Bridgeport J head rebuild step by step Do not copy this without permission from the Author, [email protected]Bridgeport J head step pulley disassembly and reassembly. Note some pictures show the head partially painted, but it is the same machine. Loosen motor mounting bolts, slacken drive belt, disconnect wiring from junction box rather than at the motor switch if possible and remove motor from top of aluminum housing. Unbolt aluminum pulley housing from backgear plate by unscrewing the allen bolts from underneath. Remove head from ram by removing the 4 hex nuts from the front of the head. Support the head as you remove the last nut. It will slide off of the bolts as you pull forward. Remove the back gear housing from the lower housing. Remove the 2 screws, retainer and felt from above the top spindle bearing.
39
Embed
Bridgeport J Head Step Pulley Disassembly and Reassembly
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Bridgeport J head rebuild step by step Do not copy this without permission from the Author, [email protected] Bridgeport J head step pulley disassembly and reassembly. Note some pictures show the head partially painted,but it is the same machine. Loosen motor mounting bolts, slacken drive belt, disconnect wiring from junction box rather than at the motorswitch if possible and remove motor from top of aluminum housing. Unbolt aluminum pulley housing from backgear plate by unscrewing the allen bolts from underneath. Remove head from ram by removing the 4 hex nuts from the front of the head. Support the head as you removethe last nut. It will slide off of the bolts as you pull forward. Remove the back gear housing from the lower housing.
Remove the 2 screws, retainer and felt from above the top spindle bearing.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Remove slotted screw from top right of depth adjuster. Underneath you will find a threaded hole in the end ofthe pivot. Put a machine screw in the end of the pivot so you can pull it out of the hole.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Tap the spindle out of the quill by hitting the splined end of the shaft from the top with a soft heavy rubber mallet. Remove the allen bolt that retains the part of the depth adjuster that contacts the depth stop (the part attached tothe quill). Slide the quill out of the bottom of the housing.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Remove the 2 allen screws from under the fine feed handle. Remove the slotted screw from the sleeve belowand the spring and detent ball underneath. Remove the allen setscrew from the opposite side, and slide off thecollar. Don’t lose the key.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Remove the double setscrews that retain the worm cradle inside the the upper part of the housing. Thesetscrews are inside the edge of the selector cover.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Remove the sliding gear set upper bushing setscrews. There are 2 screws in each hole, a setscrew AND a 1/8”tall locking screw, so don’t put your allen key in too deep or you will have great difficulty because you will betrying to get them out at the same time as they are locked together. Make sure you just get the outer screwalone first. Remove the setscrews for the lower bushing also, same deal with the locking outer screw. Take a3/8” thick bar and make a 90 degree hook at both ends. Put the hook under the bushing and tap upward to pullup the bushing. This was hard to do, probably because the setscrews put a burr on the bushing making it hard toget out of the housing. Take your time and work around it tapping gently so it comes up evenly. At this pointyou can remove the shaft and take out the sliding gears, then put the shaft back down there and stick a long (16”x ¾”x 1/8” or so) bar parallel to the fine feed handle shaft so it is up against the bevel gear under the bushing. While holding the bar, tap up from the underside, being careful not to hit the feed handwheel shaft. If you havehelp, have someone wiggle the shaft while you tap up on the bevel gear and pop it up out of its bore. This wasas much of a pain as the other bushing
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
The bearings are a light press fit, and they come off upwards (toward the splined end of the shaft). In order fromthe right we have the dirt shield, lower bearing, inner and outer bearing spacer upper bearing long top spacer,upper bearing, locking tab and nut. I thought this might be a tight press fit, so because the dirt shield was ratherthin the first time I did this I put my bearing separator around the lower bearing rather than the dirt shield so asnot to warp it if I had to apply a great deal of pressure. Turns out this was not necessary, but it was enoughpressure to separate the lower bearing that’s why it is pictured in pieces here. It had to be replaced anyway so itwas not a problem. NOTE THE ORIENTATION OF THE LOWER BEARINGS. They are abec7 (hiprecision, a matched set, you cannot replace just one) Cheapo bearings will make your milll into an expensivewobbly drill press. The set costs 150399 depending on who owes you a favor
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Reassemble the spindle with the lower bearings THRUST faces both facing the spacer that goes between them.KEEP EVERYTHING CLEAN. The bearings are a matched set and thrust face is labelled. The dirt guardgoes grooved face down. Use the long spacer to press the 2 lower spindle bearings and their spacer(s) on at thesame time, then make a sleeve (just a cut piece of black pipe, faced square, held by my thumb in the photo) topress the top bearing on, then put on the locking tab and tighten the nut (bevel side down) and bend a tab up tolock the nut.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Carefully inspect the collet locating screw for damage, clean it up if necessary with an abrasive wheel, screw it inso the tab projects into the spindle hole so the tab is parallel to the spindle and doesn’t project too far in test thedepth by inserting an r8 collet and make sure it slides in easily and can seat fully. Put in a locking screw on topof the tabbed screw while the collet is still inserted so it can’t turn. I think the OEM locking screw is brass, but Icould not find a ¼32tpi screw so I made one on the lathe which will get a little of the weak kind of locktite. This screw will be a pain to remove (may need to be replaced if you spin a collet) with the spindle in the quill soit would be better if it was an allen screw because it will be almost even with the edge of the quill once thespindle is back in the quill. Put yor spindle aside for the moment.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Remove the inner nut from the hollow shaft with a pin wrench, then the outer nut. I made a large pin wrench witha piece of 11/2 x 3/8 bar stock and 2) ¼” bolts
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
step pulley should drop out with a few taps with a plastic mallet. You can see the brake shoes up there. Therewas a ton of debris sitting in the pulley where did that come from??
