Top Banner
Catapult simulation for problem solving and variability User Manual LSS-CAT201 Version 5.20.2013
12

Catapult Simulation Instructions for Lean Six Sigma Training

Dec 05, 2014

Download

Engineering

lumensolutions

The Lean Six Sigma catapult is a great learning tool for your problem solving, Statistical Process Control (SPC) and Design of Experiments (DOE) training.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Catapult Simulation Instructions for Lean Six Sigma Training

Catapult simulation

for problem solving and variability

User Manual LSS-CAT201 Version 5.20.2013

Page 2: Catapult Simulation Instructions for Lean Six Sigma Training

Three rubber

band sizes

12”, 14”, 17”

Three balls

Three soldiers

One catapult

1. Catapult Simulation Accessories

Page 3: Catapult Simulation Instructions for Lean Six Sigma Training

2. Catapult Parts

Main block

Lever block

Clamp

Base block

Arm block

Page 4: Catapult Simulation Instructions for Lean Six Sigma Training

1

2

3

4

4 positions for lever

block with easy to hold

screw with wing nut

3. Catapult Settings: Lever Block

Page 5: Catapult Simulation Instructions for Lean Six Sigma Training

Open eye clamp to

hold the rubber band

3. Catapult Settings: Base Block

Page 6: Catapult Simulation Instructions for Lean Six Sigma Training

5 positions for arm stop

with easy to hold screw 1 2 3 4 5

4. Catapult Settings: Main Block

Page 7: Catapult Simulation Instructions for Lean Six Sigma Training

5 positions in the arm with

easy to change nuts

5. Catapult Settings: Arm Block

Ball cup holder

Plastic ball cup holder

can be moved to lower

positions

1

2

3

4

5

Page 8: Catapult Simulation Instructions for Lean Six Sigma Training

5 positions in the arm

can be used to locate

the ball cup holder.

1 position is needed for

the wing nut that holds

the rubber band

1 2 3 4 5

6. Catapult Settings: Arm Block Position To Throw the ball

Example shows setup

with a ball in position

#1 and rubber band in

position #3

Page 9: Catapult Simulation Instructions for Lean Six Sigma Training

7. Initial Setup

2 shooters for

each team

1 ball

1 catapult

Fixed distance, about 5 to 8 feet

3 soldiers

Page 10: Catapult Simulation Instructions for Lean Six Sigma Training

8. Teaching Problem Solving

1. Setup & practice 15 min

2. Round 1 10 min per team

3. Problem Solving 60 min

4. Round 2 10 min per team

5. Reflection 30 min

Page 11: Catapult Simulation Instructions for Lean Six Sigma Training

9. Results

The Catapult Game’s

goal is to knock all 3

soldiers down every time

the shooter launches a

ball.

Results must be tracked

(in yellow) by teams and

by each shooter ( e.g.

shooter 1 and shooter 2

from team 1).

Points are assigned by

the number of soldiers

down. One point for

each solder knock down.

Each shooter tries 5 times at each round. The maximum number of points each

shooter can make at each round is 15 (3 soldiers multiplied by 5 times)

Example of scoring results for one team

Page 12: Catapult Simulation Instructions for Lean Six Sigma Training

Facilitator Manual

Need step-by-step instructions to guide a catapult simulation?

A facilitator manual for practical problem solving (A3) and for

design for experiments (DOE) using the catapult simulation

can be purchased at our website LSSdeploment.com