© 2009 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the MAKING IT HAPPEN MAKING IT HAPPEN MLNG/PLM/2010/0013 PROVISION OF CONDITIONAL ASSESSMENT & REMAINING LIFE ANALYSIS FOR MODULE 2 BOILERS IN PETRONAS LNG COMPLEX INTERNAL USE Presented to Bidder’s Site Visit on 17 th May 2010 By Zamsyari Bin Madhan MLNG
18

Boiler - Conditional Assesment - Remaining Life Analysist CARLA

Apr 10, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

© 2009 PETROLIAM NASIONAL BERHAD (PETRONAS)

All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.

MAKING IT HAPPENMAKING IT HAPPEN

MLNG/PLM/2010/0013PROVISION OF CONDITIONAL ASSESSMENT & REMAINING LIFE ANALYSIS FOR MODULE 2 BOILERS IN PETRONAS LNG COMPLEX

INTERNAL USE

Presented toBidder’s Site Visit on 17th May 2010ByZamsyari Bin MadhanMLNG

Page 2: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

2MAKING IT HAPPENMAKING IT HAPPEN2

1. Objectives

2. General MLNG Boiler Arrangement

3. Scope of Inspections

Appendix I: PhotosAppendix II: Work Specification

Contents

Page 3: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

3MAKING IT HAPPENMAKING IT HAPPEN

General MLNG Boiler Arrangement

3

Page 4: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

4MAKING IT HAPPENMAKING IT HAPPEN

General MLNG Boiler Arrangement

4

Page 5: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

5MAKING IT HAPPENMAKING IT HAPPEN5

To brief the bidder with on MLNG/PLM/2010/0013 Conditional Assessment & Remaining Life Analysis For Module 2 Boilers In PETRONAS LNG Complex.

Objectives

Page 6: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

6MAKING IT HAPPENMAKING IT HAPPEN6

Scope Of Inspections

Test Conducted

1 Visual Inspection (VI) 8 Remote Field Electromagnetic Test (RFET)

2 Dye Penetrant Test (DPT) 9 Remote Visual Inspection (RVI)

3 Magnetic Particle Test (MPT) 10 In Situ Metallography (IM)

4 Ultrasonic Flaw Detection (UFD) 11 Hardness Testing (HT)

5 Ultrasonic Thickness Measurement (UTM) 12 Dimensional Measurement (DM)

6 Non Destructive Oxide Thickness Inspection (NOTI) 13 Metallographic Replication (MR)

7 Non Destructive Hydrogen Damage Inspection (NDHDI) 14 Deposit Collection (DC)

Page 7: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

7MAKING IT HAPPENMAKING IT HAPPEN

Scope Of Inspections

7

DC &DM

Drums, Stack

DPT Drums, Headers & All weld joints

MPT Drums, Headers & all weld joints

UFD Headers , Drums

UTM Headers , Drums & Stack, MSL, PSH & SSH, DSH

NOTI PSH & SSH tubes

NDHDI Furnace wall tubes

RFET Boiler bank tubes, Furnace wall tubes

RVI Headers & Drums

IM Furnace wall tubes, PSH&SSH tubes

HT Headers, Drums & MSL

DM Headers, Drums & MSL, All tubes

MR Furnace wall tubes, PSH & SSH tubes

VI All pressured parts, insulation , Structure & Drums Supports

Page 8: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

8MAKING IT HAPPENMAKING IT HAPPEN8

Photos

Visual Inspection (VI)

Mud Drum Steam Drum

Page 9: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

9MAKING IT HAPPENMAKING IT HAPPEN9

Photos

Dye Penetrant Test (DPT)

Buckstay Steam Drum

Page 10: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

10MAKING IT HAPPENMAKING IT HAPPEN10

Photos

Magnetic Particle Test (MPT)

SSH Header Steam Drum

Page 11: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

11MAKING IT HAPPENMAKING IT HAPPEN11

Photos

Ultrasonic Flaw Detection (UFD)

Steam Drum Steam Drum

Page 12: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

12MAKING IT HAPPENMAKING IT HAPPEN12

Photos

Non Destructive Oxide Thickness Inspection Service (NOTI)

Primary & Secondary Superheater

Page 13: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

13MAKING IT HAPPENMAKING IT HAPPEN13

Photos

Non Destructive Hydrogen Damage Inspection (NDHDI)

Page 14: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

14MAKING IT HAPPENMAKING IT HAPPEN14

Photos

Remote Field Electromagnetic Test (RFET)

Steam Drum Steam Drum

Page 15: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

15MAKING IT HAPPENMAKING IT HAPPEN15

Photos

Remote Visual Inspection (RVI)

Primary Superheater Header

Page 16: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

16MAKING IT HAPPENMAKING IT HAPPEN16

Photos

In Situ Metallography (IM)

Primary Superheater Outlet

Page 17: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

17MAKING IT HAPPENMAKING IT HAPPEN17

Photos

Metallographic Replication (MR)

Page 18: Boiler - Conditional Assesment - Remaining Life Analysist CARLA

18MAKING IT HAPPENMAKING IT HAPPEN18