0.445 0.133 0.300 - - - 87.80 87.80%
Satisfactory
LGC Trucking and Construction 14464
Const. of Flood Control Structures/Shoreline Protection,
Guava Jct., Brgy. Poblacion03/04/10 XIII 0.954 165 O 0.360 0.240 0.150 0.030 0.047 0.050 87.70 -
LGC Trucking and Construction 14464 Conc. of Road in Purok 1,2,3 & 5
Caramcam District 06/11/10 XIII 3.337 149 C 0.476 0.133 0.300 - - - 90.90 88.50% Satisfactory
LGC Trucking and Construction 14464
Completion/Repair/Rehab. of Flood Control Structures/Shoreline
Protection, Danipas, Brgy. Labisma06/11/10 XIII 0.950 148 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
LGC Trucking and Construction 14464
Const. of Flood Control Structures/Shoreline Protection,
Guava Jct., Brgy. Poblacion06/11/10 XIII 0.954 165 C 0.313 0.133 0.300 - - - 74.60 82.46%
Satisfactory
LGC Trucking and Construction 14464 Const. of MPB (SURSECO 1 Gym) 06/11/10 XIII 1.903 165 C 0.213 0.133 0.300 - - - 64.60 81.47%
Unsatisfactory
LGC Trucking and Construction 14464 Conc. of Talacogon-La Paz-Loreto-
Veruela-Sta. Josefa Marbon Section 06/09/09 XIII 9.483 382 C 0.409 0.200 0.300 - - - 90.90 86.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page237
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
LGC Trucking and Construction 14464 Const. of Tolosa-BLISS Rd. Tolosa 09/01/09 XIII 0.999 60 C 0.462 0.133 0.300 - - - 89.50 *89.50%
V.SatisfactoryLGC Trucking and
Construction 14464 Const. of Maparasan Primary School, San Roque 09/11/09 XIII 0.668 90 C 0.454 0.140 0.300 - - - 89.40 *89.40%
V.SatisfactoryLiberty Builders and
Development Corporation
7224 Restoration of the Burnt Bureau of Immigration Main Bldg. 03/10/09 Sp. Bldgs 30.029 645 C 0.467 0.000 0.300 - - - 76.70 83.56%
Satisfactory
Librius Construction & Supply Corporation (Formerly: Librius
Construction & Supply)
23580 Conc. of Brgy. Roads at Brgy. Maugat West (Ilaya) 06/07/10 IVA 1.974 120 C 0.431 0.133 0.300 - - - 86.40 86.40%
Satisfactory
Likayan Construction 32714 Const. of 2-CL, Rooms-Sayapot PS 05/23/09 CAR 0.866 100 C 0.466 0.116 0.300 - - - 88.20 *88.20% Satisfactory
Lim General Contractor 8482Conc. of Tablas Circ. Road, San Agustin-Calatrava Road (Can-Omiang-Cabulotan Section)
Lucban Construction 4819 Const. of MPB @ Paaralang Sekondarya ng Lucban 02/26/09 IV-A 1.447 40 C 0.492 0.133 0.300 - - - 92.50 *92.50%
V. Satisfactory
Luck-Well Construction 17510 Paving of the Newly Constructed Back-up Area Project 04/20-23/10 PPA 47.305 300 O 0.3657 0.3000 0.1256 0.024 0.0600 0.0500 92.53 -
Lucky G18 Construction, Inc. 33695 Repair and Rehab. of Road I Sitio
Almonte, Brgy. Bari 04/12/11 I 0.498 28 C 0.437 0.133 0.300 - - - 87.00 *87.00% Satisfactory
Lug Square Construction 26623 Widening/Concreting along Banaue-Mayoyao Road (Tulaed Section) 03/06/09 CAR 1.888 348 C 0.339 0.157 0.000 - - - 49.60 62.26%
Poor
LVRO Construction & Supply 18116 Conc. of Punta-Ni Road 03/29/11 XIII 2.380 60 C 0.355 0.200 0.300 - - - 85.50 *85.50%
Satisfactory
LVRO Construction & Supply 18116
Rehab./Reconst. of Damaged Paved National Road, Daang Maharlika,
(Surigao-Agusan Road)03/29/11 XIII 19.285 210 C 0.339 0.200 0.300 - - - 83.90 85.40%
Satisfactory
LVRO Construction & Supply 18116 Upgrading of Buenavista-Bunaguit
Road 03/29/11 XIII 3.890 60 O 0.343 0.225 0.150 0.030 0.055 0.050 85.30 -
LVRO Construction & Supply 18116 Conc. of Agusan del Norte Circ.
Road (Lake Mainit Circ. Road) 03/29/11 XIII 19.285 195 C 0.323 0.200 0.300 - - - 82.30 85.09% Satisfactory
LVRO Construction & Supply 18116 Conc. of Road Brgy. Matin-ao 04/06/11 XIII 3.293 179 C 0.296 0.200 0.300 - - - 79.60 83.56%
Satisfactory
LVRO Construction & Supply 18116
Const. of Roads, Drainage & Embankment (Site Dev't. of Tubay
Housing Projects)02/22/10 XIII 6.682 120 C 0.460 0.133 0.300 - - - 89.30 89.30%
V.Satisfactory
LVRO Construction & Supply 18116 Const. of Seawall, Brgy. Ipil 03/01/10 XIII 2.351 116 C 0.454 0.133 0.300 - - - 88.70 84.86%
SatisfactoryLVRO Construction &
Supply 18116 Repair/Rehab. along Jct. Bolod-Bolod-Albor Road 06/03/10 XIII 9.613 231 C 0.386 0.200 0.300 - - - 88.60 88.60%
SatisfactoryLVRO Construction &
Supply 18116 Const./Rehab. of Aguntayan-Hilong-Hilong Road (Phase II) 08/24/10 XIII 4.720 90 C 0.417 - 0.500 - - - 91.70 89.24%
V. SatisfactoryLVRO Construction &
Supply 18116 Deepening/Rechanneling of Calibunan Creek Brgy. Calibunan 08/27/10 XIII 4.587 135 C 0.431 0.158 0.300 - - - 88.90 88.90%
SatisfactoryLVRO Construction &
Supply 18116 Const. of Lake wall 08/29/10 XIII 1.881 90 C 0.333 0.200 0.300 - - - 83.30 83.30% Satisfactory
LVRO Construction & Supply 18116 Repair/Rehab. Along Dinagat-Loreto
Road 11/19/08 XIII 9.649 160 O 0.307 0.168 0.100 0.023 0.038 0.100 73.60 -
LVRO Construction & Supply 18116 Concreting of Barangay Road 03/14/09 XIII 1.924 95 C 0.430 0.200 0.300 - - - 93.00 *93.00%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page243
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
LVRO Construction & Supply 18116 Rehab./Reconstruction of Damaged
Paved along Dinagat-Loreto Road 03/04/09 XIII 7.086 225 O 0.368 0.240 0.150 0.030 0.035 0.050 87.30 -
LVRO Construction & Supply 18116 Repair/Rehab. along Dinagat-Loreto
Road 03/04/09 XIII 9.649 190 O 0.372 0.282 0.082 0.030 0.035 0.033 83.40 -
LVRO Construction & Supply 18116 Const. of Aguntayan-Hilong-Hilong
FMR 05/26/09 XIII 8.473 175 O 0.390 0.274 0.150 0.030 0.047 0.033 92.40 -
LVRO Construction & Supply 18116 Dredging/Rechanneling of
Katugasan River 05/26/09 XIII 4.816 60 C 0.407 0.200 0.300 - - - 90.70 *90.70% V. Satisfactory
LVRO Construction & Supply 18116 Const./Rehab. of Aguntayan-Hilong-
hilong FMR 09/01/09 XIII 8.473 150 C 0.408 0.165 0.300 - - - 87.30 90.36% V.Satisfactory
LVRO Construction & Supply 18116 Rehab./Reconst. along Dinagat-
Loreto Rd.(Dinagat Sect.) 09/01/09 XIII 7.086 267 C 0.458 0.162 0.300 - - - 92.00 90.50% V.Satisfactory
LVRO Construction & Supply 18116 Const./Rehab. of Agutayan-Hilong-
hilong Rd.(Phase II) 09/01/09 XIII 4.720 90 O 0.388 0.215 0.150 0.030 0.060 0.033 87.60 -
LVRO Construction & Supply 18116 Const. of School Bldg. @ La Union
Integrated School 09/01/09 XIII 0.568 90 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
LVRO Construction & Supply 18116
Repair/Rehab. Along Dinagat-Loreto Rd.(Km.0+000toKm.30+000, with
excemptions)09/04/09 XIII 9.649 228 C 0.466 0.133 0.300 - - - 89.90 83.06%
Satisfactory
LXS Builders & Supplies 25172 Const. of Arenas NHS, Brgy. Ambayat 2nd 05/22/09 I 0.964 90 C 0.498 0.166 0.300 - - - 96.40 *96.40%
V.SatisfactoryM A M Construction &
Trading (Formerly: MAM Construction)
19915 Const. of One (1) CL at Sta. Cruz ES, Lubao West 08/24/09 III 0.479 60 C 0.412 0.133 0.300 - - - 84.50 *84.50%
Satisfactory
M F Construction 22192 Const. of 7m x 7m (1CL) SB, Tupas E/S 09/06/10 VII 0.488 90 C 0.485 0.133 0.300 - - - 91.80 91.80%
V. Satisfacgtory
M F Construction 22192 Const. of Banica River Control 09/03/10 VII 2.839 130 C 0.390 0.200 0.300 - - - 89.00 89.00% Satisfactory
M M Construction 12012
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Daang Maharlika (Balete-Namamparan Section)
08/28/09 II 18.902 116 C 0.410 0.200 0.300 - - - 91.00 89.32% V. Satisfactory
M M Construction 12012 Const. of Farm-to-Market Road (Tire Path), Bliss Kirang 03/04/10 II 0.397 30 C 0.369 0.200 0.300 - - - 86.90 86.90%
Satisfactory
M M Construction 12012
Rehab./Reconst./Upgrading of Damaged Paved National Rd. along Daang Maharlika Solano-Diadi Sect.
w/ exception
06/10/10 II 9.645 80 O 0.360 0.300 0.150 0.030 0.042 0.033 91.50 -
M M Construction 12012
Rehab./Reconst./Upgrading of Damaged Paved National Rd. along Daang Maharlika Villaros-Rosario
Sect. w/ exception
06/10/10 II 14.470 90 O 0.358 0.276 0.150 0.030 0.042 0.033 88.90 -
M M Construction 12012
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Daang Maharlika, Solano-Diadi Section
09/02/10 II 9.645 90 C 0.396 0.200 0.300 - - - 89.60 90.74% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page244
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
M M Construction 12012
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Daang Maharlika, Villaros-Rosario Section
09/02/10 II 14.470 96 C 0.375 0.200 0.300 - - - 87.50 88.34% Satisfactory
M M Construction 12012
Rehab./Reconst. of Damaged National Road KO 216+830 with exception, Poblacion Villaflores
Section
06/03/09 II 14.468 200 C 0.400 0.200 0.300 - - - 90.00 89.28% V. Satisfactory
M M Construction 12012 Conc. of Bambang-Kasibu-Quezon-Solano Road (Labni Section) 03/10/09 II 14.225 120 C 0.406 0.200 0.300 - - - 90.60 86.64%
Satisfactory
M M Construction 12012Rehab./Reconst. of Damaged
National Roads, Daang Maharlika, Poblacion Villaflores Section
03/11/09 II 14.468 200 O 0.355 0.300 0.150 0.030 0.050 0.033 91.80 -
M M Construction 12012Rehab./Reconst. of Damaged
National Roads, Daang Maharlika, Poblacion Villaflores Section
11/28/08 II 14.468 200 O 0.374 0.240 0.100 0.030 0.047 0.067 85.80 -
M M Construction 12012 Conc. of Jct. Nat'l Bitnong-Belance NV-Bdry. Road, Binuangan Sect. 04/15/11 II 9.645 240 C 0.426 0.133 0.300 - - - 85.90 85.00%
Satisfactory
M N Revelo Construction 24789 Reconst. of Lanao-Pagadian-2Z Road, Lumbog Sect. Km. 1743+900 02/26/10 IX 4.035 123 O 0.275 0.285 0.150 0.020 0.047 0.050 82.70 -
M N Revelo Construction 24789Reconst. of Lanao-Pagadian-2Z
Road, Diplahan Section, Km. 1739+200 - Km. 1798+900
02/26/10 IX 3.514 203 O 0.291 0.300 0.150 0.020 0.028 0.017 80.60 -
M. E. Baning Construction 22682
Const. of Sch. Bldg., Technological University of the Philippines,
04/12/11 VIII 47.041 240 C 0.407 0.133 0.300 - - - 84.00 84.30% Satisfactory
Mac Builders 7249
Rehab. of Damaged Paved National Road along Daang Maharlika, Abuyog-Mahaplag Road Sect.,
(Batug-Balocawehay Road Sect.)
04/12/11 VIII 47.049 240 C 0.408 0.133 0.300 - - - 84.10 83.68% Satisfactory
Mac Builders 7249 Conc. of Calubian Jct. San Isidro-Tabango-Villaba Palompon Road 02/24/10 VIII 55.888 330 C 0.342 0.200 0.300 - - - 84.20 85.92%
Satisfactory
Mac Builders 7249Road Upgrading (Gravel to Paved) of Cabungaan-Tabunok-Consuerga Rd.,
Km.1014+663 - Km.1015+51306/03/10 VIII 18.539 240 C 0.451 0.163 0.300 - - - 91.40 91.40%
V. Satisfactory
Mac Builders 7249Road Upgrading (Gravel to Paved) of Belen-Consuegra Rd., Km.981+940 -
Km.981+91006/04/10 VIII 18.540 240 O 0.334 0.300 0.150 0.030 0.037 0.033 88.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page251
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mac Builders 7249Concrete Paving of Critical Portion
along Caibiran-Cabucgayan Rd. (Pawikan-Bunga Sect.)
06/02/10 VIII 19.180 300 O 0.343 0.280 0.150 0.030 0.042 0.033 87.80 -
Mac Builders 7249Replacement of Old Ticud Bridge connecting Iloilo City-Dumangas
Coastal Road09/08/10 V I 47.804 140 O 0.360 0.240 0.150 0.030 0.037 0.033 85.00 -
Mac Builders 7249 Conc. of Calubian Jct., San Isidro-Tabango-Villaba-Palompon Road 06/02/09 VIII 55.351 330 O 0.364 0.240 0.150 0.030 0.035 0.050 86.90 -
Mac Builders 7249Conc. of Calubian-San Isidro-
Tabango-Villaba Road (Tabango-Tabing Sect.)
03/12/09 VIII 17.943 220 C 0.265 0.146 0.300 - - - 71.10 80.16%Unsatisfactory
Mac Builders 7249Completion of Calaguise Steel
Bridge, along Sambulawan-Calaguise-Calubian Road
09/05/09 VIII 37.485 330 C 0.454 0.172 0.300 - - - 92.60 *92.60% V. Satisfactory
Mac Builders 7249 Concreting of Basey-Sohoton Road 08/31/09 VIII 28.495 230 C 0.401 0.200 0.300 - - - 90.10 *90.10% V. Satisfactory
Mac Builders 7249Conc. of Calubian Jct. San Isidro-Tabango-Villaba-Palompon Road
Tabango-San Isidro09/05/09 VIII 55.351 330 O 0.357 0.245 0.150 0.030 0.040 0.050 87.20 -
Mac Builders 7249 Rehab. (Conc.) of Cabungaan-Tabunok-Consuegra Road 09/05/09 VIII 14.052 180 O 0.340 0.245 0.150 0.030 0.040 0.050 85.50 -
Mac Builders 7249 Widening/Upgrading/Rehab. of Access Road to Ormoc Port 08/31/10 VIII 9.117 145 C 0.461 0.133 0.300 - - - 89.40 89.40%
V. Satisfactory
Mac Builders 7249Road Upgrading (Gravel to Paved) of Belen-Consuegra Road, Km. 981+940
- Km. 981-91008/27/10 VIII 18.540 240 C 0.458 0.133 0.300 - - - 89.10 88.68%
Satisfactory
Mac Builders 7249Concrete Paving of Critical Portion
along Caibiran to Cabucgayan Road, Pawikan-Bunga Section
08/26/10 VIII 19.180 300 C 0.410 0.133 0.300 - - - 84.30 86.40% Satisfactory
Mac Builders 7249
Rehab. of Damaged Paved National Roads along Daang Maharlika
09/02/10 VIII 47.049 240 O 0.364 0.240 0.150 0.030 0.042 0.033 85.90 -
MAC Builders / Ubas Construction (JV) JV-05-021
Impvt. of Allen-Malaga Section along Maharlika Highway, Ferry Terminal-
Allen08/30/08 VIII 46.652 260 O 0.354 0.240 0.000 0.022 0.054 0.067 73.70 -
MAC Builders/B.M. Marketing (JV) JV-07-117 Guiuan Airport Development Project 10/07/09 DOTC 0.105 180 C 0.462 0.200 0.300 - - - 96.20 *96.20%
Outstanding
Madyaw Construction & Dev. Corporation 29598
Const. of Cong. Jose C. Aquino, Sr. MPB (Training Center), Brgy.
Libertad04/12/11 XIII 9.581 254 C 0.368 0.191 0.300 - - - 85.90 89.68%
V. Satisfactory
Madyaw Construction & Dev. Corporation 29598
Conc. of Butuan City-Talacogon-La Paz-Loreto-Veruela-Sta. Josefa Road
(Talacogon Sect.)03/31/11 XIII 36.345 270 C 0.334 0.200 0.300 - - - 83.40 86.46%
Satisfactory
Madyaw Construction & Dev. Corporation 29598 Conc. of Manapa Provincial Road 05/31/10 XIII 28.877 300 C 0.420 0.200 0.300 - - - 92.00 89.36%
V. SatisfactoryMadyaw Construction &
Dev. Corporation 29598 Conc. of Brgy. Marbon along Jct. Secondary Road, Brgy. Marbon 09/07/10 XIII 4.714 168 C 0.341 0.200 0.300 - - - 84.10 84.10%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page252
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Madyaw Construction & Dev. Corporation 29598 Conc. of Manapa Provincial Rd. 02/23/10 XIII 28.879 300 O 0.379 0.239 0.150 0.030 0.045 0.033 87.60 -
Madyaw Construction & Dev. Corporation 29598 Completion of San Luis Footbridge,
Old Poblacion 12/01/08 XIII 5.722 210 O 0.324 0.300 0.100 0.030 0.032 0.100 88.60 -
Madyaw Construction & Dev. Corporation 29598
Completion of Philippine Normal University Multi-Purpose Bldg.
(Covered Court)06/08/09 XIII 1.872 150 C 0.445 0.200 0.300 - - - 94.50 *94.50%
V. Satisfactory
Madyaw Construction & Dev. Corporation 29598
Conc.of Talacogon-La Paz Road Section along Butuan City-
Talacogon-La Paz-Loreto Veruela-Sta. Josefa Road
06/09/09 XIII 19.247 416 O 0.350 0.300 0.150 0.030 0.051 0.050 93.10 -
Madyaw Construction & Dev. Corporation 29598
Const./Impvt. of Water Supply System (Hydrolic Ram Pump), Brgy.
M.J. Santos 06/11/09 XIII 1.856 133 O 0.339 0.300 0.150 0.030 0.048 0.050 91.70 -
Madyaw Construction & Dev. Corporation 29598 Completion of Azpetia Bridge along
NRJ-Awa-Prosperidad-Lianga Road 03/16/09 XIII 6.724 180 C 0.376 0.200 0.300 - - - 87.60 84.96% Satisfactory
Madyaw Construction & Dev. Corporation 29598 Const./Imprv't. of Water Supply
System, Brgy. M.J. Santos 09/16/09 XIII 1.856 133 C 0.475 0.908 0.300 - - - 168.30 91.34% V.Satisfactory
Madyaw Construction & Dev. Corporation 29598
Conc. of La Paz-loreto Rd. Sect. along Butuan city-Talacogon-La Paz-
Loreto-Veruela-Sta. Josefa Rd.09/14/09 XIII 19.242 432 C 0.430 0.150 0.300 - - - 88.00 89.62%
V.Satisfactory
Madyaw Construction & Dev. Corporation 29598
Conc. of Talacogon-La Paz Rd. Sect. along Butuan City-Talacogon-la Paz-
Veruela-Sta. Josefa Rd.09/14/09 XIII 19.247 320 C 0.395 0.135 0.300 - - - 83.00 88.55%
Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Const. of 2CL School Bldg., Leopoldo N. Lopez Sr. Memorial E/S,
Brgy. Matiao04/07/11 XI 0.991 100 C 0.448 0.181 0.300 - - - 92.90 *92.90%
V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Completion of DPWH Davao Oriental
2nd District Eng'g. Office Bldg. 04/07/11 XI 2.893 90 C 0.483 0.200 0.300 - - - 98.30 89.13% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Rehab./Reconst./Upgrading of Damaged Paved National Road Sect., Lipata (Surigao del Norte) Davao City
Highway through Daang Maharlika Road (Agusan to Davao Road)
04/11/11 XI 42.496 280 C 0.486 0.195 0.300 - - - 98.10 88.86% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
New Const./Compl./Continuation of On-Going Bridges, Surop Bridge
along Tibanban-Lavigan Sect.04/07/11 XI 11.569 165 C 0.471 0.167 0.300 - - - 93.80 88.16%
Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
New Const./Compl./Continuation of On-Going Bridges, Tagabebe Bridge
along Tibanban-Lavigan Road04/07/11 XI 19.278 190 C 0.448 0.165 0.300 - - - 91.30 83.68%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page253
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tibangan-
Lavigan Rd., Nangan Sect. 06/08/10 XI 9.639 100 O 0.385 0.240 0.150 0.030 0.045 0.033 88.30 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tibanban-
Lavigan Rd., Luzon-Tiblawan Sect. 06/08/10 XI 19.283 120 O 0.349 0.240 0.150 0.030 0.045 0.033 84.70 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Road Upgrading of Tibanban-Lavigan Rd., Tagabebe-Pundaguitan
Sect.06/08/10 XI 19.279 120 O 0.332 0.240 0.150 0.030 0.045 0.050 84.70 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Impvt./Rehab. of Agusan-Davao Road, Km. 1469+000 to Km.
1482+000 with exception Panabo-Carmen Section
02/27/10 XI 19.093 60 C 0.487 0.133 0.300 - - - 92.00 92.00% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Completion of Multi-Purpose
Building, Batobato 03/02/10 XI 2.055 90 C 0.466 0.133 0.300 - - - 89.90 89.90% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Const. of Gavino Dawang E/S
(Package: SB-09) 03/02/10 XI 1.061 90 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tibanban-
Lavigan Rd., Nangan Sect. 09/03/10 XI 9.639 100 C 0.435 0.133 0.300 - - - 86.80 87.70% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tibanban-
Lavigan Rd., Luzon-Tiblawan Sect. 09/03/10 XI 19.283 120 C 0.443 0.133 0.300 - - - 87.60 85.86% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Road Upgrading of Tibanban-Lavigan Rd. Tagabebe-Pundaguitan
Sect.09/03/10 XI 19.279 120 C 0.398 0.133 0.300 - - - 83.10 84.06%
Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Conc. of Tibanban-Lavigan Road
(Lilisan Sect.) 03/11/09 XI 19.282 148 C 0.335 0.145 0.300 - - - 78.00 84.66% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Construction of Multi-Purpose
Building 06/05/09 XI 4.723 230 O 0.387 0.266 0.150 0.030 0.043 0.033 90.90 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tibanban-
Lavigan Road 06/03/09 XI 48.233 150 C 0.446 0.149 0.300 - - - 89.50 *89.50% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Const. of Multi-Purpose Building A (10m x 18m Covered Court) with
Stage09/14/09 XI 4.723 230 C 0.414 0.133 0.300 - - - 84.70 89.04%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page254
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tiban-Lavigan
Road, Tamban-Lilisan Sect. 09/14/09 XI 9.640 100 C 0.402 0.133 0.300 - - - 83.50 *83.50% Satisfactory
Mafil Enterprises 27226 Road Upgrading (Gravel to Paved) Jct. Dologon-Panadtalan Road 06/15/10 X 4.713 75 O 0.353 0.240 0.150 0.023 0.050 0.033 84.90 -
Mafil Enterprises 27226 Road Upgrading (Gravel to Concrete) Jct. Dologon-Panadtalan 09/03/10 X 4.713 126 C 0.404 0.151 0.300 - - - 85.50 85.14%
Satisfactory
Maghuyop Construction 21641 Const./Renovation/Completion/ Expansion of MPB 03/29/11 VII 0.481 150 O 0.356 0.268 0.150 0.030 0.064 0.050 91.80 -
Maghuyop Construction 21641 Const. of MPB Cogon Norte 02/24/10 VII 2.019 120 C 0.473 0.112 0.300 - - - 88.50 93.47% V. Satisfactory
Maghuyop Construction 21641 Rehab./Impvt. of FMR, Lintuan 08/24/10 VII 0.142 100 C 0.445 0.133 0.300 - - - 87.80 87.80% Satisfactory
Maghuyop Construction 21641 Rehab./Impvt. of FMR, (leading to Atabay Beach) Ubojan-Sandingan 08/24/10 VII 0.141 100 C 0.432 0.133 0.300 - - - 86.50 86.50%
Satisfactory
Maghuyop Construction 21641 Const. of 1-CL Datag E/S 06/09/09 VII 0.459 120 C 0.491 0.182 0.300 - - - 97.30 93.24% V. Satisfactory
Maghuyop Construction 21641Completion of Multi-Purpose
Building, CVSCAFT, Tagbilaran City Campus
03/04/09 VII 0.915 115 C 0.497 0.138 0.300 - - - 93.50 *93.50%V. Satisfactory
Maghuyop Construction 21641 Concreting of Multi-Purpose Pavement Tagbuane 03/03/09 VII 0.137 110 C 0.416 0.200 0.300 - - - 91.60 *91.60%
V. Satisfactory
Maghuyop Construction 21641 Construction of Multi-Purpose Pavement, Basac Dacu 03/03/09 VII 0.137 110 C 0.450 0.133 0.300 - - - 88.30 *88.30%
Satisfactory
Maghuyop Construction 21641 Reconstruction of Balilihan Central Elementary School 03/03/09 VII 3.525 180 C 0.494 0.181 0.300 - - - 97.50 96.31%
Outstanding
Mainroad Development & Trading Corporation 33347 Impvt. of MPB at Poblacion 06/04/10 IVA 0.398 60 C 0.469 0.129 0.300 - - - 89.80 89.80%
V. Satisfactory
Mak Jay Construction 19057 Road Upgrading (Gravel to Concrete) along Baguio-Bondoc Rd. 04/08/11 CAR 9.315 172 O 0.346 0.231 0.150 0.030 0.027 0.033 81.70 -
Mak-Jay Construction 19057 Concreting of Paykek-Kapangan Road 08/26/09 CAR 0.424 30 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
Mak-Jay Construction 19057 Conc. along Topinao FMR, Poblacion 06/07/10 CAR 0.288 60 C 0.345 0.200 0.300 - - - 84.50 84.50%
Satisfactory
Mak-well Enterprises 25003 Completion of MPB at Brgy. Malaban 05/27/10 IVA 1.054 30 C 0.484 0.141 0.300 - - - 92.50 92.50% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page255
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mamsar Construction and Industrial Corporation
15885 Const. of Balo-i Bridge 08/27/10 X 74.275 432 O 0.400 0.240 0.150 0.030 0.055 0.033 90.80 -
Mamsar Construction and Industrial Corporation
15885Const. of Shore Protection including
RC Pier /Wharf and Reclamation Area, DPWH, RES
03/09/10 XI 106.212 400 O 0.328 0.300 0.150 0.030 0.045 0.033 88.60 -
Mamsar Construction and Industrial Corporation
15885
Rehab./Reconst./Upgrading of Damaged Paved National Roads at Poblacion Section, Sta. 1524+000-
Sta. 1526+000 w/ exception
09/14/09 X 18.467 150 C 0.407 0.200 0.300 - - - 90.70 90.70% V. Satisfactory
Mamsar Construction and Industrial
Corporation (Formerly: Mamsar Enterprises Agro-
Industrial Corporation)
15885
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads along Misamis Oriental-Ma. Cristina Bdr.
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page257
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Marcons Builder 8044
Const. (Road Opening) of Missing Links of National Road, Sallapadan-Tubo, Abra-Cervantes, Ilocos Sur,
Abra Side, Km.467+100 - Km.484+000
03/30/11 CAR 65.204 470 O 0.317 0.272 0.150 0.020 0.027 0.033 81.90 -
Marcons Builder 8044 Const. of DPWH Regional Office Building, Phase V 03/13/09 CAR 24.058 360 O 0.361 0.276 0.150 0.030 0.056 0.033 90.60 -
Marcons Builder 8044 Const. of DPWH Regional Office Building, Phase V 03/04/10 CAR 24.058 395 C 0.481 0.133 0.300 - - - 91.40 92.48%
V. Satisfactory
Marcons Builder 8044 Const. of DPWH Regional Office Building (Phase V) 08/29/08 CAR 24.059 360 O 0.376 0.300 0.100 0.030 0.047 0.100 95.30 -
Marcons Builder 8044 Impvt. of Benguet-Bontoc-Kalinga Road 08/15/08 CAR 12.707 180 C 0.318 0.100 0.000 - - - 41.80 58.56%
Poor
Marcons Builders 8044 Restoration of Road Cut along M. Roxas St., Km. 254+120-Km. 254+160 09/02/10 CAR 0.500 120 C 0.426 0.133 0.300 - - - 85.90 85.90%
Satisfactory
Marcphil Construction 10949 Concreting of San Aquilino-Baroc Road 02/26/09 IV-B 0.951 50 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Marcus Construction 12601Conc. of Banisilan-Guiling-Alamada-
03/31/11 XII 31.857 170 O 0.330 0.300 0.150 0.030 0.055 0.033 89.80 -
Marcus Construction 12601 Restoration/Const. of Protection Dike, Kabakan River 04/02/11 XII 18.669 317 C 0.365 0.200 0.300 - - - 86.50 84.64%
Satisfactory
Marcus Construction 12601Rehab./Impvt. of Bukidnon-Cotabato National Road (Tambad Sect.), Brgy.
Tambad09/03/09 XII 57.136 289 O 0.368 0.300 0.150 0.030 0.033 0.033 91.40 -
Marcus Construction 12601Const. of Slope Protection Works
along Dualing-New Panay-Midsayap Road (Arizona Section)
09/04/09 XII 9.407 206 O 0.400 0.240 0.150 0.010 0.042 0.033 87.50 -
Marcus Construction 12601 Const. of Multi-Purpose Building at Midsayap Pilot Elementary School 02/26/10 XII 6.096 130 C 0.449 0.188 0.300 - - - 93.70 93.70%
V. Satisfactory
Marcus Construction 12601 Concrete Re-blocking along Davao-Cotabato Road 02/27/10 XII 6.378 110 C 0.407 0.133 0.300 - - - 84.00 84.00%
Satisfactory
Marcus Construction 12601Conc. of Banisilan-Alamada-
Libungan Road Wadya-Poblacion, Banisilan Section, with exception
08/26/10 XII 29.727 190 C 0.408 0.184 0.300 - - - 89.20 89.20% V. Satisfactory
Marcus Construction 12601Const. of Slope Protection Works
along Dualing-New Panay-Midsayap Road, Arizona Section
08/26/10 XII 9.430 209 C 0.423 0.133 0.300 - - - 85.60 85.60% Satisfactory
Marcus Construction 12601Proposed Conc. of Liloy-Siocon Road, Imelda-San Roque-Gutalac
Sect.03/09/09 IX 19.128 225 C 0.459 0.155 0.300 - - - 91.40 84.05%
Satisfactory
Marcus Construction 12601Repair/Rehab./Impv't. of Damaged
Road Section along Davao-Cotabato Road, Pikit-Midsayap Section
03/04/09 XII 9.435 125 C 0.477 0.200 0.300 - - - 97.70 *97.70% Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page258
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Road with Drainage & Shoulder, KO368+000 -
KO368+548, KO369+200 - KO370+150 (with exception) Dist. I, Dist. II &
Cabaruan
04/07/11 II 16.989 210 C 0.405 0.133 0.300 - - - 83.80 90.46% V. Satisfactory
Mar-Deb Construction & Development 6715 Restoration of Flood Control
Structure at Estrella 04/08/11 II 2.877 120 C 0.470 0.133 0.300 - - - 90.30 *90.30% V. Satisfactory
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Road with
widening (with exception), KO370+060 - KO370+550
04/07/11 II 15.104 180 C 0.423 0.133 0.300 - - - 85.60 90.13% V. Satisfactory
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Road,
KO364+000 - KO364+97204/07/11 II 11.581 120 C 0.423 0.133 0.300 - - - 85.60 88.96%
Satisfactory
Mar-Deb Construction & Development 6715 Restoration of Flood Control
Structure at San Roque 04/07/11 II 4.787 120 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
Mar-Deb Construction & Development 6715
Rehab. of Alicia-San Mateo Road, KO356+000-KO361+000, Alicia-San
Mateo Section04/07/11 II 17.807 120 C 0.411 0.133 0.300 - - - 84.40 *84.40%
Satisfactory
Mar-Deb Construction & Development 6715 Const. of Manili Bridge 04/10/11 II 13.882 330 C 0.463 0.200 0.000 - - - 66.30 82.92%
Satisfactory
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Roads w/
Widening, Daang Maharlika KO 368+056-KO366+756
08/26/09 II 13.387 132 C 0.439 0.200 0.300 - - - 93.90 *93.90% V. Satisfactory
Mar-Deb Construction & Development 6715 Const. of 2-CLSB, Cauayan National
H/S Ext. Research Minante I 08/26/09 II 0.920 90 C 0.447 0.153 0.300 - - - 90.00 *90.00% V. Satisfactory
Mar-deb Construction & Development 6715 Const. of Dioton Bridge Bank
Protection 02/24/10 II 0.950 90 C 0.427 0.133 0.300 - - - 86.00 86.00% Satisfactory
Mar-deb Construction & Development 6715 Completion of Multi-Purpose
Building at Carabbatan Chica 02/24/10 II 0.143 40 C 0.395 0.162 0.300 - - - 85.70 85.70% Satisfactory
Mar-Deb Construction & Development 6715 Restoration of Flood Control
Structure 06/05/10 II 7.658 120 C 0.429 0.200 0.300 - - - 92.90 92.90% V. Satisfactory
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Rd. w/
Widening KO 354+300 - KO354+390 w/ exception
06/05/10 II 9.085 90 C 0.424 0.200 0.300 - - - 92.40 92.40% V. Satisfactory
Mar-Deb Construction & Development 6715 Const. of Cagayan River Control
Baringin Sect. 06/02/10 II 19.293 180 C 0.481 0.133 0.300 - - - 91.40 91.40% V. Satisfactory
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Rd. KO
369+(-297) - KO 370+000 w/ exception
06/02/10 II 9.816 120 O 0.379 0.247 0.150 0.030 0.051 0.050 90.70 -
Mar-Deb Construction & Development 6715 Restoration of Flood Control
Structure at Loria 06/05/10 II 2.883 120 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page259
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mar-deb Construction & Development 6715
Rehab./Reconst.Upgrading of Damaged Paved National Road
KO369+(-)297 - KO370+000 (with exception)
08/26/10 II 9.816 150 C 0.430 0.200 0.300 - - - 93.00 91.62% V. Satisfactory
Mar-deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Road with
widening (with exception), KO353+000 to KO354+200, Mabini,
Alicia Section
08/26/10 II 16.061 150 C 0.393 0.200 0.300 - - - 89.30 89.30% V. Satisfactory
Mar-deb Construction & Development 6715 Conc. of Cauayan-Cabatuan Road
(Cabatuan Sect.) 03/04/09 II 9.563 150 C 0.439 0.200 0.300 - - - 93.90 91.68% V.Satisfactory
Mar-deb Construction & Development 6715 Widening of Cauayan-Cabatuan
Road (Luna Section) 03/04/09 II 3.344 120 C 0.442 0.200 0.300 - - - 94.20 92.04% V.Satisfactory
Mar-Deb Construction & Development 6715 Completion of Turod-Banquero
Concrete Overflow Bridge PhaseIII 08/14/08 II 9.879 300 O 0.351 0.260 0.000 0.030 0.037 0.100 77.80 -
Mar-Deb Construction & Development 6715 Rehab/Reconst. Of Santiago-
Tuguegarao Road 05/26/09 II 11.473 237 C 0.454 0.200 0.300 - - - 95.40 93.03% V. Satisfactory
Mar-Deb Construction & Development 6715 Completion of Turod-Banquero
Concrete Overflow Bridge Phase III 05/26/09 II 9.879 535 C 0.457 0.200 0.300 - - - 95.70 84.96% Satisfactory
Margarita Construction 20201 Const. of MPB Sta. Lucia, Phase 4 Punturin and CNAI Bignay 03/28/11 NCR 2.742 120 O 0.377 0.240 0.150 0.030 0.058 0.050 90.50 -
Margarita Construction 20201 Rehab. of Roads @ Calantipay 04/13/11 III 0.485 10 C 0.267 0.000 0.300 - - - 56.70 *56.70% Poor
Margarita Construction 20201Rehab. of Damaged Asphalt Pavement Marilao Bridge,
Km.22+054, MNR08/28/10 III 4.745 40 C 0.478 0.133 0.300 - - - 91.10 91.10%
V. Satisfactory
Margarita Construction 20201 Rehab. of Sta. Maria-By Pass Road 09/07/09 III 4.757 100 O 0.357 0.240 0.150 0.030 0.042 0.033 85.20 -
Markbilt Construction 12522 Const. of Small Reservoir Irrigation Project - Masidem Dam (Dam) 05/2-7/11 NIA 192.198 1,098 O 0.384 0.272 0.150 0.030 0.025 0.050 91.05 -
Marknest Construction and Builders (Formerly: Marknest Construction)
16818 Rehab/Reconst/Upgrading of Drainage along GSO Road 08/25/09 III 9.520 115 C 0.402 0.133 0.300 - - - 83.50 *83.50%
Satisfactory
Marknest Construction and Trading (Formerly:
Marknest Const.)16818 Road Upgrading of Mt. Arayat Park
Road 05/19/09 III 11.429 90 O 0.356 0.300 0.150 0.020 0.033 0.050 90.90 -
Marknest Construction and Trading (Formerly: Marknest Construction)
16818 Completion of MPB @ Don Luis Gonzales H/S, Pandacaqui 03/28/11 III 1.900 30 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Marknest Construction and Trading (Formerly: Marknest Construction)
16818 Road Upgrading of Mt. Arayat National Park Road 02/15/10 III 11.429 90 C 0.460 0.200 0.300 - - - 96.00 92.94%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page260
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Marknest Construction and Trading (Formerly: Marknest Construction)
16818 Const. of Gerry Rodriguez High School Divisoria 02/15/10 III 7.517 120 C 0.485 0.200 0.300 - - - 98.50 88.98%
Satisfactory
Marquin Construction 13332 Const. of 2-CL SB at Doña Milagros Osmeña NHS 04/14/11 VII 1.207 60 C 0.467 0.133 0.300 - - - 90.00 83.98%
Satisfactory
Marquin Construction 13332 Construction of MPB Maslog E/S 03/10/09 VII 0.902 70 C 0.335 0.200 0.300 - - - 83.50 *83.50% Satisfactory
Marquin Construction 13332 Road Concreting of Brgy. Bili 03/10/09 VII 0.454 70 C 0.377 0.200 0.300 - - - 87.70 *87.70% Satisfactory
Marquin Construction 13332 Road Concreting of Brgy. Tabunan-Brgy. Managase 03/10/09 VII 0.454 70 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Marquin Construction 13332 Const. of 2-CL SB on top of the existing SB at Compostela NHS 09/14/09 VII 2.234 120 O 0.383 0.240 0.150 0.030 0.035 0.025 86.30 -
Marquin Construction 13332 Construction of 2-CL SB at Mohon NHS 09/14/09 VII 1.212 120 O 0.332 0.240 0.150 0.030 0.035 0.025 81.20 -
Marquin Construction 13332 Const. of 2-CL SB on top of the existing SB at Compostela NHS 03/09/10 VII 2.234 120 C 0.476 0.097 0.300 - - - 87.30 86.60%
Satisfactory
Marquin Construction 13332 Const. of 2-CL SB at Mohon NHS 03/09/10 VII 1.212 120 C 0.481 0.102 0.300 - - - 88.30 83.33% Satisfactory
Marquin Construction 13332 Road Conc. of Brgy. Calumbuyan 08/31/10 VII 1.353 60 C 0.378 0.200 0.300 - - - 87.80 87.80% Satisfactory
Mar-vel Construction & Supply 23722 Const. of MPB at Brgy. San Cristobal 02/24/10 IVA 2.887 40 C 0.424 0.200 0.300 - - - 92.40 92.40%
V. Satisfactory
Mar-Vel Construction & Supply 23722
Const./Impvt. of Water Supply Project in Waterless Municipality of
Repair/Rehab. of Drainage System of Aurora Blvd. (from Araneta Ave. to
EDSA, East and West Bound)08/16/10 NCR 4.802 90 C 0.404 0.133 0.300 - - - 83.70 83.70%
Satisfactory
MF Construction 22192Const.of DPWH Siquijor District Engineering Office Building inc.