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
The step pulley bearing carrier should drop out of the housing, mine needed a little help as it was stuck. Nowonder there was no way to get back gear engaged. There are 4 small ballpoint pen sized springs under theflange, don’t lose them when this drops out. Normally those springs work to return the bearing carrier to thedown position when rotating the clutch lever on top.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
While your lovely assistant (yeah, right) is stripping the crappy paint job off of the pulley housing, insert thespindle into the quill, quill gear teeth down. Should slip in by hand. Then put spindle nose on a wood block anduse a soft rubber hammer on the top edge of the quill to seat the bearings in the quill.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
wipe a little way oil in the quill bore in the housing and insert the quill with the hole for the depth stop lined upwith the slot. Only insert it enough so the hole in the quill shows up in the depth guage slot. Don’t push too farbecause you’ll be aligning the sheetmetal chip guard a few steps from now and you don’t want to hit it.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Insert the depth adjuster threaded rod thru the circlip, depth locknut, depth adjuster and quill depth stop, butscrew the quill depth stop to the quill first.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
insert both parts of the quill lock. Remove the handle so you can screw it together in a position where it will lockthe quill before hitting the housing. You may need a thin washer under its head to get it perfectly positioned. Thetop bushing is shown sitting on top of its bore.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Make sure the sheet metal quill sleeve/chip guard is positioned with the open slot facing down at the quill pinionand the tabs down in the slots on either side of the quill. Make sure it is slid down past the quill enough so thetabs disappear beyond the top of the quill. Put a felt washer down on top of the top spindle bearing and then putthe felt retainer bracket and the 2 wide flange machine screws on either side of the quill where the slots are. These screws will pull the chipguard down by those little tabs to cover the depth guage slot when the quill goesdown…that’s why they have those large screw heads.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Push the quill in all the way, then put in the clock spring assembly. You may need a strong wire hook or awl witha bent end to get the spring around the quill pinion shaft hook. Rotate the spring housing clockwise about half aturn to line up the screws and put a little tension on the spring, screw them in and then put the woodruff key onthe shaft, push the handle on and tighten its setscrew.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
insert the three square head ½” bolts in the back gear housing. Make sure the nut over the worm gear is tightand has a tab bent up locking the nut in place. Shift the worm drive engagement lever on the top of the quillhousing (the one that moves the worm cradle) out so the worm is out of the way. Bolt the back gear housing onthe quill housing and tighten the 3 nuts.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Put a little oil on the end and splines of the shaft that runs thru the small gear, and screw the plate to the backgear housing with the small machine screws. (some of these screws are under the toothed belt pulley). You cangrease these gears if the head will be inverted and you think somebody might forget to fill the housing with oil, butfilling it thru the oiler afterwards is fine. Tap the thin cover down over the roll pins and put in all the screwsbefore the cogged pulley goes on it covers some of them.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Tap the toothed pully on to the shaft until you can thread the nut on the shaft, then use a strap wrench to hold thepulley while tightening the pulley nut.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Insert the stepped pulley in its bearing assembly. Hold this assembly together and turn the housing on its side soyou have access to the top. Don’t let the bearing block slide out because the 4 little springs will drop out of theirbores into the inside of the stepped pulley.
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Loosen the tiny allen lock screws for the clutch actuating pins, then place the clutch actuating ring/handle andboth threaded inserts in place. Make sure these are very tight with the smaller inner one you are drawing thestep pulley hollow shaft up thru the bearings with a loose press fit. If the step pulley is not pulled all the way up,the clutch dogs will not raise enough to disengage when you turn the knob to the right, and so the spindle will belocked when you try to use the low speed reduction gear. While compressing the step pulley up into the housingagainst those four little springs, screw the pins in with your third hand and then tighten the tiny allen lockingscrews so the pins don’t come loose. Check function by swinging the knob around
Put the motor drive V belt and cogged belt in place, remove the rim from the cogged pulley so you can slip thecogged belt over it as you attach this last housing, then while there is still a gap before tightening the screws makesure everything spins the way it should. Finally tighten the allen screws around the housing and put the rim backon the cogged belt pulley. Mount the head on the end of the ram best to use a hoist because although its notterribly heavy, holding it while lining up the screws would be very difficult, even for 2 people. Put in thedrawbar, a collet and an end mill and apply the spindle brake while tightening the drawbar to see if the brake isworking properly. Shift the high/low clutch dog control on top of the belt housing to the right (raises front steppulley with dogs, disconnecting the front spindle pulley from the spindle) and engage the back gear lever (“in”) onthe rear right side of the head. Make sure the spindle turns by putting a wrench on the drawbar. Now shift theback gear out and the high low clutch dog control to the left, and rotate the spindle with your drawbar wrench(drive dogs should snap down into engagement taking the slack out of where the cam pins ride in the slots in thering of the high/low clutch dog control that’s those 4 little springs in action) and squirt a bunch of oil into the quillhousing till it runs out the bottom (put a pan under the spindle first), then install the oiler and fill it, and also oil allother lube points don’t forget the power feed and the ways. Finally, install the motor, tighten the belt, makesure everything still spins, and make some chips. Remember you will have to use electrical reverse when theback gears are engaged. Keep the oilers full, top oiler will keep going down until that back gear housing is full!
4/15/2015 Bridgeport J head step pulley disassembly and reassembly
Note the nifty dolly. Built a little wider than the base of the mill allows for 4 levelling screws just outboard of thebase bolts. 3/8” plate bent on a press brake, its tapped 5/811 so no nuts are required to bolt the mill to it and itonly raises the mill about 13/8”. End plates mig welded in place to stiffen it up. This 36” machine is for sale,btw, $3500 without the dolly, but the vise, rotab, and 100 mile delivery from 30527 included. See my ebaystore for knee cranks and fine feed handwheels. [email protected]