MLNG/PLM/2010/0013PROVISION OF CONDITIONAL ASSESSMENT & REMAINING LIFE ANALYSIS FOR MODULE 2 BOILERS IN PETRONAS LNG COMPLEX
INTERNAL USE
Presented toBidder’s Site Visit on 17th May 2010ByZamsyari Bin MadhanMLNG
2MAKING IT HAPPENMAKING IT HAPPEN2
1. Objectives
2. General MLNG Boiler Arrangement
3. Scope of Inspections
Appendix I: PhotosAppendix II: Work Specification
Contents
3MAKING IT HAPPENMAKING IT HAPPEN
General MLNG Boiler Arrangement
3
4MAKING IT HAPPENMAKING IT HAPPEN
General MLNG Boiler Arrangement
4
5MAKING IT HAPPENMAKING IT HAPPEN5
To brief the bidder with on MLNG/PLM/2010/0013 Conditional Assessment & Remaining Life Analysis For Module 2 Boilers In PETRONAS LNG Complex.
Objectives
6MAKING IT HAPPENMAKING IT HAPPEN6
Scope Of Inspections
Test Conducted
1 Visual Inspection (VI) 8 Remote Field Electromagnetic Test (RFET)
2 Dye Penetrant Test (DPT) 9 Remote Visual Inspection (RVI)
3 Magnetic Particle Test (MPT) 10 In Situ Metallography (IM)