Quarters09/07/09 VII 2.892 189 O 0.373 0.240 0.150 0.030 0.037 0.033 86.30 -
MF Construction 22192Const.of DPWH Siquijor District Engineering Office Building inc.
Quarters03/06/10 VII 2.892 209 C 0.489 0.112 0.300 - - - 90.10 87.44%
Satisfactory
MGBJ Rising Construction & Land
Developer18656 Conc. of Road at Brgy. Labangal 04/14/11 XII 1.358 75 C 0.434 0.200 0.300 - - - 93.40 *93.40%
V. Satisfactory
MGBJ Rising Construction & Land
Developer18656
Rehab. of Asphalt Overlay along Tampakan-Koronadal Provincial
Road06/17/10 XII 4.533 75 C 0.421 0.133 0.300 - - - 85.40 85.40%
Satisfactory
MGBJ Rising Construction & Land
Developer18656 Asphalt Overlay/Upgrading of Digos-
Markar-Buayan Road 03/19/09 XII 9.433 120 C 0.478 0.200 0.300 - - - 97.80 *97.80% Outstanding
MGDJ Construction 29352 Const. of Roads @ Brgy. Poblacion 2 09/01/09 IVA 0.292 120 C 0.466 0.133 0.300 - - - 89.90 *89.90% V. Satisfactory
MGSR Construction 33446 Const. of Multi-Purpose Pavement, Purok 2, Bulanao 05/27/09 CAR 0.281 120 C 0.380 0.200 0.300 - - - 88.00 *88.00%
Satisfactory
MGT Builder's & Supply 33872 Const. of 2-CL Academic Building Bogna E/S, Bacon District 04/11/11 V 1.212 60 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V. Satisfactory
MGT Builder's & Supply 33872 Conc. Of Naspi-Lourdes Rd. 08/30/10 V 0.724 60 C 0.418 0.200 0.300 - - - 91.80 91.80% V. Satisfactory
MH Southern Construction 5841 Sarangani-Davao Del Sur Coastal
Road, Cross Section 09/17/09 XII 7.517 150 C 0.375 0.190 0.300 - - - 86.50 83.50% Satisfactory
Midnorth Luzon Construction and
Development Corporation
31783 Completion of Pospos Pathway, Caluttit 05/23/09 CAR 0.240 155 C 0.483 0.200 0.300 - - - 98.30 *98.30%
Outstanding
Miggs Construction and Supply 17993 Const. of Line Canal @ San Nicolas 02/17/10 III 2.869 60 C 0.367 0.200 0.300 - - - 86.70 86.70%
Satisfactory
Miggs Construction and Supply 17993 Repair of 6CL at Sasmuan
Elementary School 08/24/09 III 0.956 60 C 0.477 0.133 0.300 - - - 91.00 *91.00% V. Satisfactory
Min Construction 14656
Road Upgrading (Gravel to Concrete) at Sindangan-Siayan-Dumingag-Mahayag Road (Denoyan-Pob.-
Siayan Section)
04/13/11 IX 33.841 385 O 0.328 0.300 0.150 0.030 0.038 0.050 89.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page268
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Min Construction 14656
Road Upgrading (Gravel to Concrete) of Sindangan-Siayan to Dumingag to
Mahayag Road, Kalakas to Muñoz Section
04/15/11 IX 15.782 180 O 0.360 0.244 0.150 0.030 0.048 0.050 88.20 -
Min Construction 14656 Const. of Access Road @ Ipil Airport 04/04/11 IX 9.466 120 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory
Min Construction 14656
Const. of Liloy-Siocon Road inc. RCBC Dansalan-Labason Poblacion
ByPass Road (Km. 1983+390-Km. 1984+360)
06/01/09 IX 19.130 309 C 0.486 0.133 0.300 - - - 91.90 85.48% Satisfactory
Min Construction 14656Conc. of Liloy-Siocon Road, Kipit-
Gutalac Section, Kipit, Labason and La-Libertad
06/01/09 IX 19.125 372 C 0.430 0.133 0.300 - - - 86.30 83.18% Satisfactory
Min Construction 14656Impvt./Conc. Paving of Imelda-Alicia Road (Phase III) Guintolan-Lutiman
Section03/04/09 IX 33.460 359 C 0.434 0.200 0.300 - - - 93.40 83.14%
Satisfactory
Min Construction 14656 Impvt./Conc. Paving of Imelda-Alicia Road, Lutiman Section 03/04/09 IX 17.001 230 C 0.453 0.171 0.300 - - - 92.40 93.18%
V.Satisfactory
Min Construction 14656 Proposed Conc. of Liloy, Zamboanga del Norte-Ipil,Phase II 03/04/09 IX 14.309 180 C 0.427 0.147 0.300 - - - 87.40 83.02%
Satisfactory
Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) 08/28/08 IX 19.125 168 O 0.317 0.240 0.100 0.030 0.047 0.100 83.40 -
Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) 11/25/08 IX 19.125 213 O 0.327 0.239 0.100 0.030 0.025 0.067 78.80 -
Mindanao Rock 23479 Const. of Ozamiz Coastal By-Pass Road 04/06/11 X 45.099 180 C 0.499 0.133 0.300 - - - 93.20 90.98%
V. Satisfactory
Mindanao Rock 23479Const of Ozamiz City-Sinacaban Mountain Bypass Road, Ozamiz-
Clarin Sect. 04/06/11 X 18.891 180 C 0.400 0.133 0.300 - - - 83.30 *83.30%
Satisfactory
Mindanao Rock 23479 Const./Rehab. of Montes Balaon-Montes Callagan Rd. 05/31/10 IVA 14.340 60 C 0.425 0.133 0.300 - - - 85.80 85.80%
Satisfactory
Mindanao Rock 23479Impvt. of Gurel-Bokod-Kabayan Road Km. 318+00-Km. 330+000 (Selected
Portion)08/25/09 CAR 9.628 150 C 0.395 0.133 0.300 - - - 82.80 *82.80%
Satisfactory
Mindanao Rock 23479 Maasin Dev't Project (Upgrading of Apron and Taxiway) 03/19/10 DOTC 40.424 180 C 0.438 0.200 0.300 - - - 93.80 93.80%
V.Satisfactory
Mindanao Rock 23479
Ozamis Airport Dev't Project (Asphalt Overlay of Runway,
Shoulder Grade Correction and Construction of CHB Fence)
MRJR Construction & Trading 28265 Completion of MPB, Pamplona 1 06/08/10 NCR 0.447 45 C 0.479 0.200 0.300 - - - 97.90 97.90%
Outstanding
MRRM Trading & Construction / Precious
Construction (JV)JV-08-094 Impvt. of Farm-to-Market Road,
Quinfermin-Bagbuga-San Jose Road 05/29/09 I 9.630 133 C 0.423 0.133 0.300 - - - 85.60 85.84% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page274
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
MRRM Trading & Construction / Precious
Construction Joint Venture
JV-08-094 Impvt. of Farm-to-Market Road, Quinfermin-Bugbuga-San Jose Road 02/17/10 I 9.630 133 C 0.355 0.065 0.300 - - - 72.00 80.40%
Unsatisfactory
MS Cruz Builders & Trading 33697 Const. of MPB @ Brgy. Poblacion 04/05/11 III 1.889 48 C 0.350 0.200 0.300 - - - 85.00 *85.00%
SatisfactoryMS Cruz Builders &
Trading 33697 Channeling/Impvt. of Lower Abacan River 04/05/11 III 9.502 72 C 0.000 0.150 0.300 - - - 45.00 *45.00%
PoorMS Cruz Builders &
Trading 33697 Conc. of Sta. Ines Brgy. Rd. 08/31/10 III 1.911 40 C 0.338 0.200 0.300 - - - 83.80 83.80% Satisfactory
MSB Construction & Trading 33019 Agno River Integrated Irrigation
Project 7/13-18/09 NIA 8.513 60 C 0.476 0.181 0.300 - - - 95.61 *95.61% V. Satisfactory
MSF Construction 25307 Construction of Binaratan Elementary School Building 06/05/09 I 0.904 38 C 0.489 0.133 0.000 - - - 62.20 *62.20%
Poor
Muaña Construction and Development Corp. 9354
Construction of Multi-Purpose Building, Brgy. Labangon and
Calamba06/08/09 VII 1.885 60 C 0.454 0.133 0.300 - - - 88.70 *88.70%
Satisfactory
Muaña Construction and Development Corp.
(Formerly: Muaña Const.)9354
Road Upgrading Gravel to Paved to Tabing-Kawayan-Sta. Rosa-Lawis-
Tabango Road04/09/11 VIII 18.540 240 C 0.437 0.133 0.300 - - . 87.00 87.09%
Satisfactory
Muaña Construction and Development Corp.
(Formerly: Muaña Const.)9354
Road Upgrading (Gravel to Paved) of Tabango-Catmon-La Fortuna-
Manlawaan-Gimarco Road, Km.1031+207 - Km.1031+847
04/09/11 VIII 20.970 240 C 0.428 0.133 0.300 - - - 86.10 86.04% Satisfactory
Muaña Construction and Development Corp.
(Formerly: Muaña Const.)9354 Const./Repair/Impvt. of MPB at Brgy.
Tisa 04/14/11 VII 1.158 93 C 0.488 0.200 0.300 - - - 98.80 82.63% Satisfactory
Muaña Construction Development Corp. 9354
Rehab. of Bacolod North Road, Km.96+700 - Km.97+800 with
exception03/31/11 VI 12.782 155 C 0.416 0.135 0.000 - - - 55.10 64.76%
Poor
Mulana Construction 30708 Construction of School Building Cawag P/S 09/10/09 VII 0.580 165 O 0.400 0.155 0.150 0.030 0.037 0.033 80.50 -
Mulana Construction 30708 Const. of School Building Cawag P/S 02/26/10 VII 0.580 165 C 0.442 0.133 0.300 - - - 87.50 82.60% Satisfactory
Mulaña Construction 30708Completion of Water Supply System
at Sitio Magdagook, Brgy. 3, Kalangahan
05/26/09 VII 4.771 90 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Must Enterprises 13336 Const. of School Building at Crossing Simuay 03/29/11 XII 4.323 135 C 0.470 0.133 0.300 - - - 90.30 *90.30%
V. Satisfactory
Must Enterprises 13336 Conc. of Kidapawan-Ilomavis Tourist Road, Mua-an-Ginatilan Section 04/01/11 XII 18.156 190 C 0.403 0.200 0.300 - - - 90.30 88.38%
Satisfactory
Must Enterprises 13336 Const./Concreting of Cotabato Airport @ Awang 09/01/09 XII 19.059 138 C 0.445 0.200 0.300 - - - 94.50 92.40%
V. Satisfactory
Must Enterprises 13336 Regravelling of Road at Rosay Heights 11 02/24/10 XII 0.940 18 C 0.375 0.200 0.300 - - - 87.50 87.50%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page275
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Must Enterprises 13336 Const. of MPB at Don E. Sero E/S 06/01/10 XII 1.920 79 O 0.329 0.240 0.150 0.030 0.035 0.033 81.70 -
Must Enterprises 13336 Const. of MPB at Tamontaka E/S 05/31/10 XII 1.929 50 C 0.384 0.130 0.300 - - - 81.40 81.40% Unsatisfactory
Must Enterprises 13336 Const. of MPB @ DepEd Div. Office 08/24/10 XII 1.929 50 C 0.460 0.133 0.300 - - - 89.30 89.30% V. Satisfactory
Must Enterprises 13336 Const. of MPB @ Don E. Sero Elem. School 08/24/10 XII 1.920 79 C 0.408 0.133 0.300 - - - 84.10 82.42%
Satisfactory
Must Enterprises 13336 Const./Conc. of Cotabato City Circ. Road (Western Section) inc. Bridge 08/24/10 XII 28.650 264 C 0.475 0.200 0.000 - - - 67.50 75.06%
Unsatisfactory
Must Enterprises 13336 Const./Conc. of Cotabato Airport at Awang 05/26/09 R-XII 19.058 138 O 0.342 0.300 0.150 0.030 0.055 0.033 91.00 -
Must Enterprises 13336 Impvt./Regravelling of Marbel-Midsayap Road 03/16/09 XII 9.642 65 C 0.372 0.133 0.300 - - - 80.50 *80.50%
Unsatisfactory
MWJ Construction 14882 Road Conc., Burauen-Albuera Road 04/08/11 VIII 8.337 120 O 0.332 0.300 0.150 0.030 0.055 0.050 91.70 -
MWJ Construction 14882 Rehab./Const./Upgrading of Damaged Pavement, Caibaan Road 06/10/09 VIII 9.640 90 C 0.418 0.133 0.300 - - - 85.10 *85.10%
Satisfactory
MWJ Construction 14882 Conc. of Burauen-Albuera Road 02/22/10 VIII 9.447 150 C 0.402 0.200 0.300 - - - 90.20 92.20% V. Satisfactory
MWJ Construction 14882 Upgrading of Tigbao-Pulak-Sta. Fe Road 09/18/09 VIII 5.780 100 C 0.450 0.144 0.300 - - - 89.40 88.50%
Satisfactory
MWJ Construction 14882 Construction of Burauen-Mahagnao Road 09/02/09 VIII 12.275 120 C 0.422 0.200 0.300 - - - 92.20 84.88%
Satisfactory
N.A Ibarra Construction (Formerly: Diocletian's
Const.)24742 Rehab. of Damaged Flood Control
Structures @ Brgy. Jordan 08/20/10 I 0.964 45 C 0.360 0.200 0.300 - - - 86.00 86.00% Satisfactory
N.A Ibarra Construction (Formerly: Diocletian's
Const.)24742 Rehab. of Damaged Flood Control
Structures, Brgy. Purag 08/20/10 I 0.964 70 C 0.350 0.200 0.300 - - - 85.00 85.00% Satisfactory
N.A Ibarra Construction (Formerly: Diocletian's
Const.)24742 Road Concreting, Brgy. Baracbac 02/28/09 I 0.855 18 C 0.367 0.200 0.300 - - - 86.70 *86.70%
Satisfactory
N.A. Ibarra Construction (Formerly: Diocletian's
Construction)24742 Conc. of FMR at Brgy. Cabangtalan 04/01/11 I 1.424 65 C 0.414 0.196 0.300 - - - 91.00 *91.00%
V. Satisfactory
N.B Avila Construction 13751 Repair/Rehab. of Labac Bridge 06/03/10 IVA 0.990 60 C 0.460 0.154 0.300 - - - 91.40 91.40% V. Satisfactory
N.B Avila Construction 13751 Conc. of Brgy. Road at Brgy. Bucal I 06/03/10 IVA 0.496 60 C 0.371 0.200 0.300 - - - 87.10 87.10% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page276
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
N.B Avila Construction 13751 Conc. of Sicat-Ezperanza FMR 06/03/10 IVA 0.496 60 C 0.339 0.200 0.300 - - - 83.90 83.90% Satisfactory
N.B Avila Construction 30983Road Upgrading (Gravel to Paved) of
Jct. MWCR San Jose Airport - Jct. Bubog Rd., Brgy. Bubog
N.K Enterprise 29292 Rehab./Imprv't. of Various Brgy. Rds. At Villafont & Imparayan 02/25/10 VI 18.922 210 O 0.338 0.263 0.150 0.020 0.030 0.033 83.40 -
N.K Enterprise 29292 Const./Rehab./Impvt. of Various Brgy. Roads at Villafont & Imparayan 06/10/10 VI 18.922 210 C 0.370 0.157 0.300 - - - 82.70 83.12%
Satisfactory
N.K Enterprise 29292Conc. of Bantayan-San Pedro-Cubay
Raod, Km. 101+969.40-Km. 102+432.90
09/02/10 VI 4.988 120 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory
N.K. Enterprise 29292Conc. Of Odiong-Sibalom-San
Remegio-Leon Road, Km.119+166 - Km.120+1366
04/06/11 VI 18.970 282 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory
N.M.E Construction 22984Rehab./Reconst./Upgrading of
O.G Santos Construction 2050 Completion of MPB for Package 1 at Duterte NHS, Brgy. Talomo 03/10/10 XI 2.841 180 C 0.492 0.133 0.300 - - - 92.50 92.50%
V. Satisfactory
O.G Santos Construction 2050 Const./Impv't. of 5 Classroom Bldg. at New Maligaya ES, Brgy. Ising 09/01/10 XI 4.709 180 C 0.480 0.133 0.300 - - - 91.30 91.30%
V. Satisfactory
O.G Santos Construction 2050 Conc. of Mahayag-Dumingag Road Kaangayan Section 03/12/09 IX 4.645 166 C 0.467 0.150 0.300 - - - 91.70 *91.70%
09/04/09 XI 14.465 120 C 0.430 0.133 0.000 - - - 56.30 *56.30% Poor
O.G. Santos Construction 2050Road Upgrading (Gravel to Concrete) Dipolog City Road-Aurora-Josefina
Section04/07/11 IX 18.584 218 C 0.440 0.133 0.300 - - - 87.30 88.68%
Satisfactory
O.G. Santos Construction 2050 Const. (Opening) of Tubalan-Pinalpalan-Alabel Road Nawan Sect. 03/31/11 XI 19.147 210 C 0.486 0.197 0.300 - - - 98.30 *98.30%
Outstanding
O.G. Santos Construction 2050 Const. of Sch. Bldg. (SCL) @ Don Juan Dela Cruz C/E/S, Toril District 03/29/11 XI 3.765 150 C 0.444 0.170 0.300 - - - 91.40 *91.40%
V. Satisfactory
O.G. Santos Construction 2050Const. (Opening) of Tubalan-Pinalpalan-Alabel Road Sitio
Malagsong Sect.03/31/11 XI 19.147 90 C 0.430 0.035 0.000 - - - 46.50 75.78%
Unsatisfactory
O.L De Leon Construction 16194 Const. of Plaridel Flood Control,
Brgy. Plaridel 06/10/10 V 1.911 90 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
O.L. De Leon Construction 16194 Const. of Multi-Purpose Building,
Brgy. Masalong 04/02/11 V 1.141 45 C 0.419 0.133 0.300 - - - 85.20 *85.20% Satisfactory
O.L. De Leon Construction 16194 Const. of Drainage System at Pob. 1,
2 & 3 04/03/11 V 5.725 150 O 0.356 0.225 0.150 0.030 0.035 0.033 82.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page291
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
O.R Sarmiento Construction 1411
Rehab. of Daang Maharlika Highway, Package I, Section 2 (Allen-Malaga Road Section) Km. 63+359.55-Km.
667+644.55
03/04/10 VIII 99.950 180 C 0.462 0.200 0.300 - - - 96.20 96.20% Outstanding
O.R Sarmiento Construction 1411
Rehab. of Daang Maharlika Highway Package I, Section 5 (Allen-Malaga Road Section) Km. 674+560.55-Km.
660+366.55 w/ exceptions
03/11/10 VIII 120.574 210 C 0.419 0.133 0.300 - - - 85.20 85.20% Satisfactory
O.R Sarmiento Construction 1411
Repair/Impvt./Asphalt Paving of Bugko-Nenita-San Jose Rd., Km.760+000 - Km.779+000 (Mondragon-Silvino Rd.)
06/16/10 VIII 192.823 385 O 0.387 0.300 0.150 0.030 0.042 0.050 95.90 -
O.R Sarmiento Construction 1411 Talibon Small Reservoir Irrigation
06/09/09 XI 197.331 615 O 0.378 0.279 0.150 0.030 0.060 0.050 94.70 -
P.L Sebastian Construction 1076 Rehab./Recons/Upgrading of Carmen-
Dapecol Compound Road 06/01/09 XI 67.346 180 O 0.356 0.278 0.150 0.030 0.047 0.050 91.10 -
P.L Sebastian Construction 1076 Rehab./Recons/Upgrading of Tagum-
Panabo Circumferential Road 06/01/09 XI 96.181 200 O 0.400 0.197 0.120 0.030 0.042 0.033 82.20 -
P.L Sebastian Construction 1076
Impv't/Conc. of Kapalong-Talaingod-Valencia Bukidnon Road, Brgy. Tiburcia to Brgy. Sto. Nino Sect.
03/14/09 XI 226.943 600 O 0.375 0.300 0.150 0.030 0.060 0.050 96.50 -
P.L Sebastian Construction 1076
CP-9: Imprvt./ Concreting of Surigao-Davao Oriental Coastal Road, (Manay-
Boston) Cateel-Boston Section09/11/09 XI 197.331 615 O 0.374 0.300 0.150 0.030 0.054 0.050 95.80 -
P.L Sebastian Construction 1076 Rehab./Reconst./Upgrading of
Carmen-Dapecol Compound Road 09/07/09 XI 67.347 180 O 0.347 0.300 0.150 0.030 0.047 0.050 92.40 -
P.L. Sebastian Construction 1076
Impv't./Widening of Agusan-Davao Road (Daang Maharlika) Pob.
Carmen and Pob. Panabo Sect.04/11/11 XI 30.240 280 C 0.351 0.200 0.300 - - - 85.10 85.31%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page298
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
P.M McCrann Construction & Trading 28126 Repair/Impvt. of School Bldg. at
EPZA Rest. High School 06/01/10 III 0.400 30 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory
P.S Labasbas Construction 6302 Bunacan CIP 06/1-6/09 NIA 2.125 150 C 0.447 0.120 0.300 - - - 86.68 *86.68%
SatisfactoryP.S Labasbas Construction 6302 Bunacan CIP 06/1-6/09 NIA 0.840 150 C 0.441 0.120 0.300 - - - 86.05 *86.05%
SatisfactoryPablo S. Labasbas
Construction 6302 Const./Impv't. of Pagsangahan Barangay Road 02/23/10 IVB 0.250 52 C 0.334 0.200 0.300 - - - 83.40 83.40%
SatisfactoryPablo S. Labasbas
Construction 6302 Construction of Gandara-Matuguinao Road 06/02/09 VIII 24.120 240 C 0.350 0.133 0.300 - - - 78.30 82.38%
Satisfactory
Pablo S. Labasbas Construction 6302 Const. of 1-Unit, 2-CL S/B (7mx18m),
Homonhon NHS (Sulangan Annex) 06/08/09 VIII 1.431 95 C 0.394 0.133 0.000 - - - 52.70 -
Pablo S. Labasbas Construction 6302 Const. of 1-Unit, 1-CL SB (7m x 9m)
at Tabo Elementary School 03/08/10 VIII 0.522 125 C 0.389 0.133 0.300 - - - 82.20 82.20% Satisfactory
Pablo S. Labasbas Construction 6302 Const. of 1 Unit 2 CL Sch. Bldg.,
Guiuan National High School 03/17/09 VIII 1.068 95 C 0.423 0.200 0.300 - - - 92.30 *92.30% V. Satisfactory
Pablo S. Labasbas Construction 6302 Const. of 1 Unit 2 CL Sch. Bldg.,
Maypangdan National High School 03/16/09 VIII 1.069 101 C 0.420 0.200 0.300 - - - 92.00 *92.00% V. Satisfactory
Pablo S. Labasbas Construction 6302 Const. of Gandara-Matuguinao Road 03/10/09 VIII 24.121 240 O 0.351 0.240 0.150 0.030 0.047 0.033 85.10 -
Pacer Construction & Development Corporation
4839 Repair/Rehabilitation of Roadway, Brgy. 110 06/10/09 VIII 2.890 100 C 0.347 0.200 0.300 - - - 84.70 *84.70%
Satisfactory
Pacer Construction & Development Corporation
4839 Rehab./Impvt. of Cabungaan-Tabunok-Consuega Road 08/22/08 VIII 7.115 180 C 0.350 0.200 0.300 - - - 85.00 80.86%
V. Satisfactory
Pacific Concrete Products, Inc. 17150 Rehab. of Daang Maharlika Highway,
Package II, Km.704+124-Km.726+921 04/02/11 VIII 562.889 300 C 0.402 0.200 0.300 - - - 90.20 90.92% V. Satisfactory
Pacific Star Erectors 14224 Construction of DPWH Regional Office Building, Phase VI 08/24/09 II 9.648 145 C 0.481 0.133 0.300 - - - 91.40 92.45%
V. Satisfactory
Pacific Star Erectors 14224 Const. of District Engineer's Lounge and DPWH Canteen, Regional Center 02/21/10 II 5.940 75 C 0.456 0.200 0.300 - - - 95.60 95.60%
V. Satisfactory
Pacific Star Erectors 14224 Construction of Shalom E/S 06/01/09 CAR 0.459 90 C 0.486 0.147 0.300 - - - 93.30 *93.30% V. Satisfactory
Pacific Star Erectors 14224 Const. of Apayao State College MPB (Phase IV) 05/30/09 CAR 4.717 180 O 0.343 0.292 0.150 0.030 0.029 0.033 87.70 -
Pacific Star Erectors 14224 Const. of Apayao State Multi-Purpose Building 05/30/09 CAR 2.370 151 C 0.444 0.181 0.300 - - - 92.50 82.21%
Satisfactory
Pacific Star Erectors 14224 Construction of Apayao State College Multi-Purpose Building 02/28/09 CAR 2.324 150 O 0.391 0.300 0.150 0.030 0.045 0.033 94.90 -
Pacific Star Erectors 14224 Construction of Pudtol MPB (Gymnasium) Phase IV 02/27/09 CAR 6.613 210 O 0.327 0.300 0.150 0.022 0.041 0.033 87.30 -
Pacific Star Erectors 14224Constrution/Improvement of
Calanasan - Ilocos Norte Road, Parina Section
02/26/09 CAR 13.826 620 C 0.436 0.200 0.300 - - - 93.60 90.96% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page299
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Pacific Star Erectors 14224 Construction of DPWH Regional Office Building, Phase VI 05/19/09 II 9.647 145 O 0.365 0.300 0.150 0.030 0.051 0.033 92.90 -
Pacific Star Erectors/A. De Guia Construction
(J.V.)JV-08-295
Road Upgrading of Abbut-Conner-Kabugao Road (Gravel to Concrete)
II: Section Phase II08/20/10 CAR 11.274 325 C 0.453 0.083 0.300 - - - 83.60 83.60%
Satisfactory
Pacific Stars Erectors 14224 Const. of DPWH Regional Office Building (Phase VII) Region II 04/03/11 II 10.605 300 O 0.386 0.300 0.150 0.023 0.037 0.033 92.90 -
Pacific Stars Erectors 14224 Construction of Pudtol MPB (Gymnasium) 09/04/09 CAR 6.613 266 O 0.396 0.240 0.150 0.030 0.056 0.033 90.50 -
Pacific Stars Erectors 14225 Construction of Apayao State College MPB (Phase IV) 09/04/09 CAR 4.712 199 O 0.393 0.240 0.150 0.030 0.056 0.033 90.20 -
Pacific Stars Erectors 14224 Construction of Apayao State College MPB (Phase IV) 02/21/10 CAR 4.712 199 C 0.423 0.184 0.300 - - - 90.70 89.48%
V. Satisfactory
Pacific Stars Erectors 14224 Construction of Pudtol MPB (Gymnasium) 02/18/10 CAR 6.906 266 C 0.422 0.185 0.300 - - - 90.70 89.44%
V. Satisfactory
Pacific Stars Erectors 14224Road Upgrading (Gravel to Concrete) of Abbut-Conner-Kabugao Road, Ili
Section (Phase I)02/20/10 CAR 7.463 330 C 0.408 0.133 0.300 - - - 84.10 84.10%
Satisfactory
Pader Construction 20213 Completion of MPB at (Covered Court 4 Span) Barangay Ugalingan 08/26/10 XII 3.036 110 C 0.403 0.133 0.300 - - - 83.60 83.60%
Satisfactory
Pader Construction and Supply 20213 Const. of Multi-Purpose Building
(Covered Court) @ Brgy. Liliongan 09/03/09 XII 3.795 110 C 0.395 0.133 0.300 - - - 82.80 *82.80% Satisfactory
Pader Construction and Supply 20213 Const. of Multi-Purpose Building at
Brgy. Demapaco 02/26/10 XII 2.940 110 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory
Pader Construction and Supply 20213 Concrete Re-blocking along Davao-
Cotabato Road 02/27/10 XII 2.822 89 C 0.429 0.133 0.300 - - - 86.20 86.20% Satisfactory
Pader Construction and Supply 20213 Const. of Multi-Purpose Pavement @
Sitio Pandaten, Brgy. Kibayao 06/02/10 XII 0.329 30 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
Pader Construction and Supply 20213 Const. of MPB @ Brgy. Poblacion 2 06/03/10 XII 2.276 90 C 0.413 0.133 0.300 - - - 84.60 84.60%
SatisfactoryPader Construction and
Supply 20213 Const. of 2-CL SB at Eliseo ES Brgy. Nalin 05/28/09 R-XII 1.047 70 C 0.449 0.200 0.300 - - - 94.90 91.54%
V. SatisfactoryPader Construction and
Supply 20213 Construction of 2 CL SB at Eliseo E/S 03/04/09 XII 1.047 70 O 0.353 0.300 0.150 0.030 0.035 0.033 90.10 -
Pagadian Aggregates & Marketing 14886 Conc. of Kimaya-Solana By-Pass
Road 03/11/09 X 4.820 145 C 0.400 0.200 0.000 - - - 60.00 70.38% Poor
Pagadian Aggregates & Marketing 14886 Rehab. of Carmen-Patag-Bulua Road 03/02/09 X 9.410 143 C 0.395 0.133 0.300 - - - 82.80 83.58%
Satisfactory
Palmares General Merchandise 24657
Const. of One (1) Unit One (1) Unit CL Academic SIB @ Don J.
Buencamino MPS09/09/09 XII 0.551 75 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
Palmares General Merchandise 24657 Completion of MPB at Brgy. Allah 06/02/09 R-XII 0.288 40 C 0.442 0.200 0.300 - - - 94.20 *94.20%
V. SatisfactoryPalmares General
Merchandise 24657 Const. of Multi-Purpose Building, Brgy. Ilian 03/13/09 XII 0.962 110 C 0.401 0.200 0.300 - - - 90.10 *90.10%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page300
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Palmares General Merchandise 24657
Road Upgrading (Gravel to Concrete) along Isulan Hwy. Jct. Dukay-Bagumbayan (Gapok Section)
08/18/10 XII 14.146 115 C 0.458 0.200 0.300 - - - 95.80 95.80% V. Satisfactory
Panay East Coast Construction & Supply 26469
Const. of Jalaur-Suage River Irrigation System (Irrigation & Flood
Panay East Coast Construction & Supply 26469 Const. of Multi-Purpose Bldg. at
Brgy. Lapayon 03/05/10 VI 0.384 60 C 0.323 0.200 0.300 - - - 82.30 82.30% Satisfactory
Panay East Coast Construction & Supply 26469 Impvt. of Drainage System, Brgy.
