Biogas in Germany: Today 1400 MW biogas electricity and future targets P. Weiland Johann Heinrich von Thünen-Institut (vTI) Bundesforschungsinstitut für Ländlichen Raum, Wald und Fischerei Biogas Technology for Bioenergy Production Jyväskylä, 28 April 2009
24

Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Mar 29, 2018

Download

Documents

vuongcong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Biogas in Germany:Today 1400 MW biogas electricity and future

targets

P. WeilandJohann Heinrich von Thünen-Institut (vTI)

Bundesforschungsinstitut für Ländlichen Raum, Wald und Fischerei

Biogas Technology for Bioenergy ProductionJyväskylä, 28 April 2009

Page 2: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Contents

Current state of biogas in Germany

Driving force for biogas production

Legislation

Future targets for biogas production and utilization

Conclusions

Page 3: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Biogas plants in Germany

100 120 139 159 186 274 370 450617

8501050

1300

16001750

2050

2700

3500

37004000

0

500

1000

1500

2000

2500

3000

3500

4000

Num

ber o

f pla

nts

1990 1992 1994 1996 1998 2000 2002 2004 2006 2008

Page 4: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Installed electric capacity of German biogas plants

0200400600800

1000120014001600

2000

2001

2002

2003

2004

2005

2006

2007

2008

Inst

alle

d el

. cap

acity

[MW

]

Page 5: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Substrate application in agricultural biogas plants (2005-2007)

83%

15% 2%

Energy crops and manureEnergy crops Manure

Page 6: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Use of renewable raw materials

0102030405060708090

100

Silage

maiz

eCere

al grai

nsTota

l cere

alsGras

s sila

ge

Grass

Corn C

ob Mix

Maize g

rains

Sunflo

wers

Energy crops type

Freq

uenc

y of

use

[%]

Page 7: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Renewable Energy situation in Germany (2007)

10,9 %

45.2

4

23.7

11.5 Wind energyHydro powerBiomassBiogasPhotovoltaic

Total:

87.5

TWhel

Share on electricity consumption:

14,2 %

(Biogas: 1,5 %)

Page 8: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Reactor volume of farm based biogas plants

0

5

10

15

20

25

30

35

40

< 1 1- 2 2 - 3 3 - 4 4 - 5 5 - 6 > 6

Total reactor volume [1000 m³]

Freq

uenc

y [%

]

Page 9: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Bioenergy-Park „Penkun“ (NaWaRo AG)

Page 10: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Loading rate of biogas plants

0

5

10

15

20

25

1 - 1,5 1,5 - 2 2 - 2,5 2,5 - 3 3-3,5 3,5-4 >4

ODM-Loading rate [kgODM/(m³d)]

Rel

ativ

e fr

eque

ncy

[%]

one step processmultistep process

Page 11: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Residual methane potential of digestate at 20 °C

0

1

2

3

4

5

6

7

8

9

10

0 50 100 150 200 250 300

Hydraulic retention time [d]

Res

idua

l met

hane

pot

entia

l [%

of C

H 4-y

ield

]

einstufigmehrstufigdiskontinuierlich

onestagemultistagediscontinuously

Page 12: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Full load hours of the CHP

0

10

20

30

40

50

< 3 3 - 4 4 - 5 5 - 6 6 - 7 7 - 8 > 8

Full load hours [1000 h/year]

Rel

ativ

e fr

eque

ncy

[%]

Page 13: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Frequency of heat utilization

0

10

20

30

40

50

60

only Biogas plant Farm Private house Externalutilisation

Freq

uenc

y of

hea

t util

izat

ion

[%]

Page 14: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Biogas upgrading

16 upgrading plants are in operation

PSA is the dominating technology

Pressure water scrubbing is gaining market share

2 Selexol-washing plants are in operation

2 pilot plants use chemical washing by amine, and a first full scale plant is in construction

For achieving the technology bonus the methane losses must be < 0.5 vol.-%.

