  • Book of PlansDoc Ref: 2.14 Chelsea Embankment ForeshoreAPFP Regulations 2009: Regulation 5(2)(k), (o)

    Box 61 Folder C January 2013

    Chel

    sea

    Emba

    nkm

    ent F

    ores

    hore

    Thames Tideway Tunnel Thames Water Utilities Limited

    Application for Development ConsentApplication Reference Number: WWO10001

    Hard copy available in

  • This page is intentionally left blank

  • Application for Development Consent: Book of Plans

    List of Volumes

    Box Volume Section Location Drawing type or site location 1 Project-wide drawings Works plan and sections 1 2 Project-wide drawings Land acquisition plans 3 Project-wide drawings Land plans 4 Project-wide drawings Crown and special category land plans 5 Site drawings Acton Storm Tanks 6 Site drawings Hammersmith Pumping Station 2 7 Site drawings Barn Elms

    61 8 Site drawings Putney Embankment Foreshore 9 Site drawings Carnwath Road Riverside 10 Site drawings Dormay Street 11 Site drawings King Georges Park 3 12 Site drawings Falconbrook Pumping Station 13 Site drawings Cremorne Wharf Depot 14 Site drawings Chelsea Embankment Foreshore 15 Site drawings Kirtling Street 16 Site drawings Heathwall Pumping Station 4 17 Site drawings Albert Embankment Foreshore 18 Site drawings Victoria Embankment Foreshore 19 Site drawings Blackfriars Bridge Foreshore 20 Site drawings Shad Thames Pumping Station 5 21 Site drawings Chambers Wharf

    62 22 Site drawings Earl Pumping Station 23 Site drawings Deptford Church Street 24 Site drawings Greenwich Pumping Station 25 Site drawings King Edward Memorial Park Foreshore 6 26 Site drawings Bekesbourne Street 27 Site drawings Abbey Mils Pumping Station 28 Site drawings Beckton Sewage Treatment Works. 29 Project-wide drawings Ventilation columns

    This volume is Volume 3

  • Volume 3

    Drawing Title Sheet No. Drawing number

    Section 14: Chelsea Embankment Foreshore Location plan DCO-PP-12X-CHEEF-140001

    As existing site features plan DCO-PP-12X-CHEEF-140002

    Access plan DCO-PP-12X-CHEEF-140003

    Demolition and site clearance 1 of 2 DCO-PP-12X-CHEEF-140004

    Demolition and site clearance 2 of 2 DCO-PP-12X-CHEEF-140005

    Site works parameter plan DCO-PP-12X-CHEEF-140006

    Site works parameter key plan DCO-PP-12X-CHEEF-140007

    Permanent works layout 1 of 2 DCO-PP-12X-CHEEF-140008

    Permanent works layout 2 of 2 DCO-PP-12X-CHEEF-140009

    Proposed landscape plan 1 of 2 DCO-PP-12X-CHEEF-140010

    Proposed landscape plan 2 of 2 DCO-PP-12X-CHEEF-140011

    Section AA DCO-PP-12X-CHEEF-140012

    As existing and proposed south (river) elevation DCO-PP-12X-CHEEF-140013

    As existing and proposed west elevation DCO-PP-12X-CHEEF-140014

    Proposed east elevation DCO-PP-12X-CHEEF-140015

    Proposed north elevation DCO-PP-12X-CHEEF-140016

    Kiosk design intent DCO-PP-12X-CHEEF-140017

    Typical river wall design intent DCO-PP-12X-CHEEF-140018

    Construction phases - phase 1 Site setup DCO-PP-12X-CHEEF-140019

    Construction phases - phase 2 Shaft construction and tunnelling DCO-PP-12X-CHEEF-140020

    Construction phases - phase 3 Construction of other structures DCO-PP-12X-CHEEF-140021

    Construction phases - phase 4 Site demobilisation DCO-PP-12X-CHEEF-140022

    Highway layout during construction (Utility diversion phase)* DCO-PP-12X-CHEEF-140027

    Highway layout during construction - Phase 1 - 2* DCO-PP-12X-CHEEF-140028

    Highway layout during construction - Phase 3* DCO-PP-12X-CHEEF-140029 Highway layout during construction - Bull ring resurfacing* DCO-PP-12X-CHEEF-140030

    Permanent highway layout* DCO-PP-12X-CHEEF-140031

    * Schedules of associated highway works are located in the Transport Assessment

  • Battersea Park

    Avenue

    Central

    Cycle Hire Station

    GP

    PostsSub

    way

    Post

    Post

    Post

    Central Peninsula

    Central Av

    enue

    Posts

    Posts

    Posts

    Posts

    Post

    Posts

    Posts

    Post

    Posts

    Posts

    Posts

    Posts

    Posts

    Dove W

    alk

    Posts

    Posts

    Posts

    Post

    Posts

    Posts

    Posts

    Conveyor

    P

    Cycle H

    ire Station

    Cycle H

    ire Station

    Hire Station

    Cycle

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    of Wandsworth

    London Borough

    Westminster

    City of

    Chelsea Brid

    ge

    of Kensington & Chelsea

    Royal Borough

    Main tunnel

    Mean low water

    Mean low water

    Kirtling Street

    tunnel

    connection

    Ranelagh

    Chelsea Embankment Foreshore

    Notes:

    N

    within limits of deviation.

    1. The alignment of the tunnels are illustrative

    Tunnel

    Key:

    Local authority boundary

    Shaft

    Order limits

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    FOR INFORMATION

    Location plan

    DCO-PP-12X-CHEEF-140001

    January 2013

    0100m 100m

    1:5000 if reproduced at A3

    Scale 1:2500 at A1

    This drawing

    Book of plans - section 14

    Festival Pleasure Gardens

    Chelsea Em

    bankme

    nt

    Millennium Arena

    Battersea Park

    Power Station

    Battersea

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    College stairs

    Grosvenor

    Authoris

    ed chan

    nel

    Mean low wa

    ter

    Chelsea Em

    bankme

    nt

    "Bull Ring"

    Hospital

    Royal

    + 107.80m

    + 106.00m

    + 104.84m

    + 104.88m

    + 104.25m

    + 104.90m

    + 104.88m

    + 103.71m

    + 104.18m

    + 106.43m

    CSO

    Ranelagh

    Notes:

    been used in the preparation of this drawing.

    and the topographic survey base, both of which have

    to differences between the Ordnance Survey base

    and the parameters marked on the drawings are due

    2. Any discrepancy between the location of structures

    1. All dimensions and levels are approximate.

    Monum

    ent Walk

    Gardens

    Chelsea Embankment

    N

    Approximate position of CSO outlet

    Authorised channel

    (LLAU)

    Limits of land to be acquired or used

    (shown in metres above tunnel datum)

    Existing levels + 105.40m

    Listed buildings/structures

    Key:

    (trunk sizes vary)

    Existing trees within surveyed area

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    End of brick parapet

    End of stone parapet

    (brick wall below)