Poblacion (along Plaza) 03/05/10 VI 0.481 60 O 0.347 0.300 0.044 0.010 0.023 0.033 75.70 -
Panay East Coast Construction & Supply 26469 Impvt. of Drainage System, Brgy.
Poblacion (along Plaza) 06/18/10 VI 0.481 60 C 0.476 0.200 0.300 - - - 97.60 84.46% Satisfactory
Panay East Coast Construction & Supply 26469 Reblocking of Pototan-Bangga Polot-
An Road 03/18/09 VI 4.255 105 C 0.408 0.200 0.300 - - - 90.80 87.56% Satisfactory
Panay East Coast Construction & Supply 26469 Jalaur-Suage River Irrigation System 01/10-15/11 NIA 3.307 224 O 0.3890 0.2407 0.0792 0.0300 0.0573 0.0500 84.62 -
Panay East Construction Supply 26469
Road Upgrading (Gravel to Paved) of Demoloc-Little Baguio-Alabel Road,
Kilalag Sect.04/01/11 XI 5.738 210 C 0.340 0.200 0.300 - - - 84.00 *84.00%
Satisfactory
Pangasinan New Wilson Lumber & Construction 8313 Const. of Modern Medical Laboratory 04/11/11 I 1.925 45 C 0.479 0.133 0.300 - - - 91.20 *91.20%
V. Satisfactory
Pangasinan New Wilson Lumber & Construction 8313 Const. of Drainage System, Sto. Niño
St., Brgy. Poblacion 03/03/10 I 1.927 40 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory
Pangasinan New Wilson Lumber & Construction 8313 Const. of MPB at Tawin-Tawin E/S 06/09/10 I 0.337 30 C 0.475 0.117 0.300 - - - 89.20 89.20%
V. Satisfactory
Pangasinan New Wilson Lumber & Construction 8313 Const. of Drainage System,
Barangay Basing 06/08/10 I 4.784 60 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
Pangasinan New Wilson Lumber & Construction 8313 Conc. of FMR @ Brgy. Quezon 08/30/10 I 0.434 110 C 0.379 0.171 0.300 - - - 85.00 85.00%
Satisfactory
Partido Construction & Supply 20631 Conc. of Road Sitio Culasisi, Brgy.
Bagong Sirang-Brgy. Lipilip 08/30/10 V 14.113 360 C 0.354 0.200 0.300 - - - 85.40 85.40% Satisfactory
Partido Construction & Supply 20631
Impvt. of Junction Digdigon (GOA)-Tinambac Road, (Balaynan-Tierra
Nevada Sect.)05/31/09 V 21.358 150 O 0.303 0.300 0.150 0.030 0.055 0.050 88.80 -
Partido Construction & Supply 20631 Conc. of Bagong Silang Capalonga
Road, Katabangan Sect. 06/04/09 V 6.021 180 O 0.366 0.240 0.150 0.030 0.050 0.050 88.60 -
Partido Construction & Supply 20631 Completion of Gubat-Tinawagan-
Libod Road 03/10/09 V 9.361 120 C 0.455 0.133 0.300 - - - 88.80 84.18% Satisfactory
Partido Construction & Supply 20631 Conc.of Goa-Tinambac Road,
Payatan-Tupi-Tierra Nevaion 03/10/09 V 4.704 165 O 0.388 0.240 0.150 0.030 0.056 0.050 91.40 -
Partido Construction & Supply 20631 Construction of Multi-Purpose
Building Phase II 03/10/09 V 0.935 60 C 0.484 0.133 0.300 - - - 91.70 *91.70% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page301
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Partido Construction & Supply 20631 Repair/Rehab. of Scoured
Embankment along Daang Maharlika 03/13/09 V 9.350 180 C 0.499 0.133 0.300 - - - 93.20 *93.20% V. Satisfactory
Partido Construction & Supply 20631
Conc. of Goa-Tinambac Road (Payatan-Lupi-Tierra Nevada
Section) Km. 500+045-Km.503+994.5 w/ exceptions
09/09/09 V 4.704 165 C 0.415 0.200 0.300 - - - 91.50 91.44% V. Satisfactory
Partido Construction & Supply 20631
Impvt. of Jct. Digdigon (GOA)-Tinambac Road, (Balaynan-Tierra
Nevada Section)09/09/09 V 21.358 175 O 0.318 0.300 0.150 0.030 0.051 0.050 89.90 -
Partido Construction & Supply 20631
Concreting of Bagong Silang-Capalonga Road, Katabangan
Section09/12/09 V 6.441 180 C 0.394 0.200 0.300 - - - 89.40 88.92%
Satisfactory
Partido Construction & Supply 20631
Impvt. of Jct. Digdigon (GOA)-Tinambac Road, Balaynan-Tierra
Nevada Section)03/01/10 V 21.358 175 C 0.400 0.133 0.300 - - `- 83.30 86.93%
Satisfactory
Partido Construction and Supply 20631 Impv't./Conc. Of Lagonoy-
Presentacion Road 04/08/11 V 18.235 210 C 0.398 0.133 0.300 - - - 83.10 87.60% Satisfactory
Patrick Construction 27780Rehab./Reconst./Upgrading at Luec
Bridge Approaches, Dugo San Vicente Road (DSVR)
04/01/11 II 4.820 188 C 0.403 0.133 0.300 - - - 83.60 *83.60% Satisfactory
Patrila Builders, Inc. 26628 Upgrading/Conc. of Ajuy-Concepcion Rd. 03/04/10 VI 9.233 324 C 0.458 0.200 0.300 - - - 95.80 91.08%
V. Satisfactory
Patrila Builders, Inc. 26628 Upgrading/Concreting of Ajuy-Concepcion Road 06/09/09 VI 9.233 240 O 0.373 0.300 0.150 0.030 0.050 0.050 95.30 -
Patrila Builders, Inc. 26628 Upgrading/Conc. of Ajuy-Concepcion Road 03/17/09 VI 8.394 180 O 0.362 0.300 0.150 0.030 0.055 0.050 94.70 -
Patrila Builders, Inc. 26628 Concreting of Dueñas Diversion Road 09/09/09 VI 12.539 90 C 0.420 0.200 0.300 - - - 92.00 89.90%
V. Satisfactory
Patrila Builders, Inc. 26658 Upgrading/Conc. of Ajuy-Concepcion Road 09/08/09 VI 9.233 240 O 0.322 0.286 0.000 0.030 0.050 0.050 73.80 -
Patrila Builders, Inc. 26628 Rehabilitation of San Miguel-Sebaste Road 08/15/11 PPA 25.649 30 O 0.399 0.300 0.150 0.024 0.070 0.050 99.30 -
Patrilla Builders Inc. 26628 Rehabilitation of San Miguel-Sebaste Road (Road) 06/10/11 Guimaras 28.021 30 O 0.400 0.300 0.150 0.030 0.070 0.050 100.00 -
Paula Mae Buhong Construction 26128 Construction of Ujah E/S 08/31/09 CAR 0.511 60 C 0.437 0.132 0.300 - - - 86.90 *86.90%
Satisfactory
Paula Mae Buhong Construction 26128
Widening/Concreting of Banaue-Hungduan-Tinoc-Benguet Bdry. Rd.,
Hwang Section02/25/10 CAR 4.739 349 O 0.356 0.240 0.150 0.030 0.030 0.033 83.90 -
Paula Mae Buhong Construction 26128
Widening/Conc. of Banaue-Hungduan-Benguet Bdry. Road,
Hiwang Sect. 06/03/10 CAR 4.739 429 C 0.353 0.200 0.300 - - - 85.30 84.46%
Satisfactory
Paula Mae Buhong Construction 26128 Const. of Lagawe Police Station,
Phase II 08/25/10 CAR 0.974 123 C 0.455 0.170 0.300 - - - 92.50 92.50% V. Satisfactory
Paula Mae Buhong Construction 26128 Const. of Kiangan Public Market,
Phase IV 08/25/10 CAR 1.895 136 C 0.427 0.134 0.300 - - - 86.10 86.10% Satisfactory
Paula Mae Buhong Construction / Wilper Construction Inc. (JV)
JV-08-337 Const. of Lagawe Public Market (Phase I) 04/08/11 CAR 19.195 319 C 0.436 0.200 0.300 - - - 93.60 *93.60%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page302
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Paula Mae Buhong Construction/PBO Construction (JV)
JV-07-152 Widening/Conc. of Banaue-Bontoc Road (Halsema Highway) 03/06/09 CAR 48.192 300 C 0.444 0.200 0.300 - - - 94.40 84.68%
Satisfactory
PBO Construction 18403Road Upgrading of Rizal National
04/05/11 CAR 16.330 190 C 0.409 0.200 0.300 - - - 90.90 88.08% Satisfactory
PBO Construction 18403 Road Upgrading (Gravel to Concrete) along Balbalan-Pinukpuk 04/04/11 CAR 52.708 330 C 0.433 0.131 0.300 - - - 86.40 86.82%
Satisfactory
PBO Construction 18403Impv't./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV,
Lubuagan-Cagaluan Sect. 05/23/09 CAR 47.185 300 C 0.381 0.200 0.300 - - - 88.10 84.02%
Satisfactory
PBO Construction 18403
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV,
Km. 461+000-Km. 467+000, Lubuagan-Cagaluan Section
03/04/09 CAR 47.185 300 O 0.255 0.285 0.150 0.030 0.041 0.050 81.10 -
PBO Construction 18403
Repair/Rehab. of Romualdez-Santor-Calaocan-San Pascual Section, Babalag-Kinama-San Francisco
Section
03/02/09 CAR 9.537 181 C 0.406 0.133 0.300 - - - 83.90 78.02% Unsatisfactory
PBO Construction 18403Widening/Concreting of Mayoyao-
Aguinaldo Road, Km. 399+000 - Km. 419+000 (w/ exception)
03/06/09 CAR 68.468 420 O 0.296 0.136 0.150 0.022 0.032 0.017 65.30 -
PBO Construction 18403Widening/Concreting of Mayoyao-
Aguinaldo Road, Km. 399+000 - Km. 419+000 (w/ exception)
02/24/10 CAR 68.441 473 O 0.348 0.240 0.144 0.030 0.045 0.033 84.00 -
PBO Construction 18403
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV,
Km. 461+000-Km. 467+000, Lubuagan-Cagaluan Section
11/19/08 CAR 47.185 300 O 0.305 0.240 0.100 0.030 0.040 0.100 81.50 -
PBO Construction / Wilper Construction, Inc.
(JV)JV-08-177
Conc. of Bontoc-Tabuk-Tuguegarao Rd. (Package BLT-12) Tinglayan Bdry. Lubuagan-Tabuk Section II
Km.461+000 - Km.467+000 Dinacan-Cagaluan Sect.
04/04/11 CAR 131.937 547 C 0.420 0.195 0.300 - - - 91.50 82.59% Satisfactory
Pearly Construction 5953 Const. of Multi-Purpose Bldg. at Brgy. Calumangan 03/10/10 VI 0.953 70 C 0.413 0.186 0.300 - - - 89.90 89.90%
V. Satisfactory
Pearly Construction 5953 Const. of MPB, Brgy. Hall at Brgy. Napoles 08/27/10 VI 0.955 60 C 0.493 0.133 0.300 - - - 92.60 92.60%
V. Satisfactory
Pentagon Industrial Development &
Construction Company Incorporated
12796
Widening/Conc. of McArthur Highway (MNR), Meycauayan
(Bulacan) to Mabalacat (Pampanga), Ph-VI (Package 1), Bulacan 1st
Congressional District (Malolos & Calumpit Sect.)
04/13/11 III 108.849 210 C 0.412 0.199 0.300 - - - 91.10 86.78% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page303
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Pentagon Industrial Development &
Construction Company, Inc.
12796
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan to
Mabalacat, Pampanga, Phase IV, Package III, Malolos-Calumpit
Section
05/29/09 III 53.990 180 C 0.427 0.200 0.300 - - - 92.70 90.54%V. Satisfactory
Pentagon Industrial Development &
Construction Company, Incorporated
12796
Impvt./Widening of McArthur Highway (MNR)-Phase V,
Meycauayan (Bulacan) to Mabalacat (Pampanga)-(Meycauayan-Marilao
Section)-CP III
09/09/09 III 47.235 150 O 0.376 0.300 0.150 0.030 0.042 0.033 93.10 -
Persan Construction Inc. 2852
Const./Conc. of Sect. Of the Third Bulacan Circum. Rd. Network Daang Maharlika-DRT Via San Ildefonso Rd.
(San Ildefonso Sect.)
03/04/10 III 47.642 210 O 0.367 0.300 0.150 0.030 0.047 0.050 94.40 -
Persan Construction Inc. 2852
Const./Conc. Of Sects. Of the Third Bulacan Circum. Rd. Network CVR-San Miguel-DRT-Angat Gen. Alejo
Santos Highway (Akle to DRT Sect.)
03/04/10 III 47.642 210 O 0.338 0.296 0.150 0.030 0.042 0.050 90.60 -
Persan Construction Inc. 2852Repair and Rehab. of Cavite-
Batangas Road Km. 23+000-Km. 24+000 with exception
03/01/10 IVA 9.974 51 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory
Persan Construction Inc. 2852 Conc. and Const. of Slope Protection of Pintong Bukawe FMR 02/18/10 IVA 19.230 120 O 0.333 0.300 0.150 0.030 0.050 0.033 89.60 -
Persan Construction Inc. (Formerly: Persan
Construction)2852 Repair/Rehab./Reconst./Upgrading of
General Luna St. 08/18/10 NCR 15.360 145 C 0.329 0.133 0.300 - - - 76.20 88.68% Satisfactory
Persan Construction, Inc. 2852 Rehab. of Daang Maharlika 06/11/10 III 38.022 110 C 0.448 0.200 0.300 - - - 94.80 94.80% V. Satisfactory
Persan Construction, Inc. 2852
Const./Conc. of Sect. of the Third Bulacan Circumferential Rd. Network
CVR-San Miguel-DRT-Angat Gen. Santos Highway (Akle to DRT Sect.)
06/11/10 III 47.642 210 C 0.411 0.200 0.300 - - - 91.10 90.80% V. Satisfactory
Persan Construction, Inc. 2852
Const./Conc. of Sect. of the 3rd Bulacan Circumferential Rd. Network
Daang Maharlika-DRT via San Ildefonso Rd. (San Ildefonso Sect.)
06/11/10 III 47.642 210 C 0.337 0.200 0.300 - - - 83.70 90.12% V. Satisfactory
Persan Construction, Inc. 2852Impvt./Rehab. of Daang Maharlika Road, Bulacan 3rd Congressional
District06/04/09 III 77.094 150 O 0.364 0.300 0.150 0.030 0.050 0.050 94.40 -
Persan Construction, Inc. 2852 Rehabilitation of Sibul-Biak Na Bato Road 06/01/09 III 14.299 110 O 0.372 0.239 0.150 0.030 0.051 0.050 89.20 -
Persan Construction, Inc. 2852 CVR-Junction-San Miguel-DRT-Angat-Gen.Alejo Santos Highway 03/11/09 III 47.605 210 C 0.439 0.200 0.300 - - - 93.90 *93.90%
V.Satisfactory
Persan Construction, Inc. 2852Impvt. & Rehab. of Daang Maharlika
Road, San Rafael-San Ildefonso Section
03/12/09 III 95.473 120 C 0.446 0.200 0.300 - - - 94.60 93.34% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page304
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Persan Construction, Inc. 2852 Improvement of Pintong-Bukawe Road 08/24/09 IVA 19.232 180 O 0.341 0.285 0.150 0.030 0.043 0.050 89.90 -
Persan Construction, Inc. 2852 Widening of Carmona Bridge (Phase I) inc. approaches 03/03/10 IVA 60.454 529 O 0.393 0.300 0.150 0.030 0.050 0.033 95.60 -
Persan Construction, Inc. 2852 Rehab. of Farm-to-Market Road, Brgy. Pintong Bukawe 06/05/09 IV-A 18.711 150 C 0.458 0.066 0.300 - - - 82.40 87.80%
Satisfactory
Persan Construction, Inc. 2852 Rehab. of FMR, Brgy. Pintong Bukawe 03/14/09 IV-A 18.711 150 O 0.375 0.276 0.150 0.030 0.033 0.050 91.40 -
Persan Construction, Inc. 2852Impvt. And Rehab. of Daang
Maharlika Road, San Rafael-San Ildefonso Section
11/21/08 III 95.473 120 O 0.370 0.300 0.100 0.018 0.037 0.100 92.50 -
Persan Construction, Inc. 2852 Impv't/Conc. of Kapalong-Talaingod Road 03/14/09 XI 53.764 625 C 0.468 0.200 0.300 - - - 96.80 91.67%
V. Satisfactory
Persan Construction, Inc. 2852 Impvt./Rehab. of Daang Maharlika Road 09/08/09 III 77.099 150 O 0.362 0.300 0.150 0.030 0.051 0.033 92.60 -
Persan Construction, Inc. 2852 Rehab. of Sibul-Biak na Bato Road 09/08/09 III 14.299 110 C 0.477 0.133 0.300 - - - 91.00 89.92% V. Satisfactory
Persan Construction, Inc. (Formerly: Persan
Construction)2852 Conc. and Const. of Slope Protection
of Pintong Bukawe FMR 06/09/10 IVA 19.230 120 C 0.277 0.200 0.300 - - - 77.70 84.84% Satisfactory
Persan Construction, Inc. (Formerly: Persan
Construction)2852 Widening of Carmona Bridge (Phase
I) inc. Approaches 08/31/10 IVA 60.454 529 C 0.497 0.133 0.300 - - - 93.00 94.56% V. Satisfactory
Persan Construction, Inc. (Formerly: Persan
Construction)2852 Widening (Completion) of Carmona
01/20-22/2010 UP - Baguio 19.500 240 C 0.408 0.115 0.300 - - - 82.30 82.30% Satisfactory
Plano Builders 16409 Rehabiltation of Shaded Walk and Construction of Guard Post 01/20-22/2010 UP - Baguio 0.760 30 C 0.455 0.133 0.300 - - - 88.80 88.80%
Satisfactory
PLD Construction 1859Opening/Conc. of Cebu-Toledo
Wharf Road, Linao-Talisay-Minglanilla
08/20/08 VII 18.693 160 O 0.281 0.217 0.100 0.023 0.022 0.100 74.30 -
PLD Construction 1859Const. of Main Building, Cebu State
College of Science & Tecnology (CSCST) Bitoon Campus
03/13/09 VII 19.084 160 O 0.366 0.300 0.150 0.030 0.057 0.050 95.30 -
PLD Construction 1859Const. of Main Bldg., Cebu State College of Scince & Technology
(CSCST), Bitoon Campus09/08/09 VII 19.083 239 C 0.479 0.200 0.300 - - - 97.90 86.84%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page308
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
PLD Construction 1859 Asphalting of Road leading to Sitio Inayagan & Mahayahay, Tuyom 09/11/09 VII 4.822 45 C 0.339 0.200 0.300 - - - 83.90 *83.90%
Satisfactory
PLD Construction 1859Impv't./Rehab. of Toledo-
Pinamungajan-Aloguinsan Road, Km. 59+840-Km. 63+000
08/27/10 VII 19.290 65 C 0.368 0.200 0.300 - - - 86.80 86.80% Satisfactory
Polymer-Vic Const. 6157 Asphalt Overlay of Bataan Technological Park Inc. Road 05/20/09 III 19.030 90 O 0.396 0.200 0.150 0.030 0.025 0.050 85.10 -
Polymer-vic Construction 6157 Asphalt Overlay of Bataan Technological Park Inc. Road 02/18/10 III 19.030 90 C 0.375 0.200 0.300 - - - 87.50 86.06%
Satisfactory
Polymer-vic Construction 6157 Rehab./Reconst./Upgrading of Hermosa-Poblacion Rd. 08/18/10 III 8.437 120 C 0.401 0.133 0.300 - - - 83.40 83.40%
Satisfactory
Polymer-vic Construction 6157Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo
Road (Phase I)02/24/09 III 4.794 30 C 0.440 0.200 0.300 - - - 94.00 92.14%
V.Satisfactory
Polymer-vic Construction 6157Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo
Road (Phase II)02/24/09 III 4.794 30 C 0.366 0.200 0.300 - - - 86.60 91.16%
V.Satisfactory
Pon Construction and Trading 33667 Impvt. of Pentor-Balsik River Control
(Daang Bago Section) 02/18/10 III 4.728 120 O 0.367 0.220 0.150 0.020 0.038 0.050 84.50 -
Pon Construction and Trading 33667 Impv't. of Pentor-Balsik River Control
(Daang Bago Section) 05/26/10 III 4.728 120 C 0.417 0.133 0.300 - - - 85.00 84.70% Satisfactory
Postema Construction & Development 15283 Riprapping of Mabulo River at Brgy.
Mabulo 09/09/09 IVA 0.381 60 C 0.429 0.200 0.300 - - - 92.90 *92.90% V. Satisfactory
PPG Construction Corp. 20457Const. of MPB at Cuenca (Const. of One Storey Municipal Agriculturist
Quirante Construction 32827 Construction of Multi-Purpose Building, Poblacion (Fence) 06/01/09 VII 0.464 120 C 0.426 0.198 0.300 - - - 92.40 86.31%
Satisfactory
Quirante Construction 32827 Construction of Multi-Purpose Building in Tabunoc (Fire Station) 06/01/09 VII 0.468 120 C 0.472 0.133 0.300 - - - 90.50 85.53%
Satisfactory
Quirante Construction 32827 Construction of Multi-Purpose Building, Poblacion (SWAT) 06/01/09 VII 0.922 120 C 0.454 0.133 0.300 - - - 88.70 84.71%
Satisfactory
Quirante Construction 32827 Const. of Ocaña Flood Control Structures 03/10/10 VII 4.760 60 C 0.390 0.133 0.300 - - - 82.30 85.42%
Satisfactory
Quirante Construction 32827 Const./Rehab. of Brgy. Ocaña, Sitio Lagang 06/17/10 VII 0.960 60 C 0.381 0.152 0.300 - - - 83.30 -
Quirante Construction 32827 Conc. of Brgy. Road at South Poblacion 08/24/10 VII 0.099 180 C 0.378 0.200 0.300 - - - 87.80 87.80%
Satisfactory
R C S Construction 12458Repair/Rehab. of One (1) Classroom School Building @ M.P. Cuaderno
Sr., ES, Brgy. Sibacan08/28/09 III 0.490 53 O 0.384 0.240 0.150 0.020 0.037 0.033 86.40 -
R C S Construction 12458 Rehab. of Flood Control Canal @ Brgy. Tenejero 02/19/10 III 0.747 28 C 0.466 0.163 0.300 - - - 92.90 92.90%
V. Satisfactory
R C S Construction 12458 Construction of Multi-Purpose Bldg. @ Mt. View ES Polaries 02/25/09 III 0.470 28 C 0.479 0.200 0.300 - - - 97.90 *97.90%
Outstanding
R C S Construction 12458 Rehabilitation of Drainage Facility at Brgy. Wakas 02/25/09 III 0.231 28 C 0.416 0.200 0.300 - - - 91.60 *91.60%
V.Satisfactory
R N V Construction 12570 Conc. of Parpagoha (Marigondon) Binoog Road 04/11/11 IVB 14.470 100 C 0.454 0.200 0.000 - - - 65.40 66.60%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page314
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R N V Construction 12570 Const./Imprv't of Brgy. Poblacion Line Canal-San Andres 02/22/10 IVB 1.466 100 O 0.274 0.300 0.150 0.030 0.048 0.033 83.50 -
R N V Construction 12570 Rehab./Impvt. of Romblon Engineering District Office 05/21/09 IV-B 4.692 146 C 0.442 0.200 0.300 - - - 94.20 88.25%
Satisfactory
R N V Construction 12570 Rehab./Impvt. of Romblon DEO 11/24/08 IV-B 4.693 146 O 0.355 0.240 0.100 0.030 0.032 0.100 85.70 -
R. Allosa Construction 12964
Repair of Various Roadslip along Calubian-San Isidro-Tabango-Villaba-
Palompon Road, Km. 1007+030, Km.1009+500, Km.1013+600,
Km.1026+080 & Km. 1027+751
08/28/10 VIII 3.078 90 C 0.390 0.133 0.300 - - - 82.30 82.30% Satisfactory
R.C Tagala Construction 11597 Const. of Abra de Ilog-Puerto Galera Rd. (Occ/Or. Mindoro Bdry) 02/28/09 IV-B 19.108 120 C 0.475 0.191 0.300 - - - 96.60 *96.60%
Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page318
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.C Tagala Construction 11597 Impvt. of Quezon-Punta Baja Road 03/03/09 IV-B 18.950 252 C 0.378 0.133 0.300 - - - 81.10 80.65% Unsatisfactory
R.C Tagala Construction 11597 Repair/Rehab. of Dumaguete North Road, Km. 15.090-Km. 17.0775 05/26/09 VII 20.194 105 O 0.361 0.240 0.000 0.030 0.051 0.033 71.50 -
R.C Tagala Construction 11597 Repair/Rehab. of Dumaguete North Road, Km. 15.090-Km. 17.0775 03/02/10 VII 20.194 151 C 0.479 0.200 0.300 - - - 97.90 82.06%
Satisfactory
R.C. Tagala Construction 11597 Conc. of Quezon-Punta Baja Road 03/29/11 IVB 76.993 394 O 0.334 0.289 0.111 0.030 0.050 0.033 84.70 -
R.C. Tagala Construction 11597 Conc. of Poras FMR 04/15/11 IVB 0.400 185 C 0.336 0.200 0.300 - - - 83.60 *83.60% Satisfactory
R.C. Tagala Construction 11597 Conc. of Lupac FMR 04/15/11 IVB 0.399 185 C 0.341 0.190 0.300 - - - 83.10 83.10% Satisfactory
R.C. Tagala Construction 11597Rehab. of Tabla-Sta. Cruz Sect.,
Tanjay, Dumaguete North Rd., Km. 35.183 - Km. 36.183
04/05/11 VII 19.200 240 O 0.343 0.300 0.150 0.030 0.050 0.050 92.30 -
R.D Cobacha Construction 8878
Rehab./Const./Upgrading of Damaged Pavement Calanipawan
Road06/10/09 VIII 4.820 120 C 0.395 0.133 0.300 - - - 82.80 *82.80%
Satisfactory
R.D Interior Jr. Const./Brostan Const.
Dev't. (JV)JV-08-002 Pagadian Airport Development
Project 09/04/09 DOTC 0.174 360 C 0.400 0.195 0.300 - - - 89.50 89.50% V. Satisfactory
R.D Interior Junior Construction 6483 Upgrading/Improvement of Magapit-
Mission Road 09/09/09 II 96.491 330 O 0.360 0.300 0.150 0.030 0.042 0.050 93.20 -
R.D Interior Junior Construction 6482 Improvement of Access Road,
Bagabag Airport 08/28/09 II 35.416 89 C 0.476 0.133 0.300 - - - 90.90 90.42% V. Satisfactory
R.D Interior Junior Construction 6483 Upgrading/Impvt. of Magapit-Mission
Road 02/19/10 II 96.491 330 C 0.422 0.133 0.300 - - - 85.50 89.44% V. Satisfactory
R.D Interior Junior Construction 6483
Impvt./Rehab. of Daang Maharlika, Km. 338+400-Km. 341+200 w/
exception03/01/10 II 9.618 45 C 0.425 0.133 0.300 - - - 85.80 85.80%
Satisfactory
R.D Interior Junior Construction 6483 Road Upgrading (Gravel to Paved) of
Lala-Salvador-Tubod Road 06/03/10 X 19.138 121 O 0.363 0.240 0.150 0.030 0.045 0.033 86.10 -
R.D Interior Junior Construction 6483
Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies,
Lala-Salvador-Tubod Road08/27/10 X 19.138 121 C 0.429 0.138 0.300 - - - 86.70 86.34%
Satisfactory
R.D Interior Junior Construction 6483
Impv't./Conc. of Bislig-Manay Rd. (Boston-Bislig Section) with Monkag
& San Vicente Bridge03/05/10 XIII 289.498 710 C 0.434 0.200 0.300 - - - 93.40 91.58%
V.Satisfactory
R.D Interior Junior Construction 6483
Conc. of Surigao-Davao Coastal Road, Hinatuan-Bislig-Lingig Sub-
Section with Two (2) Bridges & One (1) RCBC
06/11/10 XIII 259.779 479 C 0.437 0.200 0.300 - - - 93.70 90.34% V. Satisfactory
R.D Interior Junior Construction 6483
Rehab./Impvt. along SDCR: Bislig-Manay Sect. (Hinatuan-Bislig-Lingig
Section)09/03/10 XIII 96.500 345 O 0.364 0.240 0.150 0.030 0.055 0.033 87.20 -
R.D Interior Junior Construction 6483 Rehab./Reconst. of Daang Maharlika,
KO 313+000 - KO 314+000 05/27/09 II 15.434 115 C 0.493 0.133 0.300 - - - 92.60 *92.60% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page319
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.D Interior Junior Construction 6483
Upgrading/Improvement of Magapit-Mission Road, Lal-lo and Sta.
Teresita05/19/09 II 96.491 330 O 0.385 0.240 0.150 0.030 0.056 0.050 91.10 -
R.D Interior Junior Construction 6483 Improvement of Access Road,
Bagabag Airport 06/01/09 II 35.416 74 O 0.375 0.240 0.150 0.030 0.056 0.050 90.10 -
R.D Interior Junior Construction 6483
Conc. of SDCR, Marihatag-Hinatuan-Bislig Section, (Tagbina-Hinatuan
Subsection)11/27/08 XIII 282.908 345 O 0.331 0.300 0.100 0.030 0.050 0.100 91.10 -
R.D Interior Junior Construction 6483
Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkag &
San Vicente Bridge)11/27/08 XIII 289.168 570 O 0.342 0.300 0.100 0.030 0.055 0.100 92.70 -
R.D Interior Junior Construction 6483
Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Section with Monkag
& San Vicente Bridge)06/06/09 XIII 289.168 570 O 0.374 0.300 0.106 0.030 0.056 0.050 91.60 -
R.D Interior Junior Construction 6483
Concreting of Surigao-Davao Coastal Road, Marihatag-Hinatuan Bislig
Section (Tagbina-Hinatuan Subsection)
06/06/09 XIII 232.908 345 O 0.381 0.300 0.055 0.030 0.061 0.050 87.70 -
R.D Interior Junior Construction 6483
Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkag &
San Vicente Bridge)03/14/09 XIII 289.168 570 O 0.370 0.300 0.106 0.030 0.061 0.033 90.00 -
R.D Interior Junior Construction 6483
Conc. of Surigao-Davao Coastal Rd./ Hinatuan-Bislig-Lingig Subsection,
w/ 2 Bridges & 1 RCBC09/10/09 XIII 259.760 420 O 0.388 0.300 0.083 0.030 0.060 0.033 89.40 -
R.D Interior Junior Construction 6483
Conc. of Surigao-Davao Coastal Rd., Marihatag-Hinatuan-Bislig
Sect.,(Tagbina-Hinatuan Subsection)09/18/09 XIII 232.908 375 O 0.371 0.300 0.027 0.030 0.060 0.033 82.10 -
R.D Policarpio Inc 4414
Tacloban Airport Development Project (Continuation of Asphalt
Overlay of Runway and Construction of Shore Protection with Shoulder
Level), C.M. Recto Ict H/S 04/05/11 III 3.310 60 O 0.264 0.300 0.150 0.022 0.035 0.050 82.10 -
R.J Ibarra Construction 23538 Rehab./Reconst./Upgrading of Damaged Paved National Road 05/29/10 III 9.450 30 C 0.458 0.133 0.300 - - - 89.10 89.10%
V. Satisfactory
R.J Ibarra Construction 23538Const. of MPB, Bureau of Jail Management Penology Brgy.
Barretto05/29/10 III 3.743 90 C 0.444 0.133 0.300 - - - 87.70 89.10%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page322
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.J Ibarra Construction 23538 Repair/Rehab. of 12-CL of Kalalake National High School, Brgy. Kalalake 08/23/10 III 1.900 90 C 0.433 0.133 0.300 - - - 86.60 86.60%
Satisfactory
R.J Ibarra Construction 23538Const. of 2-CL of New Cabalan Elementary School, Brgy. New
Cabalan08/23/10 III 0.985 90 C 0.434 0.098 0.300 - - - 83.20 83.20%
Satisfactory
R.J Ibarra Construction 23538Construction of DPWH-Zambales 2nd District Engineering Office
Building05/23/09 III 18.901 180 O 0.368 0.239 0.150 0.030 0.029 0.050 86.60 -
R.J Ibarra Construction 23538 Completion of Multi-Purpose Building, Brgy. Magsaysay 03/04/09 III 0.476 45 C 0.478 0.195 0.300 - - - 97.30 *97.30%
Outstanding
R.J Ibarra Construction 23538 Const of 2 Classroom School Building Secondary 03/04/09 III 2.062 90 C 0.353 0.200 0.300 - - - 85.30 80.12%
Unsatisfactory
R.J Ibarra Construction 23538 Const. of DPWH-Zambales 2nd District Engineering Office Building 09/01/09 III 18.901 180 C 0.409 0.133 0.300 - - - 84.20 85.88%
Satisfactory
R.J Ibarra Construction 23538 Partial Completion of Gordon Heights National High School 09/01/09 III 1.958 90 O 0.320 0.240 0.150 0.030 0.048 0.033 82.10 -
R.J Ibarra Construction 23538 Const. of 2 CL Sch. Bldg. Secondary 11/12/08 III 2.062 90 O 0.260 0.266 0.100 0.030 0.023 0.100 77.90 -
R.J. Ibarra Construction 23538 Repair of Eight (8) CL Sch. Bldg., Gordon Hts. E/S, Brgy. Gordon Hts. 04/04/11 III 0.961 90 C 0.353 0.187 0.300 - - - 84.00 *84.00%
Satisfactory
R.K.X Odiamar Construction 16107 Conc. of Lumapog-Binanuaanan
Norte Rd. 08/28/10 V 4.776 120 C 0.380 0.200 0.300 - - - 88.00 88.00% Satisfactory
R.K.X Odiamar Construction 16107 Conc. of Nabua-Balatan Road 09/09/09 V 4.777 120 C 0.436 0.133 0.300 - - - 86.90 *86.90%
Satisfactory
R.L Colico Construction 24914 Const. of Day Care Center @ Barangay Ikirin 02/22/10 IVA 1.447 40 C 0.454 0.200 0.300 - - - 95.40 95.40%
V. SatisfactoryR.M Dela Cruz Construction 15895 Const./Repair & Rehab. of FMR at
Brgy. San Nicolas (Isabel) 02/25/10 III 0.482 60 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory
R.M Dela Cruz Construction 15895 Concreting/Improvement of Virgen
R.R Ricafort Construction 14402 Const./Repair & Rehab. of MPB 02/25/10 III 2.412 90 C 0.433 0.200 0.300 - - - 93.30 93.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page325
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.R Ricafort Construction 14402 Restoration of Revetment/Desilting
of Baket-Baket Creek 06/03/10 III 9.407 100 C 0.441 0.137 0.300 - - - 87.80 87.80% Satisfactory
R.R Ricafort Construction 14402
Rehab. of Daang Maharlika Highway, Package I, Section 3 (Allen-Malaga Road Section) Km. 667+644.55-Km.
