Top Banner
C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application
71

C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Dec 24, 2015

Download

Documents

Agnes Booth
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-1

Welcome to the International Right of Way

Association’s

Course 901Engineering Plan

Development and Application

Page 2: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-2

Introductions

Who you are. . .

What you do . . .

Where you work . . .

How long . . .

Page 3: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-3

Objectives• Identify and Use Plan Information

• Understand Engineering Terms

• Use Engineering Tools

• Explain Plans

• Apply Principles to Your Work

Page 4: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-4

Schedule• Follow Participant’s Manual

8:00 – 8:30 Introductions, etc.8:30 – 2:45 Use of Engineering Plans

and Plan Development

2:45 – 3:45 Other Plans and Maps3:45 – 4:15 Summary and Review4:15 – 5:00 Exam

Page 5: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Engineering Plans

C901.V3.PT.2012.02.24.0.0.0 PPT-5

• Graphic Language

➢ Lines

➢ Graphs

➢ Charts

➢ Symbols

Page 6: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Right of Way Plans used by:

C901.V3.PT.2012.02.24.0.0.0 PPT-6

• Appraiser

• Negotiator

• Attorney

• Engineer/Surveyor

Value Property

Explain detailsAcquire Property

Present in CourtLegal Documents

Design & Construct

Page 7: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-7

Three View ConceptTop View

Side View

End View

Plan View

Profile View

Cross Section

Length and Width

Height and Length

Width and Height

Gives 3 Dimensional Picture Of Project

Each View is Perpendicular to Others

Page 8: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-8

Plan View (Top View)

• Existing Features - Dashed Line• Proposed Construction - Solid Line

Page 9: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-9

• Property Information

• Drawn to Scale

Plan View (Top View)

Page 10: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-10

Engineers Scale

Inches divided into multiples of 10 per inch

Page 11: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-11

Architects Scale

Divides feet into inches and fractions

Page 12: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-12

Three Norths - Geographic True North

- Datum North- Magnetic North

North Arrow - Orientation of Plan

Page 13: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-13

• Centerline - Control Line

➢ Horizontal Direction of Project

➢ Deflection Angle Changes - Delta ()

Page 14: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-14

Compass Bearings

• Four Cardinal (Main) Directions

➢ “N” , “E”, “S”, & “W”

• Quadrants (90°)

➢ “NE” , “SE”, “SW”, & “NW”

Page 15: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-15

Compass Bearings Shows Direction of Centerline or Property line

Page 16: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-16

Stations• Marked in 100’, 100 m or 1000 m Intervals

• Intermediate Points Called “+” (Plus)

• Directions: “BK”, “AH”, “LT”, “RT”

• Always Numbered Positive

• Used for Reference and Location

Page 17: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

POB, Sta 20+00 Scale: 1” = 500’

N23

°-15

’E

1962

’N81°-45’E2126’

PISta 39+62

Sta 60+88

20+00=2000

3962+2126

3962

+1962

60+88

81°-45’ -23°-15’

6088

= 58°-30’, Rt

58° -30’

= 58°-30’

39+62

N

Exercise #1 - Utility Centerline

PPT-17C901.V3.PT.2012.02.24.0.0.0

Page 18: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Station Equations/Equalities

C901.V3.PT.2012.02.24.0.0.0 PPT-18

• Used When Stations Not Continuous

• Point has Two or More Station Numbers

Calculating Correct Distance Between Stations

➢ Add Individual Segment Lengths

➢ One Back and One Ahead

Page 19: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Station Equations

C901.V3.PT.2012.02.24.0.0.0 PPT-19

CL

R/W

R/W

NEW HIGHWAY

Page 20: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Highway & Railway Curves

