CE Facility NeedsSummary Overview: Project Cost
SUMMARY (By Room - First Floor)
Room/Area Turn Key CostNursery Area Lobby 4,600$Room 101 (Infant) 5,200$
Room 102 (Toddler) 3,800$Room 107 (Pre-K) 5,150$
Room 103 (Beginner) 6,750$Room 105 (Toddler II) 7,500$
Fellowship Hall 3,500$
Total 36,500$
SUMMARY (By Room - Third Floor)
Room/Area Turn Key CostHallway 2,350$
Bathrooms 3,050$Room 301 3,200$
Room 302 2,500$Room 303 2,200$Room 304 2,900$Room 306 2,200$Room 308 2,750$
Total 21,150$
SUMMARY (By Priority - First Floor)
Priority Level Turn Key Cost1 18,550$
2 7,700$3 5,550$4 4,700$
Total 36,500$
SUMMARY (By Priority - Third Floor)
Priority Level Turn Key Cost
1 1,100$
8/9/2019 CE Facilities Proposal
3/35
CE Facility Needs
Itemized List of Needs to be AddressedPriority Scale: 1 being the most immediate need through 5 being those needs that can wait the longest.
NURSERY COMMONS (Lobby)
Item Priority Level Turn Key CostReplace Tile Floor 1 2,200$Replace Cabinet Doors 4 1,200$Paint (Walls, Trim) 1 1,200$
Total 4,600$
ROOM 101 (Infant Nursery)
Item Priority Level Turn Key CostEvacuation Crib 1 500$Standard Cribs (two) 1 600$Replace AC/Heating Unit 2 3,000$
Kitchen Set (Safe for Infant/Toddlers) 1 600$Storage Cabinet 3 500$
Total 5,200$
ROOM 102 (Toddler I)
Item Priority Level Turn Key Cost
Light Fixture Repairs/Additions 1 300$Replace AC/Heating Unit 2 3,000$Ceiling Tile Maintenance 1 500$
Total 3,800$
ROOM 107 (Pre-K)
Item Priority Level Turn Key Cost
Paint (All Walls and Trim) 1 1,000$Replace Tile Floor (incl Bathroom) 1 1,100$Install Wall to Wall Carpet 1 1,100$Replace Bathroom Fixtures 1 750$Additional Light Fixtures 2 200$
8/9/2019 CE Facilities Proposal
4/35
ROOM 103 (Begennier)
Item Priority Level Turn Key CostPaint (All Walls and Trim) 1 1,000$Replace Tile Floor (incl Bathroom) 1 1,100$
Install Wall to Wall Carpet 1 1,100$Replace Bathroom Fixtures 1 750$Additional Lighting 2 200$Changing Table 2 1,000$Storage Cabinets 3 600$Domestic Play Set (Kitchen) 3 600$Domestic Play Set (Table) 3 200$Bookcase 3 200$
Total 6,750$
Room 105 (Toddler II)
Item Priority Level Turn Key CostCap off Sewer/Bathrrom Pipe 1 500$Paint (All Walls and Trim) 1 1,000$
Replace Tile Floor (incl bathroom) 1 1,100$Install Wall to Wall Carpet 1 1,100$Replace Bathroom Fixtures 1 750$Additional Lighting 1 300$Window Treatments (Blinds) 2 100$
Domestic Play Set (Kitchen) 3 600$Domestic Play Set (Table) 3 200$Storage Cabinets 3 850$Safety Rocker Gliders 3 1,000$
Total 7,500$
THIRD FLOOR (Hallway)
Item Priority Level Turn Key CostReplace Tile Floor (transition) 1 500$
Replace Tile Floor (entire hallway) 4 1,000$Paint Radiators 2 200$Install Window Airconditioners 3 650$
Total 2,350$
8/9/2019 CE Facilities Proposal
5/35
8/9/2019 CE Facilities Proposal
6/35
ROOM 306
Item Priority Level Turn Key CostPaint (Walls, Trim, Ceiling, Radiators) 3 1,000$Additional Lighting 3 300$Window Treatment (Blinds) 3 100$
Storage Cabinet 4 500$Dry Erase Board 4 300$
Total 2,200$
ROOM 308
Item Priority Level Turn Key CostPaint (Walls, Trim, Radiators) 3 1,400$Replace light fixture in Kitchen 4 150$Window Treatment (Blinds) 3 400$
Storage Cabinet 4 500$Dry Erase Board 4 300$
Total 2,750$
FELLOWSHIP HALL
Item Priority Level Turn Key CostPaint Walls and Trim 4 2,500$Woodwork Repair 4 1,000$
Total 3,500$
8/9/2019 CE Facilities Proposal
7/35
8/9/2019 CE Facilities Proposal
8/35
8/9/2019 CE Facilities Proposal
9/35
8/9/2019 CE Facilities Proposal
10/35
10/9/2008
1
8/9/2019 CE Facilities Proposal
11/35
8/9/2019 CE Facilities Proposal
12/35
10/9/2008
3
8/9/2019 CE Facilities Proposal
13/35
10/9/2008
4
8/9/2019 CE Facilities Proposal
14/35
10/9/2008
5
8/9/2019 CE Facilities Proposal
15/35
10/9/2008
6
8/9/2019 CE Facilities Proposal
16/35
10/9/2008
7
8/9/2019 CE Facilities Proposal
17/35
10/9/2008
8
/ /
8/9/2019 CE Facilities Proposal
18/35
10/9/2008
9
10/9/2008
8/9/2019 CE Facilities Proposal
19/35
10/9/2008
10
10/9/2008
8/9/2019 CE Facilities Proposal
20/35
10/9/2008
11
10/9/2008
8/9/2019 CE Facilities Proposal
21/35
10/9/2008
12
8/9/2019 CE Facilities Proposal
22/35
10/9/2008
8/9/2019 CE Facilities Proposal
23/35
10/9/2008
14
10/9/2008
8/9/2019 CE Facilities Proposal
24/35
0/9/ 008
15
10/9/2008
8/9/2019 CE Facilities Proposal
25/35
/ /
16
10/9/2008
8/9/2019 CE Facilities Proposal
26/35
17
10/9/2008
8/9/2019 CE Facilities Proposal
27/35
18
10/9/2008
8/9/2019 CE Facilities Proposal
28/35
19
10/9/2008
8/9/2019 CE Facilities Proposal
29/35
20
10/9/2008
8/9/2019 CE Facilities Proposal
30/35
21
10/9/2008
8/9/2019 CE Facilities Proposal
31/35
22
10/9/2008
8/9/2019 CE Facilities Proposal
32/35
23
10/9/2008
8/9/2019 CE Facilities Proposal
33/35
24
10/9/2008
8/9/2019 CE Facilities Proposal
34/35
25
10/9/2008
8/9/2019 CE Facilities Proposal
35/35
26