669+364.55 w/ exceptions
03/04/10 VIII 41.205 150 C 0.470 0.133 0.300 - - - 90.30 90.30% V. Satisfactory
R.R Ricafort Construction 14402
Const./Repair, Rehab. and Completion of MPB (Covered Court),
Brgy. Bantog05/21/09 III 2.384 90 C 0.371 0.200 0.300 - - - 87.10 *87.10%
Satisfactory
R.R Ricafort Construction 14402 Concreting of Sta. Cruz-Lubigan
Road (Widening) at Brgy. Lubigan 05/23/09 III 0.940 60 C 0.094 0.200 0.300 - - - 59.40 *59.40% Poor
R.R Ricafort Construction 14402
Conc. of Sta. Cruz-Villa Aglipay Road (Completion) going to Eco-Tourism
Park02/27/09 III 2.820 90 C 0.359 0.200 0.300 - - - 85.90 *85.90%
Satisfactory
R.R Ricafort Construction 14402
Const./Impvt. of Eco-Tourism Road, Sta. 125+009 to Sta. 127+637, with
exception03/09/09 III 14.104 150 C 0.352 0.200 0.300 - - - 85.20 *85.20%
Satisfactory
R.R Ricafort Construction 14402 Construction of Multi-Purpose
Building at Burgos, San Jose 02/27/09 III 3.004 90 C 0.461 0.200 0.300 - - - 96.10 82.03%Satisfactory
R.R Ricafort Construction 14402 Concreting of Brgy. Road at Sitio
Ambuklao, Brgy. Pinasling 09/02/09 III 1.219 60 C 0.438 0.200 0.300 - - - 93.80 *93.80% V. Satisfactory
R.R Seismundo Construction & Supply 10961
Conc. of Compostela Cateel Road-Osmeña Sect., Sitio Nursery Sec. &
Spur II-Pansansalan Sec.03/16/09 XI 46.270 330 O 0.283 0.288 0.150 0.030 0.038 0.033 82.20 -
R.R Seismundo Construction & Supply 10961
Conc. of Compostela-Cateel Road, Osmena Section, Sitio Nursery Section and Spur II-Panansalan
Section
09/10/09 XI 46.270 330 C 0.448 0.133 0.300 - - - 88.10 84.56% Satisfactory
R.R. Ricafort Construction & Supplies
/ A.C. Soliven Construction & Gen.
Merchandise (JV)
Completion/Const./Rehab./Impvt. of MPB 03/05/10 I 9.647 120 C 0.430 0.133 0.300 - - - 86.30 86.30%
Satisfactory
R.R. Ricafort Construction and
Supplies (Formerly: R.R. Ricafort Construction)
14402 Conc. Of Road Poblacion Sur-Calabtangan 04/07/11 III 2.468 70 C 0.370 0.200 0.300 - - - 87.00 *87.00%
Satisfactory
R.R. Ricafort Construction and
Supplies (Formerly: R.R. Ricafort Construction)
14402 Const. of MPB, Brgy. Burgos 11/14/08 III 3.004 90 O 0.302 0.240 0.100 0.000 0.018 0.100 76.00 -
R.R. Seismundo Construction & Supply 10961
Rehab./Reconst./Upgrading of Damaged Paved National Road
Section, Tagum-Panabo Circ. Road04/11/11 XI 24.598 180 C 0.442 0.200 0.300 - - - 94.20 89.22%
V. Satisfactory
R.S Mesa Construction Corporation 22218 Repair/Impvt. of Cainta Elementary
School 08/19/10 IVA 2.344 150 C 0.367 0.200 0.300 - - - 86.70 86.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page326
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.S Reyna Construction 9648Repair of Brgy. Roads, Brgy.
Balocawehay-Katipunan-Ulhay-Tambis
02/26/10 VIII 1.915 82 C 0.460 0.133 0.300 - - - 89.30 82.52% Satisfactory
R.S Reyna Construction 9648Repair of Brgy. Roads, Brgy.
Balocawehay-Katipunan-Ulhay-Tambis
05/28/09 VIII 1.915 25 O 0.320 0.200 0.150 0.030 0.047 0.033 78.00 -
R.S Reyna Construction 9648 Const. of Bridge (Phase II), Union 09/02/10 VIII 0.951 80 C 0.487 0.133 0.300 - - - 92.00 92.00% V. Satisfactory
R.S Reyna Construction 9648 Const. of FMR 09/02/10 VIII 1.410 35 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory
R.S. Sepian Construction & Trucking 20519
Road Upgrading of Mt. Province - Ilocos Sur Road, Tue-Balaoa &
Otucan-Dawaic Sect.04/09/11 CAR 33.038 330 C 0.444 0.154 0.300 - - - 89.80 *89.80%
V. Satisfactory
R.S. Sepian Construction & Trucking 20519 Road Upgrading of Abra-Ilocos Norte
Road, Km.412+000 - Km.431+000 03/29/11 CAR 28.369 218 O 0.322 0.263 0.150 0.010 0.032 0.050 82.70 -
R.S. Sepian Construction & Trucking 20519
Road Opening/Construction of Missing Links of National Road, Abra-
Ilocos Norte Road, Km.424+000 - Km.452+100
03/29/11 CAR 46.543 683 O 0.294 0.289 0.150 0.010 0.032 0.033 80.80 -
R.T Morabe Construction 11377Concreting of Laoang-Lapinig-Arteche Road Km. 965+515.00-
Km.966+645.0006/08/09 VIII 19.138 150 O 0.331 0.235 0.150 0.030 0.045 0.050 84.10 -
R.T Morabe Construction 11377 Const./Rehab. of Drainage System, Brgy. 85, 06/11/09 VIII 0.963 70 C 0.249 0.133 0.000 - - - 38.20 -
R.T Morabe Construction 11377 Conc. of Laoang-Lapinig-Arteche Road, Km. 965+515 - Km. 966+645 03/11/10 VIII 19.139 150 C 0.387 0.139 0.300 - - - 82.60 83.50%
Satisfactory
R.T Morabe Construction 13377 Const. of La Paz-Javier-Bito Rd., La Paz-Javier-Bito Rd. Sect. 05/31/10 VIII 14.167 120 O 0.377 0.300 0.104 0.030 0.042 0.017 87.00 -
R.T Morabe Construction 13377Conc. of Tabango-Catmon (La
06/03/10 VIII 9.353 336 C 0.423 0.200 0.300 - - - 92.30 82.73% Satisfactory
R.T Morabe Construction 11377 Concreting of Tabango-Catmon- (La Fortuna) Manlawaan-Gimarco Road 06/02/09 VIII 9.353 336 O 0.343 0.300 0.150 0.030 0.037 0.050 91.00 -
R.T Morabe Construction 11377 Construction of Footbridge, Brgy. Marao 05/28/09 VIII 0.285 30 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
R.T Morabe Construction 11377Concreting of Tabango-Catmon (La Fortuna) Manlawaan-Gimarco Road
Km 1039+540-Km 1040+00003/12/09 VIII 9.353 180 O 0.341 0.026 0.150 0.030 0.037 0.033 61.70 -
R.T Morabe Construction 13377 Const. of La Paz-Javier-Bito Road, La Paz-Javier-Bito Rd. Section 08/24/10 VIII 14.167 120 O 0.473 0.133 0.300 - - - 90.60 88.44%
Satisfactory
R.T.E Construction 15937 Construction of Farm-to-Market Road at Brgy. Macabacle 05/19/09 III 0.952 25 C 0.376 0.200 0.300 - - - 87.60 *87.60%
Satisfactory
R.T.Y Construction 10341 Const. of Bridge at Brgy. Laguna (Footbridge) 02/19/10 IVA 0.200 40 C 0.469 0.133 0.300 - - - 90.20 90.20%
V. Satisfactory
R.T.Y Construction 10341
Roads to Complete the Nautical Highways Eastern Nautical Highway 1. Daang Maharlika (LZ) A. Rehab. of
Corporation23507 Construction of UP Baguio Library
Extension 01/20-22/2010 UP - Baguio 7.227 180 C 0.486 0.200 0.300 - - - 98.60 98.60% Outstanding
R.U Aquino Construction and Development
Corporation23507 Construction of UP Baguio
Basement 01/20-22/2010 UP - Baguio 0.953 45 C 0.427 0.200 0.300 - - - 92.70 92.70% V. Satisfactory
R.U Aquino Construction and Development
Corporation / RCDG Construction Corporation
Joint Venture
JV-08-130Widening/Concreting of Mt. Data-
Bontoc Road, Malitep Bridge, Balili to Amsolong Bridge Alab Section
05/23/09 CAR 114.942 450 O 0.380 0.240 0.150 0.030 0.060 0.033 89.30 -
R.U Aquino Construction and Development
Corporation / RCDG Construction Corporation
JV-08-131
Widening/Conc. of Mount Data-Bontoc Road Amsolong Alab
Poblacion Sectiopn. Km. 385+350-Km 391+457
08/28/09 CAR 99.305 450 O 0.369 0.240 0.087 0.023 0.047 0.017 78.30 -
R.U Aquino Construction and Development
Corporation / RCDG Construction Corporation
Joint Venture
JV-08-157
Conc. of Bontoc-Tabuk-Tuguegarao Road (Package BLT-16), Tinglayan
Boundary Section I Tocucan to Betwagan Sect., Km. 401+300-Km.
406+200 with exception
08/29/09 CAR 128.685 425 O 0.351 0.240 0.004 0.023 0.056 0.017 69.10 -
R.V Construction 6110Masbate Ports Cluster Development Project (Construction of Seawalls at San Fernando and Iniwaran Ports)
4/14/2011 DOTC 1.914 45 C 0.414 0.200 0.300 - - - 91.40 91.40% V. Satisfactory
R.V Construction 6110 Construction of Multi-Purpose Building, Brgy. Obrero 06/01/09 VIII 1.929 120 C 0.423 0.133 0.300 - - - 85.60 90.50%
V. Satisfactory
R.V Construction 6110 Const. of Multi-Purpose Building, Brgy. Maguinoo 03/03/10 VIII 1.929 90 C 0.434 0.113 0.300 - - - 84.70 84.70%
Satisactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page330
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.V Construction 6110 Zamboanga Airport Development Project 04/29/09 DOTC 5.738 180 C 0.466 0.200 0.300 - - - 96.60 96.60%
Outstanding
R.V Construction 6110Cotabato Airport Development
Project ( Continuation of Rehabilitation of Terminal Buildings)
08/27/10 DOTC 4.800 60 C 0.454 0.200 0.300 - - - 95.40 95.40% V. Satisfactory
R.V Construction 6110 Rehabilitation of DPWH Building, Biliran District Engineering Office 06/03/09 VIII 0.948 90 C 0.434 0.133 0.300 - - - 86.70 *86.70%
Satisfactory
R.V Construction 6110 Const. of MPB @ Brgy. Obrero 03/10/09 VIII 1.929 120 O 0.400 0.263 0.150 0.030 0.033 0.050 92.60 -
R.V Construction 6110 Const./Impvt. Of DPWH Leyte 1st DEO, Pawing 09/08/10 VIII 3.798 210 C 0.462 0.133 0.300 - - - 89.50 89.50%
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page341
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Reydan Builders 13059 Construction of Multi-Purpose Building, Brgy. Laconon 06/05/09 R-XII 0.801 98 C 0.418 0.200 0.300 - - - 91.80 *91.80%
V. Satisfactory
Reydan Builders 13059Concerting of Road & Reblocking Markel-Makar, Crossing Rubber
Section03/20/09 XII 11.332 120 C 0.459 0.200 0.300 - - - 95.90 *95.90%
V. Satisfactory
Reydan Builders 13059 Construction of Multi-Purpose Building, Brgy. M. Roxas 03/15/09 XII 0.800 98 C 0.449 0.200 0.300 - - - 94.90 *94.90%
V. Satisfactory
Reyrose Construction 20742Rehab./Reconst./Upgrading along
DSVR, Simpatuyo Bridge Approaches
04/01/11 II 4.822 197 C 0.433 0.133 0.300 - - - 86.60 *86.60% Satisfactory
Reyrose Construction 20742Rehab./Reconst./Upgrading of Dalaya Bridge Approaches #2
(DSVR)04/01/11 II 4.821 210 C 0.414 0.133 0.300 - - - 84.70 *84.70%
Satisfactory
Reyrose Construction 20742 Improvement (Concreting) of Access Road at Aparri Airport, Phase II 09/09/09 II 2.121 90 C 0.399 0.186 0.300 - - - 88.50 87.12%
Satisfactory
Reyrose Construction 20742 Conc. of Barangay Road at Mission 08/17/10 II 0.700 120 C 0.393 0.133 0.300 - - - 82.60 82.60% Satisfactory
Reyrose Construction & Supply 22934 Const. of Rd. along Boundaries of
Brgy. Pangbugan & Villakanaga 03/10/10 XIII 1.903 60 C 0.443 0.133 0.300 - - - 87.60 87.60% Satisfactory
RFN Construction & Development Corp. 8722 Construction of Livehood,
Production & Training Center 03/16/10 NHA 5.442 90 C 0.4679 0.1573 0.3000 - - - 92.52 92.52 V. Satisfactory
RFN Construction & Development Corp. 8722 Construction of one (1) Three-Storey
School Building 12/15/09 NHA 19.880 45 C 0.490 0.200 0.000 - - - 69.00 88.10% Satisfactory
RFN Construction & Development Corp. 8722 Const. of Livelihood, Production &
Training Center 02/18/10 NHA 4.992 90 O 0.3966 0.2550 0.150 0.030 0.050 0.050 93.16 -
RFN Construction & Development Corp. 8722 Construction of One (1) unit Three-
Storey School Building 09/18/09 NHA 18.108 150 O 0.375 0.300 0.150 0.030 0.058 0.050 96.33 -
RFN Construction and Development Corporation
8722
Construction of One (1) Unit Three-Storey, 15-Classroom School
Building at Southville 6 Housing Project (Building)
02/01/11 NHA 24.055 195 C 0.493 0.200 0.300 - - - 99.30 90.60% V. Satisfactory
RG & K Construction and General Merchandise 33021 Conc. of FMR, Natumulan 04/13/11 X 0.989 166 C 0.430 0.133 0.300 - - - 86.30 *86.30%
Satisfactory
RG & K Construction and General Merchandise 33021 Const. of School Building at MSU-IIT 06/10/10 X 1.063 150 C 0.482 0.133 0.300 - - - 91.50 91.50%
V. Satisfactory
RG & K Construction and General Merchandise 33021 Rehabilitation of Multi-Purpose
Building, Brgy. Poblacion 09/09/09 X 0.240 30 C 0.480 0.133 0.300 - - - 91.30 84.30% Satisfactory
RG & K Construction and General Merchandise 33021 Rehab./Impvt. of DPWH-Misamis
Oriental 2nd DEO Building 06/03/09 X 1.919 75 C 0.461 0.182 0.300 - - - 94.30 *94.30% V. Satisfactory
RG & K Construction and General Merchandise 33021 Concreting of Brgy. Road to Divine
Mercy, Ulaliman 06/03/09 X 1.444 62 C 0.404 0.144 0.300 - - - 84.80 82.70% Satisfactory
RG & K Construction and General Merchandise 33021 Rehab. of MPB, Brgy. Poblacion 03/11/09 X 0.240 30 C 0.421 0.133 0.300 - - - 85.40 *85.40%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page342
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
RGP Builders 20680
Road Upgrading (Gravel to Concrete) Based on Gravel road Strategies,
Richmark Construction 14227 BIP No. 06-2011 Construction of Open canal and Canal Structures 09/10/11 NIA 10.446 120 C 0.416 0.141 0.300 - - - 85.70 85.70%
Satisfactory Richpil Builders, Inc.
(Formerly: Richpil Builders)
30923 Rehab. of Manila East Rd. (Rosario-Cainta Rd.) 08/26/10 NCR 17.135 120 C 0.339 0.200 0.300 - - - 83.90 83.90%
Satisfactory
RIM Construction 15938 Rehab. of Cervantes-Sabangan Road 04/09/11 CAR 28.606 366 C 0.317 0.200 0.000 - - - 51.70 56.32% Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page343
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Rim Construction 15938 Rehab./Impvt. of Mountain Province-Ilocos Sur Road via Tue 03/09/09 CAR 19.012 369 O 0.351 0.300 0.150 0.030 0.050 0.050 93.10 -
Rim Construction 15938 Rehab./Impvt. of Mountain Province-Ilocos Sur Road via Tue 08/28/09 CAR 19.011 460 O 0.367 0.240 0.061 0.015 0.042 0.017 74.20 -
Rim Construction 15938 Rehab./Impvt. Of Mountain Province-Ilocos Sur Road via Tue 02/26/10 CAR 19.300 621 C 0.453 0.200 0.300 - - - 95.30 88.31%
Satisfactory
Rism Designer's and General Merchandise & Engineering Services
32830
Const. of One (1) unit Two (2) Classroom School Building at
Enriqueta Montilla National High School
03/10/10 VI 1.090 90 C 0.369 0.200 0.300 - - - 86.90 86.90% Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Completion of Opol Building 06/09/09 X 0.952 180 O 0.400 0.225 0.150 0.010 0.011 0.033 82.90 -
Ritche-Nathalie Builders and General Merchandise 27501 Tangub-Polao By-Pass Road 03/16/09 X 8.581 189 C 0.353 0.133 0.000 - - - 48.60 73.86%
Poor
Ritche-Nathalie Builders and General Merchandise 27501 Completion of Opol Bridge, Brgy.
Maningcol 09/16/09 X 0.951 204 C 0.357 0.200 0.300 - - - 85.70 84.02% Satisfactory
Ritchie-Nathalie Builders and General Merchandise 27501 Const./Completion/Repair of Sch.
Bldgs., Tudela NHS 04/06/11 X 0.564 90 C 0.451 0.133 0.300 - - - 88.40 *88.40% Satisfactory
Ritchie-Nathalie Builders and General Merchandise 27501 Regravelling of Labo-Calube Road 04/07/11 X 2.772 120 O 0.394 0.300 0.048 0.030 0.037 0.050 85.90 -
Ritchie-Nathalie Builders and General Merchandise 27501
Impvt./Extension of Carriageway along National Road Pagadian-Ozamiz Road, Km.1683+500 - Km.1685+000 with exception
06/01/10 X 7.718 60 C 0.443 0.200 0.300 - - - 94.30 94.30% V. Satisfactory
Ritchie-Nathalie Builders and General Merchandise 27501
Impv't./Expansion of Carriageway along Ozamis-Oroquieta Rd. Km.
1700+680 - Km. 1721+442 with exceptions
03/06/10 X 14.473 120 C 0.465 0.133 0.300 - - - 89.80 89.80% V. Satisfactory
RITVIT Construction & Development Corp.
Renov. Of Acct., Budget, HRD, Legal, UPMDFI, Provident Offices & Social
Hall (Building)02/17/11 UP 14.019 150 O 0.342 0.300 0.150 0.020 0.057 0.050 91.90 -
Ritvit Construction & Development Corporation
9426Renovation of Budget, Accounting,
HRDO, Legal, UPMDFI Provident Offices & Social Hall
Rockstone Construction Services and Supply 22702 Const. of MPB, Lugan National High
School 03/15/09 XII 0.754 105 C 0.500 0.133 0.300 - - - 93.30 84.83% Satisfactory
Rockstone Construction Services and Supply 22702
Const. of Sch. Bldg., Siodina Elementary School, Brgy. Gen.
Paulino Santos 03/15/09 XII 0.470 70 C 0.485 0.200 0.300 - - - 9,685.90 *98.50%
Outstanding
Rockworld Industries 7582 Const. of Burauen-Mahagnao Rd. 05/31/10 VIII 10.713 120 O 0.371 0.300 0.104 0.030 0.042 0.033 88.00 -
Rockworld Industries 7582 Construction of the Diversion Works of Tagbawto CIS - Phase 5 11/15-20/2010 NIA 4.022 90 C 0.456 0.160 0.300 - - - 91.56 91.56%
V. Satisfactory
Rockworld Industries 7582 Const./Impvt./Rehab. of Daang Maharlika, Maharlika Highway 09/09/09 VIII 14.159 180 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Rockworld Industries 7582 Rehab. of Daang Maharlika Road, Daang Maharlika Section 09/02/09 VIII 28.343 180 C 0.430 0.077 0.300 - - - 80.70 85.14%
Satisfactory
Rockworld Industries 7582 Concrete Paving of Biliran Circ. Road (Pawikan-Baso Section) 09/04/09 VIII 9.511 120 C 0.381 0.154 0.300 - - - 83.50 83.50%
Satisfactory
Rockworld Industries 7582 Const. of Burauen-Mahagnao Road 08/24/10 VIII 10.713 120 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page347
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Rocky 5 G Builders 32506Restoration along Benguet-Nueva Vizcaya Road, Km. 255+033-Km.
255+07308/29/10 CAR 1.946 120 C 0.350 0.183 0.300 - - - 83.30 83.30%
Satisfactory
Roda Construction and General Supply 19674 Conc. of Ariman-Bulusan Lake Road 05/26/10 V 19.200 82 O 0.352 0.237 0.150 0.030 0.035 0.033 83.70 -
Roda Construction and General Supply 19674 Conc. Of Ariman-Bulusan Lake Rd. 08/26/10 V 19.200 82 C 0.339 0.200 0.300 - - - 83.90 83.78%
Satisfactory
Roda Construction and General Supply 19674 Concreting of Farm-to-Market Road,
Magallanes St., Brgy. Zone 5 05/23/09 V 0.960 99 C 0.409 0.200 0.300 - - - 90.90 *90.90% V. Satisfactory
Roda Construction and General Supply 19674 Const. of Multi-Purpose Building,
Brgy. Camcaman 05/23/09 V 0.576 99 C 0.456 0.133 0.300 - - - 88.90 *88.90% Satisfactory
Roda Construction and General Supply 19674 Conc. of Pathway 02/26/09 V 0.480 99 C 0.434 0.200 0.300 - - - 93.40 *93.40%
V.SatisfactoryRoda Construction and
General Supply 19674 Const. of Multi-Purpose Pavement 02/26/09 V 0.288 99 C 0.482 0.133 0.300 - - - 91.50 *91.50% V. Satisfactory
Roda Construction and General Supply 19674 Rehab./Impvt. of Sitio Wawa-Brgy.
Lajong Road 08/26/09 V 1.920 60 O 0.314 0.269 0.150 0.030 0.047 0.050 86.00 -
Roda Construction and General Supply 19674 Completion of Multi-Purpose
Building, Brgy. N. Roque 02/16/10 V 0.960 60 C 0.476 0.133 0.300 - - - 90.90 90.90% V. Satisfactory
Roda Construction and General Supply 19674 Rehab./Impvt. of Sitio Pawa-Brgy.
Lajong Road 02/16/10 V 1.920 91 C 0.420 0.133 0.300 - - - 85.30 85.72% Satisfactory
Roim Builders & Construction Supply 20226
Regravelling of Unpaved Road Surface along NRJ Pulang Lupa-Sta.
Josefa Road03/31/11 XIII 4.696 150 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
Roim Builders & Construction Supply 20226 Conc. of Poblacion Bayugan,
Banaba Street 03/31/11 XIII 1.884 111 O 0.375 0.225 0.150 0.022 0.043 0.033 84.80 -
Roim Builders & Construction Supply 20226 Repair of Footbridges, Brgy. La
Caridad, Patin-ay 03/31/11 XIII 1.881 90 O 0.320 0.225 0.150 0.030 0.051 0.050 82.60 -
Roim Builders & Construction Supply 20226 Conc. of Provincial Road (NRJ
Bayugan-Bucac-Marcelina Road) 03/30/11 XIII 4.715 164 O 0.353 0.225 0.150 0.022 0.043 0.033 82.60 -
Roim Builders & Construction Supply 20226 Concreting of Brgy. Hubang 03/07/10 XIII 1.877 110 C 0.453 0.133 0.300 - - - 88.60 88.30%
SatisfactoryRoim Builders &
Construction Supply 20226 Completion of Bayugan 2, Apogan Road 06/08/09 XIII 2.797 160 C 0.467 0.133 0.300 - - - 90.00 85.02%
Satisfactory
Roim Builders & Construction Supply 20226 Rehab. Along Roxas Ave. & Imprv't.
of concrete Rd. @ Brgy. 3 09/12/09 XIII 1.885 120 C 0.389 0.173 0.300 - - - 86.20 *86.20% Satisfactory
Rola Construction 6813 Road Upgrading, Roxas City Boundary, Panitan-Bailan Rd. 03/01/10 VI 19.099 238 O 0.332 0.300 0.150 0.010 0.028 0.033 85.30 -
Rola Construction 6813Road Upgrading, Roxas City Bdry., Panitan-Bailan Rd. Km.121+000 -
Km.123+00006/15/10 VI 19.100 238 C 0.309 0.200 0.300 - - - 80.90 83.54%
Satisfactory
Rola Construction 6813 Construction of Road, Casuray-Ponong Road 06/03/09 V 8.129 89 C 0.425 0.190 0.300 - - - 91.50 *91.50%
V. SatisfactoryRolando M. Villasencio
Construction 24797 Const. of Four (4) CL Sch. Bldg. (7m x 36m), Cogon NHS 04/10/11 VIII 2.890 120 C 0.472 0.133 0.300 - - - 90.50 *90.50%
V. SatisfactoryRolingbel Construction &
Trading 32543 Slope Protection along Porac River, Valdez 02/17/10 III 4.782 45 C 0.411 0.200 0.300 - - - 91.10 91.10%
V. SatisfactoryRol-Mar Developer and
Enterprises 26151 Concreting of Road, Brgy. Consolacion 05/25/09 X 0.774 100 C 0.323 0.133 0.300 - - - 75.60 *75.60%
Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page348
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Romanjo Construction 32485 Concreting of Roads, Brgy. Burabod to San Rafael 06/01/09 V 0.936 90 C 0.445 0.133 0.300 - - - 87.80 *87.80%
SatisfactoryRonwood Construction &
Supply 25311 Completion of MPB, Brgy. 01 04/04/11 X 0.219 150 C 0.451 0.133 0.300 - - - 88.40 *88.40% Satisfactory
Ronwood Construction & Supply 25311
Const. of One (1) Unit Two (2) Storey Academic Bldg., Libertad NHS, Brgy.
Libertad04/12/11 XIII 2.137 120 O 0.339 0.276 0.150 0.030 0.047 0.050 89.20 -
Ronwood Construction & Supply 25311 Del Carmen-Sta. Monica-San Isidro
Rd. Sta. Monica-San Isidro Section 02/26/10 XIII 7.715 150 C 0.446 0.133 0.300 - - - 87.90 90.72% V. Satisfactory
Ronwood Construction & Supply 25311 Const. of Drainage System along
Purok 3 & 4, Brgy. Diego Silang 03/10/10 XIII 1.904 60 C 0.456 0.133 0.300 - - - 88.90 88.90% Satisfactory
Ronwood Construction & Supply 25311 Completion of Mahogany Bridge,
Brgy. Mahogany 03/10/10 XIII 2.435 75 C 0.437 0.133 0.300 - - - 87.00 87.00% Staisfactory
Ronwood Construction & Supply 25311 Jct. Osmeña-Pilar Road 02/26/10 XIII 13.239 225 C 0.484 0.133 0.300 - - - 91.70 86.12%
Satisfactory
Ronwood Construction & Supply 25311
Jct. Del Carmen-San Benito-Burgos Rd., Del Carmen-San Benito Rd.
Section02/26/10 XIII 17.126 261 O 0.371 0.240 0.104 0.030 0.047 0.033 82.50 -
Ronwood Construction & Supply 25311 Jct. Del Carmen-San Benito-Burgos
Road 06/05/10 XIII 17.126 261 C 0.434 0.189 0.300 - - - 92.30 88.40% Satisfactory
Ronwood Construction & Supply 25311 Completion of the Channel of
Osmeña-Dapa Flood Control 06/05/10 XIII 9.645 180 O 0.304 0.300 0.150 0.030 0.040 0.033 85.70 -
Rosand Builders 15781 Construction of 3-Storey, 15 Classroom School Buildings 01/20/10 NHA 21.615 150 O 0.391 0.300 0.006 0.030 0.055 0.050 83.20 -
Rosand Builders 15781 Construction of Two-Storey Multi-Purpose Center 02/25/10 NHA 3.492 90 O 0.388 0.300 0.150 0.030 0.070 0.050 98.80 -
Rosand Builders 15781 Construction of 3-Storey, 15 Classroom School Building 04/14/10 NHA 21.605 350 O 0.397 0.300 0.150 0.030 0.050 0.050 99.70 -
Rosand Builders 15781 Rehabilitation/Reconstruction of Bayabas-Eden Road 05/25/09 XI 4.848 120 C 0.411 0.200 0.300 - - - 91.10 *91.10%
V. Satisfactory
Rosand Builders 15781
Rehab./Reconst./Upgrading of Damaged Paved National Roads at
Ma-a Road, Junction Maa Radio Station, Junction Jem Village Sect
09/16/09 XI 19.287 150 C 0.484 0.133 0.300 - - - 91.70 *91.70% V. Satisfactory
Rostel Construction & Supply 26934 Upgrading of Buenavista-Bunaguit
Road (Malpoc-Rizal Section) 03/29/11 XIII 10.563 180 C 0.379 0.200 0.300 - - - 87.90 86.49% Satisfactory
Rostel Construction & Supply 26934 Upgrading of Buenavista-Bunaguit
Road (Malpoc-Rizal Section) 05/31/10 XIII 10.663 135 O 0.374 0.249 0.150 0.023 0.035 0.033 86.40 -
Rostel Construction & Supply 26934 Upgrading of Buenavista-Bunaguit
Road (Malpoc-Rizal Section) 08/23/10 XIII 10.563 180 O 0.344 0.245 0.150 0.030 0.045 0.033 84.70 -
Rovilla Construction 19514 Conc. of Brgy. Road at Brgy. Pooc 04/09/11 VII 2.366 65 C 0.348 0.200 0.300 - - - 84.80 *84.80% Satisfactory
Rowies Construction 23595 Const. of Road, Cagwait 03/03/10 XIII 3.699 120 C 0.473 0.133 0.300 - - - 90.60 90.60% V.Satisfactory
Rowie's Construction 23595 Const. of MPB Surigao del Sur State University Fisheries Department 04/04/11 XIII 1.375 90 C 0.419 0.133 0.300 - - - 85.20 *85.20%
Satisfactory
Rowie's Construction 23595 Const. of MPB Surigao del Sur State University Main Campus 04/04/11 XIII 5.500 150 O 0.339 0.225 0.150 0.030 0.051 0.050 84.50 -
Rowie's Construction 23595 Const. of Water System 04/04/11 XIII 1.149 120 O 0.371 0.225 0.150 0.022 0.025 0.033 82.60 -
Rowie's Construction 23595 Rehab./Improvement of DPWH Surigao del Sur 1st DEO Bldg. 06/03/09 XIII 1.923 90 O 0.357 0.300 0.150 0.030 0.030 0.050 91.70 -
Rowie's Construction 23595Impvt. of Road Slip/Slope protection along Surigao-Davao Coastal Road
(SDCR), Daniog Road Section03/11/09 XIII 4.790 89 C 0.453 0.125 0.300 - - - 87.80 *87.80%
Satisfactory
Rowie's Construction 23595Impvt. of Road Slip/Slope protection along Surigao-Davao, Coastal Road
(SDCR), Antao Road Section, 03/11/09 XIII 4.790 99 C 0.438 0.133 0.300 - - - 87.80 *87.10%
Satisfactory
Rowie's Construction 23595Rehab./Imprv't. of DPWH Surigao del
Sur 1st Dist. Engineering Office Building
09/08/09 XIII 1.923 90 C 0.383 0.200 0.300 - - - 88.30 90.23% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page351
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Royal Crown Monarch Construction & Supplies
Corp. (Formerly: R.C. Miranda Const. &
Supplies)
9036 Asphalt Overlay along Romulo Highway, San Clemente Sect. 08/26/10 III 18.810 60 C 0.393 0.200 0.300 - - - 89.30 89.30%
V. Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation9036 Impvt./Rehab. along Cordon-Diffun-
Maddela-Aurora Bdry. Road 02/25/10 II 14.475 120 C 0.441 0.152 0.300 - - - 89.30 89.30% V. Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation9036 Rehab./Reconst./Upgrading of
Damaged Paved along Anao-Ramos 06/03/10 III 18.888 60 C 0.487 0.133 0.300 - - - 92.00 92.00% V. Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation9036
Rehab./Reconst./Upgrading of Damaged Paved along Romulo
Highway06/03/10 III 9.405 45 C 0.434 0.133 0.300 - - - 86.70 86.70%
Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation9036
Rehab./Reconst./Upgrading of Damaged Paved along Paniqui-
Poblacion06/03/10 III 9.339 60 C 0.428 0.133 0.300 - - - 86.10 86.10%
Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation9036
Concreting of Capas-Botolan Road, Km. 122+528-Km. 124+628, Capas
Section05/20/09 III 28.686 150 O 0.375 0.214 0.150 0.020 0.030 0.050 83.90 -
Royal Crown Monarch Construction & Supplies
Corporation9036 Const. of Multi-Purpose Building at
Tarlac College of Agriculture 09/02/09 III 9.355 150 O 0.358 0.300 0.150 0.030 0.056 0.050 94.40 -
Royal Crown Monarch Construction & Supplies
Corporation9036
Impvt./Widening/Conc. of McArthur (MNR) Phase V (Moncada San
Manuel Sect. CP1)09/02/09 III 61.461 150 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
Royal Crown Monarch Construction and
Supplies Corporation (Formerly: R.C. Miranda
Construction & Supplies)
9036 Const. of MPB at Tarlac College of Agriculture 02/24/10 III 9.355 164 C 0.468 0.200 0.300 - - - 96.80 91.62%
V. Satisfactory
Royal Sea Bees Construction 30099 Construction of Rizal Deepwells 09/03/09 CAR 2.769 140 C 0.333 0.200 0.300 - - - 83.30 *83.30%
Satisfactory
Royal Sea Bees Construction 30099 Implementation of Various Projects
under Package 15 11/17/08 CAR 0.933 120 O 0.241 0.214 0.100 0.030 0.030 0.067 68.20 -
RP Parayno Construction 32862 Dredging/Desilting & Const. of Drainage @ Zone I, III & Calomboyan 05/20/09 I 1.435 122 C 0.494 0.067 0.300 - - - 86.10 81.18%
Unsatisfactory
RPBJ Trading and Construction 30006 Impvt. of Drainage System @ Brgy.
