Chapter 12 Wall and Ceiling Construction
11

Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Jan 05, 2016

Download

Documents

Eric Richards
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Chapter 12

Wall and Ceiling

Construction

Page 2: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs

Wall Cripples Trimmers

Headers Solid Cripple

Bracing

Page 3: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.
Page 4: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Other Terms Rough Opening 16” On Center (O.C) Corner

Bracing Nailer (p.212) Blocking

Page 5: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Weather Board Placement

Page 6: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Rough Opening

• Tops of Doors and Windows are 6’-10”

• RO dimensioned to center of opening on Floor Plan

•Header Required

Page 7: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Headers

Sized for Span

Trussed?

Page 8: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Ceiling Joists Provides ceiling for interior rooms of house Can also be the floor joists of the above

floor Generally the same direction as rafters Size depends on:

Load to be supported Span distance Wood Species Spacing (OC) Grade of lumber

Page 9: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Ceiling Joist Span

Page 10: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Special Walls Bay / Bow Windows Other wide openings Masonry Construction

Bonding with metal ties or header course

Need for furring strips Firecut (P. 217) Brick ledge

Page 11: Chapter 12 Wall and Ceiling Construction. Frame Wall Construction Sole Plate (Bottom Plate) Top Plates (Double Top or Cap) Studs Wall Cripples Trimmers.

Brick Wall Section (p.219)