Top Banner
Wel come VIPs visit Became x IDC ( May 14, 2010) 1/3. 1/3. Binh Binh Duong province Duong province 2/3. Becamex IDC and its k ey pro jects 3/3. BinhDu ong New City .
30

BinhDuong New City_May 2010

Apr 10, 2018

Download

Documents

qle2004
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 1/30

Welcome VIPs visit Becamex IDC ( May 14, 2010)

1/3.1/3. BinhBinh Duong provinceDuong province2/3. Becamex IDC and its key projects3/3. BinhDuong New City.

Page 2: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 2/30

HanoiHanoi

TayTay NinhNinh

Binh PhuocBinh Phuoc

Binh DuongBinh Duong

DongDong NaiNaiHCMCHCMC

PopulationPopulationViet Nam: ~ 86 mil., add. of 1.2 mil./year.70% of population is under 35 yrs old.Ha Noi (expansion): 6.5 mil.Ho Chi Minh: 7.5 mil.Binh Duong: 1.5 mil.

http://images.businessweek.com/ss/10/02/0224_best_profit_outlook_countries/2.htm

Best Profit Outlook By Country 2010Best Profit Outlook By Country 2010Vietnam- ranking # 1Profitability grade: 91*% companies expecting increased profits: 92%% companies expecting increased revenue: 95%% companies expecting to increase employment: 64%Overall optimism rank: No. 4

Thanks to Hanoi's moves to weaken the currency, Vietnam's exporters areoptimistic about 2010. On Feb. 11 the government allowed a depreciation of thedong for the second time since November. A cheaper currency should also helpIntel, which is building a $1 billion chip assembly and testing plant in thecountry. — Bruce Einhorn 

*Note: Bloomberg BusinessWeek ranked countries based on a "profitability  grade." This percent balance is the proportion of companies that expect profits to increase less those expecting profits to decrease.

Page 3: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 3/30

§ Area : 2,695,5 Km2

§ Industrial land : 15, 000 ha

§ Population (people): ~ 1,500,000 (as April.1,09)- Working forces : 700,000

§ Admin units :- Capital town, 06 districts,89 communes & wards.

§ GDP growth per annum (1997-2007): 15%• Year 2009: ~ 10.23 % vs. 5.3% ( VN)

§ Domestic investment: ~ 8,000 projectswith capital of VND 55,000 Bil.

§ Foreign investment : 1,910 projectswith capital of ~ US$ 13.2 Bil from34 countries & territories .

By 8/2009: 3,555 By 8/2009: 3,555 expats expats working inside working inside IPs IPs ..

BÌNH DÖÔNG PRO

VINCE

Industrial:64,8%

Agri:5.5%Services:

29,7%

15 Industrial15 IndustrialParksParks

Economic Statistics 2008

13 Industrial13 IndustrialParksParks

By 2020, 39By 2020, 39 IPsIPs with totalwith totalland of 20,000 haland of 20,000 ha

Page 4: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 4/30

ac

b

d

2

5

6

4

3

6 Main Districts:1. CENTER DIST.2. THỦ DẦU MỘT DIST.3. THUẬN AN DIST.4. DĨ AN DIST.5. BẾN CÁT DIST.6. TÂN UYÊN DIST.

4 Suburban Districts:

a. DẦU TIẾNG DIST.b. PHÚ GIÁO DIST.c. BÀU BÀNG DIST.d. NORTHERN TÂN UYÊNDIST.

 Year 2020 Year 2020

Binh Duong ProvinceBinh Duong Province

Binh Duong CityBinh Duong City(tier 1)(tier 1)

1

GOOD TRANSPORTATIONSYSTEM1 – NATIONAL ROAD 13

2 – HIGHWAY MYPHUOC-TANVAN

3 – RING ROAD N3

4 - RING ROAD N4

5 – HOCHIMINH ROAD

6 – HOI NGHIA-ANTAY ROAD

1 2

5

3

4

6

Monorail

MyPhuoc-TanVanexpressway

Upgrade Hwy 13

Page 5: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 5/30

TRANSPORTATIONTRANSPORTATION INFRASTRUCTUREINFRASTRUCTURE DEVELOPMENT

MY PHUOC – TAN VAN EXPRESS WAY

- 30 KMs

- VND 3,500 BIL., ( include 1,800 BIL. for

construction cost)- Aug.7,2009: Ground Breaking Ceremony, andwill be finished in 4 years.