#73 03/19/09 VIII 0.964 70 C 0.475 0.200 0.300 - - - 97.50 *97.50% Outstanding
RPParayno Construction 32862 Const. of MPB @ Poblacion East 08/31/10 I 0.482 105 C 0.462 0.133 0.300 - - - 89.50 89.50% V. Satisfactory
RPParayno Construction 32862 Impvt. of Main Building at PSU 08/30/10 I 0.578 105 C 0.448 0.133 0.300 - - - 88.10 88.10% Satisfactory
RRL Builders Corporation 23454 Construction of Academic Building
Extension - DOST 22.461 240 C 0.463 0.20 0.30 - - - 96.28 92.02% V. Satisfactory
RRL Builders Corporation 23454 Construction of Student Leaving
Center 06/23/10 DOST 16.032 240 C 0.489 0.20 0.30 - - - 98.90 92.11% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page352
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
RRMD Construction & Supply (Formerly: RRMD
Const.)23615 Conc. of Iligan-Bukidnon Road 03/15/09 X 8.939 212 C 0.366 0.133 0.300 - - - 79.90 84.04%
Satisfactory
RRMD Construction and Supply 23615
Rehab./Reconst./Upgrading of Damaged Paved National Roads,
Along Misamis Oriental-Ma.Cristina Bdry. Road Mandulog-Tambo-IIT
Section, Sta.1520+962 - Sta.1524+094
08/28/10 X 13.935 120 C 0.464 0.200 0.300 - - - 96.40 92.74% V. Satisfactory
RRMD Construction and Supply 23615
Rehab./Reconst./Upgrading of Damaged Paved National Rd., along Overton Buru-un Road at Buru-un Poblacion Section, Sta.1535+067 -
Sta 1535+803 50 w/exception
08/28/10 X 9.284 105 C 0.444 0.200 0.300 - - - 94.40 91.64% V. Satisfactory
RRMD Construction and Supply 23615
Rehab./Reconst./Upgrading of Damaged Paved National Road @
09/14/09 X 18.464 150 C 0.339 0.200 0.300 - - - 83.90 *83.90% Satisfactory
RRMD Construction and Supply (Formerly: RRMD
Construction)23615
Conc. of Iligan-Bukidnon Road at Dodiongan Sect., Sta.1526+023 -
Sta.1526+365, Brgy..Digkilaan04/10/11 X 9.285 282 C 0.422 0.133 0.300 - - - 85.50 *85.50%
Satisfactory
RRMD Construction and Supply (Formerly: RRMD
Construction)23615
Rehab./Reconst./Upgrading along Misamis Oriental-Ma. Cristina Bdry. Road Mandulog-Tambo-IIT Section,
Sta.1520+962 - Sta.1524+094
06/07/10 X 13.935 120 O 0.378 0.240 0.150 0.030 0.055 0.050 90.30 -
RRMD Construction and Supply (Formerly: RRMD
Construction)23615
Rehab./Reconst./Upgrading along Overton Buru-un Road at Buru-un - Poblacion Section, Sta.1535+067 -
Sta.1535+803.50 w/ exception
06/10/10 X 9.284 105 O 0.373 0.240 0.150 0.030 0.055 0.050 89.80 -
RRMD Construction and Supply (Formerly: RRMD
Construction)23615
Conc. of Iligan-Bukidnon Rd. at Bonbonon Sect. (Sta. 1523+150 to
1523+385) Brgy. Bonbonon03/05/10 X 9.118 140 C 0.478 0.150 0.300 - - - 92.80 91.24%
V.Satisfactory
RSP Enterprises, Inc. 16795Completion of School Bldg. University of South Eastern Philippines, Mintal Campus
06/16/10 XI 9.435 170 C 0.485 0.133 0.300 - - - 91.80 91.73% V. Satisfactory
RSP Enterprises, Inc. 16795 Repair/Maintenance of DPWH Regional Office XI Quarters 06/12/10 XI 6.256 181 C 0.484 0.133 0.300 - - - 91.70 91.70%
V. Satisfactory
RSP Enterprises, Inc. 16795
Rehab./Reconst./Upgrading of Damaged Paved National Roads at Davao-Cotobato Old Road Libby
Section
09/16/09 XI 5.545 120 C 0.490 0.133 0.300 - - - 92.30 92.96% V. Satisfactory
RT Morabe Construction 11377 BIP No. 11-2011 Construction of Open canal and Canal Structures 09/06/11 NIA 7.071 105 O 0.359 0.258 0.150 0.023 0.057 0.050 89.74 -
Ruby Jade Construction 19202 Construction of Dinadiawan Road, Brgy. Dinadiawan 05/28/09 III 4.703 120 C 0.418 0.200 0.300 - - - 91.80 *91.80%
V. SatisfactoryRuby Lim Const. &
Supplies, Inc. 11685 Concreting of San Fernardo South Road 03/07/09 V 16.000 195 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Ruby-Jade Construction 19202 Rehab. of Lobbot Street 06/06/10 III 4.688 120 O 0.394 0.241 0.150 0.030 0.032 0.033 88.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page353
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ruby-Jade Construction 19202 Rehab. of Lobbot Street 08/21/10 III 4.688 120 C 0.363 0.200 0.300 - - - 86.30 87.32% Satisfactory
Ruby-Jade Construction 19202 Construction of Brgy. Lobbot Road 03/03/09 III 4.703 150 O 0.329 0.300 0.124 0.023 0.018 0.033 82.70 -
Ruby-Jade Construction 19202 Construction of Brgy. Lobbot Road 09/08/09 III 4.703 175 C 0.378 0.200 0.300 - - - 87.80 84.74% Satisfactory
Ruby-Jade Construction 19202 Rehab. of Mabini Rd. Km.7+185 - Km.8+585 08/19/10 NCR 9.975 120 C 0.421 0.133 0.300 - - - 85.40 85.40%
SatisfactoryRubylim Construction &
Supplies, Inc. 11685 Impvt. of San Fernando South Road, San Fernando Section 02/17/10 V 11.340 240 O 0.346 0.232 0.150 0.030 0.040 0.033 83.10 -
Rubylim Construction & Supplies, Inc. (Formerly: Ruby Lim Construction &
Supplies)
11685 Impv't. of San Fernando South Rd., San Fernando Sect. 08/24/10 V 11.340 240 C 0.375 0.200 0.300 - - - 87.50 84.86%
Satisfactory
Rubylim Construction & Supplies, Inc. (Formerly: Ruby Lim Construction &
Supplies)
11685 Road Upgrading of San Fernando South Rd. (Pinamoghaan Sect.) 08/24/10 V 19.100 170 O 0.292 0.300 0.150 0.020 0.035 0.033 83.00 -
Rudhil Construction & Enterprises, Inc./Jaykris
Enterprises (JV)JV-09-181
Concrete Paving of Junction-Imelda-Alicia Rd., Sta.1761+312 -
Sta.1761+873.6804/04/11 IX 13.682 285 C 0.470 0.133 0.300 - - - 90.30 *90.30%
V. Satisfactory
Ruiz Engineering Construction 16643 Completion of MPB (Covered Court),
Brgy. Bobon 04/12/11 XIII 0.944 45 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory
Ruiz Engineering Construction 16643 Construction of Multi-Purpose
Building (Covered court) 03/18/09 XIII 2.242 120 C 0.393 0.200 0.300 - - - 89.30 *89.30% V.Satisfactory
Rumil Construction 13484 Completion of MPB (Mangagoy Gymnasium) 03/04/10 XIII 2.858 92 C 0.500 0.133 0.300 - - - 93.30 85.44%
SatisfactoryRusmen Builders &
Development Corporation
10674Rehab./Reconst. /Upgrading of
Damaged National Road, Batangas - Lobo Road
09/01/09 IVA 48.240 180 C 0.475 0.133 0.300 - - - 90.80 89.96% V. Satisfactory
Rusmen Builders & Development Corporation
10674
Rehab./Reconst./Upgrading of Banay-banay-Cuena-Mojon Road
(Intermittent Sect.), Cuenca and Alitagtag
09/09/09 IVA 42.456 120 C 0.477 0.133 0.300 - - - 91.00 89.92% V. Satisfactory
S and CU Construction 13128Conc./Widening of Road, Jct. Sta. Fe-Magtangtang Leading to the Danao
Adventure Park03/31/11 VII 9.414 256 C 0.392 0.133 0.000 - - - 52.50 74.64%
Poor
S and CU Construction 13128 Const. of School Building, San Jose National High School 09/10/09 VII 1.042 175 O 0.400 0.257 0.150 0.030 0.042 0.033 91.20 -
S and CU Construction 13128 Completion of Multi-Purpose Building 09/01/09 VII 0.918 120 C 0.462 0.133 0.300 - - - 89.50 *89.50%
V. Satisfactory
S and CU Construction 13128 Const. of School Building, San Jose National High School 02/26/10 VII 1.042 175 C 0.457 0.175 0.300 - - - 93.20 91.80%
V. Satisfactory
S.M Castro Management & Construction Services 18216 Rehab./Impvt. Of Jct. Osmeña-Pilar-
Magpupungko Road 06/05/10 XIII 19.289 120 C 0.467 0.122 0.300 - - - 88.90 88.90% Satisfactory
S.M Castro Management & Construction Services 18216
Impv't/Rehab./Conc. of Butuan City-Malaybalay Road, Sta.1239+832-
Sta.1272+248 with exception, 03/18/09 XIII 9.626 150 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V.Satisfactory
S.M Castro Management & Construction Services 18216 Rehab./Impvt. of General Luna-Dapa-
Sayak Airport Road 03/07/09 XIII 19.290 120 C 0.441 0.133 0.300 - - - 87.40 *87.40% Satisfactory
S.T Hidalgo Construction 22498 Const. of Flood Control Brgy. Linao 02/26/10 VIII 4.745 198 C 0.421 0.178 0.300 - - - 89.90 84.53% Satisfactory
S.T Hidalgo Construction 22498 Construction of Flood Control, Brgy. Linao 05/28/09 VIII 4.745 90 O 0.310 0.240 0.150 0.022 0.030 0.033 78.50 -
S.T Hidalgo Construction 22498 Construction of Flood Control 03/04/09 VIII 4.745 90 O 0.312 0.300 0.150 0.020 0.019 0.033 83.40 -
Sabutan Construction 5520
Road Support Peace & Dev't in Mindanao & Other Conflict affected Area, Quirino Highway, Sto. Niño-
Sta. Monica-Sta. Cecilia (Int. Section)
02/27/09 IVA 47.701 148 C 0.474 0.133 0.300 - - - 90.70 *90.70% V. Satisfactory
Saint Bernard Construction 28386 Rehab. of Napolidan Spillway 08/30/10 V 5.650 120 C 0.389 0.200 0.300 - - - 88.90 88.90%
SatisfactorySaint Bernard Construction 28368 Concreting of Roads, Brgy.
Colacling 06/07/09 V 1.418 120 C 0.377 0.200 0.300 - - - 87.70 *87.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page355
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Saint Bernard Construction 28368 Concrete Pedestrian Bridge 03/12/09 V 0.947 112 C 0.420 0.200 0.300 - - - 92.00 *92.00%
V. SatisfactorySaint Bernard Construction 28368 Construction of Luban-Cagmanaba-
Pawili Road 03/22/10 V 4.777 120 C 0.422 0.160 0.300 - - - 88.20 88.20% Satisfactory
SAL Construction 34646 BIP No. 11-2011 Construction of Open canal and Canal Structures 09/06/11 NIA 6.977 105 O 0.360 0.260 0.150 0.023 0.057 0.050 90.00 -
Sammi Construction Company Ltd. FC-05-008
CP IV, Const./Impvt of Looc-Odiongan-San Andres Road Rural
Road Network Development Project05/21/09 RRNDP 646.871 890 O 0.347 0.300 0.074 0.030 0.037 0.050 83.80 -
Sammi Construction Company Ltd. FC-05-008 CP IV, Const./Impvt. of Looc-
Odiongan-San Andres Road 08/30/09 RRNDP 698.808 980 O 0.348 0.240 0.149 0.030 0.051 0.033 85.10 -
Sammi Construction Company Ltd. FC-05-008
Contract Package IV, Const./Impvt. of Looc-Odiongan-San Andres Road,
Km 101+965.00 - Km. 143+560.6802/22/10 RRNDP 646.871 750 O 0.359 0.300 0.150 0.030 0.061 0.050 95.00 -
Sammi Construction Company Ltd. FC-05008 CP IV, Const./Impvt. of Looc-
Odiongan-San Andres Road 08/29/08 IV-B 649.871 750 O 0.400 0.300 0.050 0.030 0.070 0.067 91.70 -
Sammi Construction Company Ltd. FC-05-008 CP IV, Const./Impvt. of Looc-
Odiongan-San Andres Road 11/25/08 IV-B 649.871 750 O 0.365 0.300 0.030 0.030 0.070 0.067 86.20 -
San Fernando Builders 21295 Construction of 2-CL School Building @ Bacnotan NHS Annex 09/02/09 I 1.254 80 C 0.452 0.200 0.300 - - - 95.20 *95.20%
V. Satisfactory
San Fernando Builders 21295 Const. of MPB (Phase V) 02/26/10 I 0.975 120 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
San Guillermo Construction and Trading
Corporation25661
Rehab. (Slope Protection) along Sagbat-Pililla Diversion Rd., Pililla
Bridge I, Km.57+20806/10/10 IVA 0.960 30 C 0.428 0.200 0.300 - - - 92.80 92.80%
V. Satisfactory
San Guillermo Construction and Trading
Corporation25661 Rehabilitation of Alley Area 1 & 2,
So Construction 17714 Concreting of Nueva-Ecija-Aurora Road, Baler Cemento Section 05/27/09 III 6.004 120 C 0.442 0.200 0.300 - - - 94.20 *94.20%
V. Satisfactory
Socor Construction Corporation 8020 Repair/Rehab. of Hernan Cortes
Road 04/10/11 VII 4.600 14 C 0.431 0.133 0.300 - - - 86.40 *86.40% Satisfactory
Solid M construction 33991 BIP No. 10-2011 Construction of Open Canal Canal Structures 09/5-10/11 NIA 7.892 105 C 0.435 0.139 0.300 - - - 87.40 *87.40%
Satisfactory
Solid Merchandising 31609 Const. of San Jose-Monlaque Road Brgy. Monlaque 04/08/11 VI 1.926 50 C 0.412 0.133 0.300 - - - 84.50 *84.50%
Satisfactory
Solid Merchandising 31609 Const. of Spurdike along Ibajay River Brgy. San Jose 04/08/11 VI 1.923 70 C 0.334 0.189 0.300 - - - 82.30 *82.30%
Satisfactory
Solid Rock Construction 8958
Const. of Don Mariano Marcos Ave., Ext. Project under Metro-Manila
04/12/11 VII 35.652 180 C 0.383 - 0.500 - - - 88.30 85.00% Satisfactory
St. Raymund Construction, Inc. 19242 Conc. of Bacolod South Road, Pook
Section Brgy. Pook 04/01/11 VI 9.388 150 O 0.373 0.240 0.150 0.030 0.033 0.033 85.90 -
St. Raymund Construction, Inc. 19242
Const. of Flood Control/River Bank Protection at Canmoros-Nabuswang
River, Brgy. Canmoros08/26/10 VI 9.335 190 C 0.454 0.133 0.300 - - - 88.70 85.88%
Satisfactory
St. Raymund Construction, Inc. 19242
Const. of Flood Control / River Bank Protection at Canmoros-Nabuswang
River Brgy. Canmoros06/03/10 VI 9.335 190 O 0.280 0.300 0.150 0.030 0.047 0.033 84.00 -
St. Raymund Construction, Inc. /
Wilkinson Construction (JV)
Conc. of Kabankalan-Jct.-Salong-Tapi-Dacongcogon-Bantayan Road,
Salong Section, Sitio San Jose, Brgy. Salong
04/02/11 VI 31.933 360 C 0.429 0.133 0.300 - - - 86.20 82.15% Satisfactory
Sta. Cruz Construction and Services 32289 Repair of Ro-Ro No. 2, Port Access
Road and Security Fence 04/11-13/11 PPA 16.807 180 O 0.399 0.299 0.150 0.030 0.070 0.050 99.80 *99.80% Outstanding
Stay Construction 23323 Road Upgrading of Abra-Kalinga Road, Km.439+000 - Km.464+000 03/30/11 CAR 31.792 467 C 0.428 0.200 0.000 - - - 62.80 73.99%
Poor
Stay Construction 23323 Road Upgrading of Abra-Ilocos Norte Road, Km.424+000 - Km.429+000 03/29/11 CAR 21.869 418 C 0.271 0.200 0.000 - - - 47.10 67.65%
Poor
Stay Construction 23323 Repair & Rehab. along Kennon Road 05/19/09 CAR 6.454 200 O 0.304 0.291 0.150 0.010 0.032 0.033 82.00 -
Stay Construction 23323 Concreting of Acop-Kapangan-Kibungan Road 05/21/09 CAR 19.168 180 O 0.297 0.300 0.065 0.010 0.025 0.033 73.00 -
Stay Construction 23323Conc. along Itogon-Dalupirip-San
Manuel Boundary Road, Km. 267+00 -274+055 (vs)
03/12/09 CAR 19.021 207 C 0.378 0.200 0.300 - - - 87.80 77.54% Unsatisfactory
Stay Construction 23323 Concreting along Baguio-Bua-Itogon Road 08/26/09 CAR 12.720 200 O 0.384 0.240 0.150 0.030 0.051 0.033 88.80 -
Stay Construction 23323Conc. of Acop-Kapangan-Kibungan
Road Km. 263+000- Km. 266+700 (v.s.)
08/26/09 CAR 19.168 229 O 0.356 0.240 0.150 0.015 0.042 0.033 83.60 -
Stay Construction 23323 Rehab. of Benguet National Road 08/25/09 CAR 4.718 200 O 0.379 0.194 0.067 0.015 0.042 0.017 71.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page368
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Stay Construction 23323 Concreting along Baguio-Bua-Itogon Road 03/02/10 CAR 13.413 244 C 0.378 0.161 0.300 - - - 83.90 86.84%
Satisfactory
Stay Construction 23323 Repair & Rehab. along Kennon Road 03/02/10 CAR 6.454 200 C 0.428 0.133 0.300 - - - 86.10 83.64% Satisfactory
Stay Construction 23323Conc. of Acop-Kapangan-Kibungan
Road Km. 263+000- Km. 266+700 (v.s.)
03/01/10 CAR 19.168 268 C 0.398 0.200 0.300 - - - 89.80 82.90% Satisfactory
Stay Construction 23323 Rehab. of Benguet National Road 03/02/10 CAR 4.826 314 C 0.455 0.158 0.300 - - - 91.30 79.36% Unsatisfactory
Stay Construction 23323Road Upgrading along Kennon-Agat
Road, Km. 216+648-Km. 217+723 (v.s.)
08/29/10 CAR 9.693 120 C 0.377 0.200 0.300 - - - 87.70 87.70% Satisfactory
Stay Construction/Vymeah
Construction (JV)JV-08-036 Const. of Tabuk-Tanudan-Banaue
Road, Banaue Section 05/25/09 CAR 19.126 284 O 0.361 0.145 0.100 0.015 0.040 0.033 69.40 -
Steel City Fabricators Corporation 27035 Const./Rehab./Replacement,
Completion/Repair Kalasungay E/S 09/02/09 X 6.486 75 O 0.318 0.037 0.150 0.030 0.047 0.033 61.50 -
Steven Construction & Supply 21987 Const. of MPB (Public Market) 08/19/10 V 0.960 105 C 0.435 0.200 0.300 - - - 93.50 93.50%
V. SatisfactorySteven Construction &
Supply 21987 Const. of Conc. Pavements, Rizal Ave. Ext. 03/12/09 VIII 0.700 60 C 0.486 0.000 0.300 - - - 78.60 *78.60%
Unsatisfactory
Sto. Cristo Construction and Trading (Formerly:
Sto. Cristo Construction)26096 Rehab./Impvt. of Dolores-Piring and
Sta. Maria Roads 02/16/10 III 4.725 50 C 0.445 0.173 0.300 - - - 91.80 91.80% V. Satisfactory
Sto. Cristo Construction and Trading (Formerly:
Sto. Cristo Construction)26096
Rehab./Reconst./Upgrading of Damaged Paved Mt. Arayat Nat'l.
Park08/31/10 III 6.416 30 C 0.356 0.200 0.300 - - - 85.60 85.60%
Satisfactory
Sto. Cristo Construction and Trading (Formerly:
Sto. Cristo Construction)26096 Impvt. of MP Bldg. at DHVCAT Annex
San Juan 05/18/09 III 5.703 40 C 0.488 0.200 0.300 - - - 98.80 *98.80% Outstanding
Sto. Nino Construction 4867Road Upgrading (Gravel to
04/06/11 IX 26.028 210 C 0.446 0.133 0.300 - - - 87.90 84.90% Satisfactory
Sto. Nino Construction 4867 Const. of Multi-Purpose Building (Phase IV) 03/03/10 IX 4.595 180 C 0.413 0.200 0.300 - - - 91.30 93.82%
V.Satisfactroy
Sto. Nino Construction 4867 Const./Completion of Grandstand (Bleacher 2) Dumalinao Pilot School 06/10/10 IX 5.971 180 C 0.448 0.133 0.300 - - - 88.10 88.10%
Satisfactory
Sto. Nino Construction 4867 Const. of Flood Control Project along Dipolo River, Tambulig 06/08/10 IX 9.285 429 C 0.447 0.133 0.300 - - - 88.00 86.08%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page369
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sto. Nino Construction 4867
Asphalt Overlay along Jct. Dumalinao-Margosatubig Rd. (using
06/02/09 IX 68.948 508 O 0.378 0.240 0.150 0.030 0.047 0.050 89.50 -
Sto. Nino Construction 4867Concreting of Lanao-Pagadian-
Zamboanga City Road, Pagadian-Dumalinao (Intermittent Section)
06/05/09 IX 27.850 413 O 0.359 0.240 0.150 0.030 0.047 0.050 87.60 -
Sto. Nino Construction 4867Road Upgrading (Gravel to Concrete)
Dipolog-Punta-Dansullan-Sergio Osmeña
06/10/09 IX 15.259 210 O 0.367 0.240 0.150 0.030 0.037 0.050 87.40 -
Sto. Nino Construction 4867 Construction of River Control, Salug Diut River 05/05/09 IX 9.310 420 O 0.374 0.240 0.150 0.010 0.042 0.050 86.60 -
Sto. Nino Construction 4867Concreting of Jct. Blancia-Molave-Josefina Road, Mahayag-Josefina
(Bag-ong Argao)06/04/09 IX 18.549 344 C 0.466 0.133 0.300 - - - 89.90 86.24%
Satifactory
Sto. Nino Construction 4867 Construction of Flood Control Projects along Dipolo River 06/05/09 IX 9.285 180 O 0.356 0.240 0.150 0.010 0.042 0.050 84.80 -
Sto. Nino Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road, Molave-Mahayag Section
06/04/09 IX 18.550 348 C 0.455 0.133 0.300 - - - 88.80 84.18% Satisfactory
Sto. Nino Construction 4867Impvt./Concrete Paving of Ilmelda-
Repair/Rehab. of Taft-Borongan Road, Km. 891+324-Km. 912+200 w/
exceptions,03/08/10 VIII 4.707 45 C 0.388 0.200 0.300 - - - 88.80 88.80%
Satisfactory
T. M. Abad Construction 2272 Construction of Multi-Purpose Covered Court (Building) 04/01/11 NHA 5.412 90 O 0.378 0.284 0.000 0.020 0.032 0.000 71.40 -
T. Solomon Construction 10046 Impvt./Rehab.of Brgy. 3, Sitio Kapalaran Road 03/03/10 IVA 8.683 90 C 0.472 0.133 0.300 - - - 90.50 90.50%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page376
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
T. Solomon Construction 10046 Rehab./Reconst. of Tanauan-Talisay-Tagaytay Rd. 06/10/10 IVA 14.474 90 C 0.458 0.133 0.300 - - - 89.10 89.10%
V. Satisfactory
T. Solomon Construction 10046 Impv't./Rehab. of Road, Bilog-Bilog-Cale Rd. 08/17/10 IVA 9.647 90 C 0.475 0.133 0.300 - - - 90.80 90.80%
V. Satisfactory
T. Solomon Construction 10046Impv't/Rehab. of Road inc.
Installation of Road Safety Devices Tanauan-Talisay Rd.
Road Support Peace & Dev't in Mindanao & Other Conflict affected Area, Quirino Highway, San Luis I &
II
02/27/09 IV-A 38.318 148 C 0.473 0.133 0.300 - - - 90.60 *90.60% V. Satisfactory
Three W Builders, Inc 10722Rehab./Reconst. Selective Conc. Paving & Asphalt, along Ozamis-
Pagadian Road06/09/09 X 38.659 240 O 0.292 0.300 0.000 0.030 0.043 0.033 69.80 -
Three W Builders, Inc 10722Rehab./Reconst. (Selective Concrete
Paving & Asphalt) along Ozamis-Pagadian Road
03/17/09 X 38.659 240 O 0.330 0.300 0.150 0.030 0.045 0.050 90.50 -
Three W Builders, Inc 10722Rehab./Reconst. of Selective
Concrete Paving & Asphalt along Ozamis-Pagadian Rd.
03/06/10 X 39.449 534 C 0.418 0.200 0.300 - - - 91.80 84.81% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page382
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Three W Builders, Inc. 10722 Rehab./Reconst. of Damaged Roads along San Juan-Laiya Road 04/07/11 IVA 57.098 258 C 0.370 0.200 0.300 - - - 87.00 89.16%
V. Satisfactory
Three W Builders, Inc. 10722
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads along Ozamiz-Pagadian Road, Bonifacio
Sect.
04/06/11 X 26.029 210 C 0.435 0.133 0.000 - - - 56.80 74.68% Poor
Three-in-One Construction & Trading 14695
Road Safety Devices along San Fernando-Gapan Rd. Km.69+573 -
Km.96+120 w/ exception05/24/10 III 2.475 30 C 0.403 0.133 0.300 - - - 83.60 83.60%
Satisfactory
Thunder Construction 17247 Rehab./Reconst. of Damaged Paved National Road Bangued-Cadre Rd. 03/30/11 CAR 6.221 100 C 0.392 0.171 0.300 - - - 86.30 84.50%
Satisfactory
Thunder Construction 17247Repair and Maint. of National Road
Abra-Ilocos Sur Road, Km. 388+150 - Km. 388+653 (part of Package)
02/24/09 CAR 4.770 18 C 0.362 0.190 0.300 - - - 85.20 *85.20% Satisfactory
Thunder Construction 17247 Road Upgrading , Abra-Cervantes Road, Km. 430+450 - Km. 445+450 02/25/09 CAR 14.268 208 O 0.126 0.224 0.120 0.030 0.022 0.017 53.90 -
Thunder Construction 17247 Road Upgrading , Abra-Cervantes Road, Km. 430+450 - Km. 445+450 02/25/10 CAR 14.267 206 C 0.372 0.200 0.300 - - - 87.20 67.22%
Poor
Thunderheads Construction Corporation 22420 Conc. of San Aquilino-Roma Road,
Brgy. San Aquilino 04/06/11 IVB 1.375 45 C 0.431 0.133 0.300 - - - 86.40 *86.40% Satisfactory
Thunderheads Construction Corporation 22420 Const. of MPB at Brgy. Kalinisan 09/02/10 IVB 0.897 90 C 0.398 0.200 0.300 - - - 89.80 89.80%
Satisfactory
Thunderheads Construction Corporation 22420 Concreting of Brgy. Road @
Tibaraw Construction 22710 Cagbonga CIS 06/1-6/09 NIA 3.467 150 C 0.435 0.120 0.300 - - - 85.46 *85.46% Satisfactory
Tibaraw Construction 22710 Mantang CIP 06/1-6/09 NIA 2.147 90 C 0.425 0.120 0.300 - - - 84.49 *84.49% Satisfactory
Tibaraw Construction 22710 San Gabriel CIS 06/1-6/09 NIA 2.224 150 C 0.424 0.120 0.300 - - - 84.43 *84.43% Satisfactory
Tiger Valley Builders 33063 Construction of Multi-Purpose Building, Anguiray H/S 09/10/09 II 1.914 150 C 0.424 0.133 0.300 - - - 85.70 *85.70%
Satisfactory
Tiger Valley Builders 33063 Repair/Restoration of Santiago-Tuguegarao Rd. Maddarulug Sect. 05/28/10 II 2.412 130 O 0.369 0.240 0.150 0.024 0.042 0.033 85.80 -
TJT Construction 10047 Repair/Rehab. of Pasong Tamo E/S 04/07/11 NCR 1.909 60 C 0.482 0.127 0.300 - - - 90.90 83.97% Satisfactory
TJT Construction 10047 Completion of Multi-Purpose Building 03/02/09 NCR 1.625 30 C 0.412 0.158 0.300 - - - 87.00 *87.00%
Satisfactory
TKS Builders & Supply 23415 Concreting/Improvement of Davao-Bukidnon Road, Tugbok District 05/25/09 XI 2.630 120 C 0.364 0.200 0.300 - - - 86.40 *86.40%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page383
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
TKS Builders and Supply 23415Const. of DPWH Davao City Sub DEO Bldg. incl. Materials Quality
Control Bldg.03/29/11 XI 4.695 180 C 0.484 0.200 0.300 - - - 98.40 92.38%
V. Satisfactory
Tokwing / Z.M. Construction (JV) JV-09-173
Widening/Conc. of McArthur Highway (MNR), Meycauayan
(Bulacan) to Mabalacat (Pampanga), Pampanga 4th Congressional
District, Phase VI-Package 3, Apalit-San Simon-Minalin-Sto. Tomas Sect.
03/29/11 III 315.723 300 C 0.362 0.200 0.300 - - - 86.20 88.48% Satisfactory
Tokwing / ZM Construction (JV) JV-08-274
Const./Replacement of Bucao Bridge and Approaches along Iba-South
Road over Bucao River02/20/10 III 144.750 265 C 0.422 0.200 0.300 - - - 92.20 92.84%
V. Satisfactory
Tokwing / ZM Construction (JV) JV-08-274
Const./Replacement of Bucao Bridge and Approaches along Iba-South
Road over Bucao River09/03/09 III 144.750 250 O 0.381 0.300 0.150 0.030 0.047 0.033 94.10 -
Tokwing / ZM Construction(JV) JV-08-075
Const. of Tarlac-Nueva Ecija-Dingalan Port Road (Jct.-Fort
Magsaysay-Laur Section) Contract Package 2, Fort Magasaysay-Laur
Road Section
02/23/10 III 299.123 390 C 0.443 0.200 0.300 - - - 94.30 93.36% V. Satisfactory
Tokwing Construction 9650 Rehab. of Mallig Bridge along Santiago-Tuguegarao Road 04/06/11 II 27.017 240 C 0.498 0.133 0.300 - - - 93.10 92.02%
V. Satisfactory
Tokwing Construction 9650Const. (Road Opening) of Missing
Link of National Roads, Sallapadan, Tubo, Abra-Cervantes Ilocos Sur
02/16/10 CAR 47.503 272 C 0.377 0.240 0.300 - - - 91.70 91.70% V. Satisfactory
Tokwing Construction 9650
Const. (Road Opening) of Missing Link of National Road, Abra-Ilocos
Norte Side, Km. 433+000 - Km. 452+620
02/16/10 CAR 47.656 494 O 0.349 0.262 0.150 0.020 0.033 0.033 84.70 -
Tokwing Construction 9650
Const. (Road Opening) of Missing Link of National Roads, Abra-Ilocos
Norte, Abra Side, Km.433+000 - Km.452+620
05/25/10 CAR 47.656 494 O 0.303 0.000 0.150 0.022 0.035 0.033 54.30 -
Tokwing Construction 9650 Const. of Calaba Bridge and Approaches (Phase 2), Brgy. Calaba 09/07/09 PMO 157.810 630 O 0.352 0.240 0.150 0.030 0.056 0.033 86.10 -
Tokwing Construction 9650 Construction of Calaba Bridge and Approaches (Phase II) 02/24/09 Sp. Bridges 143.959 510 O 0.355 0.235 0.150 0.022 0.040 0.033 83.50 -
Tokwing Construction 9650 Const. of Mindanao Ave. Extension (Segment C) 11/28/08 NCR 161.879 360 O 0.375 0.180 0.100 0.030 0.042 0.067 79.40 -
Tokwing Construction 9650 Ormoc Airport Development Project 09/10/11 DOTC 64.548 270 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory
Tokwing/ZM Construction (JV) JV-08-274
Const./Replacement of Bucao Bridge and Approaches along Iba South
Road over Bucao River05/27/09 III 144.750 250 O 0.384 0.253 0.150 0.030 0.051 0.050 91.80 -
Tokwing/ZM Construction (JV) JV-08-075
Const. of Tarlac-Nueva-Ecija-Aurora-Dingalan Port Road (Jct. Fort
Magsaysay-Laur Section) Contract Package 2
05/30/09 III 298.974 360 O 0.364 0.300 0.150 0.030 0.040 0.050 93.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page384
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Tokwing/ZM Construction (JV) JV-08-075
Const. of Tarlac-Nueva Ecija-Aurora-Dingalan Port Road (Jct. Fort
Magsaysay-Laur Section) Contract Package 2
09/07/09 III 298.974 360 O 0.388 0.300 0.150 0.030 0.040 0.050 95.80 -
Toledo Const. Corp./ Advanced Foundation
Const. System Corp. (JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3, Skyway
T-Square Builders 14268 Impvt./Conc. of Road at Bansalan-Mt. Apo National Park Road 03/06/09 XI 28.919 270 O 0.274 0.273 0.150 0.030 0.054 0.033 81.40 -
T-Square Builders 14268 Conc. of Roads at La Fortunata Road 09/05/09 XI 4.718 60 C 0.469 0.133 0.300 - - - 90.20 92.24% V. Satisfactory
T-Square Builders 14268 Impvt./Conc. of Road at Bansalan-Mt. Apo National Park Road 11/19/08 XI 28.919 270 O 0.214 0.279 0.100 0.030 0.040 0.100 76.30 -
T-Square Builders 14268 Conc. of Road & Reblocking, Marbel-Makar Road, Palian Section 03/20/09 XII 15.102 180 O 0.363 0.240 0.150 0.030 0.035 0.050 86.80 -
Tuchar Construction 13644Proposed Partial Const. of Three (3) Storey, Fifteen (15) Classroom Bldg.
at Quirino E/S, Anonas St.03/31/11 NCR 14.412 195 C 0.457 0.133 0.300 - - - 89.00 *89.00%
Satisfactory
Turquoise Construction & Trading 21801 Construction of Multi-Purpose
Building (Phase III & IV) 03/05/09 I 14.472 120 C 0.352 0.200 0.300 - - - 85.20 *85.20%Satisfactory
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road 03/11/10 VIII 14.160 520 C 0.425 0.133 0.300 - - - 85.80 79.11%
Unsatisfactory
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road 03/03/09 VIII 14.160 467 O 0.251 0.225 0.070 0.030 0.037 0.050 66.30 -
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road 08/31/08 VIII 14.160 270 O 0.344 0.225 0.050 0.030 0.032 0.067 74.80 -
UKC Builders, Inc. 10759 Cebu North Coastal Road, Phase 1 (Sta. 0+094.25-Sta. 1+300) 03/02/09 VII 43.189 410 C 0.450 0.200 0.300 - - - 95.00 88.52%
Satisfactory
UKC Builders, Inc. 10759 Cebu North Coastal Road, Phase I 09/03/08 VII 43.189 228 O 0.380 0.225 0.070 0.030 0.037 0.100 84.20 -
UKC-Equi-Parco (JV) 0624S Backup Area for the Newly Constructed Wharf 2/3-6/09 PPA 429.380 720 C 0.396 0.300 0.300 99.64 99.64%
Outstanding
Ulticon Builders Inc. 17267 Rehab./Reconst. of Sayre Highway (Kisolon-Lumbo Section) 06/14/10 X 189.228 300 C 0.397 0.179 0.300 - - - 87.60 88.05%
Satisfactory
Ulticon Builders Inc. 17267
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Sayre Highway, Alae-Dicklum Section
09/08/10 X 163.249 300 O 0.381 0.300 0.150 0.030 0.055 0.033 94.90 -
Ulticon Builders Inc. 17267Rehabilitation/Improvement of
National Road along Daang Maharlika
02/27/10 XI 144.738 270 O 0.368 0.300 0.150 0.030 0.055 0.050 95.30 -
Ulticon Builders Inc. 17267Const./Impvt. of Davao Del Sur-
Sarangani Coastal Road, Meybio-Glan Bdry. Section
02/24/10 XI 96.289 280 O 0.338 0.300 0.150 0.030 0.056 0.050 92.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page390
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ulticon Builders Inc. 17267CP 10: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-
Boston) Boston Section03/04/10 XI 286.477 600 C 0.353 0.200 0.300 - - - 85.30 89.18%
V. Satisfactory
Ulticon Builders Inc. 17267Rehab./Reconst./Upgrading of
Damaged National Road/Concreting along Surigao-Davao Coastal Road
03/01/10 XI 167.402 300 C 0.383 0.200 0.300 - - - 88.30 88.30% Satisfactory
Ulticon Builders Inc. 17267Rehab./Reconst./Upgrading of
Damaged Paved National Road along Daang Maharlika
03/05/10 XI 192.020 540 C 0.348 0.200 0.300 - - - 84.80 86.15% Satisfactory
Ulticon Builders Inc. 17267 Conc. of San Ildefonso-Hulid Sect. along Cateel-Compostela Rd. 03/03/10 XI 62.856 300 O 0.309 0.240 0.150 0.030 0.055 0.050 83.40 -
Ulticon Builders Inc. 17267 Rehab./Impvt. of National Rd. along Daang Maharlika 06/01/10 XI 144.736 270 C 0.493 0.133 0.300 - - - 92.60 94.22%
V. Satisfactory
Ulticon Builders Inc. 17267 Rehab. of Diwalwal Road Network 06/05/10 XI 95.736 606 C 0.433 0.200 0.300 - - - 93.30 94.22% V. Satisfactory
Ulticon Builders Inc. 17267Const./Impvt. of Davao Del Sur-
Sarangani Coastal Rd., Meybio-Glan Bdry. Sect.
