Top Banner

of 59

Chp007 Line Balancing

Apr 06, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/3/2019 Chp007 Line Balancing

    1/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    1Mata Kuliah : SISTEM PRODUKSI

    Chapter 7

    Assembly Line Balancing

  • 8/3/2019 Chp007 Line Balancing

    2/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    2Mata Kuliah : SISTEM PRODUKSI

    Assembly Linebalancing

    OBJECTIVES

  • 8/3/2019 Chp007 Line Balancing

    3/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    3Mata Kuliah : SISTEM PRODUKSI

    An Assembly Line Layout

  • 8/3/2019 Chp007 Line Balancing

    4/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    4Mata Kuliah : SISTEM PRODUKSI

    Repetitive Layout

    1 3

    2

    4

    5

    WorkWork

    OfficeOffice

    Belt ConveyorBelt Conveyor

    WorkWork

    StationStation

    Note: 5 tasks or operations; 3 work stationsNote: 5 tasks or operations; 3 work stations

    Work StationWork Station

    StationStation

  • 8/3/2019 Chp007 Line Balancing

    5/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    5Mata Kuliah : SISTEM PRODUKSI

    Assembly Line Balancing

    Analysis of production lines

    Nearly equally divides work between

    workstations while meeting requiredoutput

    Objectives

    Maximize efficiency

    Minimize number of

    work stations

  • 8/3/2019 Chp007 Line Balancing

    6/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    6Mata Kuliah : SISTEM PRODUKSI

    Assembly Line Balancing

    The General Procedure Determine cycle time by taking the demand

    (or production rate) per day and dividing it

    into the productive time available per day Calculate the theoretical minimum number of

    work stations by dividing total task time by

    cycle time

    Perform the line balance and assign specificassembly tasks to each work station

  • 8/3/2019 Chp007 Line Balancing

    7/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    7Mata Kuliah : SISTEM PRODUKSI

    Assembly Line Balancing Steps

    1. Determine tasks (operations)

    2. Determine sequence

    3. Draw precedence diagram

    4. Estimate task times

    5. Calculate cycle time

    6. Calculate number of work stations

    7. Assign tasks8. Calculate efficiency

  • 8/3/2019 Chp007 Line Balancing

    8/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    8Mata Kuliah : SISTEM PRODUKSI

    Assembly Line Balancing

    Equations

    Cycle time =Production time available

    Demand per day

    Minimum

    number of

    work stations

    7 Task times

    Cycle time

    Efficiency =

    =

    7 Task times

    * (Cycle time)(Actual number

    of work stations)

  • 8/3/2019 Chp007 Line Balancing

    9/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    9Mata Kuliah : SISTEM PRODUKSI

    KRITERIA PEMBANDING

    EFISIENSI LINI

    BALANCEDELAY

    IDLE TIME

  • 8/3/2019 Chp007 Line Balancing

    10/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    10Mata Kuliah : SISTEM PRODUKSI

    EFISIENSI LINI

    rasio antara waktu yang digunakan dengan

    waktu yang tersedia.

    Efisiensi Lini Sebelum Diseimbangkan :

    Eff! ( ti / (R x T)) x 100%Dengan

    ti : waktu proses elemen kerja yang ada dijalur

    terpanjang.

    R : jumlah daerah yang terbentuk dari

    precedence diagram.

    T : waktu terbesar dari semua elemen kerja.

  • 8/3/2019 Chp007 Line Balancing

    11/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    11Mata Kuliah : SISTEM PRODUKSI

    EFISIENSI LINI

    efisiensi lini perakitan setelah

    diseimbangkan :

    Eff!

    ( ti / (CT x N)) x100%

    Dengan :

    n : jumlah elemen kerja yang ada

    CT : cycle time atau waktu siklusN : jumlah stasiun kerja yang terbentuk

  • 8/3/2019 Chp007 Line Balancing

    12/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    12Mata Kuliah : SISTEM PRODUKSI

    BALANCE DELAY

    rasio antara waktu idle dalam lini

    dengan waktu yang tersedia.

