Top Banner
WWW.VMA.BE PROJECT DESCRIPTION His project included several BiW installations. 22x PLC Rockwell Automation Compact Logix / 122 ABB IRC 5 Robots, quantity I/O: ± 26 400, I/O local via ethernet, SEW movipro / movidrive, Electromechanical technology: welding, handling, stapling and gluing robots (ABB IRC5), transport, turning plates, light fixtures, electrical design with E-plan P8 / Sistema, software engineering, OLP, virtual commissioning, installation, manufacturing of boards, control panels and decentralised boards, start-up (PLC and Robot) + production support, training. CAR MANUFACTURING PLANT IN THE UK SITE Car manufacturing plant in the UK CLIENT Car manufacturing plant in the UK BUDGET 7.271.000,00 euro YEAR 2014 - 2015
1

CAR MANUFACTURING PLANT IN THE UK€¦ · PROJECT DESCRIPTION His project included several BiW ... welding, handling, stapling ... turning plates, light fixtures, electrical design

May 25, 2018

Download

Documents

phungnhan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CAR MANUFACTURING PLANT IN THE UK€¦ · PROJECT DESCRIPTION His project included several BiW ... welding, handling, stapling ... turning plates, light fixtures, electrical design

WWW.VMA .BE

PROJECT DESCRIPTION His project included several BiW installations.22x PLC Rockwell Automation Compact Logix / 122 ABB IRC 5 Robots, quantity I/O: ± 26 400, I/O local via ethernet, SEW movipro / movidrive, Electromechanical technology: welding, handling, stapling and gluing robots (ABB IRC5), transport, turning plates, light fixtures, electrical design with E-plan P8 / Sistema, software engineering, OLP, virtual commissioning, installation, manufacturing of boards, control panels and decentralised boards, start-up (PLC and Robot) + production support, training.

CAR MANUFACTURING PLANT IN THE UK

SITE Car manufacturing plant in the UKCLIENT Car manufacturing plant in the UKBUDGET 7.271.000,00 euro

YEAR 2014 - 2015