    CE Facility NeedsSummary Overview: Project Cost

    SUMMARY (By Room - First Floor)

    Room/Area Turn Key CostNursery Area Lobby 4,600$Room 101 (Infant) 5,200$

    Room 102 (Toddler) 3,800$Room 107 (Pre-K) 5,150$

    Room 103 (Beginner) 6,750$Room 105 (Toddler II) 7,500$

    Fellowship Hall 3,500$

    Total 36,500$

    SUMMARY (By Room - Third Floor)

    Room/Area Turn Key CostHallway 2,350$

    Bathrooms 3,050$Room 301 3,200$

    Room 302 2,500$Room 303 2,200$Room 304 2,900$Room 306 2,200$Room 308 2,750$

    Total 21,150$

    SUMMARY (By Priority - First Floor)

    Priority Level Turn Key Cost1 18,550$

    2 7,700$3 5,550$4 4,700$

    Total 36,500$

    SUMMARY (By Priority - Third Floor)

    Priority Level Turn Key Cost

    1 1,100$

  • 8/9/2019 CE Facilities Proposal

    3/35

    CE Facility Needs

    Itemized List of Needs to be AddressedPriority Scale: 1 being the most immediate need through 5 being those needs that can wait the longest.

    NURSERY COMMONS (Lobby)

    Item Priority Level Turn Key CostReplace Tile Floor 1 2,200$Replace Cabinet Doors 4 1,200$Paint (Walls, Trim) 1 1,200$

    Total 4,600$

    ROOM 101 (Infant Nursery)

    Item Priority Level Turn Key CostEvacuation Crib 1 500$Standard Cribs (two) 1 600$Replace AC/Heating Unit 2 3,000$

    Kitchen Set (Safe for Infant/Toddlers) 1 600$Storage Cabinet 3 500$

    Total 5,200$

    ROOM 102 (Toddler I)

    Item Priority Level Turn Key Cost

    Light Fixture Repairs/Additions 1 300$Replace AC/Heating Unit 2 3,000$Ceiling Tile Maintenance 1 500$

    Total 3,800$

    ROOM 107 (Pre-K)

    Item Priority Level Turn Key Cost

    Paint (All Walls and Trim) 1 1,000$Replace Tile Floor (incl Bathroom) 1 1,100$Install Wall to Wall Carpet 1 1,100$Replace Bathroom Fixtures 1 750$Additional Light Fixtures 2 200$

  • 8/9/2019 CE Facilities Proposal

    4/35

    ROOM 103 (Begennier)

    Item Priority Level Turn Key CostPaint (All Walls and Trim) 1 1,000$Replace Tile Floor (incl Bathroom) 1 1,100$

    Install Wall to Wall Carpet 1 1,100$Replace Bathroom Fixtures 1 750$Additional Lighting 2 200$Changing Table 2 1,000$Storage Cabinets 3 600$Domestic Play Set (Kitchen) 3 600$Domestic Play Set (Table) 3 200$Bookcase 3 200$

    Total 6,750$

    Room 105 (Toddler II)

    Item Priority Level Turn Key CostCap off Sewer/Bathrrom Pipe 1 500$Paint (All Walls and Trim) 1 1,000$

    Replace Tile Floor (incl bathroom) 1 1,100$Install Wall to Wall Carpet 1 1,100$Replace Bathroom Fixtures 1 750$Additional Lighting 1 300$Window Treatments (Blinds) 2 100$

    Domestic Play Set (Kitchen) 3 600$Domestic Play Set (Table) 3 200$Storage Cabinets 3 850$Safety Rocker Gliders 3 1,000$

    Total 7,500$

    THIRD FLOOR (Hallway)

    Item Priority Level Turn Key CostReplace Tile Floor (transition) 1 500$

    Replace Tile Floor (entire hallway) 4 1,000$Paint Radiators 2 200$Install Window Airconditioners 3 650$

    Total 2,350$

  • 8/9/2019 CE Facilities Proposal

    5/35

  • 8/9/2019 CE Facilities Proposal

    6/35

    ROOM 306

    Item Priority Level Turn Key CostPaint (Walls, Trim, Ceiling, Radiators) 3 1,000$Additional Lighting 3 300$Window Treatment (Blinds) 3 100$

    Storage Cabinet 4 500$Dry Erase Board 4 300$

    Total 2,200$

    ROOM 308

    Item Priority Level Turn Key CostPaint (Walls, Trim, Radiators) 3 1,400$Replace light fixture in Kitchen 4 150$Window Treatment (Blinds) 3 400$

    Storage Cabinet 4 500$Dry Erase Board 4 300$

    Total 2,750$

    FELLOWSHIP HALL

    Item Priority Level Turn Key CostPaint Walls and Trim 4 2,500$Woodwork Repair 4 1,000$

    Total 3,500$

  • 8/9/2019 CE Facilities Proposal

    7/35

  • 8/9/2019 CE Facilities Proposal

    8/35

  • 8/9/2019 CE Facilities Proposal

    9/35

  • 8/9/2019 CE Facilities Proposal

    10/35

    10/9/2008

    1

  • 8/9/2019 CE Facilities Proposal

    11/35

  • 8/9/2019 CE Facilities Proposal

    12/35

    10/9/2008

    3

  • 8/9/2019 CE Facilities Proposal

    13/35

    10/9/2008

    4

  • 8/9/2019 CE Facilities Proposal

    14/35

    10/9/2008

    5

  • 8/9/2019 CE Facilities Proposal

    15/35

    10/9/2008

    6

  • 8/9/2019 CE Facilities Proposal

    16/35

    10/9/2008

    7

  • 8/9/2019 CE Facilities Proposal

    17/35

    10/9/2008

    8

    / /

  • 8/9/2019 CE Facilities Proposal

    18/35

    10/9/2008

    9

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    19/35

    10/9/2008

    10

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    20/35

    10/9/2008

    11

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    21/35

    10/9/2008

    12

  • 8/9/2019 CE Facilities Proposal

    22/35

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    23/35

    10/9/2008

    14

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    24/35

    0/9/ 008

    15

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    25/35

    / /

    16

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    26/35

    17

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    27/35

    18

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    28/35

    19

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    29/35

    20

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    30/35

    21

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    31/35

    22

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    32/35

    23

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    33/35

    24

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    34/35

    25

    10/9/2008

  • 8/9/2019 CE Facilities Proposal

    35/35

    26