Capacity Planning
30

Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Dec 11, 2015

Download

Documents

Max Lief
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Capacity Planning

Page 2: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

How much long-range capacity is needed

When more capacity is neededWhere facilities should be located

(location)How facilities should be arranged

(layout)

Facility planning answers:

Facility Planning

Page 3: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

ForecastDemand

ComputeNeededCapacity

ComputeRated

Capacity

EvaluateCapacity

Plans

ImplementBest Plan

QualitativeFactors

(e.g., Skills)

Select BestCapacity

Plan

DevelopAlternative

Plans

QuantitativeFactors

(e.g., Cost)

Capacity Planning Process

Page 4: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Types of Planning & Time Horizons

Add FacilitiesAdd long lead time equipment

Schedule Jobs Schedule Personnel Allocate Machinery

Sub-ContractAdd EquipmentAdd Shifts

Add PersonnelBuild or Use Inventory

Long Range Planning

Intermediate Range Planning

Short Range Planning Modify

CapacityUse Capacity

*

*

Page 5: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Definition & Measures of Capacity

DesignCapacity:

The theoretical maximum “throughput,” or number of units a facility can hold, receive, store, or produce in a period of time.

Utilization: Actual output as a percent of design capacity.

Effective Capacity:

Capacity a firm can expect to receive given its product mix, methods of scheduling, maintenance, and standards of quality.

Efficiency: Actual output as a percent of effective capacity.

Page 6: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Measure of planned or actual capacity usage of a facility, work center, or machine

Utilization Actual OutputDesign Capacity

Planned hours to be usedTotal hours available

=

=

Utilization

Page 7: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Measure of how well a facility or machine is performing when used

Efficiency Actual outputEffective Capacity

Actual output in unitsStandard output in unitsAverage actual time

Standard time

=

=

=

Efficiency

Page 8: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Actual or Expected Output

Actual (or Expected) Output =

(Effective Capacity) X (Efficiency)

Page 9: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Capacity Changes

Changes in capacity will likely have implications for:SalesCash flowQualitySupply chainHuman resourcesMaintenance

Page 10: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Make Good Capacity Decisions:

Forecast demand accuratelyUnderstand the technology and

capacity incrementsFind the optimal operating level

(volume)Build for change

Page 11: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Matching Capacity to Demand

1. Make staffing changes (increasing or decreasing the number of employees)

2. Adjust equipment and processes – which might include purchasing additional machinery or selling or leasing out existing equipment

3. Improve methods to increase throughput; and/or

4. Redesign the product to facilitate more throughput

Page 12: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Matching Capacity to Demand

Demand management Vary prices Change lead times Encourage or discourage business Offer complementary products

Capacity management Adjust staffing Adjust equipment and processes Change methods to facilitate production Redesign the product to facilitate production

Page 13: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Approaches to Capacity Expansion

Expected Demand Expected Demand

Expected Demand Expected Demand

Time in Years Time in Years

Time in YearsTime in Years

Dem

and

Dem

and

Dem

and

Dem

and

New Capacity

New Capacity New Capacity

New Capacity

Capacity leads demand with an incremental expansion Capacity leads demand with a one-step expansion

Capacity lags demand with an incremental expansionAttempts to have an average capacity, with an

incremental expansion

Page 14: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Approaches to Capacity Expansion

Expected Demand

Time in Years

Dem

and

New Capacity

Capacity leads demand with an incremental expansion

Page 15: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Approaches to Capacity Expansion

Expected Demand

Time in Years

Dem

and

New Capacity

Capacity leads demand with a one-step expansion

Page 16: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Approaches to Capacity Expansion

Expected Demand

Time in Years

Dem

and

New Capacity

Capacity lags demand with an incremental expansion

Page 17: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Approaches to Capacity Expansion

Expected Demand

Time in Years

Dem

and

New Capacity

Attempts to have an average capacity, with an incremental expansion

Page 18: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Breakeven Analysis

Technique for evaluating process & equipment alternatives

Objective: Find the point ($ or units) at which total cost equals total revenue

AssumptionsRevenue & costs are related linearly to volumeAll information is known with certaintyNo time value of money

Page 19: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Break-Even Analysis

Fixed costs: costs that continue even if no units are produced: depreciation, taxes, debt, mortgage payments

Variable costs: costs that vary with the volume of units produced: labor, materials, portion of utilities

Page 20: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Breakeven Chart

Fixed cost

Variable cost

Total cost line

Total revenue line

ProfitBreakeven pointTotal cost = Total revenue

Volume (units/period)

Cost

in D

olla

rs

Loss

Page 21: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Breakeven in Units (x)

TFC = Total Fixed Cost

VC = Unit Variable Cost

P = Unit Selling Price

( )TFC

BEP xP VC

Page 22: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Breakeven in Dollars ($)

($)1

TFCBEP

VCP

TFC = Total Fixed Cost

VC = Unit Variable Cost

P = Unit Selling Price

Page 23: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Breakeven Example

A new process costs $10,000 to set upThe revenue earned is $25,000 per

1,000 units soldThe variable cost is $22.50 per unit

What is the BEP(x)?What is the BEP($)?

4,000

$100,000

Page 24: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Strategy Driven Investment

Select investments as part of a coordinated strategic plan

Choose investments yielding competitive advantage

Consider product life cycles Include a variety of operating factors in the

financial return analysisTest investments in light of several revenue

projections

Page 25: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Net Present Value

Ni

FP

)1(

F = Future valueP = Present valuei = Interest rateN = Number of years

Page 26: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Net Present Value Example #1

A new machine costs $5,000 Over the 3 years of useful life of the machine it

produces revenues of $2,000 per year, paid at the end of each year

At the end of the 3rd year the machine is sold to a competitor for $1,000

What is the NPV of the investment if the company has a cost of capital of 10%?

Page 27: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

NPV Solution #1

0 1 2 3 3

5,000 2,000 2,000 2,000 1,000

(1.1) (1.1) (1.1) (1.1) (1.1)NPV

NPV = $725.02

Page 28: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Net Present Value Example #2

Machine A Price = $15,000 Maintenance costs =

$5,000 at the end of each of 3 years

Salvage value = $2,000 at the end of year 3

Discount rate = 10%

Machine B Price = $20,000 Maintenance costs =

$4,000 at the end of each of 3 years

Salvage value = $7,000 at the end of year 3

Discount rate = 10%

Page 29: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

NPV Solution #2

Which machine should the production manager buy?

0 1 2 3 3

15,000 5,000 5,000 5,000 2,000

(1.1) (1.1) (1.1) (1.1) (1.1)ANPV

0 1 2 3 3

20,000 4,000 4,000 4,000 7,000

(1.1) (1.1) (1.1) (1.1) (1.1)BNPV

NPVA = -25,931.63

NPVB = -24,688.20

Machine B

Page 30: Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.

Limitations of Net Present Value

Investments with the same present value may have significantly different project lives and different salvage values

Investments with the same net present values may have different cash flows

We assume that we know future interest rates - which we do not

We assume that payments are always made at the end of the period - which is not always the case