C901.V3.PT.2012.02.24.0.0.0 PPT-20

T - Tangent - Straight Section of Centerline

PI - Point of Intersection

- Delta Angle - Deflection Angle

T

T

PI

Page 21: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Simple Curve

C901.V3.PT.2012.02.24.0.0.0 PPT-21

PC - Point of Curvature

PT - Point of Tangency

L - Length of Curve

R - RadiusR

PTPCPI

POC - Point on Curve

POT - Point on Tangent

POCPOT

L

Page 22: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-22

Two Curves, Adjacent, Opposite Directions

PRC - Point of Reverse Curvature

Has 2 PIs

Reverse Curve

PRC

Page 23: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-23

Two Curves, Adjacent, Same Direction

PCC - Point of Compound Curvature

Different Radii

Compound Curve

PCC

Page 24: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Spiral Curve

C901.V3.PT.2012.02.24.0.0.0 PPT-24

Spiral on Each End of a Simple Curve

TS - Tangent to Spiral SC - Spiral to Curve

CS - Curve to Spiral ST - Spiral to Tangent

Constantly Changing Radius

Page 25: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Degree of Curvature

C901.V3.PT.2012.02.24.0.0.0 PPT-25

• Measured 100’ Along Centerline• Angle at center of arc

100’

D

Page 26: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Degree of Curvature-D

C901.V3.PT.2012.02.24.0.0.0 PPT-26

➢ Small D - Large Radius

• Examples:

➢ Large D - Small Radius

➢ 10° Curve Radius = 572.96’

• Indicates Flatness/Sharpness of Curve

➢ 1° Curve Radius = 5,729.58’

Page 27: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Exercise #2 – Highway Centerline

C901.V3.PT.2012.02.24.0.0.0 PPT-27

PI: 3962-T = - 802PC = 3160

PC: 3160+ L = +1463

PT: 4623

Sta 31+60

Sta 46+23

PI: 3962+ T = +802PT = 4764Sta 47+64

(1463’)

46+23

Page 28: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Offsets

C901.V3.PT.2012.02.24.0.0.0 PPT-28

• Perpendicular Distance Right or Left of Centerline

➢ Locate any Point off Centerline

➢ Use Radial Line on Curve

14+00 21+00

65’ Lt, Sta 14+50

90’ Rt, Sta 21+00LENGTH =

(155

’)

(650’)

6502 + 1552 = 668.2’

PL

Page 29: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Contours

C901.V3.PT.2012.02.24.0.0.0 PPT-29

•Lines of Equal Elevation

•Shows Shape and Slope of Land

•Interval - Elevation Difference•Between Contour Lines

Page 30: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Contours

C901.V3.PT.2012.02.24.0.0.0 PPT-30

➢ Close Lines = Steep Slope

• Contours Point Upstream

• Relative Spacing of Lines Indicates Slope

Page 31: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Contours

C901.V3.PT.2012.02.24.0.0.0 PPT-31

Page 32: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

1. Map Scale? 1” =

2. Contour Interval:

3. Sidewalk Width:

4. Elevation Difference:

5. Ball Rolls:

6. In Flood Plain:

7. Elevation:

8.Equation: Saratoga = Bridge St

9. Saratoga St. R/W:

10: Bridge St. R/W:

Exercise #3 - Contours

C901.V3.PT.2012.02.24.0.0.0 PPT-32

50’

1’

8’

1.2’

South

238 & 240

9+9 5

60’

60’

863

0+00

Page 33: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

State Plane Coordinate System

C901.V3.PT.2012.02.24.0.0.0 PPT-33

• Survey Control - Latitude & Longitude Converted to Coordinates

• Establishes Precise Location

• Four Datums:

• Zones - Depends on Size & Shape of State

➢ Two Horizontal – NAD 27 & NAD 83

➢ Two Vertical – NGVD 29 & NAVD 88

Page 34: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

State Plane Coordinate System

C901.V3.PT.2012.02.24.0.0.0 PPT-34

• Point Identified by Two Coordinates

• Vertical Control Surveys Establish Elevations

• Advantages:

“➢ X” is “Easting”

“➢ Y” is “Northing”

➢ Excellent Control over Large Areas

➢ Accurate Locations

Page 35: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Exercise #4 – State Plane Coords

C901.V3.PT.2012.02.24.0.0.0 PPT-35

1. PI Curve GV-2: a. Station __________ Offset _______ b. N ____________ E ___________

2. Drill Hole B1: a. Station __________ Offset _______ b. N ____________ E ___________

3. Telephone Pole “TEL-25”: a. Station __________ Offset _______ b. N ____________ E ___________

21+89.46 7’ Lt10,152.824 5,473.141

21+53

24+53 5’ Lt10,210 5,733

44’ Lt10,177 5,428

Page 36: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Exercise #4 – State Plane Coords

