Top Banner
Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd. Name Roll no. Megha Desai 10 Sunil D’souza 14 Swapnil Gupta 21 Mayur Parekh 45 Koslesh Roy 49 Mukund Zaveri 58
21

Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Jan 04, 2016

Download

Documents

rae-garza

Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd. KOEL – About the company. Year of incorporation : 1946 Manufacturer of the wide range of Diesel Engines, Diesel Generating Sets and Engine Bearings and Engine Valves Chairman & Managing Director - Mr. Atul C. Kirloskar - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Business Process Re-engineering (BPR)Kirloskar Oil Engine Ltd.

Name Roll no.

Megha Desai 10

Sunil D’souza 14

Swapnil Gupta 21

Mayur Parekh 45

Koslesh Roy 49

Mukund Zaveri 58

Page 2: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

KOEL – About the company

• Year of incorporation : 1946

• Manufacturer of the wide range of Diesel Engines, Diesel Generating Sets and Engine Bearings and Engine Valves

• Chairman & Managing Director - Mr. Atul C. Kirloskar

• Industries it caters to - Agricultural Machinery, Construction & Material Handling Machinery, Marine applications and equipment used by Armed Forces (Military).

• Sales Income, year ending March 31, 2007 - Rs. 1,883 Cr.

• No. of employees : 2,858

Page 3: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Vision 2012

“We will become a major Global Player in off–highway engines and power generation businesses by offering winning combinations of Quality, Cost and Delivery through innovation and unmatched service.We will be amongst the Top Five engine companies of the world.While pursuing the above, we will continue to enhance the value of engine bearing and valves business.”

Page 4: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Case Findings

• KOEL – always held customers in high esteem

• However, in 1990s, due to heated competition entering in India, KOEL decided to pursue an aggressive BPR program with a focus on CRM

• Multi-pronged process:-

– Employee support

– Vendor support

– Customer support

– IT support

Page 5: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Key Information

Industrial Buyers

Industrial Buyers

Dealers (PG sets)Dealers

(PG sets)

Major Automobile (OEM)

Major Automobile (OEM)

Key customer segments

Crankcase

Crankcase

CrankshaftCrankshaft CamshaftCamshaft

Con-rodCon-rodGear

casingGear

casing

5 major components for Diesel Engine

Page 6: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

BPR Process

• Step One – The Implementation Committee

Vice-PresidentVice-President

3 SBU Heads3 SBU Heads

Change teams – 6 to 8 bright employeesChange teams – 6 to 8 bright employees

4 hours a day for as long as needed

2 Assistants for Co-ordination

2 Assistants for Co-ordination

• Step Two - IT program installation• Software module – Web Customer was established• E-order facility was set up with an automatic translator that interfaced with KOEL’s Oracle based ERP

Page 7: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

PROCESSES CHANGED

Page 8: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Order Registration - Old

Distributor physically sends ordersDistributor physically sends orders

Area sales officers – registers & forwardsArea sales officers – registers & forwards

HO – receives & registersHO – receives & registers

Production Planning consultedProduction Planning consulted

Regional sales officers – receives, registers & forwards

Regional sales officers – receives, registers & forwards

Order acceptance number generatedOrder acceptance number generated

Order Acceptance travels back to all offices

Page 9: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Order Registration - Reengineered

Distributor orders electronicallyDistributor orders electronically

HO receives orders through ORACLE interface

HO receives orders through ORACLE interface

Order for standard product?Order for standard product?

Order goes to Sales executiveOrder goes to Sales executive

Order acceptance generated, sent to distributor electronically

Order acceptance generated, sent to distributor electronically

System checks – finished good,

production plan

System checks – finished good,

production plan

Work order for delivery and/or production

BenefitsAverage cycle time – 10 to InstantNo. of people involved – 8 to 0/1No. of documents involved – 6 to none

Page 10: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Market Segmentation

OEM Auto segment Standard diesel engine model;Large volume; Frequent supplies

OEM Auto segment Standard diesel engine model;Large volume; Frequent supplies

Dealers of PG sets Larger variety of standard models; Frequent deliveries

Dealers of PG sets Larger variety of standard models; Frequent deliveries

Industrial segment One off or a few custom built models; Fast responsive supply chain