    Nilaibalance delaysemakin mendekati0, semakin baik, karena hal ini

    menunjukkan bahwa waktu idle yang

    terdapat dalam lini perakitan juga

    semakin mendekati 0.

  • 8/3/2019 Chp007 Line Balancing

    13/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    13Mata Kuliah : SISTEM PRODUKSI

    BALANCE DELAY

    BALANCEDELAY SEBELUMDISEIMBANGKAN :

    BD! ((R x T) ti / (R x T)) x 100%

    Dengan :

    ti : waktu proses elemen kerja yang adadi jalur terpanjang.

    R : jumlah daerah yang terbentuk dariprecedence diagram.

    T : waktu terbesar dari semua elemenkerja.

  • 8/3/2019 Chp007 Line Balancing

    14/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    14Mata Kuliah : SISTEM PRODUKSI

    BALANCE DELAY

    balance delaylini perakitan setelah

    diseimbangkan :

    BD!

    ((CT x N) ti / (CT x N)) x100%

    Dengan :

    n : jumlah elemen kerja yang ada

    CT : cycle time atau waktu siklusN : jumlah stasiun kerja yang terbentuk

  • 8/3/2019 Chp007 Line Balancing

    15/59

  • 8/3/2019 Chp007 Line Balancing

    16/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    16Mata Kuliah : SISTEM PRODUKSI

    IDLE TIME

    Idle time sebelum diseimbangkan :

    Idle ! R x T ti

    Denganti : waktu proses elemen kerja yang ada

    di jalur terpanjang.

    R : jumlah daerah yang terbentuk dariprecedence diagram

    T : waktu terbesar dari semua elemen

    kerja

  • 8/3/2019 Chp007 Line Balancing

    17/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    17Mata Kuliah : SISTEM PRODUKSI

    IDLE TIME

    idle time lini perakitan setelah

    diseimbangkan :

    Idle

    !CT x N ti

    Dengan

    n : jumlah elemen kerja yang ada

    CT : cycle time atau waktu siklusN : jumlah stasiun kerja yang terbentuk

  • 8/3/2019 Chp007 Line Balancing

    18/59

  • 8/3/2019 Chp007 Line Balancing

    19/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    19Mata Kuliah : SISTEM PRODUKSI

    SMOOTHING INDEX

    parameter untuk memilih alternatif solusiyang akan diimplementasikan denganindeks penghalusan (smoothing index)

    SI! (STmax STi)2

    Dengan STmax : waktu terbesar dari stasiun kerja

    yang terbentuk.

    STi : waktu stasiun kerja i yang terbentuk

    N : jumlah stasiun kerja yang terbentuk Nilai SI yang semakin kecil menunjukkan

    tingkat keseimbangan beban kerja setiapstasiun kerja yang tinggi.

  • 8/3/2019 Chp007 Line Balancing

    20/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    20Mata Kuliah : SISTEM PRODUKSI

    Station 1

    Minutes

    perUnit 6

    Station 2

    7

    Station 3

    3

    Assembly Lines Balancing Concepts

    Question: Suppose you load work into the three workstationsbelow such that each will take the corresponding

    numberofminutes asshown. What is the cycle time of

    this line?

    Answer: The cycle time of the line is alwaysdetermined by the workstation taking the longest

    time. In this problem, the cycle time of the line is 7

    minutes. There is also going to be idle time at the

    othertwo workstations.