    Ranelagh Gardens

    Royal Hospital South Grounds

    End of listed wall

    (stone wall and

    parapet)

    for pedestrians

    Traffic island

    cast iron lampstands

    Regular stone piers with

    outfall

    protection) to

    Apron (scour

    Bus stop

    gates

    "Bull Ring"

    central reservation

    Raised grassed

    to river wall

    Brick parapet

    Memorial Obelisk

    Royal Hospital Axis shown

    Entrances to Royal Hospital Grounds

    College stairs

    east and west of Grosvenor

    with a stone parapet above

    River wall constructed of brick

    setting to historic park and gardens

    to Royal Hospital perimeter forms

    Brick dwarf wall with railings above

    South Grounds

    Gardens and Royal Hospital

    Boundary between Ranelagh

    Car parking located in Bull ring

    up to Chelsea Bridge

    Earth embankment

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    FOR INFORMATION

    As existing

    Site features plan

    DCO-PP-12X-CHEEF-140002

    January 2013

    Book of plans - section 14

  • Shingle

    CHELS

    EA EM

    BANKM

    ENT

    River Th

    ames

    (Army Pensioners)

    Chelsea Rea

    ch

    War Memorial

    Mean

    High W

    ater

    Royal Hospital

    Boro Con

    st, GL As

    ly Const &

    LB Bdy

    CCLW

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Ap

    pedestrian crossing

    Existing signalised

    and deliveries

    stopped up for site access

    Highway to be temporarily

    Low Level Sewer No.1

    a connection to the existing

    utilities and construction of

    stopped up for diversion of

    Highway to be temporarily

    Thames Path

    Authorised channel

    Thames Path

    Mean low water

    Permament foreshore structure

    Existing public right of way

    temporarily stopped up

    Area of highway to be

    Ap

    or used (LLAU)

    Limits of land to be acquired

    of right of way

    Route of temporary diversion

    temporarily stopped up

    Existing right of way

    Key:

    Access to permanent works

    Ac Access to construction works

    Ac

    Ac

    Notes:

    1.This plan does not show stopping up and

    diversions of limited duration (eg hoarding

    erection, minor utility diversions and minor

    highway works).

    2. Only rights of way in or close to worksites

    are shown. The full extents of rights of way

    are not shown where they cease to be

    relevant to the project.

    3.The point of the construction site access

    would be moved from time to time within

    this length of frontage to enable construction

    of development.

    phases 1 and 2 only )

    Bridge Road ( Construction

    signalised crossing at Chelsea

    Rejoins Thames path at existing

    access would be located

    Highway frontage within which

    ( Construction phase 3 only )

    crossing on diversion

    Signalised temporary pedestrian

    of highway frontage (see note 3)

    be located within this length

    Construction site access would

    location to be confirmed )

    highway frontage (Precise

    located within this length of

    Permanent access would be

    of public rights of navigation

    Area of permanent extinguishment

    of public rights of navigation

    Area of temporary suspension

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    FOR APPROVAL

    Access plan

    DCO-PP-12X-CHEEF-140003

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 14

  • Mean

    High W

    ater

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    Chelsea Em

    bankme

    nt

    River T

    hames

    standards

    3 No. Ornamental lamp

    Mean low water

    Authorised channel

    Sheet 1

    Sheet 2

    Key:

    or used (LLAU)

    Limits of land to be acquired

    Trees to be removed

    Trees to be pruned

    to be removed

    Above ground structures

    relocated or reinstated

    Structure to be removed and

    where possible

    re-used elsewhere on site

    Stone parapet materials to be

    proposed position)

    (Refer to landscaping plan for

    completion of works.

    permanent pedestrian refuge on

    Traffic island to be replaced with

    to be removed or infilled

    Below ground structures

    Notes:

    vegetation not shown.

    stripping of topsoil and clearance of minor

    removal of hardstanding and foundations,

    2. General activities of site clearance such as

    bollards etc.) are not shown.

    1. Minor items to be removed (e.g. barriers,

    N

    Sheet Layout

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    FOR APPROVAL

    Demolition and site clearance

    Sheet 1 of 2

    DCO-PP-12X-CHEEF-140004

    January 2013

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 14

    Matc

    hline: Sheet 2

    construction

    construction and reinstated post

    brick facing to be stored during

    Stone parapet and section of river wall

    construction

    construction and reinstated post

    wall brick facing to be stored during

    Stone parapet and section of river

    outfall apron

    Brick and concrete

  • Shingle

    4.3mBorehole

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    Chelsea Em

    bankme

    nt

    River T

    hames

    Ranelagh Gardens

    Mean low water

    of works to match existing

    and reinstated on completion

    railings to be dismantled

    Brick boundary wall with

    Sheet 1

    Sheet 2

    Key:

    Matc

    hline: Sheet 1

    relocated or reinstated

    Structure to be removed and

    Trees to be removed

    Trees to be pruned

    or used (LLAU)

    Limits of land to be acquired

    to be removed

    Above ground structures

    N

    vegetation not shown.

    stripping of topsoil and clearance of minor

    removal of hardstanding and foundations,

    2. General activities of site clearance such as

    bollards etc.) are not shown.

    1. Minor items to be removed (e.g. barriers,

    Notes:

    Sheet Layout

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    FOR APPROVAL

    Demolition and site clearance

    Sheet 2 of 2

    DCO-PP-12X-CHEEF-140005

    January 2013

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 14

  • Shingle

    CHELS

    EA EM

    BANKM

    ENT

    River Th

    ames

    Chelsea Rea

    ch

    War Memorial

    Mean

    High W

    ater

    Boro Con

    st, GL As

    ly Const &

    LB Bdy

    CCLW

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    would be located

    Zone within which Work No. 12a

    Mean lo

    w water

    1.5m

    6.0m

    8.0m (4.0m)

    (Minimum heights are in brackets where applicable)

    Maximum height above finished ground level

    Table 1

    Electrical and control kiosk(s)

    and overflow weir chambers

    Ventilation column(s) serving interception

    Ventilation column(s) serving the shaft

    Above ground permanent structure

    Typical Section A

    (Not to scale)

    structure

    Foreshore

    Varies

    105.45m minimum

    106.00m maximum

    Top of river/parapet wall

    intertidal terracing

    Maximum extent of

    Intertidal terrace

    (See Typical Section A)

    intertidal terrace

    Maximum extent of

    (level varies)

    River foreshore

    terracing

    Maximum extent of intertidal

    Key:

    would be located

    Zone within which the shaft

    landscaping would be located

    Zone within which required

    site structures would be located

    Zone within which all permanent

    or used (LLAU)

    Limits of land to be acquired

    located (those listed in Table 1)

    above ground structures would be

    Zone within which permanent

    would be located

    and ventilation column(s) serving the shaft

    Zone within which electrical and control kiosk(s)

    chamber would be located

    and ventilation column(s) serving the interception

    Zone within which electrical and control kiosk(s)

    weir chamber(s) would be located

    column(s) serving the overflow

    Zone within which ventilation

    to be acquired or used.

    provided they are located within the Limits of land

    works may be located within or outside this zone

    under-reaming. Shaft construction temporary

    construction tolerances) and if applicable

    walls (including appropriate allowances for

    would include all permanent works including shaft

    The zone within which the shaft would be located3.

    each zone independently.

    The Site Works Parameter Key Plan identifies2.

