Top Banner
Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical Research Centre of Finland Ltd
12

Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

Mar 02, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

Biomass and WasteGasification and Fast Pyrolysis

Ilkka HiltunenVTT Technical Research Centre of Finland Ltd

Page 2: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

10.6.2016 2

Biofuels and Bioenergy R&D at VTT

Circulatingfluidised bed

CCS (option)Supercriticalsteam(Option)

Power,heat &cooling

COMBUSTION

GasificationGASCLEANINGto syngas

SYNTHESIS FuelsChemicals

Fuel gas

GASIFICATION

BoilersKilnsEngines

Thermal orcatalytic fastPyrolysis PRODUCT

UPGRADINGGasolineDiesel, jet fuel

FAST PYROLYSIS Power,heat &cooling

Fuel oil

CFD MODELLING PROCESS CONCEPT EVALUATION

Page 3: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

10/06/2016 3

Oil

Coal

Biomass

Waste/SRF

GASIFICATION800 – 1400° C

O2AIR

STEAM

Wide FeedstockBasis

High-QualityFinal Products

SYNGAS(CO + H2)

FUEL GAS

FT-diesel fuelMethanol, DMEGasoline, jet-fuelHydrogenSynthetic methaneChemicals

Industrial kilnsco-firing in boilersGas turbinesEnginesFuel cells

Biomass gasification todifferent Final Products

GAS

CLEANING

Page 4: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

426/08/2014

R & D on Hot GasFiltration andCatalytic Gas

CleaningIGCC development

SYNGAS R&D AT VTT• Concept development for biofuels• Gasification process development

• Support to industrial demonstrations• Improved process conceptsin 2G Biofuels project 2012->

INDUSTRIALPILOT

• VARKAUS• CHICAGO

NEW APPLICATIONS• New gasification systems• Fuel cells, 2nd gen. IGCC• Hydrogen, synthetic methane,

Chemicals• Hybrid Renewable Systems• Material Recovery from Waste

BIOMASS/WASTEGASIFICATION FOR POWER

PIONEERING DEMO’S: LAHTI,CORENSO,VÄRNAMO

Gasification testsIn USA and Germany +

Supporting R&Dat VTT for Oulu

1995 2000 2005 2010 2015 20201985 2025 2030

BIOREFINERIES AT PULP AND PAPERMILLS AND AT LARGE CHP PLANTS• FT-Diesel or methanol 50-200 ktons / plant•Gasoline, SNG, H2 or olefins in the next phase

PEATAMMONIA

PLANTOULU/FINLAND

19805 p-years

199015 p-years

201520 p-years

WASTE-TO-ENERGY PLANTS ANDCO-FIRING IN COAL BOILERS• Corenso 2001, Lahti II 2012, Vaasa 2013• High electric efficiency, material recovery• Replacement of coal by biomass-derived gas

as part of thermochemical fuel conversionactivities of ca. 100 p-years

(combustion, gasification, synthesis, pyrolysis)

BIOMASS-TO-POWER PLANTS• Small-scale CHP by gas engines 0.1-5 MW• IGCC plants 30-150 MW

Bioneer Gasifierfor Small-scale

VTTresources

Biomass and Waste Gasificationfrom R&D to industrial success

Page 5: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

ReferencesOperational plant

Waste receivingand pre-handling

CFB gasifier 2x80 MW fuelwith candle filters

New Bio-Gas fired power boilerwith an air quality control system

Product gas from wastefor power production

Existing PC boilerBiomass receivingand pre-handling

Large-scalebelt dryer

CFB gasifier140 MW fuel

Product gas for power boilersThe Vaskiluoto 2 power plant

20155 © Valmet

Source: Juhani Isaksson, Valmet Technologies Oyj,2015 Gasification Technologies Conference, 11-14 October 2015, Colorado Springs, US

Page 6: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

Source: Jarno Haapakoski, Volter Ltd

Output: Generator output 40kW, thermal 100kWFuel: Wood chips (birch, spruce, pine, aspen)Fuel moisture: <18%Particle size: >80% between 16-50mm, >60% between 30-50mm,

≤9% 50-63mm, all below 63mm. ≤1% below 3,2mmFuel consumption: ca. 4,5 m3 of chips/24h at 100% power level

Volter 40 Indoor

Page 7: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

710/06/2016 7

Fast Pyrolysis Concepts and Products

Pyrolysis HydrotreatmentBiomass

Bio-Oil 1TransportationFuels

Heating

CatalyticPyrolysis HydrotreatmentBiomass

Bio-Oil 2TransportationFuels

Electricity

Page 8: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

Fast Pyrolysis for Bio-Fuel Oil - Scale-Up

SCALE-UP 2004 - 2015o ENSYN IN CANADAo BTG IN MALAYSIAo VALMET 2008-o FORTUM DEMONSTRATION 2014o BTG DEMONSTRATION 2015

FIRST EUROPEAN PILOTS 1994-2000o TWO CANADIAN, ONE FINNISH TECHNOLOGYo CONTINUOUS OPERATION VERIFIEDo OPERATED BY EUROPEAN UTILITIES

EARLY FAST PYROLYSISBENCH-SCALEo CANADA, USAo IEA BIOENERGY ASSESSMENTS

FORTUM DEMONSTRATION - JOENSUU, FINLAND

2000 20051980 199519901985 20152010

ENEL, BASTARDO, ITALY

FORTUM, PORVOO, FINLAND

IEA BIOENERGYCOLLABORATION VALMET, TAMPERE, FINLAND

UNION FENOSA,SPAIN

Page 9: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

Bio-oil capacity 30 MWAnnual production 50 000 t, 210 GWhStart-up 2013Feedstock Forest residues, sawdust

Fortum Joensuu: an Integrated Bio-Oil Demonstration Plant

Fuel receiving, dryingand crushing

Reactor and pyrolysis oilrecovery inside the boilerbuilding

Page 10: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

101026/08/2014

CHPand replacing

fossil fuels

CHPand replacing

fossil fuels

Preliminaryprocessconceptevaluation

Bench-scaledevelopmentand testing

Processmodelingandfeasibilityanalysis

Pilot-scaledevelopmentand processverification

Innovativesolutionsand basis forindustrialrealisation

Fuels &Chemicals

Fuels &Chemicals

Feedstockcharacterisation

VTT Thermochemical platform– Gasification & Fast Pyrolysis

Page 11: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

NEW ERA

Page 12: Biomass and Waste Gasification and Fast Pyrolysisbiomassnorth.org/documents/nordic/VTT Biomass and Waste...Biomass and Waste Gasification and Fast Pyrolysis Ilkka Hiltunen VTT Technical

12

TECHNOLOGY FOR BUSINESS