  • 8/3/2019 Chp007 Line Balancing

    21/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    21Mata Kuliah : SISTEM PRODUKSI

    Example of Line Balancing

    Youve just been assigned the job a setting

    up an electric fan assembly line with the

    following tasks:

    Task Time (Mins) Description PredecessorsA 2 Assemble frame None

    B 1 Mount switch A

    C 3.25 Assemble motor housing None

    D 1.2 Mount motor housing in frame A, C

    E 0.5 Attach blade DF 1 Assemble and attach safety grill E

    G 1 Attach cord B

    H 1.4 Test F, G

  • 8/3/2019 Chp007 Line Balancing

    22/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    22Mata Kuliah : SISTEM PRODUKSI

    Example of Line Balancing:

    Structuring the Precedence DiagramTask Predecessors

    A None

    A

    B A

    B

    C None

    C

    D A, C

    D

    Task Predecessors

    E D

    E

    F E

    F

    G B

    G

    H E, G

    H

  • 8/3/2019 Chp007 Line Balancing

    23/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    23Mata Kuliah : SISTEM PRODUKSI

    Example of Line Balancing:

    Precedence Diagram

    A

    C

    B

    D E F

    GH

    2

    3.25

    1

    1.2 .5

    11.4

    1

    Question: Which processstep defines themaximumrate of production?

    Answer: Task C is the cycle time of the line and

    therefore, themaximumrate of production.

  • 8/3/2019 Chp007 Line Balancing

    24/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    24Mata Kuliah : SISTEM PRODUKSI

    Example of Line Balancing: The Bottleneck

    Task Time (Mins) Description Predecessors

    A 2 Assemble frame None

    B 1 Mount switch A

    C 3.25 Assemble motor housing NoneD 1.2 Mount motor housing in frame A, C

    E 0.5 Attach blade D

    F 1 Assemble and attach safety grill E

    G 1 Attach cord B

    H 1.4 Test E, G

    Max Production =Production time per day

    Bottleneck time=

    420 mins

    3.25 mins / unit=129 units

  • 8/3/2019 Chp007 Line Balancing

    25/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    25Mata Kuliah : SISTEM PRODUKSI

    Example of Line Balancing: Determine

    Cycle Time

    Required Cycle Time, C =Production time per period

    Required output per period

    C =420 mins / day

    100 units / day= 4.2 mins / unit

    Question: Suppose we want toassemble 100 fans perday. Whatwould ourcycle time have to be?

    Answer:

  • 8/3/2019 Chp007 Line Balancing

    26/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    26Mata Kuliah : SISTEM PRODUKSI

    Example of Line Balancing: Determine

    Theoretical Minimum Number ofWorkstations

    Question: What is the theoretical minimumnumberof workstations forthis problem?

    Answer:Theoretical Min. Number of Workstations,N

    N =Sum of task times (T)

    Cycle time (C)

    t

    t

    N =11.35 mins / unit

    4.2 mins / unit= 2.702, or3t

  • 8/3/2019 Chp007 Line Balancing

    27/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    27Mata Kuliah : SISTEM PRODUKSI

    Example of Line Balancing: Rules To Follow

    for Loading Workstations Assign tasks to station 1, then 2, etc. in sequence. Keep

    assigning to a workstation ensuring that precedence ismaintained and total work is less than or equal to thecycle time. Use the following rules to select tasks forassignment.

    Primary: Assign tasks in orderof the largest numberoffollowing tasks

    Secondary (tie-breaking): Assign tasks in orderof thelongest operating time

  • 8/3/2019 Chp007 Line Balancing

    28/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    28Mata Kuliah : SISTEM PRODUKSI

    A

    C

    B

    D E F

    G

    H

    2

    3.25

    1

    1.2 .5

    11.4

    1

    Station 1 Station 2 Station 3

    Task Followers Time (Mins)

    A 6 2

    C 4 3.25

    D 3 1.2B 2 1

    E 2 0.5

    F 1 1

    G 1 1

    H 0 1.4

  • 8/3/2019 Chp007 Line Balancing

    29/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    29Mata Kuliah : SISTEM PRODUKSI

    A

    C

    B

    D E F

    G

    H

    2

    3.25

    1

    1.2 .5

    11.4

    1

    Station 1 Station 2 Station 3

    A (4.2-2=2.2)