    1. All dimensions and levels are approximate.

    Notes:

    works platform

    Maximum extent of temporary

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    FOR APPROVAL

    Site works parameter plan

    DCO-PP-12X-CHEEF-140006

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 14

  • MHW

    Monument

    Chelsea Reach

    Shingle

    Shingle

    CHELS

    EA EM

    BANKM

    ENT

    River Th

    ames

    Chelsea Rea

    ch

    War Memorial

    Mean

    High W

    ater

    Boro Con

    st, GL As

    ly Const &

    LB Bdy

    MHW

    Monument

    Chelsea Reach

    Shingle

    Shingle

    CHELS

    EA EM

    BANKM

    ENT

    River Th

    ames

    Chelsea Rea

    ch

    War Memorial

    Mean

    High W

    ater

    Boro Con

    st, GL As

    ly Const &

    LB Bdy

    MHW

    Monument

    Chelsea Reach

    Shingle

    Shingle

    CHELS

    EA EM

    BANKM

    ENT

    River Th

    ames

    Chelsea Rea

    ch

    War Memorial

    Mean

    High W

    ater

    Boro Con

    st, GL As

    ly Const &

    LB Bdy

    MHW

    Monument

    Chelsea Reach

    Shingle

    Shingle

    CHELS

    EA EM

    BANKM

    ENT

    River Th

    ames

    Chelsea Rea

    ch

    War Memorial

    Mean

    High W

    ater

    Boro Con

    st, GL As

    ly Const &

    LB Bdy

    MHW

    Monument

    Chelsea Reach

    Shingle

    Shingle

    CHELS

    EA EM

    BANKM

    ENT

    River Th

    ames

    Chelsea Rea

    ch

    War Memorial

    Mean

    High W

    ater

    Boro Con

    st, GL As

    ly Const &

    LB Bdy

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    would be located

    Zone within which Work No. 12a

    Mean low w

    ater

    Mean low w

    ater

    Mean low w

    ater

    Mean low w

    ater

    Mean low w

    ater

    terracing

    Maximum extent of intertidal

    Key:

    would be located

    Zone within which the shaft

    landscaping would be located

    Zone within which required

    site structures would be located

    Zone within which all permanent

    or used (LLAU)

    Limits of land to be acquired

    would be located

    serving the overflow weir chamber(s)

    Zone within which ventilation column(s)

    the shaft would be located

    kiosk(s) and ventilation column(s) serving

    Zone within which electrical and control

    chamber would be located

    and ventilation column(s) serving the interception

    Zone within which electrical and control kiosk(s)

    located

    above ground structures would be

    Zone within which permanent

    to be acquired or used.

    provided they are located within the Limits of land

    works may be located within or outside this zone

    under-reaming. Shaft construction temporary

    construction tolerances) and if applicable

    walls (including appropriate allowances for

    would include all permanent works including shaft

    The zone within which the shaft would be located3.

    to those shown on the Site works parameter plans.

    each zone independently. The zones are identical

    The Site Works Parameter Key Plan identifies2.

    1. All dimensions and levels are approximate.

    Notes:

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    FOR INFORMATION

    Site works parameter key plan

    DCO-PP-12X-CHEEF-140007

    January 2013

    10m 0 100m

    1:2500 if reproduced at A3

    Scale 1:1250 at A1

    This drawing

    Book of plans - section 14

  • Mean

    High W

    ater

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    River wall

    Ranelagh CSO

    Chelsea Em

    bankme

    nt

    Authorised channel

    Matc

    hline: Sheet 2

    104.40

    104.95

    104.40

    106.05

    column, 6m high

    0.225m internal dia ventilation

    Sewer No. 1

    Existing northern Low Level

    No. 1 overflow weir chamber

    northern Low Level Sewer

    Connection culvert from

    Existing Ranelagh Sewer (Main line)

    Storm Relief Sewer

    Kings Scholars Pond

    Existing Ranelagh and

    Existing Sloane Street Sewer

    culvert

    Ranelagh connection

    Mean low water

    over connection culvert

    Inter-tidal terraceProposed access cover

    or used (LLAU)

    Limits of land to be acquired

    Existing sewers

    104.50above tunnel datum)

    Proposed level (shown in metres

    would be located

    Zone within which the shaft

    and/or Proposed site features plan.

    are shown on the Proposed landscape plan

    only. Landscaping hard works and soft works

    This drawing shows permanent site structures3.

    in the preparation of this drawing.

    survey base, both of which have been used

    Ordnance Survey base and topographical

    drawings are due to differences between the

    structures and the parameters marked on the

    Any discrepancy between the location of2.

    All dimensions and levels are approximate.1.

    Notes:

    Key:

    site structures would be located

    Zone within which all permanent

    be located

    above ground structures would

    Zone within which permanent

    Sheet 1

    Sheet 2

    Sheet Layout

    N

    would be located

    serving the interception chamber

    control kiosk and ventilation column

    Zone within which electrical and

    match opposite side

    Inter-tidal terrace to

    Existing sewer access

    landscaping plans

    landscaping refer to proposed

    Traffic island to be modified. For

    Scour protection area

    Scour protection area

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Permanent works layout

    Sheet 1 of 2

    DCO-PP-12X-CHEEF-140008

    January 2013

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 14

    and valve chamber

    Interception chamber

    Ventilation duct

    Parapet wall

    stairs

    To Grosvenor College

    Bull Ring

    de-aeration chamber

    4.8m internal dia

    of 4m minimum to 8m maximum height

    2 No. 0.9m internal dia ventilation columns

    Cremorne Wharf

    main tunnel to

    7.2m internal dia

    Work No. 1b.

    Kirtling Street

    main tunnel to

    7.2m internal dia

    Work No. 1b.

    proposed landscape plans.

    For landscaping refer to

    To be modified.

    connection tunnel

    4m internal dia

    Work No. 12b.

    would be located

    kiosk serving the shaft

    the electrical and control

    ventilation columns and

    Zone within which the

    chamber

    Air treatment

    (12m Internal dia)

    CSO drop shaft

    Work No. 12a.

    shaft

    recirculation vent to

    Horizontal de-aeration

    5.5m x 2.5m x 1.5m high

    Electrical and control kiosk

    with mountable kerbs

    Access for maintenance vehicles

    6m x 2m x 1.5m high

    Electrical and control kiosk

    Outfall apron

    would be located

    Work No. 12a

    Zone within which

    CSO overflow

  • 4.3m

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    Chelsea Em

    bankme

    nt

    Ranelagh Gardens

    Matc

    hline: Sheet 1

    culvert to interception chamber

    2.5m internal dia. connection

    106.45

    Low Lev

    el Sewe

    r No. 1

    Existing norther

    n

    column, 6m high

    0.225m internal dia. ventilation

    Mean low water

    Proposed access cover

    or used (LLAU)

    Limits of land to be acquired

    Existing sewers

    104.50above tunnel datum)

    Proposed level (shown in metres

    and/or Proposed site features plan.

    are shown on the Proposed landscape plan

    only. Landscaping hard works and soft works

    This drawing shows permanent site structures3.

    in the preparation of this drawing.

    survey base, both of which have been used

    Ordnance Survey base and topographical

    drawings are due to differences between the

    structures and the parameters marked on the

    Any discrepancy between the location of2.

    All dimensions and levels are approximate.1.