06/15/10 XI 96.289 280 C 0.445 0.133 0.300 - - - 87.80 90.56% V. Satisfactory
Ulticon Builders Inc. 17267 Repair/Rehab./Impvt. of Daang Maharlika Rd. 06/04/10 XI 88.226 180 O 0.374 0.284 0.102 0.030 0.051 0.033 87.40
Ulticon Builders Inc. 17267 Conc. of San Alfonso-Hulid Sect. along Cateel-Compostela Rd. 06/06/10 XI 62.856 330 O 0.326 0.234 0.150 0.030 0.056 0.050 84.60 -
Ulticon Builders Inc. 17267 Repair/Rehab./Impv't. of Daang Maharlika 09/01/10 XI 88.226 243 C 0.456 0.133 0.300 - - - 88.90 88.00%
Satisfactory
Ulticon Builders Inc. 17267Rehab./Impv't./Conc. Of Surigao del
09/07/10 XI 73.588 390 O 0.364 0.293 0.106 0.030 0.043 0.033 86.90 -
Ulticon Builders Inc. 17267 Conc. Of San Alfonso-Hulid Sect. along Cateel-Compostela Rd. 09/06/10 XI 62.856 330 C 0.460 0.127 0.300 - - - 88.70 85.88%
Satisfactory
Ulticon Builders Inc. 17267 Rehab./Reconst. of Sayre Highway (Kisolon-Lumbo Section) 09/04/09 X 189.228 300 O 0.286 0.290 0.150 0.030 0.051 0.033 84.00 -
Ulticon Builders Inc. 17267Impvt./Conc. of Surigao Sur-Davao
Oriental Coastal Road (Manay Boston) Boston Section
06/09/09 XI 286.479 600 O 0.367 0.300 0.150 0.030 0.065 0.050 96.20 -
Ulticon Builders Inc. 17267 Rehab./Reconst./Upgrading of Digos Diversion Road 05/30/09 XI 46.834 220 O 0.365 0.300 0.150 0.030 0.042 0.050 93.70 -
Ulticon Builders Inc. 17267CP-10: Imprvt./ Conc. of Surigao-
Davao Oriental Coastal Road, (Manay-Boston) Boston Section
09/11/09 XI 286.477 600 O 0.373 0.300 0.150 0.030 0.054 0.033 94.00 -
Ulticon Builders Inc. 17267 Improvement of Monkayo-Diwalwal Road 09/10/09 XI 92.877 505 C 0.443 0.174 0.300 - - - 91.70 91.37%
V. Satisfactory
Ulticon Builders Inc. 17267Rehab./Reconst./Upgrading of
Damaged Paved National Road along Daang Maharlika
09/07/09 XI 192.020 540 O 0.373 0.240 0.150 0.030 0.059 0.050 90.20 -
Ulticon Builders Inc. 17267 Rehab./Upgrading of Digos Diversion Road 09/05/09 XI 46.834 220 O 0.374 0.240 0.150 0.030 0.054 0.050 89.80 -
Ulticon Builders Inc. 17267CP 10: Impv't./Conc. of Surogao Sur-Davao Oriental Coastal Road (Manay-
Boston) Boston Section11/26/08 XI 286.479 600 O 0.345 0.284 0.100 0.030 0.060 0.100 91.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page391
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ulticon Builders, Inc. 17267Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Roads along Bukidnon-Davao City Road
03/30/11 X 78.872 350 C 0.429 0.133 0.300 - - - 86.20 90.58% V. Satisfactory
Ulticon Builders, Inc. 17267Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Roads along Sayre Highway, Alae-Dicklum Sect.
04/01/11 X 163.249 390 O 0.376 0.240 0.150 0.030 0.047 0.050 89.30 -
Ulticon Builders, Inc. 17267Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Roads along Sayre Highway
03/30/11 X 96.441 350 C 0.398 0.133 0.300 - - - 83.10 84.18% Satisfactory
Ulticon Builders, Inc. 17267
Opening/Impv't of Davao del Sur-Sarangani Coastal Road, Meybio-
Jose Abad Santos-Glan Bdry. Section
03/31/11 XI 94.997 500 C 0.469 0.200 0.300 - - - 96.90 93.87% V. Satisfactory
Ulticon Builders, Inc. 17267 Rehab./Reconst./Upgrading of Digos Diversion Road 04/02/11 XI 19.089 239 C 0.469 0.200 0.300 - - - 96.90 90.36%
V. Satisfactory
Ulticon Builders, Inc. 17267
Rehab./Reconst./Upgrading of Damaged Paved National Road along Surigao Sur-Davao Oriental Coastal
Road (Pantukan Sect.)
04/12/11 XI 89.702 375 C 0.381 0.200 0.300 - - - 88.10 89.42% V. Satisfactory
Ulticon Builders, Inc. 17267Rehab./Impv't./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-
Boston Sect.)04/04/11 XI 373.049 448 O 0.346 0.300 0.057 0.030 0.055 0.033 82.10 -
Ultron Construction and Supply 30275 Const. of Flood Control at Maapon
River 05/27/10 IVA 4.821 40 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory
Uni Construction 13198 Repair of School Building Lupi H/S 08/31/10 V 0.246 90 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory
Uni Construction 13198Const. of MPB (Brgy. Covered Court and Perm. Roofing over the Social
Hall in front of Stage)03/09/09 V 0.954 120 C 0.476 0.200 0.300 - - - 97.60 89.86%
V. Satisfactory
Unitec Builder Inc. 4803 Proposed Widening of Sinunuc Bridge and Approaches, Phase II 02/22/10 IX 11.878 545 O 0.383 0.300 0.150 0.030 0.047 0.050 96.00 -
Unitec Builder Inc. 4803 Impvt./Rehab. of RT Lim Boulevard 02/22/10 IX 18.661 300 C 0.282 0.200 0.300 - - - 78.20 82.73% Satisfactory
Unitec Builder Inc. 4803Proposed Widening of Sinunuc
Bridge and Approaches (Phase II) along Zamboanga City-Labuan Rd
08/23/10 IX 12.222 575 C 0.440 0.133 0.300 - - - 87.30 92.52% V. Satisfactory
Unitec Builder Inc. 4803 Rehab./Impvt. of Balite-Seven Hills-Happy Valley Section 05/22/09 VIII 19.176 180 C 0.435 0.200 0.300 - - - 93.50 83.96%
Satisfactory
Unitec Builder Inc. 4803
Rehab. of Daang Maharlika Highway, Package I, Section 1 (Allen-
Malaga Road Section) Km. 658+804.55-Km. 663+359.55 w/
exceptions
03/04/10 VIII 99.961 180 C 0.464 0.200 0.300 - - - 96.40 96.40% Outstanding
Unitec Builder Inc. 4803 Conc. of Bobon-Acerida National Road 03/05/10 VIII 19.276 240 C 0.388 0.133 0.300 - - - 82.10 82.22%
Satisfactory
Unitec Builder Inc. 4803
Rehab. of Daang Maharlika Highway, Sect. 8, Allen-Malaga Rd. Sect.,
Km.687+366.55 - Km.690+866.55 w/ exceptions
06/16/10 VIII 96.441 200 O 0.357 0.300 0.150 0.030 0.042 0.033 91.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page392
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Unitec Builder Inc. 4803
Rehab. of Daang Maharlika Highway, Sect 7, Allen-Malaga Rd. Sect.,
Km.683+866.55 - Km.687+366.55 w/ exceptions
06/16/10 VIII 96.435 200 O 0.354 0.300 0.150 0.030 0.042 0.033 90.90 -
Unitec Builder Inc. 4803Rehab./Const./Upgrading of
Damaged Paved National Rd. along Catarman-Laoang Rd.
06/14/10 VIII 47.963 150 O 0.350 0.240 0.150 0.030 0.042 0.050 86.20 -
Unitec Builder Inc. 4803
Rehab. of Daang Maharlika Highway, Package 1, Section 7, Allen-Malaga
Road Section, Km.683+866.55 - Km.687+366.55, with exceptions
09/10/10 VIII 96.434 230 C 0.438 0.196 0.300 - - - 93.40 91.90% V. Satisfactory
Unitec Builder Inc. 4803
Rehab. of Daang Maharlika Highway, Package 1, Section 8, Allen-Malaga
Road Section, Km.687+366.5 - Km.690+866.55, with exceptions
09/10/10 VIII 96.440 230 C 0.425 0.200 0.300 - - - 92.50 91.72% V. Satisfactory
Unitec Builder Inc. 4803 Sanga-Sanga Airport Development Project 08/08/09 DOTC 31.769 180 C 0.457 0.200 0.300 - - - 95.70 95.70%
V. Satisfactory
Unitec Builder Inc. 4803 Improvement/Rehabilitation of R.T. Lim Boulevard 05/26/09 IX 18.661 270 O 0.343 0.240 0.150 0.010 0.042 0.050 83.50 -
Unitec Builder Inc. 4803Widening of Sinunuc Bridge and
Approaches, Phase I along Zamboanga City-Labuan Road
09/03/09 IX 21.668 436 C 0.459 0.200 0.300 - - - 95.90 86.60% Satisfactory
Unitec Builder Inc. 4803 Improvement/Rehabilitation of R.T. Lim Boulevard 09/02/09 IX 18.661 300 O 0.311 0.300 0.150 0.023 0.045 0.033 86.20 -
Unitec Builder Inc. 4803 Rehab./Impvt. of Balite-Seven Hills-Happy Valley Section 03/07/09 VIII 19.176 180 O 0.294 0.205 0.150 0.030 0.047 0.050 77.60 -
Unitec Builder Inc. 4803 Construction / Extension of Catarman River Control 09/14/09 VIII 9.627 120 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
Unitec Builder Inc. 4803 Concreting of San Jose-Mandugang National Road 09/14/09 VIII 19.277 180 O 0.337 0.240 0.150 0.030 0.050 0.033 84.00 -
Unitec Builder Inc. 4803 Widening of Sinunuc Bridge &
Approaches, Phase I, along Zamboanga City-Labuan Road
11/18/08 IX 21.668 436 O 0.354 0.289 0.100 0.030 0.045 0.100 91.80 -
Unitec Builder Inc. 4803Proposed Widening of Sinunuc
Bridge & Approaches, Phase I, along Zamboanga City-Labuan Road
08/21/08 IX 21.672 436 O 0.311 0.240 0.000 0.030 0.042 0.067 69.00 -
Unitec Builder, Inc. 4803
Const./Opening of Zamboanga West Coast Road, Tapanayan-Talabiga-
Pogos Section, Sta.7+600.00 to Sta.9+700.00
03/31/11 IX 56.927 385 C 0.434 0.133 0.300 - - - 86.70 *86.70% Satisfactory
Uy Construction & Development 12336
Rehab. of Bacolod South Road, Km.33+420 - Km.36+482 (Tabao-Roman Section) with exception
03/30/11 VI 47.614 280 C 0.446 0.133 0.300 - - - 87.90 87.90% Satisfactory
Uy Construction & Development 12336
Rehab. (Asphalt Overlay) of Kabankalan-Bais Road, Km.97+500 -
Km.99+50004/02/11 VI 36.813 220 O 0.374 0.240 0.150 0.030 0.033 0.050 87.70 -
Uy Construction & Development 12336
Rehab./Reconst./Upgrading of Guimaras Circ. Road-Salvacion-
Lucmayan Sect., Km.84+000 -04/05/11 VI 24.179 360 C 0.431 0.133 0.300 - - - 86.40 87.00%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page393
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Uy Construction & Development 12336
Rehab. (Asphalt Overlay) of Kabankalan-Bais Road, Km.95+1989 -
Km.97+50004/02/11 VI 41.553 200 O 0.380 0.240 0.150 0.030 0.033 0.033 86.60 -
Uy Construction & Development 12336 Repair/Rehab. of Balabag-Sulangan
Road, Km.27+950 - Km.33+950 04/11/11 VI 31.271 282 O 0.365 0.187 0.150 0.024 0.060 0.050 83.60 -
Uy Construction & Development 12336 Reconst./Replacement of Juan Colon
Bridge, Brgy. Mayabon 09/15/09 VII 26.141 389 O 0.390 0.240 0.150 0.030 0.042 0.050 90.20 -
Uy Construction & Development 12336
Imprv't/Concrete Paving of Dumaguete South Rd. Sta.0+859-
Sta.1+100 and Sta. 1+900-Sta.5+38009/15/09 VII 61.645 240 O 0.400 0.240 0.150 0.030 0.037 0.033 89.00 -
Uy Construction & Development 12336 Imprv't. of Bayawan-Kabankalan Rd.
Sta. 1+250-Sta.3+020 09/16/09 VII 29.868 210 O 0.385 0.240 0.150 0.030 0.033 0.033 87.10 -
Uy Construction & Development 12336 Reconst./Replacement of Juan Colon
Bridge, Brgy. Mayabon 03/05/10 VII 28.751 404 C 0.479 0.133 0.300 - - - 91.20 91.32% V. Satisfactory
Uy Construction & Development 12336 Impvt. of Bayawan-Kabankalan Rd.
Sta. 1+250-Sta.3+020 03/05/10 VII 30.402 220 C 0.450 0.133 0.300 - - - 88.30 87.58% Satisfactory
Uy Construction & Development 12336
Rehab./Reconst./Upgrading of Damaged National Rd. Dumaguete
South Rd. Giligaon Sect.06/09/10 VII 11.214 160 O 0.336 0.293 0.150 0.030 0.025 0.033 86.70 -
Uy Construction & Development 12336
Impvt./Concrete Paving of Dumaguete South Road, Sta. 0+859-Sta. 1+100 and Sta. 1+900-Sta. 5+380
09/01/10 VII 61.645 270 C 0.418 0.200 0.300 - - - 91.80 91.17% V. Satisfactory
Uy Construction & Development 12336 Rehab. of Dumaguete South Road 09/03/10 VII 17.309 240 O 0.386 0.224 0.150 0.030 0.051 0.050 89.10 -
Uy Construction & Development 12336
Rehab./Reconst./Upgrading of Damaged National Roads:
Dumaguete South Road, Giligaon09/08/10 VII 11.214 160 C 0.462 0.133 0.300 - - - 89.50 87.82%
Satisfactory
Uy Construction & Development 12336 Impvt. of Bais-Kabankalan Road, Sta.
50+400-Sta. 52+603.60 03/02/10 VII 54.039 260 C 0.456 0.133 0.300 - - - 88.90 89.62% V. Satisfactory
Uy Construction & Development 12336 Dumaguete Airport Development
Project 02/20/09 DOTC 81.824 150 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfctory
Uy Construction & Development 12336 Dumaguete Airport Dev't Project
(Asphalt Overlay of Runway) 01/20/10 DOTC 9.594 60 C 0.466 0.200 0.300 - - - 96.60 96.60% V.Satisfactory
Uy Construction & Development 12336 Rehab./Reconst. of Iloilo East Coast
Capiz Road, Barotac Viejo Section 09/08/09 VI 38.180 150 C 0.410 0.185 0.300 - - - 89.50 85.84% Satisfactory
Uy Construction & Development 12336
Rehab./Reconst./Upgrading of Guimaras Circ. Road, Salvacion-Lucmayan Section, Km.84+000-
Km.88+643 with exceptions
08/30/10 VI 24.179 360 O 0.372 0.238 0.150 0.030 0.051 0.033 87.40 -
Uy Construction & Development 12336 Rehab./Recons. of Iloilo East Coast
Capiz Road, Barotac Viejo Section 06/09/09 VI 38.180 150 O 0.351 0.240 0.150 0.008 0.035 0.050 83.40 -
Uy Construction & Development 12336 Re-const./Replacement of Juan
Colon Bridge Brgy. Mayabon 05/27/09 VII 26.141 389 O 0.345 0.300 0.150 0.030 0.051 0.050 92.60 -
Uy Construction & Development 12336 Concreting of Bais-Kabankalan Road
(Intermittent Section) 05/27/09 VII 94.413 369 O 0.343 0.238 0.150 0.030 0.051 0.050 86.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page394
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Uy Construction & Development 12336 Conc. of Dumaguete South Road
(DSR) 03/12/09 VII 21.739 190 O 0.389 0.225 0.150 0.030 0.061 0.033 88.80 -
Uy Construction & Development 12336 Conc. of Bais-Kabankalan Road
(Intermittent Section) 03/02/10 VII 95.830 527 C 0.430 0.133 0.300 - - - 86.30 86. 24% Satisfactory
Uy Construction & Development 12336 Conc. of Dumaguete South Road
(DSR) 11/26/08 VII 21.705 160 O 0.380 0.300 0.100 0.030 0.038 0.100 94.80 -
Uy Construction & Development/ARN
Builders (JV)JV-07-001 Conc. of Bais-Kabankalan Road @
Intermittent Section 08/20/08 VII 95.268 300 O 0.295 0.221 0.070 0.030 0.065 0.100 78.10 -
Uy Construction and Development 12336 Widening/Upgrading/Rehab. of
Access Rd. to RORO Port 04/06/11 VII 6.814 160 C 0.461 0.133 0.300 - - - 89.40 *89.40% V. Saisfactory
Uy Construction and Development 12336
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Road:
Bayawan-Kabankalan Rd.04/06/11 VII 10.593 40 C 0.433 0.133 0.300 - - - 86.60 *86.60%
Satisfactory
Uy Construction and Development 12336
Road Upgrading (Gravel to Paved) of Jct. SH. Manolo Fortich-Libona-
Indahag Road (Camp 9-Poblacion Sect.)
03/31/11 X 14.984 172 O 0.368 0.225 0.054 0.030 0.042 0.050 76.90 -
V.B Gines Construction 21993
Rehab./Reconst./Upgrading of Damaged paved National Road along Daang Maharlika, KO 263+131.75-KO
263+782.40
06/02/09 II 3.469 44 C 0.446 0.133 0.300 - - - 87.90 *87.90% Satisfactory
V.B Manubay Construction 32705 Magat River Flood Control
(Camarunggayan Sect.) 05/31/10 II 4.821 120 O 0.368 0.300 0.150 0.018 0.042 0.033 91.10 -
V.B Manubay Construction 32705 Magat River Flood Control (Kalabaza
Sect.) 05/31/10 II 4.823 120 O 0.343 0.300 0.150 0.024 0.042 0.033 89.20 -
V.B Manubay Construction 32705 Magat River Flood Control (Apiat
Sect.) 05/31/10 II 4.823 120 O 0.342 0.300 0.150 0.024 0.042 0.033 89.10 -
V.B Manubay Construction 32705 Magat River Flood Control
(Camarunggayan Section) 08/24/10 II 4.821 120 C 0.382 0.150 0.300 - - - 83.20 87.94% Satisfactory
V.B Manubay Construction 32705 Magat River Flood Control (Kalabaza
Section) 08/24/10 II 4.823 120 C 0.384 0.150 0.300 - - - 83.40 86.88% Satisfactory
V.B Manubay Construction 32705 Magat River Flood Control (Apiat
Section) 08/24/10 II 4.823 120 C 0.335 0.142 0.300 - - - 77.70 84.54% Satisfactory
V.B. Manubay Construction 32705 Baramban Creek Flood Control
(Sotero Nuesa E/S Section) 04/06/11 II 4.821 143 C 0.433 0.133 0.300 - - - 86.60 *86.60% Satisfactory
V.B. Manubay Construction 32705 Baramban Creek Flood Control
(Sotero Nuesa Section) 04/06/11 II 4.821 150 C 0.350 0.200 0.300 - - - 85.00 *85.00% Satisfactory
V.B. Manubay Construction 32705 Siffu River Control (Qui-Bur Bridge
Section) 04/06/11 II 4.821 120 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory
V.B. Manubay Construction 32705 Siffu River Control (Qui-Bur Bridge
Section) 04/06/11 II 4.821 150 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory
V.M Jhek Builders 33639 Impv't. of Flood Control of Bulacan River and Creeks 06/10/10 III 4.777 89 C 0.458 0.123 0.300 - - - 88.10 -
V.M Jhek Builders 33639 Impv't. of Flood Control Of Guiguinto River and Creeks 08/26/10 III 4.776 80 C 0.400 0.133 0.300 - - - 83.30 83.30%
SatisfactoryV.O Chupuico Construction 17585 Completion of Umapad Road 06/05/09 VII 1.107 60 C 0.397 0.200 0.300 - - - 89.70 *89.70%
V. Satisfactory
V.R Patron Builders & Developers 13487
Rehab./Reconst./Upgrading of Damaged National Roads along Bauan-Mabini Rd., Bauan Side
04/12/11 IVA 9.647 129 C 0.433 0.200 0.300 - - - 93.30 93.30% V. Satisfactory
V.R. Patron Builders & Developers 13487 Const./Replacement of Malaking Ilog
Bridge (4 lanes), Phase 2 04/07/11 IVA 29.905 120 C 0.428 0.198 0.300 - - - 92.60 *92.60% V. Satisfactory
V.R.D.J Construction 19837 Construction of Sto. Tomas Multi-Purpose Building 05/23/09 II 3.818 137 C 0.484 0.133 0.300 - - - 91.70 82.88%
Satisfactory
V.R.D.J Construction 19837 Const. of Sto. Tomas MPB 11/18/08 II 3.818 120 O 0.317 0.240 0.100 0.030 0.037 0.067 79.10 -
V.R.D.J. Construction 29837 Const. of School Building, Fermeldy National H/S, Fermeldy 04/04/11 II 0.995 90 C 0.449 0.133 0.300 - - - 88.20 *88.20%
SatisfactoryValley Construction &
Aggregates 14315 Impvt. of the Acop-Kapangan-Kibungan National Road 03/10/09 CAR 18.822 253 C 0.454 0.200 0.300 - - - 95.40 86.73%
SatisfactoryValley Construction &
Aggregates 14315 Rehab. Along Acop-Kapangan-Kibungan Road 03/10/09 CAR 19.100 229 C 0.473 0.200 0.300 - - - 97.30 87.76%
Satisfactory
Valley Construction & Aggregates 14315
Restoration of Road Cuts & Road Slips along Acop-Kapangan-
Kibungan-Bakun Road, Km. 264+000-Km. 288+000
08/31/10 CAR 11.277 260 C 0.481 0.085 0.300 - - - 86.60 86.60% Satisfactory
Valley Construction & Aggregates 14315 Impvt. of the Acop-Kapangan
National Road 08/13/08 CAR 18.822 240 O 0.321 0.240 0.100 0.023 0.030 0.100 81.40 -
Valley Construction and General Merchandise 13777
Construction of Metrology Laboratory & DOST Regional Office
Building12/08/10 DOST 19.799 215 C 0.48 0.20 0.30 - - - 98.00 94.08%
V. Satisfactory
Vannie General Merchandise 27335
Completion of Excavation & Riprap of Drainage Floodway at Banago Creek, Brgy. Banago (Phase III)
03/29/11 VI 5.640 195 C 0.453 0.115 0.300 - - - 86.80 86.74% Satisfactory
Vannie General Merchandise 27335 Expansion of 2-Storey DOST-VI Rstl
Building 03/17/10 DOST 4.537 215 C 0.462 0.20 0.30 - - - 96.20 96.20% Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page396
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Vannie General Merchandise 27335 Construction of Damaged Canal,
Purok Riverside, Brgy. Binago 06/01/09 VI 5.793 564 C 0.414 0.200 0.300 - - - 91.40 85.70% Satisfactory
Vannie General Merchandise 27335 Const. of 425 ln.m. Drainage Canal,
Purok Riverside 03/03/09 VI 5.793 564 O 0.281 0.300 0.150 0.030 0.042 0.050 85.30 -
Vannie General Merchandise 27335 Const. of Two (2) CL School
Building, Pototan NCHS 09/09/09 VI 0.884 60 C 0.482 0.177 0.300 - - - 95.90 *95.90% V. Satisfactory
Vannie General Merchandise 27335 Const. of Pototan Flood Control
Suage River Brgy. Poblacion 09/09/09 VI 2.895 180 O 0.383 0.240 0.150 0.015 0.050 0.033 87.10 -
Vannie General Merchandise 27335 Const. of 425 ln.m. Drainage Canal 11/18/08 VI 5.738 154 O 0.320 0.200 0.070 0.030 0.032 0.133 78.50 -
Vanvi Construction 29387 Completion of MPB for Package 2-B at Brgy. V. Duterte 03/10/10 XI 1.855 150 C 0.400 0.133 0.300 - - - 83.30 83.30%
Satisfactory
Vanvi Construction 29387 Const. of MPB at Digos City National High School, Zone II, Digos City 06/10/10 XI 0.949 75 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
Vanvi Construction 29387 Const. of MPB at Girl Scout of the Philippines (GSP) Bldg. 08/27/10 XI 0.950 103 C 0.419 0.133 0.300 - - - 85.20 85.20%
Satisfactory
Vanvi Construction 29387 Construction of MPB, Brgy. Poblacion 09/16/09 XII 0.286 75 O 0.364 0.300 0.150 0.030 0.052 0.050 94.60 -
Vanvi Construction 29387 Concreting of Road @ Pangyan 05/25/09 XI 0.656 75 C 0.451 0.133 0.300 - - - 88.40 *88.40% Satisfactory
Vanvi Construction 29387 Const. of Multi-Purpose Building at Purok San Vicente 03/18/09 XI 0.419 60 C 0.438 0.200 0.300 - - - 93.80 *93.80%
V. Satisfactory
Various Construction 26640 Conc. of Road at Purok Idugan, Irisan Barangay 06/08/10 CAR 1.892 60 C 0.334 0.200 0.300 - - - 83.40 83.40%
Satisfactory
VC Varin Construction & Hardware Supply 12475
Restoration of Damaged Embankment & Slope Protection along Bagong Silang-Capalonga
Road Km. 309+800 - Km. 309+820, Brgy. Tanawan
06/10/10 V 0.965 60 C 0.477 0.133 0.300 - - - 91.00 91.00% V. Satisfactory
VC Varin Construction & Hardware Supply 12475 Rehab./Reconst. of Bagong Silang-
Capalonga Rd. 09/01/10 V 4.906 90 C 0.359 0.200 0.300 - - - 85.90 85.90% Satisfactory
VCD Construction 13949 Construction of 2-Storey Building @ San Nicolas E/S 09/08/09 I 1.483 147 C 0.368 0.200 0.300 - - - 86.80 84.00%
Satisfactory
VCD Construction 13949 Construction of 2-Storey School Building @ San Nicolas E/S 06/04/09 I 1.348 132 O 0.325 0.240 0.150 0.030 0.050 0.033 82.80 -
VCH Construction & Trading 32050 Repair and Rehab. of Brgy. Roads,
San Isidro 06/03/09 IV-B 0.474 38 C 0.337 0.200 0.300 - - - 83.70 *83.70% Satisfactory
VCH Construction and Trading 32050 Const. of 1-CL Bagong Bayan NHS 04/01/11 IVB 0.586 80 C 0.420 0.133 0.300 - - - 85.30 *85.30%
SatisfactoryVCH Construction and
Trading 32050 Completion of MPB Poblacion 04/01/11 IVB 2.385 120 O 0.362 0.300 0.010 0.030 0.040 0.000 74.20 -
VCO Construction 14120 Const. of Slope Protection / Seawall / Riverwalls at Brgy. Bucana 04/12/11 IVA 0.499 90 C 0.333 0.200 0.300 - - - 83.30 *83.30%
Satisfactory
VCO Construction 14120 Const./Impvt. of Multi-Purpose Building at Brgy. Tunggal 09/02/09 IVA 0.474 60 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V. Satisfactory
Ven Ray Construction 18310 Road Conc. at Tagaytay, Calero 04/14/11 VII 0.950 45 C 0.370 0.200 0.300 - - - 87.00 *87.00% Satisfactory
Ven Ray Construction 18310Rehab. of Liloan-Borbon-Bogo
09/08/09 VII 47.680 515 O 0.353 0.244 0.150 0.030 0.033 0.033 84.30 -
Ven Ray Construction 18310Rehab./Reconst. of Siquijor Circ. Rd.
Km.10.475-Km.13.020, Larena-E. Villanueva Rd. Sect.
09/08/09 VII 47.085 459 O 0.345 0.247 0.150 0.030 0.033 0.033 83.80 -
Ven Ray Construction 18310Concrete Paving of Siquijor Circ.Rd.
San Juan Rd. Sec. Km. 61.820-Km.62.883
09/08/09 VII 18.685 326 O 0.344 0.246 0.150 0.030 0.033 0.033 83.60 -
Ven Ray Construction 18310
Conc. of Siquijor Circ. Rd. Km.72.707-Km.74.427 San Juan Siquijor Rd.
Sect. Km. 13.020-Km. 14.22-Larena E. villanueva Rd. Sect.
09/07/09 VII 52.030 270 O 0.325 0.242 0.150 0.030 0.033 0.050 83.00 -
Ven Ray Construction 18310Concrete Paving of Siquijor Circ.Rd.
San Juan Rd. Sec. Km. 61.820-Km.62.883
03/06/10 VII 18.915 364 C 0.432 0.133 0.300 - - - 86.50 84.76% Satisfactory
Ven Ray Construction 18310Rehab./Reconst. Of Siquijor Circ. Rd,
Km.22.860-Km.25.268, Larena - E. Villanueva-Maria Rd. Sect.
03/06/10 VII 47.680 600 C 0.300 0.200 0.300 - - - 80.00 82.58% Satisfactory
Ven Ray Construction 18310Rehab./Reconst. Of Siquijor Circ. Rd.
Km.10.475-Km.13.020, Larena-E. Villanueva Rd. Sect.
03/06/10 VII 47.613 527 C 0.300 0.200 0.300 - - - 80.00 80.57% Unsatisfactory
Ven Ray Construction 18310 Rehab. of Cebu North Hagnaya Wharf Rd., Mandaue Sect. 06/14/10 VII 18.555 73 C 0.237 0.133 0.300 - - - 67.00 67.00%
Poor
Ven Ray Construction 18310
Rehab./Reconst./Upgrading (Conc./Asphalting) of Cebu-Toledo Wharf Rd., Km.29+135 - Km.55+990
(w/ exception)
06/12/10 VII 19.090 280 C 0.220 0.133 0.300 - - - 65.30 65.30% Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page398
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ven Ray Construction 18310 Conc. of Luyang-Poo-Lazi National Road, Km. 16+080-Km. 17+700 08/31/10 VII 34.330 776 C 0.394 0.133 0.300 - - - 82.70 82.70%
Satisfactory
Ven Ray Construction 18310Rehab./Reconst. of Siquijor
06/02/09 VII 31.724 351 O 0.255 0.300 0.150 0.030 0.051 0.050 83.60 -
Ven Ray Construction 18310Conc. of Toledo-Pinamungajan-
Aloguinsan Barili Na'tl. Road Km. 84+450 - Km. 85+891
03/12/09 VII 19.093 180 O 0.205 0.040 0.000 0.010 0.016 0.050 32.10 -
Ven Ray Construction 18310
Concreting of Antonio Y. De Pio Highway (Tigbawan-Olivo-Luyang
Section, Tabuelan-San Remigio Section)
03/06/09 VII 14.155 90 C 0.175 0.139 0.300 - - - 61.40 68.18% Poor
Ven Ray Construction 18310 Concreting of Roads Sitio Sta. Cruz 03/09/09 VII 0.245 90 O 0.273 0.000 0.150 0.015 0.030 0.050 51.80 -
Ven Ray Construction 18310 Const. of 2 CL Sch. Bldg. @ Liloan NHS 03/09/09 VII 1.936 70 C 0.436 0.181 0.300 - - - 91.70 87.85%
Satisfactory
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Larena-Enrique Villanueva Rd. Sect. 03/10/09 VII 46.671 368 O 0.319 0.219 0.150 0.023 0.033 0.033 77.70 -
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Siquijor-Larena Rd. Sect. 03/10/09 VII 31.733 328 O 0.340 0.222 0.150 0.030 0.047 0.033 82.20 -
Ven Ray Construction 18310Road Upgrading (Gravel to Paved) along Argao-Ronda Road (Argao-
Ronda Section)09/08/09 VII 18.718 88 C 0.460 0.191 0.300 - - - 95.10 94.68%
V. Satisfactory
Ven Ray Construction 18310Rehab./Reconst./Upgrading of
Natalio Bacalso Ave. (Cebu South Rd.)
08/24/10 VII 42.357 225 C 0.393 0.200 0.300 - - - 89.30 89.30% V. Satisfactory
Ven Ray Construction 18310Impvt./Rehab. of Toledo-
Pinamungajan-Aloguinsan Road, Km. 64+400-Km. 65+300
08/27/10 VII 19.285 65 C 0.346 0.200 0.300 - - - 84.60 84.60% Satisfactory
Ven Ray Construction 18310Repair/Rehab. of Cebu North
Hagnaya Wharf Road, Km. 21+844-Km.25+947 with exceptions
08/31/10 VII 4.864 8 C 0.300 0.200 0.300 - - - 80.00 80.00% Unsatisfactory
Ven Ray Construction 18310
Rehab./Reconst. of Siquijor Circumferential Road, Km. 10.475-Km.13.020, Larena, E. Villanueva
Road Section
06/03/09 VII 47.085 428 O 0.220 0.300 0.150 0.030 0.047 0.050 79.70 -
Ven Ray Construction 18310Impvt. of Cagayan de Oro-Talakag-
Camp Kabaritan Sto. Niño Dagumbaan-Basak Road
09/17/09 X 66.400 270 O 0.400 0.300 0.034 0.030 0.047 0.017 82.80 -
Ven Ray Construction 18310 Conc. of Antonio de Pio Highway, (Tigabawan-Olivio-Luyang Section) 09/02/08 VII 14.154 90 O 0.295 0.300 0.000 0.010 0.022 0.100 72.70 -
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Larena-Enrique Villanueva Rd. Sect. 11/22/08 VII 46.671 330 O 0.331 0.246 0.100 0.022 0.027 0.100 82.60 -
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Siquijor-Larena Rd. Sect. 11/22/08 VII 31.737 313 O 0.363 0.238 0.100 0.030 0.032 0.100 86.30 -
Ven Ray Constuction 18310 Widening of Cagayan de Oro Airport Road 04/13/11 X 28.886 150 C 0.418 0.133 0.300 - - - 85.10 84.56%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page399
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ven Ray Constuction 18310Road Upgrading (Gravel to Paved)
along Junction Sayre Highway, Aglayan-Zamboanguita Road
03/31/11 X 47.327 330 C 0.398 0.133 0.300 - - - 83.10 83.70% Satisfactory
Ven Ray Constuction 18310Road Upgrading (Gravel to Concrete) Barandias-Dominorog Road (Madaya
Sect.)04/01/11 X 9.473 135 O 0.361 0.240 0.000 0.030 0.042 0.033 70.60 -
Vertical Builders 14029Const. of Gen. Santos City Circ.Road (Road Upgrading), Northern Section,
Brgy. Mabuhay04/14/11 XII 18.690 120 O 0.362 0.278 0.150 0.030 0.045 0.033 89.80 -
Vertical Builders 14029 Construction of Multi-Purpose Building 03/20/09 XII 1.882 90 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
Verzontal Builders 31579 Conc. of FTMR, Angustia Zone 1-7 04/06/11 V 0.475 40 C 0.422 0.133 0.300 - - - 85.50 *85.50% Satisfactory
Vesa Engineering & Construction 32334 Const./Rehab./Impvt. of Dumaguete-
Valencia Road 09/02/10 VII 1.930 90 C 0.395 0.133 0.300 - - - 82.80 82.80% Satisfactory
Vesa Engineering & Construction 32334
Dumaguete Airport Dev't Project (Continuation of Improvement of
Vesa Engineering and Construction 32334 Rehab. of Dumaguete South Rd.,
Km.0.867 - Km. 1+100 04/05/11 VII 5.777 150 O 0.357 0.300 0.150 0.030 0.055 0.050 94.20 -
VF Construction 10048 Const. of One (1) Storey MPB 02/18/10 III 1.419 75 C 0.446 0.200 0.300 - - - 94.60 88.18% Satisfactory
Vicente T. Lao Construction 7040
Const./Opening of Zamboanga West Coast Road, Sibuco-Sirawai Rd. Panganuran-Montivoh-Anongan Section, Zamboanga del Norte, Sta.32+495.00-Sta.25+320.00 w/
exceptions
03/30/11 IX 273.406 912 O 0.355 0.300 0.150 0.030 0.059 0.033 92.70 -
Vicente T. Lao Construction 7040
Preventive Maint. (Asphalt Overlay) and Application of Reflective
Thermoplastic Pavement Markings along Dipolog-Sindangan-Liloy
Road, Irasan-Dohinob Sect.