BOT PROJECT HIGHWAY 13

- 62 KM- VND 700 BIL

- IPO in April 2007

- COMPLETED IN 2007

Success : The trademark ofVSIP has become the brandname of Vietnam and gained theprestige in the world market.

Development orientation: VSIPwill continuously invest & developinto other provinces.

DEVELOPMENT ORIENTATION -VSIPMarking the success : On 2006,VSIP organized the 10thanniversary of establishmentwith the presence of two PrimeMinisters: Nguyen Tan Dung &Ly Hien Long.

Page 6: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 6/30

Bac Ninh Province (2)700 Ha Integrated Township andIndustrial Park (launched in 2007)

Haiphong City (3)1,600 Ha Integrated Township andIndustrial Park ~ USD 1 bil. (GroundBreaking on Jan. 13, 2010)

VIET NAM - SINGAPOREINDUSTRIAL PARK

Binh Duong Province (1)VSIP I : 500 Ha (launched in 1996)VSIP II: 344 Ha (launched in 2005)VSIP II Exp: 1,700 Ha (launched in 2007)

PCI in year 2009PCI in year 2009

Page 7: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 7/30

1/3.1/3. BinhBinh Duong provinceDuong province2/3. Becamex IDC and its keyprojects3/3. BinhDuong New City

PROFILE & ACTIVITIES

BECAMEX IDC CORPORATION

PROCESS & MANUFACTURING

CIVIL ENGINEERING, INDUSTRIAL CONSTRUCTION &

TRANSPORTATIONINFRASTRUCTURE, INDUSTRIAL PARKS AND RESIDENTIAL AREAS

- JOINT VENTURE, JOINT STOCK & INVESTMENT

- BANKING & FINANCE

- SECURITIES AND STOCK EXCHANGE

- HEALTH CARE, EDUCATIONAL, CULTURAL & SPORTS PROJECTS

- COMMUNITY PROJECTS

FORM OF BUSINES : HOLDING INC.

SUBSIDIARIES/AFFILIATES : 28

REGISTERED CAPITAL : VND 4,500 BIL

EQUITY : VND 25,000 BIL

EMPLOYEE : 2, 500 STAFFs

CHAIRMAN & CEO : MR. NGUYEN VAN HUNG

Page 8: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 8/30

SYSTEM OF SUBSIDIARIESBECAMEX IDC CORP. www.becamex.com.vn

FINANCIAL FIELD:1. The First Securities JS Company (FSC)2. Phươ ng Nam commercial JS Bank (HCM City)CONSTRUCTION– TRADING–REAL SESTATE –

SERVICES FIELD:3. Construction & Transportation JS Company (BCC)4. Trading & Development JS Company (TDC)5. Trading & Development JS Company (ITC)6. Mineral & Construction Company7. BD Environmental & Water Supply Company8. Urban development JS Company (Becamex UDJ)9. Technical-infra Development JS Co.,(Becamex IJC)10.Technology & telecommunication JS Co.(VNTT)11.Investment consultant services JS Co.(Becamex ISC)12.Lien Viet JS company13.Anh Sao Duong Communications JS companyPHARMACERTICAL FIELD :

1. Binh Duong Pharmacertical & Health Material JS Co.,2. Savi pharmacertical JS Company (Savipharm)HEALTHCARE – EDUCATION:1. Binh Duong Hospital JS Company2. University of South-Eastern Region.

SUBSIDIARIES–JOINT EFFORT

Capital contribution ofBecamex on Subsidiaries

913916

1,829

Becamex Share Othershareholders

Total

SYSTEM OF SUBSIDIARIES

BECAMEX IDC CORP.Projects – Subsidiaries ( ha

of land)

1. Viet Nam – Singapore IP

Residential & Industrial development

2. My Phuoc Industrial City3. Thoi Hoa Residential & IP4. Bau Bang Residential & IP5. Binh Duong New Township6.Tan Uyen Residential & IP

844

3,429

2,200

956

4,196

1,850

VSIP MPIP Thoi Hoa BauBang

BD Township TanUyen

Page 9: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 9/30

Master plan:Phase 1 :

Industry: 377 Ha

Service : 53 HaPhase 2 :

Industry : 471 HaService : 328 Ha

Phase 3:Industry : 1,000 HaService : 1,200 Ha

Phase 4 :Industry : 200 HaService : 756 Ha

KCN &ÑT MP2

KCN &ÑT MP3

KCN &ÑT MP1

KCN &ÑT THÔÙI HOØA

Natual Land in BinhDuong

Page 10: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 10/30

INVESTMENTCAPITAL(MIL USD)