    Notes:

    Key:

    site structures would be located

    Zone within which all permanent

    be located

    above ground structures would

    Zone within which permanent

    would be located

    ventilation column

    Zone within which

    overflow weir chamber

    northern Low Level Sewer No. 1

    diverted gas main

    maintenance access to

    Gate for utility company

    N

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Permanent works layout

    Sheet 2 of 2

    DCO-PP-12X-CHEEF-140009

    January 2013

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 14

    Sheet 1

    Sheet 2

    Sheet Layout

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    Chelsea Em

    bankme

    nt

    N

    CSO

    Ranelagh

    104.40

    104.90

    106.00

    105.45

    104.90

    + 105.60m

    + 104.67m

    + 104.54m

    + 104.52m

    + 104.77m

    + 104.65m

    + 104.65m

    + 104.72m

    + 104.43m

    + 104.28m

    + 104.28m+ 104.24m

    + 104.34m+ 104.28m

    + 104.53m

    + 104.63m

    104.40

    Notes:

    Sheet Layout:

    Sheet 1

    Sheet 2

    AA

    Landscape key:

    Reed bed planting

    Proposed trees

    Approximate position of CSO outlet

    (LLAU)

    Limits of land to be acquired or used

    ground structures would be located

    Zone within which permanent above

    (shown in metres above tunnel datum)

    Existing levels

    (shown in metres above tunnel datum)

    Proposed levels

    + 105.40m

    105.40

    would be located

    Zone within which required landscaping

    Listed buildings/structures

    Key:

    (trunk sizes vary)

    Existing trees within surveyed area

    Maximum extent of foreshore structure

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    and cream granite sets

    Floral motif pattern in grey

    pimple paving)

    match existing (concrete slab /

    Surface of footway reinstated to

    extent of access covers required.

    the Permanent works layout for an indication of the

    4. Access covers not shown on this drawing. Refer to

    works parameter plan.

    statement are those listed in table 1 on the Site

    scale of above ground structures which is indicative"

    3. The above ground structures in the "Save for the

    been used in the preparation of this drawing.

    and the topographic survey base, both of which have

    to differences between the Ordnance Survey base

    and the parameters marked on the drawings are due

    2. Any discrepancy between the location of structures

    1. All dimensions and levels are approximate.

    Royal Hospital Axis shown

    Boundary enscribed in stone parapet

    New parish boundary marker stone.

    4m minimum to 8m maximum height

    2 No. signature ventilation columns of

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Proposed

    Landscape plan sheet 1 of 2

    DCO-PP-12X-CHEEF-140010

    January 2013

    Book of plans - section 14

    Save for the scale of above ground structures

    which is indicative

    of space without impeding views

    Simple stone bench marks end

    "Bull Ring" gates

    with surrounding finish

    Paving flush at junction

    Royal Hospital South Grounds

    portable platform)

    (to be used in conjunction with

    terrace for periodic maintenance

    Fixed ladder access to intertidal

    raised

    paving slightly

    Sculptured

    portable platform)

    (to be used in conjunction with

    periodic maintenance to terraces

    Fixed ladder access to terrace for

    of pavement edge

    wall reinstated along the back

    Exsiting stone parapet to river

    island relocated east

    Existing pedestrian

    Start of new river wall

    Start of new river wall

    bus stop and car parking spaces

    Brass studs or a flush kerb to define

    new structure into river wall

    create inter-tidal terrace and blend

    Brick facing to wall peels out to

    into existing space

    to tie foreshore structure

    continues into "Bull Ring"

    Paving treatment

    to agreement with TfL

    realigned to define shape better. All subject

    Kerbs to junction with Chelsea Embankment

    6m high

    Ventilation column

    interception structure

    Inter-tidal terrace above Ranelagh

    in existing parapet wall

    kiosk 1.5m high marks intervention

    Stone clad electrical and control

    Mea

    n low water

    structure

    embankment and foreshore

    Inter-tidal terrace between

    in existing parapet wall

    kiosk 1.5m high marks intervention

    Stone clad electrical and control

    stop retained

    Existing bus

    Monum

    ent Walk

    kerb alignment

    Lamp post and bollards relocated to suit

    Stone parapet wall

    mark historic axis

    Grooves in scuptured paving

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    existing

    Road surface to be reinstated as

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Proposed

    Landscape plan sheet 2 of 2

    DCO-PP-12X-CHEEF-140011

    January 2013

    Save for the scale of above ground structures

    which is indicative

    Book of plans - section 14

    Ranelagh Gardens

    Chelsea Em

    bankme

    nt

    around the works

    Tree positions reconfigured

    Planting around works to reinstate

    green screening to road

    Wall and railing reinstated after

    construction to match existing

    + 107.31m

    + 105.90m

    + 104.18m

    for construction

    replacing trees removed

    planted on embankment

    Semi mature London planes

    106.30

    to diverted utilities

    Gates for maintenance access

    Landscape key:

    Root barrier

    Chelsea Embankment Gardens

    N

    Ventilation column 6m high

    Proposed trees

    (LLAU)

    Limits of land to be acquired or used

    ground structures would be located

    Zone within which permanent above

    (shown in metres above tunnel datum)

    Existing levels

    (shown in metres above tunnel datum)

    Proposed levels

    + 105.40m

    105.40

    would be located

    Zone within which required landscaping

    Listed buildings/structures

    Key:

    (trunk sizes vary)

    Existing trees within surveyed area

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Sheet 1

    Sheet 2

    extent of access covers required.

    the Permanent works layout for an indication of the

    4. Access covers not shown on this drawing. Refer to

    works parameter plan.

    statement are those listed in table 1 on the Site

    scale of above ground structures which is indicative"

    3. The above ground structures in the "Save for the

    been used in the preparation of this drawing.

    and the topographic survey base, both of which have

    to differences between the Ordnance Survey base

    and the parameters marked on the drawings are due

    2. Any discrepancy between the location of structures

    1. All dimensions and levels are approximate.

    Notes:

    Sheet Layout:

    Native shrub tree planting

    match existing

    Paving stone reinstated to

    construction site

    Grass seeding to

    weir chamber

    adjacent to new overflow

    Lamp post repositioned

    around utility diversions

    Extent of root barrier

    Mean low water

    green screening to road

    Planting around works to reinstate

    to new overflow weir chamber

    Lamp post repositioned adjacent

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    Section AA

    Inter-tidal terrace

    6m high

    Ventilation column

    to match existing

    Curved brick wall

    to match existing

    Curved brick wall

    and parapet

    lamp column

    Reinstated

    and parapet

    lamp column

    Reinstated

    Notes:

    the below ground infrastructure to be provided.