    Task Followers Time (Mins)

    A 6 2

    C 4 3.25

    D 3 1.2B 2 1

    E 2 0.5

    F 1 1

    G 1 1

    H 0 1.4

  • 8/3/2019 Chp007 Line Balancing

    30/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    30Mata Kuliah : SISTEM PRODUKSI

    A

    C

    B

    D E F

    G

    H

    2

    3.25

    1

    1.2 .5

    11.4

    1

    A (4.2-2=2.2)

    B (2.2-1=1.2)

    Task Followers Time (Mins)

    A 6 2

    C 4 3.25

    D 3 1.2

    B 2 1

    E 2 0.5

    F 1 1

    G 1 1

    H 0 1.4

    Station 1 Station 2 Station 3

  • 8/3/2019 Chp007 Line Balancing

    31/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    31Mata Kuliah : SISTEM PRODUKSI

    A

    C

    B

    D E F

    G

    H

    2

    3.25

    1

    1.2 .5

    11.4

    1

    A (4.2-2=2.2)

    B (2.2-1=1.2)

    G (1.2-1= .2)

    Idle= .2

    Task Followers Time (Mins)

    A 6 2

    C 4 3.25

    D 3 1.2

    B 2 1

    E 2 0.5

    F 1 1

    G 1 1

    H 0 1.4

    Station 1 Station 2 Station 3

  • 8/3/2019 Chp007 Line Balancing

    32/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    32Mata Kuliah : SISTEM PRODUKSI

    A

    C

    B

    D E F

    G

    H

    2

    3.25

    1

    1.2 .5

    11.4

    1

    C (4.2-3.25)=.95

    Task Followers Time (Mins)

    A 6 2

    C 4 3.25

    D 3 1.2

    B 2 1

    E 2 0.5

    F 1 1

    G 1 1

    H 0 1.4

    A (4.2-2=2.2)

    B (2.2-1=1.2)

    G (1.2-1= .2)

    Idle= .2

    Station 1 Station 2 Station 3

  • 8/3/2019 Chp007 Line Balancing

    33/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    33Mata Kuliah : SISTEM PRODUKSI

    C (4.2-3.25)=.95

    Idle = .95

    A

    C

    B

    D E F

    G

    H

    2

    3.25

    1

    1.2 .5

    11.4

    1

    Task Followers Time (Mins)

    A 6 2

    C 4 3.25

    D 3 1.2

    B 2 1

    E 2 0.5

    F 1 1

    G 1 1

    H 0 1.4

    A (4.2-2=2.2)

    B (2.2-1=1.2)

    G (1.2-1= .2)

    Idle= .2

    Station 1 Station 2 Station 3

  • 8/3/2019 Chp007 Line Balancing

    34/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    34Mata Kuliah : SISTEM PRODUKSI

    C (4.2-3.25)=.95

    Idle = .95

    A

    C

    B

    D E F

    G

    H

    2

    3.25

    1

    1.2 .5

    11.4

    1

    D (4.2-1.2)=3

    Task Followers Time (Mins)

    A 6 2

    C 4 3.25

    D 3 1.2

    B 2 1

    E 2 0.5

    F 1 1

    G 1 1

    H 0 1.4

    A (4.2-2=2.2)

    B (2.2-1=1.2)

    G (1.2-1= .2)

    Idle= .2

    Station 1 Station 2 Station 3

  • 8/3/2019 Chp007 Line Balancing

    35/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    35Mata Kuliah : SISTEM PRODUKSI

    A

    C

    B

    D E F

    G

    H

    2

    3.25

    1

    1.2 .5

    11.4

    1

    C (4.2-3.25)=.95

    Idle = .95

    D (4.2-1.2)=3

    E (3-.5)=2.5

    Task Followers Time (Mins)

    A 6 2

    C 4 3.25

    D 3 1.2

    B 2 1

    E 2 0.5

    F 1 1

    G 1 1

    H 0 1.4

    A (4.2-2=2.2)

