Top Banner
Dr. José Miguel González Santaló Dr. M. Vita Peralta Martínez Dr. Zdzislaw Mazur Czerwiec November 2015 Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico
16

Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

May 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

Dr. José Miguel González Santaló

Dr. M. Vita Peralta Martínez

Dr. Zdzislaw Mazur Czerwiec

November 2015

Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico

Page 2: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

2

CCUS Road Map for México

Page 3: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

3

CCUS ROADMAP ACTIVITIES 2014 - 2024

Page 4: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

4

Road Map (Incubation)

Framework agreement

Carbon marketanalysis

Link with International Institutions in CCUS Scienceand Technology

National and International Funding mechanism fortehcnology implementation

Regulatory framework analysis

INCUBATION

World Bank grant in progress

Consultancy contractingprocess ongoing

Page 5: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

5

Creation of Mexican CCUS Center Capacity Building

Regulatory framework adjustments

Permanent monitoringbinding

National financing mechanism and incentives for technolgy development and programs compliance

Aditional International Financing and Funding mechanism and Carbon Markets

Disemination of theTechnology Implentation Plan

Entailment with stakeholder

Policies to Encourage the Private Sector

Implementation Plan for National CO2 Transport Network

National Policy of CCUS READY

PUBLIC POLICY

Road Map (Public Policy)

Consultancy contractingprocess ongoing

Actually planning

A graduate program in planning withUNAM and Berkeley University

Page 6: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

6

Estimation of storage capacity

Potential Fields Analysis, Selection and Priorization

CO2 –EOR strategies

CO2 –EOR Plans

Capture and storage plan fromPower Plants

CO2 Use and Supply Strategy

Use and Supplyreview

Use and Supplyreview

Use and Supplyreview

Road Map (Planning)PLANNING

Page 7: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

7

Road MapPilot and demonstration project Power Plants

Site selection for NGCC power plants

Selection of capture technology (Consultancy contracting process ongoing)

Feasibility and design studies

Tender

Construction and commissioning

Operation

Closure and decommissioning

Feasibility and design studies

Tender

PILOT PROJECT-POWER PLANT

DEMONSTRATION PROJECT-POWER PLANT

Environmental studies and authorizations

Builiding of Plant and CO2transport network

Public comunication

Commissioning

Injection tests and base line studiesand monitoring Injection and monitoring

Injection site caracterization

and social involvement

Page 8: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

8

Site Selection for first pilot test

Lab Analysis /first pilot

Pilot Testing Design/firt pilot

First pilotimplementation

Monitoring, reporting and verification (MRV)/First pilot Evaluation

Follow up

CCS-EOR Scaling Plant

CCS-EOR Research

Field scale design

Execution

Operations from comercial scaleprojects according to theimplementation plan

Operation and MRV

PILOT PROJECT-EOR

DEMONSTRATION PROJECT-EOR

Road MapPilot and demonstration project EOR

Page 9: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

9

Page 10: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

10

Road Map (Commercial Scale)

Identification of priority capture plants

CO2 –pipelines feasability analysis

CO2 transport network construction

Construction and commercial operation of CCS and CCS-EOR

CO2 commercialization

MRV

COMMERCIAL SCALE

Page 11: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

11

Key Remarks

Page 12: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

12

Works on CCS at IIEPOST-COMBUSTION PROGRAM AT IIE(ElectricalResearch Institute)

• A bench scale absorption unit to test different amine solvents to knowthe behaviour of these and study the different variables and parametersinvolved in the process of CO2 capture

• Absorber with 1.7 m highand 4 inches diameter

• Stripper with 2.15 m highand 5 inches diameter

• Both columns made withborosilicate glass Schott® Duran 3.3

• Packing polypropilene pallring 5/8 inches

Page 13: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

13

Works on CCS at IIEOXYCOMBUSTION FURNACE AT IIE

• Purposes:– Hands on experience with

oxycombustion– Characterize the

combustion process– Assess applicability to

Mexico

• Part of IIE’s strategic program for CCS• 30 KW thermal• Oxygen delivered by oxygen bottles• Originally CO2 and steam were also externally produced to

simulate recirculation. Now recirculation is beingimplemented

Page 14: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

14

• A small gas turbine to investigate the behaviour in operationalconditions using biofuels, CO2 capture, CO2 recirculation and the use in cogeneration.

Works on CCS at IIE gas turbine

Page 15: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

15

CCS Pilot Plant

ObjectiveTo develop a conceptual design for a capture pilot plant, to test three different technologies, this pilot plant will be located at the 160 MW Poza Rica NGCC (retrofitted plant)

PRE-FEASIBILITY STUDY by Nexant

Page 16: Carbon Capture, Utilization and Storage (CCUS) Roadmap for ...€¦ · Carbon Capture, Utilization and Storage (CCUS) Roadmap for Mexico . 2 CCUS Road Map for México. 3 CCUS ROADMAP

Thanks for your attention