Current BPA RTU ResearchCurrent BPA RTU Research
BPA/EWEB/PECI Premium Ventilation Package ◦ 2008 – 2009 field tests with detailed pre/post metering◦ 2 sites, 4 RTUs
BPA/PNNL /State of Washington Smart Monitoring and Diagnostic System◦ Field test of concept and energy savings◦ 44 meters installed July 2008◦ SMDS units fall 2008 – spring 2009. ◦ Analysis and reporting will be completed by December 2009
BPA/PNNL development of self-correcting HVAC diagnostics
RTF Rooftop Unit subcommittee
Current BPA RTU PilotsCurrent BPA RTU Pilots
Completed BPA 2008 AirCare Plus Pilot◦ 63 Rooftop Units Serviced◦ 27 units with ~ 2 weeks pre/post metering.
Planned 2009 RTU Pilot◦ Summer of 2009◦ 600 Rooftop Units◦ 2 to 4 Program Delivery Contractors◦ Pre/Post metering for 120 + units◦ Use, test and develop M&V Protocol
Planned 2010-2012 regional RTU servicing programs.
BPA 2008 AirCare Plus BPA 2008 AirCare Plus SM SM Pilot Pilot Inland PowerKootenai Electric CooperativeCity of CheneyCity of ChewelahPECIDRS MechanicalBPA
2008 AirCare Plus Research Project 2008 AirCare Plus Research Project Opportunity in SpokaneJune – October 2008Service on 63 RTUs at 25 businessesMetering and analysis for 27 RTUs
AirCare Plus AirCare Plus SMSM
Servicing RTUs and split systems ranging in size from 3 to 60 tons
HVAC Service Assistant™ Economizer diagnostics Programmable Thermostats
PECI AirCare Plus enhanced maintenance service
AirCare Plus MeasuresAirCare Plus Measures
2008 AirCare Plus 2008 AirCare Plus SM SM ServicingServicing
2008 RTU Pilot Summary2008 RTU Pilot Summary
4 participating utilities21 sites visited63 units serviced27 units metered247 measures completed$15,530 Incentives paid$13,077 program delivery cost
BPA 2008 ACP Pilot – Predicted Measure Cost and Savings
DescriptionAverage of
SavingsAverage of Incentive
$/first year kWh
Basic pkg w econ 176 $50 $ 0.28
Basic pkg w/o econ - $25 $ -
Economizer adjustment 1,181 $150 $ 0.13
Economizer control pkg 61 $100 $ 1.65
Refrig 1 compressor 195 $125 $ 0.64
Refrig 2 compressor 1,163 $175 $ 0.15
Refrig prescreen - $25 $ -
TSTAT modification 3,749 $25 $ 0.01
TSTAT replacement 848 $100 $ 0.12
RTU MeteringRTU Metering
Sampling Plan◦ At least 20 RTUs◦ Time and Cost are main drivers
Erik Boyer, BPA: Metering Installation and Data CollectionOnset HOBO U-30 GSM Loggers
◦ Temp/RH Sensors Outside Air, Supply, Return, Mixed Air
◦ RTU Total kWh◦ T-Stat (Y1) call for cooling
1 to 2 weeks pre/post metering1-minute interval data
RTU MeteringRTU Metering
Measured Energy SavingsMeasured Energy Savings
Questions?
BPA 2009 RTU Service Pilot BPA 2009 RTU Service Pilot Preview for Regional Technical ForumApril 7th, 2009
Jack CallahanBonneville Power Administration
2009 RTU Service Pilot2009 RTU Service Pilot
Summer of 2009600 Rooftop Units Up to 20 utilities2 to 4 Program Delivery Contractors (PDC)Pre/Post metering for 120 + unitsUse, test and develop M&V Protocol
2009 RTU Service Pilot 2009 RTU Service Pilot Projected TimelineProjected Timeline
April 10, 2009 - Final selection of utilities
May 1, 2009 - Final selection of PDC’s
May 2009 - Pilot Kick-off meetings
July – Nov - 600 RTU's serviced
Questions?
Rooftop Unit OpportunityRooftop Unit OpportunityJack Callahan
Bonneville Power Administration
Presented to Regional Technical ForumApril 7th, 2009
Existing RTUs Existing RTUs
500,000 + RTU’s in the regionKnown problemsKnown fixesScalable Solutions
RTU Tools & TechniquesRTU Tools & Techniques
Palm Pilot toolFlow plate
rik
Rooftop Unit (RTU) Efficiency Rooftop Unit (RTU) Efficiency Optimization StrategiesOptimization Strategies
A. EconomizerB. Refrigerant cycleC. Thermostat D. Other
Research and Pilot GoalsResearch and Pilot GoalsMeasured Energy Savings
RTF M & V protocols Feedback to Service Providers
BPA Long Term RTU PlanBPA Long Term RTU Plan
Ongoing Research2008 60 unit Pilot2009 600 unit Pilot RTF approved M&V Protocols2010 Region-wide Program