C901.V3.PT.2012.02.24.0.0.0 PPT-36

4. PL Intersection with R/W line: a. Station __________ Offset _______ b. N ____________ E ___________

21+53

5. BM “A-267”: a. Station __________ Offset _______ b. N ____________ E ___________

10,089 5,453

24+86 28’ Lt10,240 5,761

47’ Rt

Page 37: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Profile View

C901.V3.PT.2012.02.24.0.0.0 PPT-37

• Side View – (Length & Height)

• Stations & Elevations on Centerline Only

➢ Existing – Dashed Line ➢ Proposed – Solid Line

Page 38: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-38

Profile View

• Horizontal Scale same as Plan View• Vertical Scale exaggerated for Clarity• Datum - Reference Elevation• Bench Marks - Known Location & Elevation

Page 39: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Profile View - Pipeline

C901.V3.PT.2012.02.24.0.0.0 PPT-39

Page 40: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Profile View - Overhead Line

C901.V3.PT.2012.02.24.0.0.0 PPT-40

Page 41: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Profile View - Highway

C901.V3.PT.2012.02.24.0.0.0 PPT-41

Page 42: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Profile Grade Line/Point

C901.V3.PT.2012.02.24.0.0.0 PPT-42

• Profile Grade Line - Stations & Final Elevations on Centerline

• Profile Grade Point - Centerline Elevation at Specific Station

Page 43: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-43

Profile Grade Line

• Percent Grade - Rise (+) or Fall (-) ➢ % = 100 V/H

V = Change in Elevation

H = Horizontal Distance in Feet

Page 44: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Vertical Highway Curve

C901.V3.PT.2012.02.24.0.0.0 PPT-44

• Parabolic Curves ➢ Sag or Crest

Page 45: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-45

Vertical Highway Curve

• PVT - Point of Vertical Tangent• Length = PVT - PVC

• PVI - Point of Vertical Intersection• PVC - Point of Vertical Curve

Page 46: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Highway Plan – Profile Sheet

C901.V3.PT.2012.02.24.0.0.0 PPT-46

➢ Provides Two Dimensional View

Page 47: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Exercise #5 – Vertical Curves

C901.V3.PT.2012.02.24.0.0.0 PPT-47

1. Percent Grade:

2. 600’ Curve: PVC: ______ PVT: _______

3. 400’ Curve: PVC: ______ PVT: ______

4. Cut or Fill @: 11+00: _____ 25+00:______

5. Datum:_________________

100(19.5)/(650)=

18+50

24+00

12’ F 4’ C

Mean Sea Level

- 3.0%

20+00

12+50

Page 48: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Utility Typical Cross-Section

C901.V3.PT.2012.02.24.0.0.0 PPT-48

Overhead Line (H frame)Typical Section

Page 49: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Highway Typical Cross-Section

C901.V3.PT.2012.02.24.0.0.0 PPT-49

Page 50: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Highway Cross-Section

C901.V3.PT.2012.02.24.0.0.0 PPT-50

• Perpendicular to Centerline

• Shows Construction Details

Page 51: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-51

Highway Cross-Section

• In Ahead Direction

• Existing and Proposed Elevations at Specific Station

• Right (RT) and Left (LT) of Centerline

Page 52: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-52

Highway Cross-Section

• Shows Cut and/or Fill

• Profile Grade Point from Profile

• Construction Limits

• Slope Ratio

Page 53: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Superelevation

C901.V3.PT.2012.02.24.0.0.0 PPT-53

• Counters Centrifugal Force

• Sloping Pavement Surface

Page 54: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Exercise #6 – Highway Cross-Section

C901.V3.PT.2012.02.24.0.0.0 PPT-54

1. Station 2. P G P Elevation 3. Pavement Width 4. Shoulder Width

29+50827.524’

8’ Lt, 10’ Rt

Page 55: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Exercise #6 – Highway Cross-Section

C901.V3.PT.2012.02.24.0.0.0 PPT-55

5. Fill on Centerline 7.5’

6. Side Slope Ratio

7. Construction Limit

8. Min Cover

3:1 Lt, 2:1 Rt

33’ Lt, 32’ Rt

3’ Lt, 3.5’ Rt

9. Ditch Elevation 822.5 Lt, 822 Rt

Page 56: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Highway Cross-Sections

C901.V3.PT.2012.02.24.0.0.0 PPT-56

Several Sections per Sheet

Read from Bottom to Top of Sheet

Shows Excavation (Cut)

or Embankment (Fill)

