Budget 2012 - revision Revision of the budget 2012 by the end of this week Budget below deduced from most recent information.
Feb 14, 2016
Budget 2012 - revision
Revision of the budget 2012 by the end of this week Budget below deduced from most recent information.
Budget 2012 as published last year
Remember: budget/resources should be included in APT
Critical cabling needs
Known elements from WUs that might require new cables
Element Where is/will be converter/control Where is/will be elementKFA53 ? SS53SMH42 same as today ? SS42Inj. Bumpers 365 (as today) ? SS40-42-43-44Low-energy elements (DVT, BHZ, Qlow, Skew) 152 (or 355, as today) ? distributed BCTs as today ? ?IPM to be defined to be definedBLMs (normal) 368 (as today) ? distributedBLMs (fast) to be defined to be defined Ralentisseur 150 (as today) ? SS12 New long.itudinal FB kicker to be defined to be definedNew 40 or 80 MHz cavity (not decided) to be defined to be defined New e-cloud monitor to be defined SS84
MDs for 2012, new updateWhat When Mode Time needed Priority (1=highest) Responsible BP needed
Space charge studies Early part of the year Parallel 1 1-2 bp
Second injection h=9As soon as injection bucket selector
prototypes ready Parallel 1 H. Damerau 3 bp
Batch compression (h=9->10->20->21) First tests early part of the year with single injection
Parallel+dedicated 1 2-3 bp
Batch compresson and merging (h=7->…->14->7->21)
As soon as injection bucket selector prototypes ready Parallel 1 2-3 bp
PS-SPS transfer - longitudinal and transverse Depending on the SPS Parallel 1 S. Gilardoni/H. Damerau 1-3 bp
Longitudinal loss maps with rotation durations
Depending on the SPS Dedicated and no ions 1 3 bp
Repeat injection kicker tests Early part of the year Dedicated 1 1 bp
Preservation of emittance for very low emittance beams
Early in year as precursor to operation Dedicated and parallel 1 S. Gilardoni 2-3 bp
Tests of longitudinal feed-backs during the year Parallel+dedicated 1 H. Damerau 1-3 bp
Resonance compensation during the year Parallel 1 1-2 bpEcloud studies As soon as the 25 ns will be ready Parallel 2 2-3 bp
Coupled-bunch instability reference measurements
As soon as 25/50 ns beams ready Parallel 2 H. Damerau 2-3 bp
Headtail at 2 GeV with chromaticity control Early part of the year Parallel 2 2-3 bp
Transverse damper commissioningNot clear, depending on the availability of the new electronics, injection damping possibly
earlier?Parallel 2 1-3 bp
Measure Q'' for 5-CM matrix during the year (early for the low energies) Parallel 2 1-2 bp
Tests of low energy elements early in the year Parallel 2 1-2 bp
Impedance identification Early part of the year, since M. Migliorati will
remain only 6 months Parallel 3 M. Migliorati (tbc) 1-2 bp
Optics model During the year Parallel 3 R. Wasef 1-2 bp
Establish low-loss 25 and 50 ns beams for LHC operation and SPS scrubbing
50 ns: OP setup early in year25 ns: before ecloud and scrubbing
investigations Beam setup N/A 3 bp
Higher intensity (1.7e11 for 25ns, 1.9e11 for 50 ns) studies
Early part of the year, neeed for LHC? Parallel N/A S. Gilardoni/H. Damerau 2-3 bp