Page 15: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Growth drivers for biogas in Germany

The Government has decided to increase the renewable energy electricity production to 30 % and the portion of heat to 14 % by 2020. 40 % reduction of CO2-emissions by 2020.High dependency on foreign gas imports. 42 % of the natural gas is imported from Russia with a high risk for gas supply disruptions.The Government is aiming to improve the share of biogas on the natural gas market to 10 % by 2030.The most important growth driver is the Renewable Energy Sources Act (EEG).

Page 16: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Main factors of the Renewable Energy Act

A guaranteed fixed fee for the electricity paid by the grid operators for a 20-year period.Priority for connection to the electric grid.Priority purchase and transmission of the produced electricity.Security for long term planning and investmentCalculable costs for the consumers.Specific fees dependent on plant size, substrate type and technology.

Page 17: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

11,67

7

4

3

221

9,18

7

13

221

8,25

4

3

2

7,79

3

0

5

10

15

20

25

30

35

Euro

-Ct/k

Wh e

l

< 150 kW >150-500 kW >500 KW-5 MW >5-20 MW

Clean air bonusLandscape bonusTechnology bonusCHP-bonusManure bonusBiomass bonusBasic fee

Compensation for electricity 2009 (EEG)

Page 18: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Gas network access ordinance

The gas grid operator must connect biogas upgrading plants to the grid.

50 % of the connection costs must be paid by the gas grid operator.

The gas grid operator is responsible for odo-rization, gas quality control and compression.

Biomethane is fed into the grid by traders not by the producer.

Page 19: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Gas upgrading in Germany

16 biogas upgradingplants are in operation.

Only one plant producesbiomethane for vehicles.

15 plants are planned.

Up to 2020 yearly 6 bill.m3 methane should be injected into the grid (2030: 10 bill. m3 )

Page 20: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Biogas plants tomorrow

Strong increase of the gas production capacity. The number of biogas plants will increase up to 10,000 – 12,000 facilities in 2020.Within the next 4 years mainly small biogas plants < 200 kW and large biogas plants > 1 MW will be installed.Small biogas plants will be operated mainly with 30 % manure and more (manure bonus).Large biogas plants will be used mainly for producing biomethane with gas injection intothe grid.

Page 21: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Substrates tomorrow

Renewable energy crops will be the main substrate for biogas production also in future.New energy crops which are not in competition to food and feed crops becomes more impor-tant, e.g. Sudan grass, sorghum, topinambur, silphium and intercrops.The application of manure will strong increase due to the manure bonus.Pure plant by-products will be more often applied but wastes will play a minor role in agricultural biogas plants.

Page 22: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Gas utilization tomorrow

Biogas and biomethane will be used mainly in combined heat and power plants. Most of the produced biomethane will be injected into the grid and the mixture of natural gas and biomethaneis used in CHP, as vehicle fuel or for chemical proces-ses.Micro biogas grids will be more often applied. 30 % of the investment costs are supported by MAP. Local heat grids find increased application due to the financial support of 60 €/m - 80 €/m.Bioenergy villages with energy self sufficiency find increased application. Combined renewable power stations (biogas, wind, photovoltaic) will be applied for stabilizing the electric grid.

Page 23: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Summary: Biogas today in Germany

Workplaces > 10,000

Turnover (manufacturer, planner) 650 mill. €

Turnover electricity 1,000 mill. €

Export share ~ 20 %

Electricity production 2008 11 bill. kWh

CO2 -reduction 2008 9 mill. t/a

Source: GBA

Page 24: Biogas in Germany: Today 1400 MW biogas electricity and ... · PDF fileToday 1400 MW biogas electricity and future targets. ... type and technology. 11,67 7 4 3 2 2 1 9,18 7 1 3 2

Thank you for your

attention!

Biogas Technology for Bioenergy ProductionJyväskylä, 28 April 2009