NUMBER OFPROJECTS

2,252301TOTAL 

17115OTHER COUNTRIES1082FRANCE9

2205THAILAND8

103HOLLAND733613USA6201ENGLAND5

16053VIETNAM420527JAPAN360574KOREA2487108TAIWAN1

TIL 05/2008

NATION

RESULTS IN INVESTMENT ATTRACTION OF MPIPRESULTS IN INVESTMENT ATTRACTION OF MPIP

SAFETYSAFETYINVESTMENTINVESTMENT

Page 11: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 11/30

STABILITY &SUSTAINABLE

DEVELOPMENT FORINVESTORS & LOCAL

PEOPLE

BECAMEX CITY CENTER- 6ha- 2,500 bil. VND project

Page 12: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 12/30

ECOLAKES, My Phuoc

SetiaBecamex@Ecolake

• 226 ha developmentat My Phuoc -Valueof 839 mil. USD( ~ 10,000 units of allkinds)

• Villas, link house,condominium,commercial center,medical center, waterfeatures…

New Projects in Binh Duong ProvinceNew Projects in Binh Duong Province

MyPhuoc

EASTERN INTERNATIONAL UNIVERSITYEASTERN INTERNATIONAL UNIVERSITY

(26 HA(26 HA-- 24,000 STUDENTS INSIDE BINHDUONG TOWNSHIP)24,000 STUDENTS INSIDE BINHDUONG TOWNSHIP)

Page 13: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 13/30

BECAMEX INTERNATIONAL HOSPITAL-1,000 BEDS/ 12.7 HA OF LAND- Start Construction in Q1/2010

(금 호 타이 어 M OU 체 결 식) (오 리 온제 과 투 자 계 약 식 )

GS RETAIL DEPARTMENT STORE & SERVICE ( 9ha, Mỹ

Phư ớc 3)

Page 14: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 14/30

1/3.1/3. BinhBinh Duong provinceDuong province2/3. Becamex IDC and its key projects

3/3. BinhDuong New City

fr design research 2008

MASTER PLAN

.

Binh Duong New City, Vietnam ▪ master plan review and urban design | BECAMEX IDC

Page 15: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 15/30

7

1. TRUONG AN: 158 Ha

2. PHU GIA: 133 Ha

3. VSIP 2: 344 Ha

4. KIM HUY: 237 Ha5. SONG THAN 3: 533 Ha

6.  ĐAI  ĐANG: 274 Ha

7.BINH DUONG NEW CITY: 1.007 Ha8. SERVICES:650 Ha-02 GOLF COURSES-01 RACING CIRCUIT-01 FILM STUDIO

9. LOCAL RESIDENTIAL:650 Ha

Total: 4,196 HaTotal: 4,196 Ha

1

2

3

4

5

6

8

NEW TOWNSHIPNEW TOWNSHIP

OF INDUSTRY, URBAN AND SERVICESOF INDUSTRY, URBAN AND SERVICES

binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008

MASTER PLANMASTER PLAN

Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

You are here

Master Planwasconsulted byNUS.

Approved byJune. 22009.

Page 16: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 16/30

binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008

MASTER PLANMASTER PLAN

Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

Political & AdminCentre

Commercial /Mixed Devt

Central Biz /Financial District

High TechBiz Park

Residential -Apartments

Residential -Low Rise

Residential –Street Row

Houses

Cultural Centre

EasternInternational

University (EIU)

SportsCentre

Central Park

Commercial (Office & Retail) :

1.25 mil sqm (excl High Tech Biz Park)

Residential :

4.25 mil sqm

Admin Centre, Public /Residential Facilities :

1.2 mil sqm

 YEAR 2020 YEAR 2020

600,000 to 1 Million600,000 to 1 MillionPeoplePeople

(working & living)(working & living)

Development ControlDevelopment Control•For ALL investors

•Objective: Ensures that ALLdevelopments are carried outorderly and in accordance with theplanning intentions stipulated in theMaster Plan

•Strict control parameters still

allow flexibility in design•Strikes a balance betweenfacilitating developments whileminimizing adverse impact on theneighbouring properties & MasterPlan intent

Page 17: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 17/30

Development ControlDevelopment Control (cont(cont’’d)d)

Controls ParametersControls Parameters• Macro

– Land Use

– Building Height

– Development Density

• Micro

– Use Quantum

– Floor to Floor Height

– Building Edge

– Elegant Facade / Corner Articulation Treatment (at major street

 junctions only)