    2. The purpose of this section is to show the scale of

    1. All dimensions and levels are approximate.

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    N

    A

    terrace

    Inter-tidal

    CSO drop shaft

    area

    "Bull Ring"

    New tree to

    struture

    foreshore

    New tree on

    parapet

    stone

    Curved

    A

    1.5m high

    control kiosk

    electrical and

    Stone clad

    control kiosk 1.5m high

    Stone clad electrical and

    gates

    "Bull Ring"

    Valve chamber

    with coir matting

    Sediment anchored

    Ranelagh connection culvert

    with coir matting

    Sediment anchored

    8m maximum height

    columns of 4m minimum to

    2 No. signature ventilation

    impeding views

    end of space without

    Stone bench marks

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Section AA

    DCO-PP-12X-CHEEF-140012

    January 2013

    Book of plans - section 14

    2020 flood defence level 105.41m ATD

    Mean high water springs 103.91m ATD

    Mean low water springs 97.81m ATD

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    As existing South (river) elevation

    Proposed South (river) elevation

    Royal Hospital South Grounds Ranelagh Gardens

    1. All dimensions and levels are approximate.

    bridge ramp

    Planted slope retaining

    brick wall

    Curved

    parapet

    stone

    Curved

    kiosk 1.5m high

    Electrical and control

    kiosk 1.5m high

    Electrical and control

    terrace

    Inter-tidal

    ramping up to Chelsea Bridge

    Railings at back of pavement Brick river wall

    Notes:

    6m high

    Ventilation column

    maximum height (behind tree)

    columns of 4m minimum to 8m

    2 No. signature ventilation

    CSO outfall

    Ranelagh

    CSO outfall

    Ranelagh

    6m high (behind tree)

    Ventilation column

    Foreshore structure

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    N

    South (rive

    r) eleva

    tion

    2020 flood defence level 105.41m ATD

    Mean high water springs 103.91m ATD

    Mean low water springs 97.81m ATD

    2020 flood defence level 105.41m ATD

    Mean high water springs 103.91m ATD

    Mean low water springs 97.81m ATD

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    As existing and proposed

    South (river) elevation

    DCO-PP-12X-CHEEF-140013

    January 2013

    Book of plans - section 14

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    Proposed West elevation

    Stone parapet

    As existing West elevation

    of South Gardens

    Treelines to perimeter

    Station beyond

    Western Pumping

    Gardens perimeter

    above to Royal Hospital

    Brick upstand with railings

    kiosks 1.5m high

    Electrical and control

    Inter-tidal terrace

    (behind tree)

    columns 6m high

    2 No. ventilation

    to 8m maximum height

    columns of 4m minimum

    2 No. signature ventilation

    Royal Hospital South Gardens Chelsea Embankment"Bull Ring"

    Notes:

    1. All dimensions and levels are approximate.

    Foreshore structure

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    N

    West ele

    vatio

    n

    Brick wall

    Chelsea Bridge

    Grade II listed

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    As existing and proposed

    West elevation

    DCO-PP-12X-CHEEF-140014

    January 2013

    Book of plans - section 14

    2020 flood defence level 105.41m ATD

    Mean high water springs 103.91m ATD

    Mean low water springs 97.81m ATD

    2020 flood defence level 105.41m ATD

    Mean high water springs 103.91m ATD

    Mean low water springs 97.81m ATD

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    Ring"

    South Gardens and "Bull

    Treelines to perimeter of

    Inter-tidal terrace

    6m high

    Ventilation column

    1.5m high

    Electrical and control kiosks

    8m maximum height

    columns, 4m minimum to

    2 No. signature ventilation Ranelagh CSO outfall

    parapet

    Curved stone

    Notes:

    1. All dimensions and levels are approximate.

    Foreshore structure

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    N

    East ele

    vation

    East elevation

    foreshore structure

    2 No. new trees on

    match existing

    Brick wall to

    Chelsea Embankment

    2020 flood defence level 105.41m ATD

    Mean high water springs 103.91m ATD

    Mean low water springs 97.81m ATD

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Proposed

    East elevation

    DCO-PP-12X-CHEEF-140015

    January 2013

    Book of plans - section 14

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    North elevation

    and parapet

    lamp column

    Reinstated

    and parapet

    lamp column

    Reinstated

    high

    Ventilation column 6m

    Notes:

    1. All dimensions and levels are approximate.

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    N

    North eleva

    tion

    of space without impeding views

    Simple stone bench marks end

    Curved stone parapet

    parapet

    incorporated into stone

    control kiosk 1.5m high

    Stone clad electrical and

    parapet

    into stone

    incorporated

    1.5m high

    control kiosk

    electrical and

    Stone clad

    wall on historic axis

    Line inscribed on

    8m maximum height

    columns of 4m minimum to

    2 No. signature ventilation

    foreshore struture

    2No. new trees on

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Proposed

    North elevation

    DCO-PP-12X-CHEEF-140016

    January 2013

    Book of plans - section 14

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    1. All dimensions and levels are approximate.

    Notes:

    104.90

    N

    104.90

    104.40 104.40

    01m 4m

    1:100 if reproduced at A3

    Scale 1:50 at A1

    This drawing

    N

    Scale 1:50

    Scale 1:50

    Scale 1:50

    Scale 1:50

    West kiosk East elevation

    Stone parapet wall

    incorporate kiosk

    Top of wall raised to

    West kiosk West elevation

    Stone parapet wall

    incorporate kiosk

    Top of wall raised to

    incorporate kiosk

    Top of wall raised to Stone parapet wall

    Scale 1:50

    East kiosk West elevation

    Scale 1:50

    East kiosk East elevation

    Scale 1:50

    East kiosk sectionWest kiosk section

    incorporate kiosk

    Top of wall raised to Stone parapet wall

    incorporate kiosk

    Top of wall raised to Stone parapet wall

    incorporate kiosk

    Top of wall raised to Stone parapet wall

    Scale 1:50

    East kiosk planWest kiosk plan

    louvres as required

    with architectural

    PPC metal panel doors

    louvres as required

    with architectural

    PPC metal panel doors

    East Ele

    vation

    West Ele

    vatio

    n

    West Elevatio

    n

    East Elevatio

    n

    terrace below

    Inter-tidal

    terrace below

    Inter-tidal

    against integral kiosk

    reinstated and terminates

    Existing stone parapet wall

    against integral kiosk

    reinstated and terminates

    Existing stone parapet wall

    equipment

    control

    electrical and

    accomodate

    wall thickens to

    Stone parapet

    equipment

    control

    electrical and

    accomodate

    wall thickens to

    Stone parapet

    roof to shed water

    Slight fall on stone

    roof to shed water

    Slight fall on stone

    West

    East

    architectural louvres

    Metal panel doors with

    architectural louvres

    Metal panel doors with

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Kiosk design intent

    DCO-PP-12X-CHEEF-140017

    January 2013

    Save for the scale of the kiosk

    which is indicative

    Book of plans - section 14

    Sect. Sect.

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    Notes:

    1. All dimensions and levels are approximate.

    This drawing

    01m 4m

    1:100 if reproduced at A3

    Scale 1:50 at A1

    N

    Scale 1:50

    Detail section Isometric

    NTSScale 1:50

    South elevation

    Scale 1:50

    existing

    Brick wall to match

    wall

    to prevent uneven staining of

    habitat from below and extend

    Metal pipes to flood inter-tidal

    Granite paving

    106.00m ATD

    104.60m ATD

    106.00m ATD

    104.90m ATD

    prevent uneven staining of wall

    habitat from below and extend to

    Metal pipes to flood inter-tidal

    with coir matting

    Sediment anchored

    Brick wall to match existing

    106.00m ATD

    104.90m ATD

    South ele

    vation

    North elev

    ation

    MHW 103.91m ATD

    MLW 97.81m ATD MLW 97.81m ATD

    MHW 103.91m ATD

    Rip-rap as required

    Rip-rap as required

    existing

    stone to match

    Parapet in natural

    North elevation

    104.60m ATD

    Sect.

    wall

    to prevent uneven staining of

    habitat from below and extend

    Metal pipes to flood inter-tidal

    Reed bed planting

    Substructure shown notionallySubstructure shown notionally

    of existing brick wall

    Height to match top

    Brick coping.