    B (2.2-1=1.2)

    G (1.2-1= .2)

    Idle= .2

    Station 1 Station 2 Station 3

  • 8/3/2019 Chp007 Line Balancing

    36/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    36Mata Kuliah : SISTEM PRODUKSI

    A

    C

    B

    D E F

    G

    H

    2

    3.25

    1

    1.2 .5

    11.4

    1

    C (4.2-3.25)=.95

    Idle = .95

    D (4.2-1.2)=3

    E (3-.5)=2.5

    F (2.5-1)=1.5

    Task Followers Time (Mins)

    A 6 2

    C 4 3.25

    D 3 1.2

    B 2 1

    E 2 0.5

    F 1 1

    G 1 1

    H 0 1.4

    A (4.2-2=2.2)

    B (2.2-1=1.2)

    G (1.2-1= .2)

    Idle= .2

    Station 1 Station 2 Station 3

  • 8/3/2019 Chp007 Line Balancing

    37/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    37Mata Kuliah : SISTEM PRODUKSI

    A

    C

    B

    D E F

    G

    H

    2

    3.25

    1

    1.2 .5

    11.4

    1

    C (4.2-3.25)=.95

    Idle = .95

    D (4.2-1.2)=3

    E (3-.5)=2.5

    F (2.5-1)=1.5

    H (1.5-1.4)=.1

    Idle = .1

    Task Followers Time (Mins)

    A 6 2

    C 4 3.25

    D 3 1.2

    B 2 1

    E 2 0.5

    F 1 1

    G 1 1

    H 0 1.4

    A (4.2-2=2.2)

    B (2.2-1=1.2)

    G (1.2-1= .2)

    Idle= .2

    Station 1 Station 2 Station 3

    Which station is the bottleneck? What is the effective cycle time?

  • 8/3/2019 Chp007 Line Balancing

    38/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    38Mata Kuliah : SISTEM PRODUKSI

    Example of Line Balancing: Determine the

    Efficiency of the Assembly Line

    Efficiency =Sum of task times (T)

    Actual number of workstations (Na) x Cycle time (C)

    Efficiency =11.35 mins / unit

    (3)(4.2mins / unit) =.901

  • 8/3/2019 Chp007 Line Balancing

    39/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    39Mata Kuliah : SISTEM PRODUKSI

    Assigning Tasks in Assembly LineBalancing

    Longest task time - choose task with longestoperation time

    Most following tasks - choose task with

    largest number of following tasks Ranked positional weight- choose task

    where the sum of the times for each followingtask is longest

    Shortest task time - choose task with shortestoperation time

    Least numberof following tasks - choose taskwith fewest subsequent tasks

  • 8/3/2019 Chp007 Line Balancing

    40/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    40Mata Kuliah : SISTEM PRODUKSI

    METODE HEURISTIC

    Kilbridge WesterHeuristic

    Metode Moodie Young

    Metode Immediate Update First Fit/ IUFF (Heuristic)

    Rank and assign Heuristic

    41

  • 8/3/2019 Chp007 Line Balancing

    41/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    41Mata Kuliah : SISTEM PRODUKSI

    Kilbridge Wester

    Heuristic Buatprecedence diagram. Padaprecedencediagram yang telah dibuat, tandai daerah-daerah yang memuat elemen-elemen kerjayang tidak saling bergantung.

    Tentukan CT dengan cara mencoba-cobafactor dari total waktu elemen kerja yang ada.Setelah CT ditentukan, kemudian tentukan

    jumlah stasiun kerja yang mungkin terbentukmenggunakan rumus :

    N ! ti / CT Dengan N : jumlah stasiun kerja

    ti : elemen kerja ke-i

    42

  • 8/3/2019 Chp007 Line Balancing

    42/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    42Mata Kuliah : SISTEM PRODUKSI

    Distribusikan elemen kerja pada setiap

    stasiun kerja dengan aturan bahwa total

    waktu elemen kerja yang terdistribusi pada

    sebuah stasiun kerja tidak boleh melebihiCT.