Industrial segment One off or a few custom built models; Fast responsive supply chain

Page 11: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Q1 - Auto OEM – JIT – KOEL’S strategy

• This was achieved in the following steps

– The OEM (Auto) first determined it’s own production schedule (no. of tractors to be produced per day)

– Based on this, KOEL committed to delivering a fixed number of diesel engines

– Electronically networked with Auto so changes were communicated instantaneously

– Created a stand alone production cum assembly line to manufacture engines for Auto

– 7 workstations being set up and a division of the target amongst them

– Detailed breakdown of the production down to nuts & bolts was determined

– Each workstation – One operator/ team

Page 12: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

• Advantages– First pass of product was increased from 90% to 99% – Reduction in wastages of about 2 lakhs per month– Created a sense of ownership and further motivated the

employees– Customer Satisfaction

Page 13: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Q2 – Custom built engines for Industrial applicationDelivery time < 10 days? …If yes, how does KOEL achieve

it?

Source: ttp://www.indiamarkets.com/imo/industry/engineering/engine/engine.

Page 14: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Delivery time – Custom built engines for Industrial application

• The demand pattern for such custom made engines is inconsistent

• Leading players delivery time ranges from 8-12 days so KOEL

• Standard Product Platforms, customization towards the end

• Key Success Factors lie in Technology upgradation & efficient After sales services

• A dedicated facility from a vendor like KOEL should serve the Industrial customers to maximum satisfaction

• Delivery time lesser than this would increase costs for KOEL but would not offer equal or more value to the customer

• Thus, no need to reduce delivery time to lesser than 10 days

Page 15: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Q3 - Backward Integration – Yes or No?

• Oil Engines used as prime movers of industrial plants / machinery.

• Production cannot be planned.• Instantaneous order registration & On-line communication of all

orders• Customization of products only in the end.• This helps in faster deliveries , small batch production and help

reduce defects .• Defects have come down from 1.5% to 0.2%• Small batch production helps identify defects quickly and

helps take corrective steps.

Hence, KOEL should not consider backward integration.

Page 16: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Q4 – 5 Major Components

Crank Case - In an internal combustion, housing for the crankshaft. Is located below the cylinder block.

2 Stroke Engine 4 Stroke Engine

Page 17: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Crank Shaft

• The shaft is subjected to various forces but generally needs to be analyzed in two positions.

• Firstly, failure may occur at the position of maximum bending; this may be at the centre of the crank or at either end. In such a condition the failure is due to bending and the pressure in the cylinder is maximal.

• Secondly, the crank may fail due to twisting, so the conrod needs to be checked for shear at the position of maximal twisting. The pressure at this position is the maximal pressure, but only a fraction of maximal pressure.

Components of a typical, four stroke cycle, DOHC piston engine. (E)Exhaust camshaft, (I) Intake camshaft, (S) Spark plug, (V)Valves, (P) Piston, (R) Connecting rod, (C) Crankshaft, (W) Water jacket for coolant flow.

Page 18: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Camshaft

A rod that transmits motion or power from one moving part to another, especially the rod connecting the crankshaft of a motor vehicle to a piston. Also called pitman.

Page 19: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

• All the above parts are critically important for the functioning of the engine.

• They spend only 25-30 hours on the shop floor of KOEL.

• KOEL is known for consistent quality of it machines

• Superior technology is a key differentiator in this industry along with fuel efficiency

• Hence, these 5 major components were manufactured in-house as they were a critical success factor to KOEL

Page 20: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

Q5 - Reduction in suppliers from 500 to 100

• The need for JIT-this meant working with suppliers who could deliver JIT

• Technological criteria required• Accurate forecasting: this meant that KOEL did not need a

large base of suppliers in order to satisfy unstructured demand

• The redesigning of the customization business lead to the need of less suppliers of customised parts

• Cost reduction• Minimising error• Stronger relationships with lesser partners• Sense of ownership & increased motivation

Page 21: Business Process Re-engineering (BPR) Kirloskar Oil Engine Ltd.

In conclusion…

• KOEL faced many challenges while implementing BPR• Attitudes & mindset of employees• Resistance to change from internal & external

stakeholders• Educating, training• Convincing vendors to invest in technology &

automation• 3 long years and still running….

THANK YOU