    match existing

    Brick wall to

    paving

    Granite

    notionally

    Substructure shown

    planting

    Reed bed

    coir matting

    Sediment anchored with

    brick wall

    top of existing

    Height to match

    Brick coping.

    of existing brick wall

    Height to match top

    Brick coping.

    planting

    Reed bed

    Varies

    existing

    stone to match

    Parapet in natural

    Rip-rap as required

    to match existing

    Parapet in natural stone

    to match existing

    Parapet in natural stone

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Typical river wall design intent

    DCO-PP-12X-CHEEF-140018

    January 2013

    Book of plans - section 14

  • River Th

    ames

    (Army Pensioners)

    Chelsea Rea

    ch

    War Memorial

    Royal Hospital

    GV

    UTT

    GV

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    traffic island

    Removal of lane closure

    Intermittent

    operations

    servicing piling

    Jack up barge

    Piling rig

    Existing pedestrian crossing

    Barge on campshed

    works

    traffic maintained throughout

    One lane closed but two way

    Thames Path

    throughout the works

    two way traffic maintained

    Intermittent lane closure

    works

    traffic maintained throughout

    One lane closed but two way

    Authorised channel

    Chelsea Em

    bankmen

    t

    Traffic barriers

    left turn out

    Construction access,

    left turn in

    Construction access,

    Temporary working area

    at all times.

    6. Existing flood defence levels to be maintained

    5. Gate position to alter to suit construction progress.

    on this drawing.

    barriers may be required but is not shown

    4. Additional noise mitigation including noise

    would be agreed with the relevant utility company.

    3. Utility supplies for the construction of the works

    arrangements are shown.

    appropriate, outline traffic management

    appropriate authority for approval. Where

    phases of the work would be submitted to the

    2. Traffic management plans for construction

    submission and approval process.

    on layout imposed through the planning

    construction methods subject to any controls

    construction depending on their preferred

    may choose to lay sites out differently during

    the principal construction phases. Contractors

    prepared to illustrate possible site layouts for

    1. These construction phasing plans have been

    Notes :

    in river to reduce scour impact

    Rounded edge to cofferdam

    Permanent river wall

    Cofferdam

    in river to reduce scour impact

    Rounded edge to cofferdam

    construction

    overflow weir chamber

    undertaken in advance of

    Utility diversion works to be

    N

    Authorised channel

    Bridge Road

    signalised crossing at Chelsea

    Rejoins Thames path at existing

    Sheet piles

    Existing public right of way

    Key:

    Access / haul route

    Maximum extent of working area

    Site access

    Existing sewers

    Hoarding

    or used (LLAU)

    Limits of land to be acquired

    of right of way

    Route of temporary diversion

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Construction phases - phase 1

    Site setup

    DCO-PP-12X-CHEEF-140019

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 14

  • River Th

    ames

    (Army Pensioners)

    Chelsea Rea

    ch

    War Memorial

    Royal Hospital

    CL 105.49

    UTT

    Pit IL 104.49

    Oil Valve Pit

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Crane Crane

    closure

    Intermittent lane

    Segment storage

    Existing pedestrian crossing

    Barge on campshed

    Thames Path

    works

    traffic maintained throughout

    One lane closed but two way

    Authorised channel

    Chelsea Em

    bankmen

    t

    tunnel.

    jack up barge during construction of connection

    Working area allows for ground treatment from

    Offices/welfare building

    and handling area

    Excavated material storage

    Shaft

    Workshop buildings

    Security office

    Storage (open area or containerised)

    aggregate storage area

    Concrete batching plant and

    Permanent river wall

    left turn out

    Construction access,

    Site power structure

    left turn in

    Construction access,

    at all times.

    6. Existing flood defence levels to be maintained

    5. Gate position to alter to suit construction progress.

    on this drawing.

    barriers may be required but is not shown

    4. Additional noise mitigation including noise

    would be agreed with the relevant utility company.

    3. Utility supplies for the construction of the works

    arrangements are shown.

    appropriate, outline traffic management

    appropriate authority for approval. Where

    phases of the work would be submitted to the

    2. Traffic management plans for construction

    submission and approval process.

    on layout imposed through the planning

    construction methods subject to any controls

    construction depending on their preferred

    may choose to lay sites out differently during

    the principal construction phases. Contractors

    prepared to illustrate possible site layouts for

    1. These construction phasing plans have been

    Notes :

    in river to reduce scour impact

    Rounded edge to cofferdam

    in river to reduce scour impact

    Rounded edge to cofferdam

    Authorised channel

    Main tunnel

    Connection tunnel

    Cofferdam

    Bridge Road

    signalised crossing at Chelsea

    Rejoins Thames path at existing

    Sheet piles

    Existing public right of way

    Key:

    Access / haul route

    Maximum extent of working area

    Site access

    Existing sewers

    Hoarding

    or used (LLAU)

    Limits of land to be acquired

    of right of way

    Route of temporary diversion

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Construction phases - phase 2

    Shaft construction & tunnelling

    DCO-PP-12X-CHEEF-140020

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 14

  • River Th

    ames

    (Army Pensioners)

    Chelsea Rea

    ch

    War Memorial

    Royal Hospital

    GV

    CL 105.49

    UTT

    Pit IL 104.49

    Oil Valve Pit

    UTT

    GV

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Crane

    Crane

    closure

    Intermittent lane

    Piling rig

    Existing pedestrian crossing

    works

    traffic maintained throughout

    One lane closed but two way

    Authorised channel

    works

    traffic maintained throughout

    One lane closed but two way

    Thames Path

    Chelsea Em

    bankmen

    t

    crossing on diversion

    Signalised temporary pedestrian

    throughout works

    way traffic maintained

    weir chambers but two

    construction of overflow

    Lane closure during

    Barge on campshed

    Offices/welfare building

    and handling area

    Excavated material storage

    Shaft

    left turn in, left turn out

    to suit construction,

    gate position can alter

    Construction access,

    Site power structure

    Security office

    Workshop buildings

    Storage (open area or containerised)

    Permanent river wall

    at all times.

    6. Existing flood defence levels to be maintained

    5. Gate position to alter to suit construction progress.

    on this drawing.

    barriers may be required but is not shown

    4. Additional noise mitigation including noise

    would be agreed with the relevant utility company.

    3. Utility supplies for the construction of the works

    arrangements are shown.

    appropriate, outline traffic management

    appropriate authority for approval. Where

    phases of the work would be submitted to the

    2. Traffic management plans for construction

    submission and approval process.

    on layout imposed through the planning

    construction methods subject to any controls

    construction depending on their preferred

    may choose to lay sites out differently during

    the principal construction phases. Contractors

    prepared to illustrate possible site layouts for

    1. These construction phasing plans have been

    Notes :

    in river to reduce scour impact

    Rounded edge to cofferdam

    Connection tunnel

    Authorised channel

    in river to reduce scour impact

    Rounded edge to cofferdam

    Cofferdam Main tunnel

    Connection culvert

    weir chamber

    Construction of overflow

    Sheet piles

    Existing public right of way

    Key:

    Access / haul route

    Maximum extent of working area

    Site access

    Existing sewers

    Hoarding

    or used (LLAU)

    Limits of land to be acquired

    of right of way

    Route of temporary diversion

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Construction phases - phase 3

    Construction of other structures

    DCO-PP-12X-CHEEF-140021

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 14

  • River Th

    ames

    (Army Pensioners)