    Keluarkan elemen kerja yang telah

    didistribusikan pada stasiun kerja, dan

    ulangi langkah 3 sampai semua elemenkerja yang ada terdistribusi ke stasiun kerja.

    Kilbridge Wester Heuristic

    43

  • 8/3/2019 Chp007 Line Balancing

    43/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    43Mata Kuliah : SISTEM PRODUKSI

    CASE

    44

  • 8/3/2019 Chp007 Line Balancing

    44/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    44Mata Kuliah : SISTEM PRODUKSI

    METODE MOODIE-YOUNG

    Metode ini terdiri dari 2 fase yaitu :

    Fase 1 : pada fase ini, dariprecedencediagram kemudian dibuat matrik P dan

    F, yang menggambarkan elemen kerjapendahulu (P) dan elemen kerjasesudahnya (F) untuk semua elemenkerja yang ada. Apabila ada 2 elemen

    yang bisa dipilih, maka dipilih elemenyang mempunyai waktu terbesar.

    45

  • 8/3/2019 Chp007 Line Balancing

    45/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    45Mata Kuliah : SISTEM PRODUKSI

    METODE MOODIE-YOUNG

    Fase 2 : Pada fase ini, dilakukan re-

    distribusi elemen kerja ke setiap

    stasiun kerja hasil dari fase 1.

    46

  • 8/3/2019 Chp007 Line Balancing

    46/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    46Mata Kuliah : SISTEM PRODUKSI

    Fase 2 ini dilakukan dengan beberapa langkah :

    Identifikasi waktu stasiun kerja terbesardanwaktu stasiun kerja terkecil.

    Tentukan GOAL, dengan rumus :

    GOAL ! ( waktu SK max waktu SK min ) / 2 Identifikasi sebuah elemen kerja yang terdapat

    dalamstasiun kerja dengan waktu yang palingmaksimum, yang mempunyai waktu lebih kecildari GOAL, yang elemen kerja tersebut apabiladipindah kestasiun kerja dengan waktu yangpaling minimum tidakmelanggarprecedencediagram.

    Pindahkan elemen kerja tersebut. Ulangi evaluasi sampai tidak ada lagi elemen

    kerja yang dapat dipindah.

    47

  • 8/3/2019 Chp007 Line Balancing

    47/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    47Mata Kuliah : SISTEM PRODUKSI

    CASE

    48

  • 8/3/2019 Chp007 Line Balancing

    48/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    48Mata Kuliah : SISTEM PRODUKSI

    Metode Immediate Update

    First Fit /I

    UFF (Heuristic) Pengelompokan elemen kerjadilakukan dengan melibatkan sebuah

    fungsi score.

    digunakan notasi IUFFn, dengan n !1,.,8, untuk menggambarkan fungsi

    mana yang digunakan.

    49

  • 8/3/2019 Chp007 Line Balancing

    49/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    49Mata Kuliah : SISTEM PRODUKSI

    Penggolongan Fungsi Score :

    Bobot posisi (Helgeson dan Birnie)

    Kebalikan bobot posisi

    Jumlah pengikut

    Jumlah pengikut langsung

    Jumlah predecessor

    Waktu elemen kerja

    Berat posisi mundur yang berulang

    Tepi mundur yang berulang

    Metode Immediate Update First Fit / IUFF

    (Heuristic)

    50

  • 8/3/2019 Chp007 Line Balancing

    50/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    50Mata Kuliah : SISTEM PRODUKSI

    Langkah-Langkah :

    Berikan fungsi score n(x) untuk setiapelemen kerja x.

    Update, sekumpulan elemen kerja yangtersedia (elemen kerja yang mempunyaielemen kerja pendahulu yang sudahdikelompokkan pada sebuah stasiunkerja).