– Pedestrian Walkway

– Car Park Quantum & Entrance Locations

• Other applicable Local Codes

Power & Water Conservation

• Unique feature in line with the Government’s campaign

• Mandatory requirement for ALL developments

• 2 active and 2 passive conservation features of

investor’s choice

Development ControlDevelopment Control(cont(cont’’d)d)

Page 18: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 18/30

Development ControlDevelopment Control (cont(cont’’dd))

Office +Retail

Usage

5,000 m2

(10%)

Retail GFA

5 – 8Storey

49,000 m2

(90%)19,000 m2A10

Storey HtOffice GFAPlot SizeLot No

binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008

GREEN AND BLUE PLANGREEN AND BLUE PLAN ur  b  an  d  e s i   gn  an al   y  s i   s 

Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

Page 19: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 19/30

PEDESTRIAN NETWORK PLANPEDESTRIAN NETWORK PLAN ur  b  an  d  e s i   gn  an al   y  s i   s 

binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

arcaded walkway

cantilevered walkway

covered galleria

binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008

URBAN IMPRESSIONSBOULEVARD SOUTH ZONE

Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

Page 20: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 20/30

COMMUNICATION CENTRECOMMUNICATION CENTRE

binh duong new city, vietnam▪master plan review and urban design | nus centre for design research 2008 IV-1Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

MapleTree

BCC

BCCUDJ

IJC

IJC

TDC

UNIVERSITY

UDJ

ITC

ITC

SIS

Waiting to sign contract

Signed contract

Under construction

Commercial discussion

VNTT

Projects under design

TDC

 Đang thi công

 Đã ký H Đ

 Đang ký H Đ

 Đang thảo luận ĐT

 Đang thiết kế

Page 21: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 21/30

•Under construction:

•IJC Aroma hi-rise apartments ( 17-20stories- ~ 80,000 m2 GFA; 499 units)

OnOn--going projects in BDNCgoing projects in BDNC

OnOn--going projects in BDNCgoing projects in BDNC•Under construction:

•TDC Plaza- hi-rise apartments ( 18-20 stories,

133,740 m2 GFA, 799 units)

Page 22: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 22/30

•Under construction:

• BCC Shopping/House

complex-73,157 m2 GFA; 168

units of 4-5 stories

OnOn--going projects in BDNCgoing projects in BDNC

•Under Construction• Eastern International University( 26 ha, 24,000 students, ~ 250,000

m2 GFA). Ground Breaking on Aug.13, 2009- Phase 1: ~ 70,000 m2

GFA, recruiting for school year 2010-2011, ~ 1000-2000 students

OnOn--going projects in BDNCgoing projects in BDNC

Page 23: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 23/30

•Under Arch. Design Selection process :

• Admin. and Political Centre( City Hall of BinhDuongProvince/City); ~ 315,000 m2 GFA – start construction in April, 2010

OnOn--going projects in BDNCgoing projects in BDNC

•Under Arch. Design process ( 1/500 approved)• High Tech City by MapleTree of Singapore ( 75 ha), ~ 710.000

GFA (m2), up to 20 stories

OnOn--going projects in BDNCgoing projects in BDNC

Page 24: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 24/30

•Under Arch. Design:

• International School- KinderWorld Singapore- SIS(Kindergarten to High School)- 2.6 ha

•Opening in Aug. 2010 ( phase 1)

OnOn--going projects in BDNCgoing projects in BDNC

•Under detailed arch. Design:

• Office, commercial, entertainment, subway

• Designed by Ong & Ong (Singapore)

OnOn--going projects in BDNCgoing projects in BDNC

Page 25: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 25/30

•Under detailed Arch. Design:

•Cultural Centre project ( 7 ha)

•Designed by Cendes International (Singapore)

OnOn--going projects in BDNCgoing projects in BDNC

Page 26: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 26/30

Need more jointefforts/cooperation from

international and localinvestors and partners tomake this BinhDuong New

City come true SOONSOON

Page 27: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 27/30

Page 28: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 28/30

Page 29: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 29/30

binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

PERSPECTIVESCEREMONIAL AXIS

binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.

PERSPECTIVESCIVIC AXIS

Page 30: BinhDuong New City_May 2010

8/8/2019 BinhDuong New City_May 2010

http://slidepdf.com/reader/full/binhduong-new-citymay-2010 30/30

THANK YOUTHANK YOU

the New Destination for Allthe New Destination for All……

Contact: Le Simon QuocContact: Le Simon Quoc--Hung; Business Development Director.Hung; Business Development Director.

Email:Email: [email protected]@becamex.com.vn. 0917662288. 0917662288