    Chelsea Rea

    ch

    War Memorial

    Royal Hospital

    Borehole

    103.64

    104.22

    Borehole

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Authorised channel

    Chelsea Em

    bankmen

    t

    Shaft

    restrictions removed

    Temporary traffic

    and foreshore reinstated

    cofferdam piling and fill removed

    Construction facilities removed,

    Mean low water

    foreshore reinstated

    Campshed removed and

    Hoarding removed

    Park reinstated

    reinstatement

    prior to foreshore

    Outfall apron constructed

    prior to foreshore reinstatement

    Scour protection constructed

    Permanent river wall

    Authorised channel

    removed

    Thames Path diversion

    wall brick facing reinstated

    Stone parapet and river

    wall brick facing reinstated

    Stone parapet and river

    removed

    Hoarding

    Sheet piles

    Existing public right of way

    Key:

    Maximum extent of working area

    Site access

    Existing sewers

    Hoarding

    or used (LLAU)

    Limits of land to be acquired

    Royal Borough of Kensington & Chelsea

    Chelsea Embankment Foreshore

    ILLUSTRATIVE

    Construction phases - phase 4

    Site demobilisation

    DCO-PP-12X-CHEEF-140022

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 14

  • Monument

    Ranelagh

    Gardens

    M

    h

    w

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    Ranelagh gardens

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    M

    e

    a

    n

    h

    ig

    h

    w

    a

    te

    r

    Monument

    Ranelagh

    Gardens

    M

    h

    w

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    Ranelagh gardens

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    M

    e

    a

    n

    h

    ig

    h

    w

    a

    te

    r

    CHEEF_C01

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Mapping reproduced by permission of Ordnance

    Database right 2012. All rights reserved. Ordance

    Survey licence number 100019345

    N

    Application for Development Consent

    Location

    Document Information

    Coordinates are to be Ordance Survey Datum

    OSGB36. All levels are in metres and relate to the

    Tunnel Datum which is 100 metres below Ordnance

    Datum Newlyn.

    Proposed highway layout during construction

    Existing highway layout

    This drawing

    KeyExisting

    On street parkingBus stop / standPedestrian crossing

    CHEEF_C00 See schedule of works

    Revised

    Traffic barrierSite access point

    L.L.A.U.

    DCO-PP-12X-CHEEF-140027

    (Utility diversion phase)

    Highway layout during construction

    ILLUSTRATIVE

    Chelsea Embankment Foreshore

    RB Kensington and Chelsea

    January 2013

    Notes1. All dimensions and levels are approximate.2. Any discrepancy between the locations of structures and the

    parameters marked on the drawing are due to differencesbetween the ordinance survey base and the topographicalbase, both of which have been used in the preparation of thisdrawing.

    N

    On street parking

    Cycle lanebarclays cycle superhighwaysmon - fri 7.00am - 7.00pmcycle lane mon - fri 8.00am -6.30pm

    Permit holdersresident permit holders onlymon - fri 8.30am - 10.00pmsat 8.30am - 1.30pm

    StageConstruction phases - utility diversion10m 0 40m

    Scale 1:500 at A1

    1:1000 if reproduced at A3

    Standards

    Design manual for roads and bridges, Dft, 1992Traffic signs regulations & general directions, TSO, 2002Traffic signs manual, Dft, 2006Manual for streets, Dft, 2007Manual for streets 2, CIHT, 2010Designing for deliveries, Fta, 1998Cycle infrastructure design Ltn 2/08, Dft, 2008Design of pedestrian crossings Ltn 2/95, Dft, 1995Guidance for the use of tactile paving, Dft, 1998Accessible bus stop design guidance, TfL, 2006

  • Monument

    Ranelagh

    Gardens

    M

    h

    w

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    Ranelagh gardens

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    M

    e

    a

    n

    h

    ig

    h

    w

    a

    te

    r

    Monument

    Ranelagh

    Gardens

    M

    h

    w

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    Ranelagh gardens

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    M

    e

    a

    n

    h

    ig

    h

    w

    a

    te

    r

    CHEEF_C04CHEEF_C02

    CHEEF_C03

    Permit holderpermit holders onlymon - fri 8:30am - 10.00pmsat - 8.30am - 1.30pm

    Proposed highway layout during construction

    Existing highway layout

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Mapping reproduced by permission of Ordnance

    Database right 2012. All rights reserved. Ordance

    Survey licence number 100019345

    N

    Application for Development Consent

    Location

    Document Information

    Coordinates are to be Ordance Survey Datum

    OSGB36. All levels are in metres and relate to the

    Tunnel Datum which is 100 metres below Ordnance

    Datum Newlyn.

    DCO-PP-12X-CHEEF-140028

    Phase 1 - 2

    Highway layout during construction

    ILLUSTRATIVE

    Chelsea Embankment Foreshore

    RB Kensington and Chelsea

    January 2013

    Notes1. All dimensions and levels are approximate.2. Any discrepancy between the locations of structures and the

    parameters marked on the drawing are due to differencesbetween the ordinance survey base and the topographicalbase, both of which have been used in the preparation of thisdrawing.

    N

    KeyExisting

    On street parkingBus stop / standPedestrian crossing

    CHEEF_C00 See schedule of works

    Revised

    Traffic barrierSite access point

    L.L.A.U.

    On street parking

    StageConstruction phases10m 0 40m

    Scale 1:500 at A1

    1:1000 if reproduced at A3

    Site hoarding

    Standards

    Design manual for roads and bridges, Dft, 1992Traffic signs regulations & general directions, TSO, 2002Traffic signs manual, Dft, 2006Manual for streets, Dft, 2007Manual for streets 2, CIHT, 2010Designing for deliveries, Fta, 1998Cycle infrastructure design Ltn 2/08, Dft, 2008Design of pedestrian crossings Ltn 2/95, Dft, 1995Guidance for the use of tactile paving, Dft, 1998Accessible bus stop design guidance, TfL, 2006

    This drawing

  • Monument

    Ranelagh

    Gardens

    M

    h

    w

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    Ranelagh gardens

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    M

    e

    a

    n

    h

    ig

    h

    w

    a

    te

    r

    Monument

    Ranelagh

    Gardens

    M

    h

    w

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    Ranelagh gardens

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    M

    e

    a

    n

    h

    ig

    h

    w

    a

    te

    r

    CHEEF_C06

    CHEEF_C05

    Proposed highway layout during construction

    Existing highway layout

    This drawing

    KeyExisting

    CHEEF_C00 See schedule of works

    Revised

    On street parkingBus stop / standPedestrian crossing

    Traffic barrierSite access point

    Illustrative on-site manoeuvring zoneTemporary pedestrian crossing

    L.L.A.U.

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Mapping reproduced by permission of Ordnance

    Database right 2012. All rights reserved. Ordance

    Survey licence number 100019345

    N

    Application for Development Consent

    Location

    Document Information

    Coordinates are to be Ordance Survey Datum

    OSGB36. All levels are in metres and relate to the

    Tunnel Datum which is 100 metres below Ordnance

    Datum Newlyn.

    Notes1. All dimensions and levels are approximate.2. Any discrepancy between the locations of structures and the

    parameters marked on the drawing are due to differencesbetween the ordinance survey base and the topographicalbase, both of which have been used in the preparation of thisdrawing.