    Untuk elemen kerja yang tersisa,kelompokkan elemen kerja berurutan dariyang mempunyai fungsi score tertinggikemudian kembali lagi ke langkah 2.

    Metode Immediate Update

    First Fit / IUFF (Heuristic)

    51

  • 8/3/2019 Chp007 Line Balancing

    51/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    51Mata Kuliah : SISTEM PRODUKSI

    CASE

    52

  • 8/3/2019 Chp007 Line Balancing

    52/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    52Mata Kuliah : SISTEM PRODUKSI

    Rank and assign Heuristic

    Pada metode ini, setelah fungsi score

    setiap elemen kerja dihitung,

    kemudian elemen kerja di rangking

    berdasar fungsi score-nya.

    Elemen kerja yang mempunyai fungsi

    score tertinggi diberi rangking 1, dan

    seterusnya.

    53

  • 8/3/2019 Chp007 Line Balancing

    53/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    53Mata Kuliah : SISTEM PRODUKSI

    Langkah-langkah : Hitung fungsi score setiap elemen

    kerja berdasarkan fungsi yang adapada metode IUFF.

    Buat perangkingan untuk semuaelemen kerja berdasarkan nilai fungsiscore-nya.

    Kelompokkan elemen kerja-elemenkerja pada stasiun kerja denganmemperhatikan precedence diagramdan batasan CT.

    Rank and assign Heuristic

    54

  • 8/3/2019 Chp007 Line Balancing

    54/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    Mata Kuliah : SISTEM PRODUKSI

    CASE

    55

  • 8/3/2019 Chp007 Line Balancing

    55/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    Mata Kuliah : SISTEM PRODUKSI

    Question Bowl

    If the production time perday is 1200minutes and therequired output perday is 500 units, which of thefollowing will be therequired

    workstation cycle time forthisassembly line?

    a. 2.4 minutesb. 0.42 minutesc. 1200 unitsd. 500 unitse. None of the above

    Answer: a. 2.4

    minutes

    (1

    200/500=

    2.4minutes)

    56

  • 8/3/2019 Chp007 Line Balancing

    56/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    Mata Kuliah : SISTEM PRODUKSI

    Question Bowl

    You havejust finished determining the

    cycle time foran assembly line to be 5minutes. Thesum of all the tasksrequired on this assembly is is 60minutes. Which of the following is the

    theoretical minimum numberofworkstationsrequired to satisfy theworkstation cycle time?

    a. 1 workstationb. 5 workstationsc. 12 workstationsd. 60 workstationse. None of the above

    Answer: c. 12

    workstations

    (60/5=12)

    57

  • 8/3/2019 Chp007 Line Balancing

    57/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    Mata Kuliah : SISTEM PRODUKSI

    Question Bowl

    If thesum of the task times foranassembly line is 30 minutes, the actualnumberof workstations is 5, and theworkstation cycle time is 10 minutes,what is theresulting efficiency of this

    assembly line?a. 0.00b. 0.60c. 1.00

    d. 1.20e. Can not be computed from the data

    aboveAnswer: b. 0.60 (30/(5x10)=0.60)

    58

  • 8/3/2019 Chp007 Line Balancing

    58/59

    Andre Sugiyono 2006 Jurusan Teknik Industri UNISSULA.

    Mata Kuliah : SISTEM PRODUKSI

    Question Bowl

    Which of the following are ways thatwe can accommodate a 20 second

    task in a 18 second cycle time?

    a. Share the task

    b. Use parallel workstations

    c. Use a moreskilled worker

    d. All of the above

    e. None of the aboveAnswer: d.All of the above

    59

  • 8/3/2019 Chp007 Line Balancing

    59/59

    Mata Kuliah : SISTEM PRODUKSI

    Question Bowl

    Which of the following are ambientconditions that should be

    considered in layout design?

    a. Noise level

    b. Lighting

    c. Temperature

    d. Scent

    e. All of the above

    Answer: e.All of the above