  • 8/14/2019 Burr Formation and Minimisation in Drilling

    1/31

    FORMATION ANDFORMATION AND

    MINIMISATION OFMINIMISATION OF

    BURR IN DRILLINGBURR IN DRILLING

    [email protected]@gmail.com

    BhubaneswarBhubaneswar

    mailto:[email protected]:[email protected]:[email protected]
  • 8/14/2019 Burr Formation and Minimisation in Drilling

    2/31

    What is a burr?

    Unwanted material

    remaining after a

    machining operation

    Undesirable projections

    of materials beyond the

    edge of the work-piece

    arising because of plastic

    deformation during

    machining.

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    3/31

    Why remove burr ?

    Accounts for a significant portion of machining costs

    Cause Of Many Industrial Problems.

    Inspection

    Assembly

    Automated Manufacturing Of Precision Components

    Reduce the quality of machined parts

    Can cause interference, jamming and misalignment

    A safety hazard to personnel

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    4/31

    Estimates of between 10% and 30% of the total costof a part

    In 1977 estimated cost of deburring $100 million inCanada alone

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    5/31

    Classification of burr

    According to height of the burr

    Uniform burr

    Type 1-The height of burr varies upto 0.150 mm

    Type 2-The height of burr varies in between 0.150 to1.1mm .

    Also reffered as transient burr

    Crown burr

    Height varies in between 1.1 to 1.5 mm .Burr is not uniform

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    6/31

    Uniform burr Type 2Uniform burr Type 1

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    7/31

    Crown burr

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    8/31

    According to location of burr,

    Entrance burrProduced on the side of the work piece where the drill enters

    Smaller than the exit burr

    Usually of little concern

    Exit burr

    Is formed on the opposite side of the work piece

    They are more challenging to remove

    Interlayer burr

    Drilling Through A Number Of Layers

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    9/31

    Entrance burr, Interlayer burr and Exit burr

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    10/31

    Mechanism of burr formation

    Uniform burrSmall feed force condition this type of burr is formed.

    Fracture takes place at the chisel edge

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    11/31

    Crown burr

    Large feed condition this type of burr is formed

    initial rupture will occur at the center

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    12/31

    Entrance burr

    Material bumped up on theperimeter of the drill

    engaging region

    As more part of cutting edge

    engages small amount of

    bumps of material is always

    observed on the perimeter of

    the hole

    When almost all cutting

    edges are engaged, the

    shape of bump on the

    perimeter starts to change

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    13/31

    Interlayer burr

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    14/31

    Exit burr

    The mechanism of formation of exit burr is same as that of

    uniform burr or crown burr depending on feed condition

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    15/31

    MINIMIZATION OF BURR

    (DBCC) can be used to predict what

    type of burr will be formed given certain

    drilling parameters.feed rate and thrust force with varying

    drill diameters can be approximated by

    applying the shear plane modelMerchant equation, = / 4 + (-) / 2

    and the expression for the rake angle

    varying with relative radius, R.thrust force

    2-Axis Drilling Burr Control Charts

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    16/31

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    17/31

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    18/31

    Pre-drilling and pre-chamfering

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    19/31

    Burr minimization through drill tip design

    Gillespie found that increasing helix angle will reduce burr

    height by up to 50%, thickness by up to 20%Sofronas increase helix angle and harden the exit surfaceby changing the tip of the drill it is possible to minimize the burr

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    20/31

    Plastic deformation region

    is formed by the stress

    caused by cutting resistancein the slant section

    The position at which

    bending deformation starts is

    determined by the rigidity of

    the remained part

    When the stiffness of the

    part which is bent by thrustforce imposed in drill cutting

    edge is large enough, no

    bending occurs and cutting is

    continued

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    21/31

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    22/31

    Observation of burr formation in chamfered drill

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    23/31

    Observation of burr formation in round drill

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    24/31

    Observation of burr formation in step drill

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    25/31

    METHODS OF DEBURRING

    Ultrasonic vibration indrilling

    The distribution of the ultrasonic

    vibration pressure depends on

    the properties of the medium,

    initial speed,

    density of slurry

    frequency

    Results of Ultrasonic vibration in drilling

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    26/31

    Results of Ultrasonic vibration in drilling

    Before

    After

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    27/31

    Integrated drilling and deburring tools

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    28/31

    Burr off tools:

    One-Pass Hole-Deburring tool which can remove both Entrance

    and exit burr .Simple and Rugged One-Piece Construction

    Allows cutting chips to clear easily

  • 8/14/2019 Burr Formation and Minimisation in Drilling

    29/31

    References

    Sung-lim ko1, Jae-eun Chang1 Development of drill geometryfor burr minimization in drilling

    P. Stringer, G. Byrne and E. Ahearne Tool Design For BurrRemoval In Drilling Operations.

    Jinsoo Kim Development of a drilling burr control chart for

    stainless steel.

    H. Z. Choi, s. W. Lee, y. J. Choi, s. L. Ko Study on deburringtechnology using Ultrasonic Cavitations

    Jihong Choi ,Sangkee Min, David A. Dornfeld Finite ElementModeling of Burr Formation in Drilling of a Multi-Layered Material

    Choi, Sangkee Min ,David Dornfeld ,Mahboob Alam, T. Tzong Modeling of Inter-Layer Gap Formation in Drilling of a Multi-LayeredMaterialJihong

  • 8/14/2019 Burr Formation and Minimisation in Drilling