1 Broad Area Maritime Surveillance Unmanned Aircraft System: Distributed Test International Test and Evaluation Association (ITEA) Live, Virtual, Constructive Conference El Paso, Texas January 24-27, 2011 BAMS Lead Test Engineer Naval Air Systems Command 5.1.1.5 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
19
Embed
Broad Area Maritime Surveillance Unmanned Aircraft System ......Rolls-Royce AE3007H 23+ Million hrs 8,500 lb Thrust (SL) Metallic Fuselage Graphite Wing External Provisions Automatic
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
Broad Area Maritime Surveillance
Unmanned Aircraft System:
Distributed Test
International Test and Evaluation Association (ITEA)
Live, Virtual, Constructive Conference
El Paso, Texas
January 24-27, 2011
BAMS Lead Test Engineer
Naval Air Systems Command 5.1.1.5
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
2
Outline
• BAMS Program Background
• BAMS System Description
• Distributed Test Drivers
• Distributed Test Challenges / Lessons Learned
• Summary
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
3
Integrated Maritime Patrol Concept
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 10-1042, 3 August 2010 (updated: 4 January 2011).
DISTRIBUTION STATEMENT A: Approved for public release; Distribution is unlimited. 09-983 8
9
Distributed Test Drivers
• Distinct types of test data - UAS “organic” data – C2, sensor data, etc
- Test-unique data –e.g. telemetry, SIL/lab connections, M&S
• Test network supports a variety of test needs - Programmatic needs
- Engineering needs
- Mission plans, test cards, etc distribution PRE-MISSION
- Handle C2 and mission data REAL-TIME
- Telemetry / further mission data distribution REAL-TIME
- Recorded instrumentation / mission data distribution POST-MISSION
- Connect test nodes together for early testing, especially in the case of System of Systems testing
• Planning to leverage Joint Mission Environment Test Capability (JMETC)/Test and Training Enabling Architecture (TENA) / Interoperability Test and Evaluation Capability (InterTEC) to the maximum extent practical
9 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
10
Test Network Relationship to OV-1 Operational Architecture
UA Satcom TP MCS GIG
SDD Test Phase
IOC+
UA Satcom TP MCS GIG JMETC
SDREN
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
11
Unit Code Testing
Satcom
JMETC /
SDREN
FOB
MCS
Contractor
SIL
Contractor Site
Pax River
BAMS
NSIL
ATR
SAIL
ACETEF P-8 SIL
E-2 ESTEL
Contractor
Network
CSCI
Integration
Classifie
d
Network
WX
Other
services Operational
“GIG”
CSU Programming
Bench
MCS
UA
Development
“GIG”
Aggregation
Router
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
12
Satcom
JMETC /
SDREN
FOB
MCS
Contractor
SIL
Contractor Site
Pax River
BAMS
NSIL
ATR
SAIL
ACETEF P-8 SIL
E-2 ESTEL
Contracto
r Network
MCS CSCI
Integration
Classifie
d
Network
WX
Other
services Operational
“GIG”
CSU Programming
Bench
MCS
UA
Development
“GIG”
Aggregation
Router
Segment Level Testing
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
13
Satcom
JMETC /
SDREN
FOB
MCS
Contractor
SIL
Contractor site
Pax River
BAMS
NSIL
ATR
SAIL
ACETEF P-8 SIL
E-2 ESTEL
Contractor
Network
CSCI
Integration
Classifie
d
Network
WX
Other
services Operational
“GIG”
CSU Programming
Bench
MCS
UA
Development
“GIG”
Aggregation
Router
System Level Testing
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
14
Satcom
JMETC /
SDREN
FOB
MCS
Contractor
SIL
Contractor site
Pax River
BAMS
NSIL
ATR
SAIL
ACETEF P-8 SIL
E-2 ESTEL
Contractor
Network
CSCI
Integration
Classifie
d
Network
WX
Other
services Operational
“GIG”
CSU Programming
Bench
MCS
UA
Development
“GIG”
Aggregation
Router
DT/OT Ground/Flight Testing
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
15
Satcom
JMETC /
SDREN
FOB
MCS
Contractor
SIL
Contractor site
Pax River
BAMS
NSIL
ATR
SAIL
ACETEF P-8 SIL
E-2 ESTEL
Contractor
Network
CSCI
Integration
Classifie
d
Network
WX
Other
services Operational
“GIG”
CSU Programming
Bench
MCS
UA
Development
“GIG”
Aggregation
Router
OPEVAL Testing
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
16
Satcom
JMETC /
SDREN
FOB
MCS
Contractor
SIL
Contractor site
Pax River
BAMS
NSIL
ATR
SAIL
ACETEF P-8 SIL
E-2 ESTEL
Contractor
Network
CSCI
Integration
Classifie
d
Network
WX
Other
services Operational
“GIG”
CSU Programming
Bench
MCS
UA
Development
“GIG”
Aggregation
Router
NISPOM vs DOD Instr 8500.2
• Slight differences in NISPOM vs 8500.2 policy
• Presented minor issues when peering
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
17
Satcom
JMETC /
SDREN
FOB
MCS
Contractor
SIL
Contractor
Facility
Pax River
BAMS
NSIL
ATR
SAIL
ACETEF P-8 SIL
E-2 ESTEL
Contractor
Network
CSCI
Integration
Classified
Network
WX
Other
services Operational
“GIG”
CSU Programming
Bench
MCS
UA
Development
“GIG”
Aggregation
Router
Information Assurance Certification and Accreditation
• IA C&A is a significant effort
• Start early and have dedicated personnel
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
18
Summary
• Benefits of distributed test
- Test early, test often
- Greatly reduces risk, especially in System of Systems scenarios
• Lessons learned / challenges
- Dealing with non fleet representative encryption
- Use dedicated IA personnel for certification and accreditation efforts
- Minor differences in NISPOM and 8500.2
- Budgeting for SoS testing
• Looking to leverage existing test networks and tools to the maximum extent practical
18 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.
19 19
QUESTIONS?
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 11-097, 20 January 2011.