BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

Aug 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project
Page 2: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

BLUE LINE EXTENSION

South Oak Cliff - 3

CM/GCCM/GC

Public MeetingPublic MeetingPublic MeetingPublic MeetingDecember 3, 2013December 3, 2013December 3, 2013December 3, 2013

Page 3: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

Dawn DormanCommunity Affairs Representative Community Affairs Representative

Page 4: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

MEETING AGENDA

• Welcome

• DART Update

• Communications Tools

• Project Team

• Project Overview & Goals

• Design Team• Design Team

• Construction Team

• Schedule

• Questions / Comments

Page 5: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project
Page 6: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

COMMUNICATION TOOLS

Temporary

NOTICE

Door Hangers:

•Can be used for utility shut-offs or

work that will affect a small area

•Will be hung on individual doors Temporary

Service

Interruption

There will be a temporary

interruption in service on

Friday, July 31st between

10:00 a.m. and 11:00

a.m.

Call XXX-XXX-XXXX for

questions.

•Will be hung on individual doors

Page 7: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

•General Public Meetings

•Home Owner’s Associations

•Educational Institutions

Community Meetings:

COMMUNICATION TOOLS

•Educational Institutions

•Business Organizations

•Face-to-Face

Page 8: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

•DART:

http://www.dart.org/about/expansion/bluelinesoc3.asp

•SOC-3:

Web Sites:

COMMUNICATION TOOLSCOMMUNICATION TOOLSCOMMUNICATION TOOLSCOMMUNICATION TOOLS

•SOC-3:

www.soc3info.org (under construction)

Page 9: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

POSSIBLE COMMUNICATION TOOLS

Blue Line Express

Monday, December 20, 20089 Vol. 1

Electronic Newsletter:

•Quarterly

•Distributed by request

•Also available on the Web Site•Also available on the Web Site

Page 10: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

Reza Shirmanesh, P.E.DART Design and Construction DART Design and Construction

Project Manager

Page 11: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

PROJECT TEAM

•Reza Shirmanesh – DART Project Manager

•Steve Knobbe – Design Team Project Manager

•Brian Carpenter – Construction Team Project Manager•Brian Carpenter – Construction Team Project Manager

•Dawn Dorman – Community Affairs Representative

Page 12: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

Wagon

Wheels Trail

Wagon

Wheels Trail

Crouch

Road

Crouch

Road

Project Overview

Red Bird Lane

(future)

Camp Wisdom

Road

UNTD Station

(future)

UNTD Station

Crossing

(future)

Crossings

Aerial in Blue

At-Grade in

OrangeUNTD East

Crossing

Page 13: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

PROJECT GOALSPROJECT GOALSPROJECT GOALSPROJECT GOALS

•Develop and deliver a high quality light rail

project in a collaborative manner.

•Provide revenue service prior to the end of 2016.

Page 14: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

Stephen Knobbe, P.E.Design TeamDesign Team

Page 15: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

DESIGN TEAM

Page 16: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

DESIGN REFINEMENTS

• Advancing 5% design and incorporating

refinements such as:

o Profiles modified to define better alignment

for noise reduction.for noise reduction.

o Bridge spans lengthened to eliminate sub-

structure elements and maximize spans.

Page 17: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

MITIGATIONResource Mitigation of Potential Impacts

Community Facilities and

Character

The Dallas PD South Central Station is the only community facility impacted by the project:

- We have modified design to avoid displacement of parking spaces within the Police Station

- Increased clearances over the driveways (3)

- Potential relocation of monument sign for better visibility

- Potential visual intrusion in rear parking area will be mitigated with plant screenings

- Creation of enhanced streetscape and street parking

Transportation - No at-grade crossing of existing streets

- Dedicated left turn added for “kiss-and-ride” at Ledbetter Station

Air Quality No adverse indirect impacts anticipated

Noise and Vibration - Noise impacts would be expected to occur at the residence immediately south of Wagon Wheel Trail – sound barrier wall

added to bridge

- No vibration impacts requiring mitigation are projected to occur- No vibration impacts requiring mitigation are projected to occur

Visual and Aesthetic

Resources

- Various changes to existing views would be anticipated in the four Visual Assessment Units, but impacts are not expected

to be significant.

- $50k Art & Design Program for visual enhancements at each of the Camp Wisdom and UNT Dallas stations

Cultural Resources (including

Historic, Archeological and

Parklands)

- No historic properties affected

- No adverse effects to archeological resources identified

- No impacts to parklands identified

Water Resources - No wetlands or waters of the U.S. (WOTUS) affected, all waterways will be clear-spanned

- Nation-wide general construction permit (#14) and flood-plain alteration permits anticipated

- Some additional runoff potential: temporary and limited to construction phase

- Retaining walls to mitigate against flooding

Safety and Security Station landscaping will be altered for better visibility, increased camera coverage and improved pedestrian access

Construction Temporary and limited duration impacts

Page 18: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

PROPOSED MODIFICATIONS/IMPROVEMENTS

Ledbetter Station

• Maintains existing bus bay configuration and capacity.

• Provides kiss-and-ride facility on East side.

Page 19: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

PROPOSED STATION LAYOUT

Camp Wisdom Station

• Coordinating with City of Dallas on the recreation center.

Page 20: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

PROPOSED STATION LAYOUT

UNT Dallas Station

• Coordinating with University of North Texas at Dallas.

Page 21: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

Brian CarpenterProject ManagerProject Manager

Page 22: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

CONSTRUCTION TEAM

Page 23: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

DART

South Oak CliffDesign

WORKING SCHEDULE

Line Section 3

ConstructionTesting andAcceptance

DART Milestone

Pre-revenue Service

Page 24: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

Schedule:Schedule:

DesignDART

South Oak Cliff

Wagon

Wheels Trail

Wagon

Wheels Trail

Crouch

Road

Crouch

Road

Construction Overview

Red Bird Lane

(future)

Construction

Systems and Integrated

Testing

South Oak Cliff

Line Section 3Camp Wisdom

Road

UNTD Station

(future)

UNTD Station

Crossing

(future)

Crossings

Aerial in Blue

At-Grade in

OrangeUNTD East

Crossing

Page 25: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

•Hugh Harrison

•Raquel Olivier

•Brittney Hutchison

COMMUNITY OUTREACH TEAM

•Brittney Hutchison

Page 26: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

FIELD CONCERNS & COMPLAINTS

(469) 516-9563

[email protected]

[email protected]

Field Concerns & Complaints

Brittney Hutchison

DART Community Affairs

(214) 749-2598

[email protected]

DART Concerns

Dawn Dorman

Page 27: BLUE LINE EXTENSION - DART.org...PROJECT TEAM •Reza Shirmanesh – DART Project Manager •Steve Knobbe – Design Team Project Manager •Brian Carpenter – Construction Team Project

Questions / CommentsQuestions / Comments