Top Banner
BUSINESS PROCESS REENGINEERING Presented by Ramji Divya Uthirarajan Anitha Thevasena
26

Business process re-engineering (BPR)

Nov 22, 2014

Download

Business

The analysis and redesign of workflow within the organisation .
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Business process re-engineering (BPR)

BUSINESS PROCESS REENGINEERING

Presented by Ramji Divya Uthirarajan Anitha Thevasena John paul

Page 2: Business process re-engineering (BPR)

SIMPLE DEFINITION OF BPRMeans: “Starting Over”Does not mean: Tinkering with

what already exists or making incremental changes

Ask: “IF I were recreating the company today, given what I know and given current technology, what would it look like?”

Page 3: Business process re-engineering (BPR)

Business Process Re-engineering or BPR is the analysis and redesign of workflow and processes within and between Organizations

BPR is the Fundamental rethinking and Radical redesign of Business Processes to achieve Dramatic improvements in critical measures of performance .. such as Cost, Quality, Service and Speed

- Michael Hammer & James Champy, 1993

Page 4: Business process re-engineering (BPR)

THE NEED FOR BPRCustomersCompetitionChangeTechniques lag behind technologyProblem of the stovepipeFragmented piecemeal systemsIntegration

Page 5: Business process re-engineering (BPR)

BPR PROCESS (1 OF 2)Frame the projectCreate the vision, values and

goalsRedesign the business operationConduct proof of concept

Page 6: Business process re-engineering (BPR)

BPR PROCESS (2 OF 2)

Plan the implementationObtain implementation approvalImplement the redesignTransition to a continuous

improvement state

Page 7: Business process re-engineering (BPR)

VALUE METRICSA Value metric is that which

determines an organization's behaviour and performance.

QualityServiceCostCycle Time

Page 8: Business process re-engineering (BPR)

VALUE METRICS

Value =Quality X Service

Cost X Cycle Time

Page 9: Business process re-engineering (BPR)

CHARACTERISTICS OF BUSINESS PROCESS REENGINEERING (1 OF 2)Several jobs are combined into

oneEmployees make decisionsSteps in business process: natural

orderProcess may have multiple

versionsWork is performed where it makes

the most sense

Page 10: Business process re-engineering (BPR)

CHARACTERISTICS OF BUSINESS PROCESS REENGINEERING (2 OF 2)Controls, checks, other non value

added work is minimizedReconciliation is minimized -

minimize external contact pointsHybrid centralized / decentralized

operation is usedA single point of contact is

provided for the customer

Page 11: Business process re-engineering (BPR)

BPR & RESTRUCTURING THE ORGANIZATION

Redesign of processesFrom mass production to mass

customizationCycle time reductionRestructuring organizations

Page 12: Business process re-engineering (BPR)

THE 7 NEW QUALITY TOOLSGeneral Planning

Affinity DiagramInterrelationship Diagram

Intermediate PlanningTree DiagramMatrix DiagramMatrix Data Analysis

Detailed PlanningProcess Decision Program ChartArrow Diagram

Page 13: Business process re-engineering (BPR)

AFFINITY DIAGRAMGathers large amounts of data and organizes it into groups based on the natural relationship between each item.

Page 14: Business process re-engineering (BPR)

INTERRELATIONSHIP DIAGRAPM

Page 15: Business process re-engineering (BPR)

TREE DIAGRAMSystematically maps out the full range of tasks/methods needed to achieve goal.

Page 16: Business process re-engineering (BPR)

MATRIX DIAGRAMDisplays the relationship between necessary tasks and people or other tasks, often to show responsibility for tasks.

Page 17: Business process re-engineering (BPR)

DATA MATRIX ANALYSIS

Temp

Humidity

Page 18: Business process re-engineering (BPR)

PROCESS DECISION PROGRAM CHART (PDPC)

Maps out every conceivable event and contingency that can occur when moving from a problem statement to possible solutions.

Problem Statement

Solution x

Things that can go wrong

Countermeasures

Solved

Page 19: Business process re-engineering (BPR)

ARROW DIAGRAM

Page 20: Business process re-engineering (BPR)

ADDITIONAL TOOLS/METHODSBenchmarkingProcess SimplificationConcurrent EngineeringDemand Flow TechnologyActivity Based CostingEliminate Non-Value Added

Activities

Page 21: Business process re-engineering (BPR)

9 CHANGES OCCASIONED BY BPR (1 OF 2) Work Units change

o from functional departments to process teams

Jobs changeo from simple tasks to multi-

dimensional work People’s roles change

o from controlled to empowered Job preparation changes

o from training to education

Page 22: Business process re-engineering (BPR)

9 CHANGES OCCASIONED BY BPR (2 OF 2) Measures of Performance & compensation change

o from activity to results Criteria for career advancement change

o from performance to ability Values change

o from protective to productive Organizational Structures change

o from hierarchical to flat Executives change

o from scorekeepers to leaders4-22

Page 23: Business process re-engineering (BPR)

CHALLENGES IN A BPR EXERCISE

1. Identifying Customer Needs & Performance Problems in the current Processes

2. Reassessing the Strategic Goals of the Organization

3. Defining the opportunities for Re-engineering

4. Managing the BPR initiative5. Controlling Risks 6. Maximizing the Benefits7. Managing Organizational Changes8. Implementing the re-engineered Processes

Page 24: Business process re-engineering (BPR)

CRITICAL SUCCESS FACTORS IN BPR1. Clear Vision for Transformation2. Top management commitment3. Identification of Core Processes

for BPR4. Ambitious BPR team5. Knowledge of Reengineering

techniques6. Engaging external consultants7. Tolerance of “genuine failures"8. Change Management

Page 25: Business process re-engineering (BPR)

CRITICAL FAILURE FACTORS IN BPR

1. Trying to Fix a process instead of Changing it

2. Lack of focus on Business-critical Processes

3. Lack of holistic approach4. Willingness to settle for minor results5. Quitting too early6. Limiting the scope of BPR by existing

constraints7. Dominance of existing corporate culture8. Adopting bottom-up approach9. Poor leadership10. Trying to avoid making anyone unhappy11. Dragging the BPR exercise too long.

Page 26: Business process re-engineering (BPR)

THANK YOU