C-139 Client Westinghouse Electric Company Location: Hematite, MO Project: Hematite Remedial Investigation Date Started 07/01/04 Date Finished 08/04/04 Geologist: J. Bostwick Drilling Contractor: Geotechnology Boring: BR-7-RB Drilling Method Rotary Surf. Elev. 476.48 Northing 864152.42 Easting 829600.86 Total Depth of Boring 265.0 feet Top of Casing 478.74 Total Depth of Well 265.3 feet g c o 1il ii w g "" 15. " o ROD >- " " c .a" " " mo- " LL Litholo9Y Litholo9Y Description Well Construction Well Construction Desc. B Westinghouse Westinghouse Electric Company Hematite Facility 3300 State Road P Festus, MO 63028 High Solids Bentonite Grout (Tremied) Westinghouse Electric Company Hematite Remedial Investigation Hematite, MO BR-7-RB 4of6 Client: Project: Location: Borehole: Sheet: DOLOMITE: gray, very hard, silty, w/wavy green shale lam inae DOLOMITE: gray, very hard, sandy crystalline, turbid DOLOMITE: gray, very hard, sandy, pitted, crystalline DOLOMITE: gray, very hard, sandy, crystalline, pitted DOLOMITE: gray, very hard, fine-grained sandy, pitted DOLOMITE: gray, very hard, fine-grained, wloccasional black/gray shale laminae SAIC 8421 S1. John Industrial Drive S1. Louis, Missouri o o o 94 98 97 100/100 100 0 195 185 200 155 190 100/100 175 160 100/100 100 0 165 170 100/100 150 180 100/100 290 285 300 310 305 320 325 295 315 280
5
Embed
Boring: BR-7-RB Drilling Method Rotary Top of Casing … · Date Finished 08/04/04 Geologist: J. Bostwick Drilling Contractor: Geotechnology Boring: BR-7-RB Drilling Method Rotary
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
C-139
Client Westinghouse Electric CompanyLocation: Hematite, MOProject: Hematite Remedial InvestigationDate Started 07/01/04Date Finished 08/04/04Geologist: J. BostwickDrilling Contractor: Geotechnology
Boring: BR-7-RB Drilling Method RotarySurf. Elev. 476.48Northing 864152.42Easting 829600.86Total Depth of Boring 265.0 feetTop of Casing 478.74Total Depth of Well 265.3 feet
gco1iliiw
g""15."o ROD
>
" "~ c.a"" "mo-~ "LL~
LL Litholo9Y Litholo9Y Description Well Construction Well Construction Desc.
B WestinghouseWestinghouse Electric CompanyHematite Facility3300 State Road PFestus, MO 63028
High Solids Bentonite Grout(Tremied)
Westinghouse Electric Company
Hematite Remedial Investigation
Hematite, MO
BR-7-RB
4of6
Client:
Project:
Location:
Borehole:
Sheet:
DOLOMITE: gray, very hard, silty, w/wavygreen shale lam inae
DOLOMITE: gray, very hard, sandycrystalline, turbid
DOLOMITE: gray, very hard, sandy, pitted,crystalline
DOLOMITE: gray, very hard, sandy,crystalline, pitted
DOLOMITE: gray, very hard, fine-grainedsandy, pitted
DOLOMITE: gray, very hard, fine-grained,wloccasional black/gray shale laminae
SAIC8421 S1. John Industrial DriveS1. Louis, Missouri
o
o
o
94
98
97
100/100 100 0
195
185
200
155
190 100/100
175
160 100/100 100 0
165
170 100/100
150
180 100/100
290
285
300
310
305
320
325
295
315
280
C-140
Client Westinghouse Electric CompanyLocation: Hematite, MOProject: Hematite Remedial InvestigationDate Started 07/01/04Date Finished 08/04/04Geologist: J. BostwickDrilling Contractor: Geotechnology
Boring: BR-7-RB Drilling Method RotarySurf. Elev. 476.48Northing 864152.42Easting 829600.86Total Depth of Boring 265.0 feetTop of Casing 478.74Total Depth of Well 265.3 feet
gco1iliiw
g""15."o ROD
>
" "~ c.a"" "mo-~ "LL~
LL Lithology Lithology Description Well Construction Well Construction Desc.
Westinghouse Electric CompanyHematite Facility3300 State Road PFestus, MO 63028