    N

    DCO-PP-12X-CHEEF-140029

    Phase 3

    Highway layout during construction

    ILLUSTRATIVE

    Chelsea Embankment Foreshore

    RB Kensington and Chelsea

    January 2013

    StageConstruction phases10m 0 40m

    Scale 1:500 at A1

    1:1000 if reproduced at A3

    Site hoarding

    Permit holderpermit holders onlymon - fri 8:30am - 10.00pmsat - 8.30am - 1.30pm

    On street parking

    Standards

    Design manual for roads and bridges, Dft, 1992Traffic signs regulations & general directions, TSO, 2002Traffic signs manual, Dft, 2006Manual for streets, Dft, 2007Manual for streets 2, CIHT, 2010Designing for deliveries, Fta, 1998Cycle infrastructure design Ltn 2/08, Dft, 2008Design of pedestrian crossings Ltn 2/95, Dft, 1995Guidance for the use of tactile paving, Dft, 1998Accessible bus stop design guidance, TfL, 2006

  • Monument

    Ranelagh

    Gardens

    M

    hw

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    Ranelagh gardens

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    M

    e

    a

    n

    h

    ig

    h

    w

    a

    te

    r

    CHEEF_C07

    CHEEF_C08

    CHEEF_C09

    CHEEF_C10

    Monument

    Ranelagh

    Gardens

    M

    h

    w

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    Ranelagh gardens

    Shingle

    C

    h

    e

    ls

    e

    a

    e

    m

    b

    a

    n

    k

    m

    e

    n

    t

    M

    e

    a

    n

    h

    ig

    h

    w

    a

    te

    r

    Proposed highway layout during construction

    Existing highway layout

    This drawing

    KeyExisting

    On street parkingBus stop / standPedestrian crossing

    CHEEF_C00 See schedule of works

    Revised

    Traffic barrierSite access point

    Temporary pedestrian crossing

    L.L.A.U.

    Temporary parking restrictionTemporary bus stop restriction

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Mapping reproduced by permission of Ordnance

    Database right 2012. All rights reserved. Ordance

    Survey licence number 100019345

    N

    Application for Development Consent

    Location

    Document Information

    Coordinates are to be Ordance Survey Datum

    OSGB36. All levels are in metres and relate to the

    Tunnel Datum which is 100 metres below Ordnance

    Datum Newlyn.

    Notes1. All dimensions and levels are approximate.2. Any discrepancy between the locations of structures and the

    parameters marked on the drawing are due to differencesbetween the ordinance survey base and the topographicalbase, both of which have been used in the preparation of thisdrawing.

    N

    DCO-PP-12X-CHEEF-140030

    Bullring resurfacing

    Highway layout during construction

    ILLUSTRATIVE

    Chelsea Embankment Foreshore

    RB Kensington and Chelsea

    January 2013

    StageConstruction phases10m 0 40m

    Scale 1:500 at A1

    1:1000 if reproduced at A3

    Removed pedestrian crossing

    Permit holderpermit holders onlymon - fri 8:30am - 10.00pmsat - 8.30am - 1.30pm

    On street parking

    Standards

    Design manual for roads and bridges, Dft, 1992Traffic signs regulations & general directions, TSO, 2002Traffic signs manual, Dft, 2006Manual for streets, Dft, 2007Manual for streets 2, CIHT, 2010Designing for deliveries, Fta, 1998Cycle infrastructure design Ltn 2/08, Dft, 2008Design of pedestrian crossings Ltn 2/95, Dft, 1995Guidance for the use of tactile paving, Dft, 1998Accessible bus stop design guidance, TfL, 2006

  • Monument

    Ranelagh

    Gardens

    M

    H

    W

    Shingle

    C

    H

    E

    L

    S

    E

    A

    E

    M

    B

    A

    N

    K

    M

    E

    N

    T

    Ranelagh Gardens

    Shingle

    C

    H

    E

    L

    S

    E

    A

    E

    M

    B

    A

    N

    K

    M

    E

    N

    T

    4.9m

    5.4m

    7.5m

    4.3m

    M

    e

    a

    n

    H

    ig

    h

    W

    a

    te

    r

    CHEEF_P02

    CHEEF_P03

    CHEEF_P01

    Monument

    Ranelagh

    Gardens

    M

    H

    W

    Shingle

    C

    H

    E

    L

    S

    E

    A

    E

    M

    B

    A

    N

    K

    M

    E

    N

    T

    Ranelagh Gardens

    Shingle

    C

    H

    E

    L

    S

    E

    A

    E

    M

    B

    A

    N

    K

    M

    E

    N

    T

    4.9m

    5.4m

    7.5m

    4.3m

    M

    e

    a

    n

    H

    ig

    h

    W

    a

    te

    r

    Proposed highway layout during construction

    Existing highway layout

    KeyExisting

    On street parkingBus stop / standPedestrian crossing

    CHEEF_C00 See schedule of worksRevised

    Pedestrian refuge

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Mapping reproduced by permission of Ordnance

    Database right 2012. All rights reserved. Ordance

    Survey licence number 100019345

    N

    Application for Development Consent

    Location

    Document Information

    Coordinates are to be Ordance Survey Datum

    OSGB36. All levels are in metres and relate to the

    Tunnel Datum which is 100 metres below Ordnance

    Datum Newlyn.

    Notes1. All dimensions and levels are approximate.2. Any discrepancy between the locations of structures and the

    parameters marked on the drawing are due to differencesbetween the ordinance survey base and the topographicalbase, both of which have been used in the preparation of thisdrawing.

    N

    DCO-PP-12X-CHEEF-140031

    Permanent highway layout

    ILLUSTRATIVE

    Chelsea Embankment Foreshore

    RB Kensington and Chelsea

    January 2013

    This drawing

    StagePermanent phase10m 0 40m

    Scale 1:500 at A1

    1:1000 if reproduced at A3

    Permit holderpermit holders onlymon - fri 8:30am - 10.00pmsat - 8.30am - 1.30pm

    On street parking

    Standards

    Design manual for roads and bridges, Dft, 1992Traffic signs regulations & general directions, TSO, 2002Traffic signs manual, Dft, 2006Manual for streets, Dft, 2007Manual for streets 2, CIHT, 2010Designing for deliveries, Fta, 1998Cycle infrastructure design Ltn 2/08, Dft, 2008Design of pedestrian crossings Ltn 2/95, Dft, 1995Guidance for the use of tactile paving, Dft, 1998Accessible bus stop design guidance, TfL, 2006

    Strengthen footway / vehicle crossover area

  • Copyright notice Copyright Thames Water Utilities Limited January 2013. All rights reserved. Any plans, drawings, designs and materials (materials) submitted by Thames Water Utilities Limited (Thames Water) as part of this application for Development Consent to the Planning Inspectorate are protected by copyright. You may only use this material (including making copies of it) in order to (a) inspect those plans, drawings, designs and materials at a more convenient time or place; or (b) to facilitate the exercise of a right to participate in the pre-examination or examination stages of the application which is available under the Planning Act 2008 and related regulations. Use for any other purpose is prohibited and further copies must not be made without the prior written consent of Thames Water. Thames Water Utilities LimitedClearwater Court, Vastern Road, Reading RG1 8DB The Thames Water logo and Thames Tideway Tunnel logo are Thames Water Utilities Limited. All rights reserved. DCO-DT-000-ZZZZZ-021400