04/13/11 IX 19.983 78 C 0.454 0.200 0.300 - - - 95.40 91.86% V. Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Unpaved Shoulder/Impvt. along Jct.
Dumalinao-Margosatubig Road, K1706+500 - K1719+900 with exception, Molum-Poblacion,
Margosatubig Section
04/06/11 IX 43.377 150 C 0.480 0.133 0.300 - - - 91.30 *91.30% V. Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Unpaved Shoulder/Impvt. along Jct.
Victor M. Daet Construction & Supply 15621 Legaspi Airport Development Project 07/09/09 DOTC 7.672 60 C 0.461 0.200 0.300 - - - 96.10 96.10%
OutstandingVictor M. Daet
Construction & Supply 15621 Virac Airport Development Project 07/11/09 DOTC 4.803 120 C 0.418 0.200 0.300 - - - 91.80 91.80% V. Satisfactory
Victor M. Daet Construction & Supply 15621 San Andres Port Development
Project 07/10/09 DOTC 4.780 90 C 0.457 0.200 0.300 - - - 95.70 95.70% V. Satisfactory
Victor M. Daet Construction & Supply 15621 Legaspi City LTFRB Regional Office
Building Project 11/04/09 DOTC 3.193 150 C 0.475 0.200 0.300 - - - 97.50 97.50% Outstanding
Victor M. Daet Construction & Supply 32638 Rehabilitation of Riprap Seawall 06/02/09 VIII 0.944 90 C 0.438 0.133 0.300 - - - 87.10 *87.10%
SatisfactoryVictor M. Daet
Construction & Supply 32638 Repair/Impv't of Multi-Purpose Building, Brgy. Pob. Del Norte 03/11/09 VIII 0.188 40 C 0.494 0.035 0.300 - - - 82.90 *82.90%
Satisfactory
Victor M. Daet Construction and Supply 15621 Legaspi Airport Dev't Project
(Construction of Terminal Building) 4/13/2011 DOTC 8.168 120 C 0.431 0.200 0.300 - - - 93.10 93.10% V. Satisfactory
Victoriano C. Lim Construction 25318 Gravelling of Lumipac-Magsaysay
Road 04/07/11 X 2.784 120 O 0.279 0.300 0.150 0.030 0.042 0.050 85.10 -
Victoriano C. Lim Construction 25318 Regravelling of Batibut-Libertad,
Sapang Ama, Caluya Road 04/07/11 X 4.640 175 O 0.277 0.300 0.150 0.030 0.037 0.033 82.70 -
Victoriano C. Lim Construction 25318
Rehab./Impvt. of Pagadian-Ozamiz Road, Digson-Sumirap Section, Km.1666+000 - Km.1672+000 w/
06/01/10 X 13.472 60 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
Victoriano C. Lim Construction 25318
Rehab. of Ozamiz-Oroquieta Road, Km.1702+000 - Km.1702+335.50 w/
exception08/24/10 X 6.409 120 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page407
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Victoriano C. Lim Construction 25318
Rehab. of Bagacay-Cadre Road, Km.1698+224 - Km.1698+568
w/exception08/24/10 X 5.275 120 C 0.408 0.133 0.300 - - - 84.10 84.10%
Satisfactory
Victoriano C. Lim Construction 25318 Ozamis Airport Development Project 05/22/09 DOTC 28.851 180 C 0.432 0.200 0.300 - - - 93.20 93.20%
V. SatisfactoryVictoriano C. Lim
Construction 25318 Ozamis Airport Development Project 05/23/09 DOTC 3.855 120 C 0.469 0.200 0.300 - - - 96.90 96.90% Outstanding
Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon Road
(Maluko Slip Section) 03/06/09 X 14.457 400 C 0.373 0.133 0.000 - - - 50.60 66.98% Poor
Vicvera Builders, Inc. 13903Const./Rehab. of Road (along Umali
and Espeleta Pantalan) Brgy. Poblacion
06/08/10 NCR 2.856 213 C 0.414 0.200 0.300 - - - 91.40 89.78% V. Satisfactory
Vicvera Builders, Inc. 13903 Const./Rehab. of Road at Riverside Purok I 09/02/10 NCR 1.199 45 C 0.410 0.133 0.300 - - - 84.30 84.30%
SatisfactoryVigan Fortune Construction 3887 Restoration of Damaged Shore
Protection, MNR 03/30/11 I 19.691 281 C 0.393 0.200 0.300 - - - 89.30 86.63% Satisfactory
Vigan Fortune Construction 3887
Rehab./Reconst./Upgrading of Damaged Paved National Road along
MNR03/30/11 I 19.099 235 C 0.373 0.200 0.300 - - - 87.30 85.08%
Satisfactory
Vigan Fortune Construction 3887
Rehab./Reconst./Upgrading of Damaged Paved National Roads,
Tagudin Section09/04/09 I 19.090 222 O 0.338 0.300 0.150 0.022 0.040 0.033 88.30 -
Vigan Fortune Construction 3887
Rehab./Reconst./Upgrading of Damaged National Roads, Tagudin
Section02/17/10 I 19.089 225 C 0.293 0.200 0.300 - - - 79.30 84.70%
Satisfactory
Vigan Fortune Construction 3887 Candon - Salcedo Road, Candon &
Calimuyod 05/29/09 I 18.922 270 C 0.316 0.133 0.300 - - - 74.90 67.92% Poor
Vigan Fortune Construction 3887 Rehab/Replacement of Paing Bridge
2 along MNR 02/28/09 I 8.473 486 C 0.333 0.200 0.300 - - - 83.30 83.63%Satisfactory
Vigan Fortune Construction & Supply 3887 Const. of Boys Dormitory Phase II
(Building) 03/8-9/11 DOST 11.919 330 C 0.451 0.164 0.300 - - - 91.50 82.61% Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Road Upgrading (Gravel to Pave)
Libungao-Matag-ob, Palompon Road 02/25/10 VIII 18.225 256 C 0.443 0.150 0.300 - - - 89.30 87.38% Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Road Slip along Liloan-Sogod Road
Section 05/26/09 VIII 9.542 270 O 0.382 0.238 0.150 0.030 0.047 0.033 88.00 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Road Upgrading (Gravel to Paved),
Libungao-Matag-ob-Palompon Road 05/30/09 VIII 18.225 225 O 0.367 0.239 0.150 0.030 0.042 0.033 86.10 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Widening of Carigara Wharf 06/06/09 VIII 1.885 120 O 0.381 0.240 0.150 0.022 0.033 0.033 85.90 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178
Const. of Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Road, Barugo-
Carigara Road Section06/06/09 VIII 18.887 150 O 0.340 0.240 0.150 0.030 0.037 0.033 83.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page408
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Viguz Construction Corporation (Formerly:
Viguz Construction)8178
Rehab./Reconst./Upgrading of Palompon-Isabel-Merida-Ormoc
Road05/30/09 VIII 12.764 180 O 0.341 0.237 0.105 0.030 0.033 0.017 76.30 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Construction of Multi-Purpose
Building (ABC Bldg.) Phase 1 03/16/09 VIII 0.945 120 C 0.423 0.133 0.300 - - - 85.60 *85.60%Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Rehabilitation along Maharlika
Highway (Paril Section Km 986+280) 03/04/09 VIII 7.130 222 O 0.343 0.226 0.000 0.030 0.025 0.050 67.40 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Road Slip along Liloan-Sogod Road
Section 03/05/09 VIII 9.542 240 O 0.320 0.246 0.150 0.030 0.030 0.050 82.60 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Widening of Carigara Wharf 09/01/09 VIII 1.885 120 C 0.479 0.133 0.300 - - - 91.20 88.02%
Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Raod Slip along Liloan-Sogod
Section 09/09/09 VIII 9.542 270 C 0.450 0.133 0.300 - - - 88.30 86.50% Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Const. of Bagahupi-Babatngon-Sta.
Cruz-Barugo-Carigara Road 09/01/09 VIII 18.887 150 C 0.424 0.133 0.300 - - - 85.70 84.08% Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Widening of Carigara Wharf 08/23/10 VIII 2.360 87 C 0.485 0.133 0.300 - - - 91.80 91.80%
V. Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Const. of Seawall, Brgy. West
Visoria 09/09/10 VIII 9.447 120 C 0.467 0.133 0.300 - - - 90.00 90.00% V. Satisfactory
Viking Construction &Supplies 18129 Sabangan-San Esteban Road 02/17/10 I 14.223 180 C 0.347 0.200 0.300 - - - 84.70 84.70%
SatisfactoryViking Construction
&Supplies 18129 Sta. Lucia-Salcedo Road 09/09/09 I 9.457 102 C 0.297 0.200 0.300 - - - 79.70 65.24% Poor
Viking Construction &Supplies 18129
Rehab./Reconst./Upgrading of Damaged Paved National Road along
MNR, Sta. Cruz Section05/27/10 I 19.105 56 C 0.429 0.133 0.300 - - - 86.20 86.20%
Satisfactory
Viking Construction & Supplies 18129
Rehab./Reconst./Upgrading of Damaged Paved National Road,
Tagudin-Sta. Cruz Sect.03/30/11 I 19.105 56 C 0.448 0.152 0.300 - - - 90.00 *90.00%
V. Satisfactory
Viking Construction and Supplies 18129 San Juan-San Antonio-Darapidap
Flood Control 03/30/11 I 9.844 285 C 0.336 0.200 0.300 - - - 83.60 82.49% Satisfactory
Viking Construction and Supplies / B.M.K. Construction (JV)
JV-09-199
Rehab./Reconst./Upgrading of Badoc-Currimao-Batac-San Nicolas along
MNR, Badoc, Currimao, Batac City & San Nicolas
04/02/11 I 178.280 360 C 0.405 0.199 0.300 - - - 90.40 *90.40% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page409
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Virgo Construction 31068 Const. of MPB Cadlan 04/07/11 V 0.995 100 C 0.389 0.133 0.300 - - - 82.20 *82.20% Satisfactory
Virlo Construction 5765Repair/Rehab.of Mactan Circ. Rd.,
Cordova Sect. (Km.25+700 - Km.27+000)
04/10/11 VII 4.670 18 C 0.424 0.133 0.300 - - - 85.70 *85.70% Satisfactory
Virlo Construction 5765 Conc. of Bacolod South Road (Su-ay Section) 03/06/09 VI 22.306 319 O 0.231 0.300 0.150 0.030 0.060 0.050 82.10 -
Virlo Construction 5765Conc. of Bacolod South Road (Su-ay
Section) Sta. 80+700.70-Sta. 83+400.70
09/16/09 VI 24.531 394 C 0.441 0.079 0.300 - - - 82.00 80.68% Unsatisfactory
Virlo Construction 5765 Conc. of Antonio de Pio Highway, Luyang-Victoria-Kinawahan Sect. 03/06/09 VII 30.402 185 C 0.327 0.133 0.300 - - - 76.00 76.78%
Unsatisfactory
Virlo Construction 5765 Impv't/Conc. of JCT.LIR Carmen-Sagbayan-Bacani Road 03/07/09 VII 23.600 252 O 0.388 0.200 0.150 0.030 0.047 0.033 84.80 -
Virlo Construction 5765 Impv't/Conc. of JCT.LIR Carmen-Sagbayan-Bacani Road 02/23/10 VII 23.600 252 C 0.361 0.133 0.300 - - - 79.40 82.64%
Satisfactory
Virlo Construction 5765 Conc. of Bacolod South Road (Su-ay Section) 11/21/08 VI 22.306 319 O 0.335 0.225 0.100 0.010 0.038 0.067 77.50 -
Vites Construction & Development
Corporation (Formerly: Vites Trading & Const.)
9444 Proposed Const./Repair/Rehab. of School Bldg. Manila Science H/S 02/16/10 NCR 4.819 116 O 0.364 0.240 0.150 0.022 0.041 0.050 86.70 -
Vites Construction & Development
Corporation (Formerly: Vites Trading & Const.)
9444 Proposed Repair/Rehab./Const. of Multi-Purpose Bldg. Brgy.737 02/15/10 NCR 0.963 137 C 0.470 0.133 0.300 - - - 90.30 78.68%
Unsatisfactory
Vites Construction & Development
Corporation (Formerly: Vites Trading & Const.)
9444Proposed Const./Repair/Rehab. of School Bldg., Manila Science High
06/02/09 VII 1.927 180 C 0.490 0.163 0.300 - - - 95.30 *95.30% V. Satisfactory
VVER Construction 14122 Construction of Multi-Purpose Building, Campalanas 06/02/09 VII 2.392 150 C 0.491 0.133 0.300 - - - 92.40 *92.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page411
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
VVER Construction 14122 Repair/Rehab. of Brgy. Road at Bamban (Sta. 0+000-Sta. 0+260) 06/02/09 VII 0.963 120 C 0.433 0.163 0.300 - - - 89.60 *89.60%
V. Satisfactory
VVER Construction 14122 Concreting of Punta Beach Road (Sta. 0+690-Sta. 0+590), Poblacion 05/30/09 VII 1.836 222 C 0.486 0.133 0.300 - - - 91.90 87.82%
Satisfactory
VVER Construction 14122 Const. of Multi-Purpose Building at Brgy. Poblacion 06/02/09 VII 1.924 150 O 0.364 0.241 0.150 0.030 0.038 0.050 87.30 -
VVER Construction 14122 Repair/Rehab. of Punta Road, Poblacion 05/30/09 VII 1.832 35 C 0.451 0.148 0.000 - - - 59.90 74.72%
Poor
VVER Construction 14122 Construction of (1) unit School Building at Liloan Elem. School 03/10/09 VII 1.173 90 C 0.482 0.133 0.300 - - - 91.50 *91.50%
V. Satisfactory
VVER Construction 14122 Construction of Drainage Canal (Flood Control System), Brgy. Jawa 03/13/09 VII 0.420 70 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
VVER Construction 14122 Repair/Rehabilitation of Punta Road, Poblacion 03/13/09 VII 1.832 193 O 0.400 0.200 0.150 0.030 0.033 0.033 84.60 -
VVH Construction Corp. 32689 Conc. of Baligat Farm-to-Market Road 02/22/10 I 1.730 55 C 0.395 0.200 0.300 - - - 89.50 89.50%
V. Satisfactory
W B X Construction 28370 Rehab./Reconst./Upgrading at Tabang Service Road 03/03/10 III 9.639 88 C 0.448 0.133 0.300 - - - 88.10 90.14%
V. Satisfactory
W B X Construction 28370Const. of School Building for
Aeronautical School in Bulacan State University Bustos Campus
03/03/10 III 5.737 140 C 0.450 0.133 0.300 - - - 88.30 89.84% V. Satisfactory
W B X Construction 28370 Rehab. of Daang Maharlika Road, Plaridel Section 03/03/10 III 4.784 12 C 0.461 0.133 0.300 - - - 89.40 89.40%
V. Satisfactory
W B X Construction 28370Rehab./Rconst./Upgrading of
Damaged Paved National Road at Daang Maharlika Rd.
06/09/10 III 19.113 100 O 0.377 0.300 0.150 0.008 0.027 0.050 91.20 -
W B X Construction 28370Rehab./Reconst./Upgrading of Plaridel-Pulilan Diversion Rd.
(Pulilan Sect.)06/10/10 III 4.777 27 C 0.437 0.133 0.300 - - - 87.00 87.00%
Satisfactory
W B X Construction 28370 Rehab./Reconst./Upgrading of Plaridel Airport Rd. 06/09/10 III 6.211 15 C 0.429 0.133 0.300 - - - 86.20 86.20%
Satisfactory
W B X Construction 28370Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Rds. At Daang Maharlika Rd.
08/27/10 III 19.113 115 C 0.486 0.109 0.300 - - - 89.50 90.52% V. Satisfactory
W B X Construction 28370 Construction of Slope Protection along Bocaue River 05/29/09 III 9.543 60 O 0.376 0.240 0.150 0.030 0.038 0.050 88.40 -
W B X Construction 28370 Rehab/Reconst./Upgrading of at Pulilan RR Station Road 05/28/09 III 9.541 55 C 0.356 0.200 0.300 - - - 85.60 *85.60%
Satisfactory
W B X Construction 28370 Const. of Multi-Purpose Building at Senior Citizens Federation 03/06/09 III 0.473 12 O 0.368 0.284 0.150 0.030 0.020 0.017 86.90 -
W B X Construction 28370 Const. of Multi-Purpose Building at Senior Citizens Federation 09/04/09 III 0.474 12 C 0.472 0.133 0.300 - - - 90.50 87.98%
Satisfactory
W B X Construction 28370 Road Repair/Rehabilitation of Pritil 09/04/09 III 0.477 10 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
W B X Construction 28370Const. of Standard Two (2)
Classroom School Building Modified at F. De Jesus H/S
09/04/09 III 1.098 40 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page412
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
W B X Construction 28370 Const. of Two (2) Storey Classroom School Building at Sta. Monica NHS 09/04/09 III 2.106 53 C 0.428 0.133 0.300 - - - 86.10 *86.10%
Satisfactory
W B X Construction 28370 Const. of Slope Protection along Bocaue River 09/05/09 III 9.543 60 C 0.391 0.133 0.300 - - - 82.40 86.00%
Satisfactory
W B X Construction 28370
Rehab./Reconst./Upgrading along East Service Rd. Inc. Drainage
System (Intermittent Section) from Polo-Novaliches Road to Polo Pugad
W B X Construction 28370 Conc. of FMR, Brgy. Agnaya 04/13/11 III 0.966 16 C 0.439 0.000 0.300 - - - 73.90 *73.90% Poor
W.B Alagao Construction 15622Const. of Multi-Purpose Building (Student Center) Naval Institute of
Technology06/03/09 VIII 0.953 90 C 0.496 0.133 0.300 - - - 92.90 *92.90%
V. Satisfactory
W.C Doyola Construction 26044 Paguite CIS 10/6-10/08 PIO 833.488 45 C 0.339 0.175 0.300 - - - 81.35 81.35% V.Satisfactory
W.D Navarro Construction, Co. 14327
New Const./Completion/Continuation On-going Maxingal Bridge along
Cagayan Valley Rd.05/25/10 II 16.710 290 O 0.372 0.300 0.150 0.024 0.033 0.033 91.20 81.35%
V.Satisfactory
W.D Navarro Construction, Co. 14327
New Const./Completion/Continuation of On-going Maxingal Bridge along
Cagayan Valley Road08/17/10 II 16.710 290 O 0.342 0.300 0.042 0.020 0.004 0.000 70.80 -
W.D Navarro Construction, Co. 14327
Upgrading/Improvement of Manila North Road (Jct. Bangag-Paraddum
Section)09/09/09 II 9.445 251 C 0.425 0.133 0.300 - - - 85.80 86.58%
Satisfactory
W.D Navarro Construction, Co. 14327
Upgrading/Improvement of Manila North Road (JCt. Bangag-Paraddum
Section)05/20/09 II 9.445 251 O 0.354 0.240 0.150 0.030 0.047 0.050 87.10 -
W.D Navarro Construction, Co. 14327
Upgrading/Impvt. of Manila North Road (Jct. Bangag-Mabanguc-
Paruddun Section)05/21/09 II 20.258 300 C 0.472 0.133 0.300 - - - 90.50 83.00%
Satisfactory
W.D Navarro Construction, Co. 14327 Const. of Cagayan River Control 02/26/09 II 14.238 318 C 0.465 0.200 0.300 - - - 96.50 88.37%
Satisfactory
W.D. Navarro Construction Co. 14327
Widening/Upgrading/Rehab. of Access Road to Airports at Aparri
Airport Road, Maura - Buguey, Cagayan Section
04/01/11 II 21.694 240 O 0.363 0.288 0.150 0.015 0.038 0.033 88.70 -
W.D. Navarro Construction Co. 14327 Rehab./Reconst./Upgrading of
Damaged Paved (DSVR) 04/01/11 II 19.290 270 C 0.453 0.133 0.300 - - - 88.60 *88.60% Satisfactory
W.D. Navarro Construction Co. 14327 Rehab./Reconst./Upgrading of
Damaged Paved along DSVR 04/01/11 II 9.647 240 C 0.434 0.133 0.300 - - - 86.70 *86.70% Satisfactory
W.D. Navarro Construction Co. 14327
Widening/Upgrading/Rehab. of Access Road to Airports at Aparri
Airport Road04/01/11 II 19.295 240 O 0.296 0.277 0.150 0.030 0.038 0.033 82.40 -
W.J. Construction 19497 Widening of Sariaya-Lucena Junction (MSR) 04/01/11 IVA 14.470 150 C 0.340 0.200 0.300 - - - 84.00 *84.00%
SatisfactoryW.J.P Construction &
Supply 23192 Concreting of San Vicente to Poblacion West 03/05/09 I 2.893 37 C 0.371 0.200 0.300 - - - 87.10 *87.10%
SatisfactoryW.J.P. Construction and
Supply 23192 Rehab. of Balincanaway FMR, Balincanaway 04/14/11 I 9.647 150 C 0.428 0.133 0.300 - - - 86.10 *86.10%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page413
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
W.J.P. Construction and Supply 23192 Conc./Impv't. of Acop Brgy. Road 04/14/11 I 2.891 72 C 0.412 0.133 0.300 - - - 84.50 *84.50%
SatisfactoryW.M Salayog
Construction & General Merchadise
12851 Construction of Multi-Purpose Building, San Jacinto E/S 08/28/09 I 1.157 100 C 0.478 0.200 0.300 - - - 97.80 84.08%
Satisfactory
W.M. Salayog Construction and
General Merchandise12851 Repair & Rehab. of FMR connecting
Brgys. Navaluan and Osiem 04/12/11 I 1.157 30 C 0.388 0.133 0.300 - - - 82.10 *82.10% Satisfactory
W.T.G Construction and Development Corporation
7494 Const./Rehab. of River Control including Seawall at Tabajan 06/05/09 VII 9.363 300 O 0.226 0.300 0.150 0.030 0.047 0.033 78.60 -
W.T.G Construction and Development Corporation
7494 Const./Rehab. of River Control including Seawall at Tabajan 02/25/10 VII 9.363 315 C 0.350 0.133 0.300 - - - 78.30 78.48%
Unsatisfactory
Walter Ng Lao Construction 23739 Balingasag River Irrigation Project 09/26-27/11 NIA 199.249 515 O 0.350 0.240 0.000 0.024 0.056 0.017 68.68 -
Walter Ng Lao Construction 23739 Panansalan-Cartagena Communal
Irrigation System 10/6-10/08 NIA 5.787 148 O 0.370 0.160 0.070 0.015 0.053 0.200 86.72 -
Walter Ng Lao Construction 23739 Const. of Multi-Purpose Building
(Phase II) 06/03/09 X 4.820 120 O 0.309 0.240 0.150 0.030 0.013 0.050 79.20 -
Walter Ng Lao Construction 23739 Cluster 1-Repair/Rehab. of Various
Farm-to-Market Roads, Brgy. Lumbo 09/10/09 X 9.644 75 C 0.415 0.200 0.300 - - - 91.50 *91.50% V. Satisfactory
Walter Ng Lao Construction 23739 Construction of Multi-Purpose
Building (Phase II) 09/09/09 X 4.821 120 C 0.445 0.200 0.300 - - - 94.50 83.79% Satisfactory
Walter Ng Lao Construction 23739
Road Upgrading (Gravel to Paved) OroquietaCity-Calamba Mt. Road Km. 1760+400-Km. 1761+274 w/
exceptions
09/15/09 X 3.211 120 O 0.392 0.297 0.000 0.030 0.061 0.017 79.70 -
Wangjo Construction 29924
Asphalt Overlay/Conc. Reblocking along Nueva Vizcaya-Ifugao-Mt.
Province Bdry. Road Km. 324+000-Km.334+000
05/26/09 CAR 9.601 200 O 0.372 0.300 0.150 0.010 0.040 0.050 92.20 -
Wangjo Construction 29924
Asphalt Overlay/Conc. Reblocking along Nueva Vizcaya-Ifugao-Mt.
Province Bdry. Road Km. 324+000-Km.334+000
02/25/10 CAR 9.601 200 C 0.414 0.133 0.300 - - - 84.70 89.20% V. Satisfactory
Water Ng Lao Construction 23739 Construction of 3-Storey DOST
Region VII Regional Office Bldg. 11/25/10 DOST 24.758 347 C 0.488 0.20 0.30 - - - 98.80 87.53% Satisfactory
WCS Construction Inc. (Formerly: WCS Construction)
6516 Const./Conc. Of Lamba San Isidro Road 03/28/11 V 28.839 488 O 0.392 0.289 0.150 0.022 0.040 0.050 94.30 -
WCS Construction Inc. (Formerly: WCS Construction)
6516
Libmanan-Cabusao Embankment, Completion of the Upgrading of
existing Embankment (Sta.0+000 - Sta.7+274) and Const. of Manual
Sluice Gates
04/06/11 V 57.460 356 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory
WCS Construction Inc. (Formerly: WCS Construction)
6516 Opening of Rizal Brgy. 26 Victory Village Road, Rizal Street 03/28/11 V 9.596 179 O 0.334 0.300 0.150 0.022 0.035 0.033 87.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page414
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
WCS Construction Inc. (Formerly: WCS Construction)
6516 Conc. of Puro-Taysan Road 03/28/11 V 4.798 199 O 0.378 0.200 0.150 0.030 0.050 0.050 85.80 -
WCS Construction Inc. (Formerly: WCS Construction)
6516 Gainza Flood Control, Const./Impv't. of Flood Control Projects 04/05/11 V 38.497 243 C 0.419 0.133 0.300 - - - 85.20 85.20%
Satisfactory
WCS Construction, Inc. 6516Repair/Rehab. of Basey-Marabut-Pinamitinan Road, Km.928+000-
Km.953+110 @ random03/29/11 VIII 5.980 240 C 0.438 0.133 0.300 - - - 87.10 86.68%
Satisfactory
WCS Construction, Inc. 6516Conc. of San Juanico-Basey-Sohoton Road, Km.916+000 -
Km.918+000 (intermittent section)03/30/11 VIII 15.914 240 C 0.413 0.133 0.300 - - - 84.60 85.02%
Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Ext. of Seawall, Brgy. Buhatan 08/17/10 V 2.879 150 C 0.444 0.200 0.300 - - - 94.40 94.40% V. Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Completion of Padang Bridge, Sto. Domingo-Legazpi City Boundary 08/16/10 V 11.500 147 C 0.398 0.143 0.300 - - - 84.10 85.18%
Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Const. of Basud (Labanon Section) River Control 08/17/10 V 8.158 180 C 0.333 0.200 0.300 - - - 83.30 84.08%
Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Completion of Padang Bridge, Sto Domingo-Legaspi City Boundary 05/28/10 V 11.500 120 O 0.344 0.240 0.150 0.030 0.045 0.050 85.90 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Const. of Basud (Labanon Section) River Control 05/28/10 V 8.158 180 O 0.336 0.240 0.150 0.030 0.040 0.050 84.60 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516New Const./Completion/Continuation
of On-going Bridges, Cawayan Bridge along Maharlika Highway
08/31/10 V 61.593 210 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516Rehab./Impvt. of Catbalogan North Road, Km. 801+000-Km. 802+000
with exception, 06/05/09 VIII 18.696 120 O 0.289 0.240 0.150 0.030 0.045 0.033 78.70 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516Road Conc. of San Juanico-Basey-Sohoton Road, Km. 908+890-Km.
910+14006/04/09 VIII 18.697 202 O 0.171 0.240 0.150 0.030 0.040 0.033 66.40 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516Repair/Rehab. of National Rd. along
Wright-Taft-Borongan Rd., Km.827+252 - Km.828+512
06/10/10 VIII 24.375 240 O 0.347 0.300 0.150 0.030 0.042 0.033 90.20 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516Repair/Rehab. of National Road
along Wright-Taft-Borongan Road, Km.827+252 - Km.828+512
09/03/10 VIII 24.335 185 C 0.453 0.133 0.300 - - - 88.60 89.56% V. Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516Repair/Rehab. of National Road
along San Juanico-Basey-Sohoton Road, Km.913+310 - Km.914+410
09/03/10 VIII 18.699 179 C 0.432 0.133 0.300 - - - 86.50 86.50% Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Land Development of Polangui Resettlement Project 7/21-25/08 SLB 23.994 150 O 0.332 0.243 0.000 0.030 0.065 0.033 70.29 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Construction of Bayandong Bridge 02/22/10 V 12.466 281 C 0.445 0.133 0.300 - - - 87.80 87.32% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page415
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Construction of Flood Control Higabu River 02/24/09 V 3.838 180 C 0.491 0.133 0.300 - - - 92.40 *92.40%
V. Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Construction of Comon Bridge 09/01/09 V 28.813 180 O 0.380 0.240 0.150 0.030 0.047 0.050 89.70 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Const. of Bayandong Bridge 09/01/09 V 12.466 233 O 0.353 0.240 0.150 0.030 0.047 0.050 87.00 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Conc. of San Juanico-Basey-Sohotan Road 03/12/09 VIII 18.697 150 O 0.357 0.000 0.110 0.030 0.033 0.050 58.00 -
WCS Construction, Inc. / DSB Construction &
Supply Inc. (JV)JV-08-206 Construction of Calbayog Bridge,
Phase I, Calbayog 05/18/09 V 19.178 180 O 0.358 0.240 0.150 0.023 0.040 0.050 86.10 -
WCS Construction, Inc./DSB Construction &
Supply JV-08-206 Const. of Calbayog Bridge, Phase I 09/01/09 V 19.178 180 C 0.494 0.133 0.300 - - - 92.70 88.74%
Satisfactory
WCS Construction, Inc./Makapa Corporation
(JV)6516 Construction of Breakwater 08/24/09 V 23.763 145 O 0.333 0.300 0.150 0.030 0.051 0.033 89.70 -
WDM Construction & Supplies 18877 Construction of Bench Flume & Fab.
of Teruvian Grills 04/13-18/09 NIA 3.481 90 C 0.368 0.180 0.300 - - - 84.84 *84.84% Satisfactory
WDM Construction & Supplies 18877 Construction of Bench Flume, Sta.