Page 57: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

C901.V3.PT.2012.02.24.0.0.0 PPT-57

Right of Way Plans

Page 58: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Right of Way Plans

C901.V3.PT.2012.02.24.0.0.0 PPT-58

• Multipurpose Land Map

• Property Boundaries, Areas and Rights Existing and to be Acquired

• Establish R/W Limits and Points of Ingress and Egress

• Map of Record

Page 59: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Right of Way Plans

C901.V3.PT.2012.02.24.0.0.0 PPT-59

• Ownership Index Contains: ➢ Parcel Numbers & Names ➢ Areas of Acquisition and Remainders

➢ Deed Data

• Topography - Ground Features & Improvements

• Political Boundaries

• Survey Data & Centerline with Stations

Page 60: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Exercise #7 – Right of Way Plans

C901.V3.PT.2012.02.24.0.0.0 PPT-60

1. Scale of Drawing: 1” =

2. New Bridge Length:

3. Affected Property Owners:

4. a. Ellis

b. Wendell

c. Lowe

d. Lowe

20’

102.60’

6

73 Temp. Construction Easement

67 Right of Way

68 Right of Way 68 Permanent Drainage Easement

Page 61: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Exercise #7 – Right of Way Plans

C901.V3.PT.2012.02.24.0.0.0 PPT-61

5. Culvert Through:

6. Distance to Basic Creek:

7. P. D. E. Area:

8. Garage to New Pavement:

9. Driveway Width:

10. Distance Between Poles:

Lowe

74’

1830 SF

101’

20’

215’

Page 62: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Exercise #7 – Right of Way Plans

C901.V3.PT.2012.02.24.0.0.0 PPT-62

11. Sta. Rte 81 = Sta. Basic Creek

12. What Happens to “A 267”:

13. Basic Creek Separates:

25+23.35

Removed

Lowe & WilliamsWurtz & Criss

17+06.10

Page 63: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Aerial Photogrammetry

C901.V3.PT.2012.02.24.0.0.0 PPT-63

Page 64: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Aerial Photogrammetry

C901.V3.PT.2012.02.24.0.0.0 PPT-64

• Measurement by Photographs

• Combine With Ground Control Points

• Drawings Can be Prepared to Desired Scale

• Easier to Understand Than Regular Plans

Page 65: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Aerial Photogrammetry

C901.V3.PT.2012.02.24.0.0.0 PPT-65

• Photos Used by:

➢ Surveyors - Property Lines, Size & Shape of Parcel

➢ Appraisers - Land Use & Indicates Access

➢ Negotiators - Explain to Owner

➢ Attorney - Present Details in Court

Page 66: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Aerial Photogrammetry

C901.V3.PT.2012.02.24.0.0.0 PPT-66

• Photos Used for:

➢ Route & Site Location

➢ Public Hearings

➢ Property Inventory

➢ Tax Maps & Land Use

➢ Mining & Forestry

➢ Military

Page 67: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Types of Aerial Photographs

C901.V3.PT.2012.02.24.0.0.0 PPT-67

• Vertical (perpendicular to the earth’s surface)

• Oblique (at an angle to the earth’s surface)

• Ground (taken at ground level)

• High Altitude (by aircraft or satellite)

Page 68: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Aerial Photogrammetry

C901.V3.PT.2012.02.24.0.0.0 PPT-68

• Government:

➢ US Geological Survey

➢ www.usgs.gov

• Private Contracts

Page 69: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Summary:Engineering Plan Development

C901.V3.PT.2012.02.24.0.0.0 PPT-69

• Three View Concept

• State Plane Coordinates

• Right of Way Plans

➢ Plan, Profile, Cross-Section

• Aerial Photography

Page 70: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Review Objectives

C901.V3.PT.2012.02.24.0.0.0 PPT-70

• Read and interpret engineering plansand nomenclature (terms)

• Use tools to plot information to scale

• Be able to explain plans

• Apply principles of interpreting engineeringdrawings to work activities

Page 71: C901.V3.PT.2012.02.24.0.0.0 PPT-1 Welcome to the International Right of Way Association’s Course 901 Engineering Plan Development and Application.

Finally, The End!Woo-Hoo!

PPT-71C901.V3.PT.2012.02.24.0.0.0