Top Banner
CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15 May 2003 Toulouse, France
16

CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

Mar 27, 2015

Download

Documents

Joshua Griffith
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 1

Core Site WGISS Test FacilityWGCV & WGISS Efforts

John Faundeen & Stu Doescher, USGS

WGISS-15

May 2003

Toulouse, France

Page 2: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 2

Background

September 2001 proposal via WGCV (Yves-Louis Desnos) WGISS-13 Discussions (Peter Churchill) Spring of 2002 – USGS agrees to sponsor a WTF The WTF plan discussed at …

WGCV Ottawa Meeting (May 2002) WGISS Frascati Subgroup (May 2002) WGISS Alexandria Subgroup (Sept. 2002)

The WGCV/WGISS WTF plan approved 15 October 2002 edcsgs16.cr.usgs.gov/wgiss/

username = calval99 password = wgiss03

Page 3: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 3

Objectives

   * Establish linkages between site data archives to facilitate improved product access and knowledge assessments of the long-term stability and interoperability to address the challenges of the Terrestrial Carbon Observation (TCO) theme.

* Ramp-up validation efforts, leveraging off of the infrastructure and protocols developed through existing site activities,

   * Address science questions suitable for combined field and multi-resolution data.

   * Enable ready collaboration between validation investigators and existing science networks and programs.

   *  Facilitate validation activities directed at better product knowledge and assessment of the products’ stability and interoperability.

Page 4: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 4

Goals: Phase I

Simple, Web-Based Interface Over CEOS Core Sites Allow Users to Specify Conversion Parameters Provide Access to EO and in-situ Data Begin With MODIS & Landsat Allow Reprojecting Allow Reformatting into GeoTIFF

Page 5: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 5

Goals Phase II        Incorporate GTOS “Terrestrial Ecosystem Monitoring Sites”        Add CEOP/NASDA, CSIRO, GT-net, ILTERS as Phase II efforts        Enable synergy within and between Satellite/Sensor science teams for data collection and subsequent research        Provide science community with immediate, easily accessible data from CEOS member sensors        Provide a focus for ongoing satellite, aircraft, and ground data collection for validation of CEOS member satellite/sensor products        Provide scientists with sets of readily accessible in-situ and CEOS member instrument data for algorithm validation and improvement         Build on infrastructure of existing scientific networks and validation sites        Realize international cost-sharing opportunities

Page 6: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 6

The WGCV/WGISS WTF

Page 7: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 7

The WGCV/WGISS WTF

Page 8: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 8

The WGCV/WGISS WTF

Page 9: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 9

The WGCV/WGISS WTF

Page 10: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 10

The WGCV/WGISS WTF

Page 11: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 11

The WGCV/WGISS WTF

Page 12: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 12

The WGCV/WGISS WTF

Email Notification for User:

EMAIL:

Page 13: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 13

Re-Projection Tool Results

Boreas Test Site MODIS Data in Sinusoidal Projection

Boreas MODIS re-projected from Sinusoidal to Universal Transverse Mercator

Page 14: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 14

NAMING CONVENTIONS: DATA SET NAMES

MOD09A1 MODIS/Terra Surface Reflectance 8-Day L3 Global 500m ISIN Grid

ShortName

Instrument

Platform

Parameter

Temporal Resolution

Processing Level

Global or Swath

Spatial Resolution

Grid or not

Page 15: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 15

MOD09A1.A2000185.h11v05.003.2000193081710.hdf

ShortName

Julian Acquisition Date

TileID

Processing Version

Julian Processing DataYear, Day, Hour, Minute, Seconds

NAMING CONVENTIONS: FILE NAMES

Page 16: CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.

CEOS Working Group on Information Systems and Services - 16

Summary

Close to Phase 1 Completion SPOT Requirements Creep for Vegetation Accommodated

WGCV Happy With Results CEOS Plenary Demo Planned

November 2003

Phase II Requirements Captured June 2003