0+477.50-Sta. 0+698.45 04/13-18/09 NIA 3.381 90 C 0.344 0.180 s - - - 52.36 *82.36% Satisfactory
WDM Construction & Supplies 18877 Const. of Multi-Purpose Building,
Brgy. Bulua 06/01/09 X 0.939 105 C 0.405 0.064 0.300 - - - 76.90 82.71% Satisfactory
WDM Construction & Supplies 18877 Conc. of FMR at South Poblacion 03/09/09 X 0.462 120 C 0.460 0.133 0.300 - - - 89.30 83.84%
SatisfactoryWDM Construction &
Supplies 18877 Const. of MPB 03/09/09 X 0.940 105 O 0.347 0.240 0.150 0.030 0.035 0.050 85.20 -
WDM Construction & Supplies 18877 Road Upgrading (Gravel to Concrete)
Medina By Pass Road 09/08/09 X 2.023 120 C 0.369 0.187 0.300 - - - 85.60 *85.60% Satisfactory
Wearr Enterprises & Development Corp. 14123 Cullat-Bongalon-Kidaco FMR 05/28/10 V 2.828 180 O 0.351 0.240 0.150 0.030 0.035 0.033 83.90 -
Wearr Enterprises & Development Corp. 14123 Const./Rehab. of Salog River Control 08/27/10 V 0.933 60 C 0.396 0.200 0.300 - - - 89.60 89.60%
V. SatisfactoryWearr Enterprises & Development Corp. 14123 Const. of Sampaloc Seawall 08/27/10 V 0.854 60 C 0.388 0.200 0.300 - - - 88.80 88.80%
SatisfactoryWearr Enterprises & Development Corp. 14123 Const./Rehab. of Balogo (Sitio
Mahingan) Seawall 08/27/10 V 0.832 60 C 0.365 0.200 0.300 - - - 86.50 86.50% Satisfactory
Wearr Enterprises & Development Corp. 14123 Const. of Cambulaga Seawall 08/27/10 V 0.854 60 C 0.341 0.200 0.300 - - - 84.10 84.10%
Satisfactory
Wearr Enterprises & Development Corp. 14123 Cullat-Bongalon-Kidaco FMR 08/18/10 V 2.828 180 C 0.405 0.200 0.300 - - - 90.50 86.54%
Satisfactory
Wearr Enterprises & Development Corp. 14123
Const. of 17-Units, 1-CL Modified Type School Building (7.00Mx7.00M) various Locations, Catbalogan I CES
06/05/09 VIII 0.441 124 O 0.336 0.240 0.150 0.030 0.035 0.050 84.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page416
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Wearr Enterprises & Development Corp. 14123
Const. of 1-Unit, 1-CL Modified Type Secondary S/B (7.00Mx9.00M) on
various locations, Hinabangan NHS 06/04/09 VIII 0.503 90 C 0.328 0.133 0.300 - - - 76.10 *76.10%
Unsatisfactory
Wearr Enterprises & Development Corp. 14123 Road Concreting of Dolongan-Basey
Road 06/05/09 VIII 9.347 249 C 0.414 0.133 0.300 - - - 84.70 73.42% Poor
Wearr Enterprises & Development Corp. 14123 Construction of Seawall Poblacion 03/02/10 VIII 9.348 362 C 0.390 0.192 0.300 - - - 88.20 87.84%
Satisfactory
Wearr Enterprises & Development Corp. 14123
Const. of 17-Units, 1-CL Modified Type Elementary School Building
(7.00m x 7.00m) on various locations03/02/10 VIII 0.442 124 C 0.377 0.150 0.300 - - - 82.70 83.68%
Satisfactory
Wearr Enterprises & Development Corp. 14123 Concreting of Muladbucad Road 05/22/09 V 0.950 200 C 0.429 0.133 0.300 - - - 86.20 *86.20%
SatisfactoryWearr Enterprises & Development Corp. 14123 Concreting of Milagrosa Road 08/24/09 V 0.474 200 C 0.406 0.200 0.300 - - - 90.60 89.88%
V. SatisfactoryWearr Enterprises &
Development Corporation
14123 Rehab./Impv't. of FTMR Pararao-Camangahan Road 04/06/11 V 19.081 98 C 0.427 0.124 0.300 - - - 85.10 86.00%
Satisfactory
Wee Builders 16375Concreting of Zamboanga City-
Labuan-Limpapa Road (Bangayan Section)
05/25/09 IX 18.887 185 O 0.343 0.240 0.150 0.030 0.056 0.050 86.90 -
Wee Builders 16375 Conc. of Zamboanga City-Labuan-Limpapa Road (Bangayan Section) 09/01/09 IX 18.887 185 O 0.192 0.300 0.150 0.030 0.050 0.033 75.50 -
Wee Eng Construction Inc. 16380
Conc. of Surigao-Davao Coastal Rd. (Cortes-Buenavista Subsection) along Cortes-Tandag-Marihatag
Section
03/02/10 XIII 244.651 510 O 0.362 0.300 0.150 0.030 0.051 0.050 94.30 -
Wee Eng Construction Inc. 16380
Rehab. of San Miguel Bridge & Approaches along Jct. Gamut-San
Miguel Road09/01/10 XIII 48.172 225 C 0.433 0.133 0.300 - - - 86.60 86.60%
Satisfactory
Wee Eng Construction Inc. 16380
Const. of SCDR Marihatag-Hinatuan-Bislig Road (Marihatag-San Agustin-
Lianga Sect)08/30/08 XIII 146.935 480 O 0.351 0.300 0.100 0.030 0.045 0.100 92.60 -
Wee Eng Construction Inc. 16380
Const. of SDCR (Lianga-Barobo Subsection) along Marihatag-
Hinatuan-Bislig Sect11/27/08 XIII 257.508 480 O 0.317 0.300 0.100 0.030 0.065 0.100 91.20 -
Wee Eng Construction Inc. 16380
Conc. of Surigao-Davao Coastal Rd.(Lianga-Borobo Subsection)along
Marihatag-Hinatuan-Bislig Sect.09/09/09 XIII 257.508 480 O 0.385 0.285 0.150 0.030 0.056 0.050 95.60 -
Wee Eng Construction Inc. 16380
Conc. of Surigao-Davao Coastal Rd.(Marihatag-San Agustin-Lianga,
Salvacion-Lianga Sect)09/09/09 XIII 373.799 405 O 0.392 0.300 0.124 0.030 0.065 0.033 94.40 -
Wee Eng Construction Inc. 16380
Imprv't./Conc. of SDCR Marihatag-Hinatuan-Bislig Rd. (Marihatag-San
Agustin-Lianga Sect.)09/09/09 XIII 146.938 480 C 0.447 0.200 0.300 - - - 94.70 93.44%
V.Satisfactory
Wee Eng Construction Inc. 16380
Conc. of Surigao-Davao Coastal Rd. (Cortes-Buenavista Subsection)
along Cortes-Tandag-Marihatag Sect.09/09/09 XIII 244.651 510 O 0.368 0.300 0.056 0.030 0.070 0.050 87.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page417
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Wee Eng Construction Inc. 16380
Concreting of SDCR (Marihatag-San Agustin-Lianga) Salvacion-Lianga
Sect.06/05/09 XIII 373.799 405 O 0.358 0.300 0.150 0.030 0.056 0.050 94.40 -
Wee Eng Construction Inc. 16380
Conc. of SDCR (Lianga-Barobo Subsection) along Marihatag-
Hinatuan-Bislig Sect.06/04/09 XIII 257.508 480 O 0.365 0.300 0.150 0.030 0.056 0.033 93.40 -
Wee Eng Construction Inc. 16380
Concreting of Surigao-Davao Coastal Road (Marihatag-San Agustin-
Lianga), Salvacion-Lianga Section Section
03/13/09 XIII 373.799 405 O 0.330 0.300 0.150 0.030 0.047 0.050 90.70 -
Wee Eng Construction, Inc. 16380
Rehab./Impvt. of SDCR: Marihatag-Hinatuan-Bislig Road (Diatagon-
Lianga Sect.)04/04/11 XIII 77.970 225 O 0.346 0.300 0.150 0.030 0.059 0.050 93.50 -
Wee Eng Construction, Inc. 16380
Rehab./Impvt. (Conc.) along Surigao-Davao Coastal Road, Tandag-Cortes-
Marihatag Sect.04/05/11 XIII 17.506 150 O 0.387 0.250 0.136 0.030 0.059 0.050 91.20 -
Wee Eng Construction, Inc. / Danvic
Construction Joint Venture
JV-10-030Completion/Impvt. of MPB at
University of Southeastern Phils. (USEP), Bo. Obrero
04/14/11 XI 28.342 331 O 0.335 0.300 0.150 0.030 0.058 0.050 92.30 -
Wee Eng Construction, Inc./P.L Sebastian Construction (JV)
JV-06-056 CP-3, Const./Impv't. of Maguindanao-
Sultan Kudarat-Bdry. Lebak-Kalamansig Road
03/11/09 XII 764.659 670 O 0.347 0.300 0.149 0.030 0.070 0.033 92.90 -
Welex Construction 9323 Land Dev't of Taysan Resettlement project 10/6-9/09 NHA 49.802 244 C 0.397 0.300 0.300 - - - 99.70 99.70%
Outstanding
Welex Construction 9323 Land Dev't. of Taysan Resettlement Project 9/16-18/08 SLBMO-
Region V 49.802 244 O 0.382 0.288 0.000 0.030 0.070 0.067 83.70 -
Welex Construction, Incorporated 9323
Impv't./Conc. of Access Rd. to Airport Rd., Southern Luzon
International Airport08/16/10 V 96.000 495 C 0.451 0.200 0.300 - - - 95.10 88.68%
Satisfactory
Werr Corp. (International) / K.D.C.M. Construction
(JV)JV-08-141
Conc. of Bontoc-Tabuk-Tuguegarao Road (Package BLT-16), Tinglayan
Boundary-Lubuagan-Tabuk Section II, Km. 483+500- Km 499+310 Balani-
Tulyao Section
09/04/09 CAR 93.305 310 O 0.347 0.240 0.150 0.030 0.060 0.033 86.00 -
Werr Corp. (International) / K.D.C.M. Construction
(JV)JV-08-143
Conc. of Bontoc-Tabuk-Tuguegarao Road (Package BLT-16), Tinglayan
Boundary-Lubuagan-Tabuk Section II, Km. 483+500- Km 499+310 Balani-
Tulyao Section
02/22/10 CAR 95.783 343 C 0.424 0.167 0.000 - - - 59.10 75.24% Unsatisfactory
Westmin Enterprises & Construction Services 20989 Const./Completion of MPB at JRMSC 06/13/10 IX 2.861 100 C 0.500 0.133 0.300 - - - 93.30 93.30%
V. SatisfactoryWestmin Enterprises & Construction Services 20989 Completion of Multi-Purpose
Building 03/09/10 IX 3.795 150 O 0.327 0.300 0.150 0.030 0.041 0.050 89.80 -
Westmin Enterprises & Construction Services 20989 Completion of MPB 08/30/10 IX 3.795 150 C 0.442 0.133 0.300 - - - 87.50 89.11%
V. SatisfactoryWestmin Enterprises & Construction Services 20989 Construction of Drainage Canal at
Brgy. Dawo 09/15/09 IX 4.770 180 C 0.455 0.200 0.300 - - - 95.50 89.44% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page418
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Westmin Enterprises & Construction Services 20989
Road Upgrading (Gravel to Concrete) Dipolog-Punta-Dansullan-Sergio
Osmeña, Zambo. Del Norte-Sur Bdry. Km.1871+500-Km.1872+000, Dilawa
Section
09/14/09 IX 9.322 120 C 0.456 0.200 0.300 - - - 95.60 89.18% V. Satisfactory
Westmin Enterprises & Construction Services 20989 Construction of Drainage Canal at
Brgy. Dawo 06/09/09 IX 4.770 180 O 0.347 0.240 0.150 0.030 0.037 0.050 85.40 -
Westmin Enterprises & Construction Services 20989 Const. of River Bank Protection
(Phase 1) 03/17/09 IX 4.771 165 C 0.446 0.200 0.300 - - - 94.60 *94.60% V. Satisfactory
Westmin Enterprises & Construction Services 20989 Const./Completion of Multi-Purpose
Building 03/17/09 IX 1.908 120 C 0.422 0.175 0.300 - - - 89.70 *89.70% V. Satisfactory
Westmin Enterprises and Construction Services 20989 Const. and Cementing of Road
No.12, Dawo 04/11/11 IX 9.627 150 C 0.468 0.133 0.300 - - - 90.10 83.80% Satisfactory
Westwalk Corporation 30650 Const. of MPB 11/25/08 NCR 2.101 90 C 0.369 0.200 0.300 - - - 86.90 *86.90% V. Satisfactory
WG & J Construction 26257 Repair/Restoration of Flood Control, Sta.000+200 - Sta.000+318 04/11/11 II 9.650 90 C 0.420 0.133 0.300 - - - 85.30 86.92%
Satisfactory
WG & J Construction 26257 Concreting of Burgos-Gen. Aguinaldo Road 05/28/09 II 2.700 90 C 0.424 0.133 0.300 - - - 85.70 *85.70%
Satisfactory
WG & J Construction 26257 Construction of Multi-Purpose Building, Divisoria E/S 03/05/09 II 0.479 120 C 0.336 0.200 0.300 - - - 83.60 *83.60%
Satisfactory
Wilkinson Construction 21422
Upgrading of Road (Gravel to Paved) along Bacolod City Bdry. Road,
Km.2+555 - Km.10+000 with exceptions
03/28/11 VI 11.286 208 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory
Wilkinson Construction / Trimluv Builders &
Supply (JV)JV-09-139 Rehab./Upgrading of Bacolod North
Road, Manapla Section 03/29/11 VI 37.747 220 C 0.397 0.200 0.300 - - - 89.70 85.71% Satisfactory
William Integrated Contractor 7669
Proposed Rehab./Impv't. of Baliwasan Seaside (Intermittent
Sect.)09/08/10 IX 9.104 162 O 0.335 0.228 0.150 0.023 0.035 0.050 82.10 -
Wilper Construction / Paula Mae Buhong Construction (JV)
JV-08-196Widening / Conc. of Bontoc-Banaue
Road View Point to Awan-Igid Section, Km. 345+828 - Km. 354+550
08/30/09 CAR 106.072 405 O 0.366 0.240 0.150 0.030 0.056 0.033 87.50 -
Wilper Construction / Paula Mae Buhong Construction (JV)
JV-08-179
Conc. of Bontoc-Tuguegarao Road, Bontoc-Tinglayan Bdry. Section I
Betwangan to Ampawile Sect. Km. 406+220-Km. 411+140 (with
exception)
08/30/09 CAR 130.727 420 O 0.384 0.240 0.000 0.030 0.056 0.017 72.70 -
Wilper Construction Inc. 1632 Const. of San Vicente-Gutan-Lubak-Anguib Road 02/19/10 II 96.100 360 O 0.336 0.240 0.150 0.030 0.053 0.033 84.20 -
Wilper Construction Inc. 1632 Conc. of San Carlos-Dumaguete Rd., Dumaguete City and Bais City 09/12/09 VII 47.369 373 O 0.366 0.240 0.150 0.030 0.037 0.050 87.30 -
Wilper Construction Inc. 1632 Conc. of San Carlos-Dumaguete Road Dumaguete City and Bais City 03/02/10 VII 47.369 370 O 0.204 0.292 0.000 0.030 0.045 0.050 62.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page419
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Wilper Construction Inc. 1632 Concreting of Guiuan Airport (Access Road) 06/07/09 VIII 12.865 120 O 0.296 0.300 0.150 0.030 0.045 0.033 85.40 -
Wilper Construction Inc. 1632 M'lang Airport Development Project 06/18/09 DOTC 21.143 180 C 0.408 0.200 0.300 - - - 90.80 90.80% V. Satisfactory
Wilper Construction Inc. 1632 M'lang Airport Development Project 03/13/09 DOTC 28.833 210 C 0.400 0.200 0.300 - - - 90.00 90.90% V. Satisfactory
Wilper Construction Inc. 1632Concreting of San Carlos-
Dumaguete Road, Dumaguete City & Bais City
03/12/09 VII 44.001 310 O 0.391 0.221 0.150 0.030 0.051 0.033 87.60 -
Wilper Construction Inc. 1632Concreting of San Carlos-
Dumaguete Road, Dumaguete City and Bais City
05/26/09 VII 44.001 310 O 0.380 0.243 0.148 0.030 0.056 0.033 89.00 -
Wilper Construction Inc. 1632 Concreting of Guiuan Airport (Access Road) 09/17/09 VIII 12.865 120 C 0.468 0.144 0.300 - - - 91.20 87.72%
Satisfactory
Wilper Construction Inc. 1632 Const. of TESDA Training Center Bldg. (Phase I) 05/29/09 X 4.741 120 O 0.326 0.265 0.150 0.030 0.027 0.033 83.10 -
Wilper Construction Inc. 1632Asphalt Overlay along Sayre
Highway Alae-Kisolon Road (Dalirig Section)
03/06/09 X 4.815 82 C 0.428 0.133 0.300 - - - 86.10 *86.10% Satisfactory
Wilper Construction Inc. 1632Asphalt Overlay along Sayre
Highway Alae-Kisolon Road (Maluko Section)
03/06/09 X 4.815 77 C 0.442 0.133 0.000 - - - 57.50 *57.50% Poor
Wilper Construction Inc. 1632 Const. of TESDA Training Center Building (Phase I) 09/04/09 X 4.741 120 C 0.468 0.052 0.300 - - - 82.00 82.77%
Satisfactory
Wilper Construction Inc. 1632 Impvt. (Concreting) of Access Road leading Dawis Port 05/29/09 XI 43.322 220 O 0.368 0.300 0.150 0.030 0.037 0.033 91.80 -
Wilper Construction Inc. 1632 Improvement (Concreting) of Access Road Leading to Dawis Port 09/05/09 XI 43.322 220 O 0.384 0.240 0.107 0.030 0.059 0.033 85.30 -
Wilper Construction Inc. / Wangjo Construction
(JV)JV-08-195
Widening / Conc. of Bontoc-Banaue Road Awan-Igid to Mt.polis Section,
Km.354+550 - Km.362+200 (IS)08/30/09 CAR 106.560 405 O 0.367 0.240 0.139 0.030 0.056 0.033 86.50 -
Wilper Construction Inc. / Z F Construction (JV) JV-09-111 Const. of Classroom, Aurora
National Science HS 04/09/11 III 15.192 180 C 0.481 0.135 0.300 - - - 91.60 88.34% Satisfactory
Wilper Construction Incorporated 1632 Talakag Irrigation Project 09/26-10/01/11 NIA 14.432 451 O 0.327 0.300 0.000 0.030 0.051 0.050 75.82 -
Wilper Construction, Inc. / So Construction (JV) JV-09-112 Rehab. of MPB Brgy. Suklayin 06/05/10 III 18.092 240 C 0.467 0.133 0.300 - - - 90.00 90.00%
V. Satisfactory
Wilper Construction, Inc./Wangjo Construction
(JV)JV-08-195
Widening/Conc. of Bontoc-Banaue Road, Awan-Igid to Mt. Polis Section,
Km.354+550 - Km.362+200 (IS)06/03/10 CAR 106.559 405 C 0.408 0.200 0.300 - - - 90.80 88.22%
Satisfactory
Wilper Construction/Paula Mae
Buhong Construction (JV)
JV-08-196Widening/Conc. of Bontoc-Banaue
Road, View Point to Awan-Igid Sect., Km.345+828 - Km.354+550
06/03/10 CAR 106.072 435 C 0.385 0.200 0.300 - - - 88.50 87.90% Satisfactory
Winces Construction & Supply 32341 Const. of H.E. Building, Santiago
NHS 06/16/10 VI 0.985 60 C 0.473 0.171 0.300 - - - 94.40 94.40% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page420
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Wismon Construction 33087 Conc. Of Jct. Nat'l Bitnong-Belance-N.V. Bdry. Rd. Teggep Sect. 04/15/11 II 18.045 180 C 0.416 0.133 0.300 - - - 84.90 86.28%
Satisfactory
Wismon Construction 33687
Rehab./Reconst./Upgrading of Damaged Paved National Rd. along Daang Maharlika San Luis-Isabela
Bdry. Sect. w/ exception
06/10/10 II 19.285 90 O 0.369 0.244 0.150 0.030 0.047 0.033 87.30 -
Wismon Construction 33087
Rehab./Reconst./Upgrading of Damaged Paved National Road along Daang Maharlika, (San Luis-Isabela
Bdry. Section)
09/02/10 II 19.285 120 C 0.438 0.200 0.300 - - - 93.80 89.90% V. Satisfactory
Wismon Construction 33087 Rehab./Reconst. of Jaen-San Antonio Rd. 08/19/10 III 14.382 120 C 0.33 0.200 0.300 - - - 83.00 83.00%
Satisfactory
Wismon Construction 33087Rehab. of Mambangnan-Poblacion
San Leonardo Flood Control & Drainage
09/04/09 III 7.165 150 C 0.436 0.133 0.300 - - - 86.90 84.08% Satisfactory
Wismon Construction / N.S. Gambito
Construction Services (JV)
Rehab./Reconst./Upgrading Daang Maharlika (Bugnay-San Luis Section) 04/12/11 II 19.280 110 C 0.369 0.133 0.300 - - - 80.20 84.40%
Satisfactory
Wizard Trading & Const. / Kyro Builders & Supply
(JV) JV-07-139 Rehab./Reconstruction (Asphalt
Overlay), San Jose-Lupao Road 03/03/09 III 37.449 150 C 0.405 0.200 0.300 - - - 90.50 *90.50%V. Satisfactory
Wizard Trading & Construction 21921 Upgrading of Muñoz-Lupao Road 06/07/10 III 4.899 30 O 0.338 0.240 0.150 0.030 0.054 0.050 86.20 -
Wizard Trading & Construction 21921
Restoration of Scoured Bridge Approach (Ganduz Bridge),
Pinagpanaan-Rizal-Pantabangan Rd. Brgy. Ganduz
06/08/10 III 4.681 30 C 0.422 0.133 0.300 - - - 85.50 85.50% Satisfactory
Wizard Trading & Construction 21921 Upgrading of Muños-Lupao Rd. 08/24/10 III 4.899 30 C 0.365 0.200 0.300 - - - 86.50 86.32%
SatisfactoryWizard Trading &
Construction 21921 Concreting of Brgy. Mangandingay Road 05/26/09 III 1.882 25 C 0.321 0.200 0.300 - - - 82.10 *82.10%
SatisfactoryWizard Trading and
Construction 21921 Const. of Bridge, Brgy. Palusapis 04/08/11 III 1.135 45 C 0.412 0.000 0.300 - - - 71.20 *71.20% Poor
WMLC Trading & Construction Supply 24535
Rehab./Reconst./Upgrading of Damaged Roads along Rosario-San
Juan Rd.06/07/10 IVA 4.820 90 O 0.400 0.225 0.150 0.023 0.040 0.050 88.80 -
WMLC Trading & Construction Supply 24535
Rehab./Reconst./Upgrading of Damaged Roads along Rosario-San
Juan Rd.08/19/10 IVA 4.819 90 C 0.283 0.200 0.300 - - - 78.30 84.60%
Satisfactory
WMLC Trading & Construction Supply 24535 Road Upgrading of Manila-Batangas
X.Y.Z Construction & Supplies 31816 Conc. of Roads, Brgy. Bisaya 03/04/09 IV-A 0.954 60 C 0.435 0.133 0.300 - - - 86.80 *86.80%
Satisfactory
Y S Construction 11928 Const. of MPB (Balilihan Public Market) 02/24/10 VII 9.180 210 C 0.472 0.118 0.300 - - - 89.00 91.17%
V. Satisfactory
Yakal Construction 9685 Tacloban Airport Development Project 12/12/09 DOTC 72.202 310 O 0.389 0.300 0.000 0.030 0.056 0.050 82.50 -
Yakal Construction 9685Rehab. of Wright-Taft-Borongan
Road, including Layug Bridge, Km. 860+570-Km. 938+500
06/07/09 VIII 161.048 403 O 0.324 0.240 0.150 0.030 0.050 0.050 84.40 -
Yakal Construction 9685 Upgrading/Concreting of Taft-Borongan Road with exceptions 06/07/09 VIII 166.287 365 O 0.247 0.300 0.150 0.030 0.050 0.050 82.70 -
Yakal Construction 9685 Upgrading/Concreting of Borongan-MacArthur Road with exceptions 06/07/09 VIII 161.533 355 O 0.321 0.240 0.150 0.030 0.050 0.033 82.40 -
Yakal Construction 9685Asphalt Concrete Overlay @ Picas
San Jose DZR Airport Road Km.910+1575 - Km.913+722
09/09/10 VIII 48.226 240 O 0.312 0.300 0.150 0.030 0.025 0.050 86.70 -
Yakal Construction 9685Asphalt Concrete Overlay @ Apitong
Paterno Road Km.908+856 - Km.909+448
09/08/10 VIII 27.010 185 C 0.406 0.133 0.300 - - - 83.90 83.90% Satisfactory
Yakal Construction 9685 Masbate Airport Dev't Project (Extension of Runway) 4/13/2011 DOTC 19.232 150 C 0.416 0.200 0.300 - - - 91.60 91.60%
V. Satisfactory
Yakal Construction 9685 Conc. of Aroroy-Baleno-Lagta-Masbate Jct. Buenavista Road 02/20/10 V 95.080 533 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
Yakal Construction 9685Rehabilitation of Tagbilaran North Road, Clarin-Talibon Section, Km.
58.000-112.500 (w/ exception)03/05/09 VII 14.077 240 O 0.360 0.229 0.150 0.030 0.033 0.050 85.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page426
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Yakal Construction 9685 Rehab. of Borongan-Guiuan Road (Borongan-Maydolong Section) 09/17/09 VIII 43.348 241 C 0.432 0.200 0.300 - - - 93.20 *93.20%
V. Satisfactory
Yakal Construction 9685 Upgrading/Conc. of Taft-Borongan Road with exception 09/17/09 VIII 166.281 365 O 0.371 0.240 0.150 0.030 0.055 0.050 89.60 -
Yakal Construction 9685Asphalt Overlay along Tanauan-Dagami Road, Km. 922+643-Km.
929+896 09/08/10 VIII 48.194 210 O 0.360 0.200 0.150 0.030 0.047 0.050 83.70 -
Yakal Construction 9685 Ormoc Airport Development Project 09/07/11 DOTC 8.655 150 C 0.393 0.200 0.300 - - - 89.30 89.30% V. Satisfactory
Yap Mabuhay Enterprises, Incorporated 15540 Const. of Multi-Purpose Building @
Poblacion 09/12/09 XII 0.950 84 O 0.363 0.300 0.150 0.030 0.023 0.033 89.90 -
Yap Mabuhay Enterprises, Incorporated 15540 Construction of Multi-Purpose
Building @ Poblacion 09/12/09 XII 0.952 126 O 0.364 0.262 0.150 0.030 0.035 0.033 87.40 -
Yap Mabuhay Enterprises, Incorporated 15540 Construction of 2-CL School
Building @ San Vicente NHS 09/11/09 XII 1.297 105 O 0.329 0.280 0.150 0.030 0.041 0.033 86.30 -
YL Trading General Merchandising 22543 Conc. of San Remegio-Bugo Road 06/10/10 VI 9.479 100 O 0.339 0.300 0.150 0.015 0.033 0.033 87.00 -
YL Trading General Merchandising 22543 Concreting of Hamtic-Bia-an-Egana-
Sibalom Road (Catangan Section) 06/04/09 VI 19.259 300 C 0.438 0.200 0.300 - - - 93.80 87.38% Satisfactory
YL Trading General Merchandising 22543 Concreting of Road, Funda Dalipe-
San Pedro (San Jose) 06/04/09 VI 9.502 180 O 0.371 0.240 0.150 0.030 0.040 0.033 86.40 -
YL Trading General Merchandising 22543 Conc. of Hamtic-Bia-an-Egana-
Sibalom Road, Catungan Section 03/13/09 VI 19.259 300 O 0.280 0.294 0.150 0.024 0.050 0.033 83.10 -
YL Trading General Merchandising 22543 Conc. of Road, Funda Dalipe-San
Pedro (San Jose) 09/02/09 VI 9.502 180 C 0.398 0.133 0.300 - - - 83.10 85.08% Satisfactory
YL Trading General Merchandising 22543 Conc. of San Remegio-Bugo Road 09/02/10 VI 9.479 100 C 0.421 0.133 0.300 - - - 85.40 86.36%
Satisfactory
YL Trading/Settlers Builders (JV) JV-08-268 Conc. of Hamtic-Bia-an-Egaña-
Sibalom Road 09/03/09 VI 18.775 240 C 0.428 0.075 0.300 - - - 80.30 *80.30% Unsatisfactory
YL Trading/Settlers Builders(JV) JV-08-267 Impvt. (Conc.) of Access Road to
Antique Airport, Funda-Dalipe 09/03/09 VI 8.152 145 C 0.440 0.073 0.300 - - - 81.30 *81.30% Unsatisfactory
Young Builders Corporation 15807
Rehab. of Bulwang Curve Section-Lumbangan Section, Bais Mabinay
Road09/01/10 VII 57.809 240 O 0.360 0.300 0.150 0.030 0.047 0.033 92.00 -
Yoyen Enterprises 15541 Const. of Box culvert Brgy. Bonoy 02/25/10 VIII 1.247 100 C 0.463 0.139 0.300 - - - 90.20 90.20% V. Satisfactory
Yoyen Enterprises 15541 Road Upgrading of Libungao-Matag-ob-Palompon Rd. 06/04/10 VIII 18.227 225 O 0.372 0.240 0.150 0.030 0.042 0.050 88.40 -
Yoyen Enterprises 15541 Construction of 2-Classroom School Building Liloan National High School 03/10/09 VIII 0.808 263 C 0.351 0.200 0.300 - - - 85.10 *85.10%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page427
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Yoyen Enterprises 15541Conc. of Culaba-Caibiran National
Circumferential Road (Culaba-Looc Section)
09/03/09 VIII 3.742 160 C 0.451 0.200 0.300 - - - 95.10 89.22% V. Satisfactory
Yoyen Enterprises 15541Asphalt Overlay along Ormoc-
Baybay Southern Leyte Bdry. Road, Km. 1012+600-Km. 1014+196 w/
09/01/10 VIII 9.592 127 C 0.452 0.133 0.300 - - - 88.50 88.50% Satisfactory
Yoyen Enterprises 15541 Impvt. (Conc.) of Ormoc City Airport 09/01/10 VIII 18.244 225 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
Yoyen Enterprises 15541 Road Upgrading of Libungao-Matag-ob-Palompon Road 08/31/10 VIII 18.227 225 C 0.435 0.133 0.300 - - - 86.80 87.76%
Satisfactory
Yoyen Enterprises 15541 Conc. of Culaba-Caibiran National Circ. Road, Culaba-Looc Section 11/18/08 VIII 3.742 160 O 0.320 0.281 0.100 0.015 0.037 0.100 85.30 -
Yoyen Enterprises 15541 Conc. of Dayhagan-Salvacion-Coob-Libertad Road 08/26/08 VIII 12.537 150 O 0.317 0.220 0.100 0.020 0.038 0.100 79.50 -
Yoyen Enterprises/Uy Construction & Dev't.
(JV)JV-08-263 Upgrading/Conc. of MacArthur-
Guiuan Road exception 09/17/09 VIII 90.226 300 O 0.367 0.240 0.150 0.030 0.050 0.050 88.70 -
YS Construction 11982 Widening/Concrete paving of Tubigon Port Access Rd. 09/01/09 VII 4.639 70 C 0.406 0.200 0.300 - - - 90.60 93.12%
V. Satisfactory
YS Construction 11928Const./Imprvt. Of Vallehermoso-Canlaon City-La Castellana Rd.
(VLCR)09/14/09 VII 20.753 260 O 0.386 0.240 0.150 0.030 0.037 0.050 89.30 -
YS Construction 11928 Imprv't./Conc. of Magtangtang-Carbon Rd. 09/09/09 VII 2.842 170 C 0.460 0.075 0.300 - - - 83.50 *83.50%
Satisfactory
YS Construction 11928Const./Imprvt. Of Vallehermoso-Canlaon City-La Castellana Rd.
(VLCR)03/05/10 VII 21.058 280 C 0.469 0.096 0.300 - - - 86.50 88.18%
Satisfactory
YS Construction 11928 Const. of MPB West Pob., Alburquerque 06/09/10 VII 0.148 80 C 0.388 0.200 0.300 - - - 88.80 88.80%
Satisfactory
YS Construction 11928 Widening/Concrete Paving of Tubigon Port Access Road 06/09/09 VII 4.639 91 O 0.375 0.296 0.150 0.030 0.047 0.050 94.80 -
YSL Builder 19516 Proposed Const. of Public Market (Phase II) 04/01/11 IX 4.813 205 C 0.353 0.200 0.300 - - - 85.30 *85.30%
Satisfactory
YSL Builder 19516Rehab./Impvt. of DPWH Zamboanga
del Norte 3rd DEO Office Bldg., Segabe, Piñan
04/11/11 IX 4.751 150 C 0.427 0.133 0.300 - - - 86.00 84.53% Satisfactory
YSL Builder 19516Road Upgrading (Gravel to Concrete)
05/26/09 III 28.676 30 C 0.427 0.200 0.300 - - - 92.70 *92.70%V. Satisfactory
Z M Construction 9052 Const. of Sheet Pile Revetment, Phase II, Sitio Buton 08/20/10 III 19.263 90 C 0.373 0.200 0.300 - - - 87.30 87.30%
Satisfactory
Z.A.S Construction 8971 Const. of Multi-Purpose Pavement Brgy. Campokpok 02/24/10 VIII 0.143 45 C 0.444 0.133 0.300 - - - 87.70 87.70%
Satisfactory
Z.A.S Construction 8971 Const. of Health Center, Brgy. Maybog 06/06/10 VIII 0.190 70 C 0.480 0.133 0.300 - - - 91.30 91.30%
V. Satisfactory
Z.A.S Construction 8971 Const./Rehab./Impvt. of Multi-Purpose Building (Phase II) 05/28/09 VIII 0.473 40 C 0.438 0.133 0.300 - - - 87.10 *87.10%
Satisfactory
Z.A.S. Construction 8971 Completion of MPB Villaba Pob. 04/09/11 VIII 0.947 60 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory
Z.F Construction 17676 Road Upgrading (Gravel to Paved) San Luis-Ma.Aurora-Castaneda 08/21/10 III 40.112 240 O 0.341 0.272 0.150 0.030 0.037 0.033 86.30 -
Z.F Construction 17676Impvt./Conc. of San Luis-Ma. Aurora Rd., So. Hilltop-So. Gulugod Baboy,
Brgy. Dianawan11/26/08 III 18.346 300 C 0.318 0.300 0.300 - - - 91.80 *91.80%
Outstanding
Zabu Engineering 31104 Rehab. of Bulanao-Paracelis Road 04/05/11 CAR 19.972 160 C 0.457 0.133 0.300 - - - 89.00 84.86% Satisfactory
Zact Builders 33702 Riprapping of Lagarian Creek, Brgy. E. Rodriguez 03/31/11 NCR 2.837 75 C 0.470 0.078 0.300 - - - 84.80 *84.80%
Satisfactory
Zeus Trading & Construction 15420
Conc. Reblocking of Jct. Catanduanes Circumferential Rd.,
Virac Port08/18/10 V 1.020 109 C 0.404 0.200 0.300 - - - 90.40 90.40%
V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Rehab./Reconst./Upgrading of Sibonga-Dumanjug Road, Tubod-
Dugoan Section05/29/09 VII 14.175 75 O 0.383 0.240 0.150 0.030 0.055 0.050 90.80 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Road Upgrading (Gravel to Paved) along Dalaguete-Mantalongon-
Badian Road05/29/09 VII 18.895 75 C 0.394 0.195 0.300 - - - 88.90 *88.90%
Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Widening of H. Abellana Road 06/05/09 VII 4.656 320 O 0.343 0.240 0.150 0.030 0.047 0.050 86.00 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Conc. of Jct.(LIR) Dat-an,Carmen-S. Bullones-Pilar-Alicia Rd. Sta.90+290-
Sta.92+240(Alicia Sec.) with exception
09/04/09 VII 18.637 232 O 0.337 0.237 0.150 0.030 0.037 0.033 82.40 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Impv't./Conc. of Jct. (LIR) Dat-an, Carmen-Sierra Bullones-Pilar-Alicia
Rd.(Pilar Sec.)Km. 81+980-Km.82+890 with exemption
09/04/09 VII 18.386 224 O 0.340 0.237 0.144 0.030 0.037 0.033 82.10 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Completion of MPB (Municipal Hall) 06/02/10 VII 0.915 90 C 0.366 0.200 0.300 - - - 86.60 86.60%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page430
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Impvt./Conc. of Tagbilaran-Corella-
Sikatuna-Loboc Road 08/25/10 VII 14.557 148 O 0.342 0.300 0.150 0.030 0.047 0.033 90.20 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Completion of MPB, Agape 08/25/10 VII 1.416 107 O 0.347 0.300 0.150 0.030 0.032 0.033 89.20 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Const. of Two (2) Classroom School
Building at Manlapay E/S, Manlapay 09/08/09 VII 1.191 186 C 0.455 0.190 0.300 - - - 94.50 *94.50% V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Road Rehab./Reconst./Upgrading along Sibonga-Dumanjug Road,
Tubod-Dugoan Section09/08/09 VII 14.175 75 C 0.468 0.198 0.300 - - - 96.60 93.12%
V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Const. of Multi-Purpose Pavement,
Brgy. Apas 09/16/09 VII 0.482 50 C 0.471 0.133 0.300 - - - 90.40 *90.40% V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Const. of Multi-Purpose Pavement,
Brgy. Busay 09/16/09 VII 1.446 50 C 0.462 0.133 0.300 - - - 89.50 *89.50% V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Widening of H. Abellana Road 09/02/09 VII 4.657 348 C 0.452 0.133 0.300 - - - 88.50 88.50%
Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Widening of H. Abellena Road 03/05/09 VII 4.656 261 O 0.343 0.300 0.150 0.030 0.027 0.050 90.00 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Conc. of Jct. (LIR) Dat-an, Carmen-Sierra Bullones-Pilar-Alicia Road
(Sta. 90+290-Sta. 92+240 with exception), Alicia Section
06/05/09 VII 18.637 206 O 0.363 0.300 0.150 0.030 0.047 0.033 92.30 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Road Upgrading (Gravel to Paved) along Dalaguete Mantalongon-
Badian Road09/07/10 VII 18.341 107 C 0.405 0.200 0.300 - - - 90.50 90.50%
V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Access Road to Airport, RORO Ports, Declared Tourism Hubs &
Spokes Central Nautical Highway, Santander Port
09/03/10 VII 7.441 121 C 0.329 0.200 0.300 - - - 82.90 82.90% Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881 Rehab. of Brgy. Road, Brgy. Cagsing
to Brgy. Salamanca 04/08/11 VII 0.969 58 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page431
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881 Completion of MPB 04/02/11 VII 0.968 90 C 0.483 0.133 0.300 - - - 91.60 91.18%
V. Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881
Rehab./Reconst./Upgrading of Santander-Barili-Toledo Rd. (Other
Sections)04/08/11 VII 28.212 60 C 0.402 0.200 0.300 - - - 90.20 *90.20% V.
Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881 Completion of MPB 04/01/11 VII 1.417 121 C 0.491 0.133 0.300 - - - 92.40 90.16% V.
Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881
Reblocking along Tagbilaran East Road, Km. 177+400 - Km. 216+200
(with exception)04/01/11 VII 9.582 218 C 0.365 0.200 0.300 - - - 86.50 88.72%
Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881 Const./Rehab. of River Control,
Tabajan 04/01/11 VII 4.714 169 C 0.342 0.200 0.300 - - - 84.20 87.56% Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881
Rehab./Reconst./Upgrading of Jct. Loay Interior Rd. Loboc Sect.
Km.194+240 - Km.194+517.45 (with exception)
04/01/11 VII 5.676 256 C 0.392 0.158 0.300 - - - 85.00 *85.00% Satisfactory
Zircon Builder 16158 Construction of 3-CL School Bldg. Toytoyan E/S 05/27/09 III 1.580 120 C 0.463 0.200 0.300 - - - 96.30 *96.30%
Outstanding
ZM / DMJ Construction (JV) JV-07-084
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan,
Bulacan to Mabalacat, Pampanga, Phase IV Package V City of San
Fernando, Pampanga & Mabalacat Section
03/11/09 III 93.521 270 C 0.452 0.200 0.300 - - - 95.20 *95.20%V. Satisfactory
ZM / DMJ Construction (JV) JV-08-056 Replacement of Bravo Bridge 03/03/09 III 42.820 180 O 0.382 0.300 0.150 0.030 0.033 0.050 94.50 -
ZM / VRF Construction (JV) JV-08-014
Construction of Bridge and Approaches
(Contact Package II)03/03/09 III 38.937 210 O 0.357 0.244 0.150 0.020 0.028 0.050 84.90 -
ZM Construction / R.Z. Roncal Construction and
Trading (JV)JV-09-142
Completion/Continuation of the Replacement of Bravo Bridge along
Palayan-Natividad Road04/12/11 III 129.731 260 C 0.487 0.200 0.300 - - - 98.70 93.12%
V. Satisfactory
ZM Construction /DMJ Construction (JV) JV-07-084
Impvt./Widening of McArthur Highway (Manila North Road) Phase
V Meycauayan Bulacan) to Mabalacat Pampanga Sect., (Angeles-Mabalacat
Section) CP1
08/28/09 III 85.883 240 O 0.392 0.240 0.150 0.030 0.050 0.033 89.50 -
ZM/DMJ Construction Joint Venture JV-08-056 Replacement of Bravo Bridge,
Palayan City-Natividad Road 06/02/09 III 42.820 180 C 0.408 0.200 0.300 - - - 90.80 93.02% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page432
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Zoe Builders and Supplies Company 20991 Rehab./Reconst. of Calapan North