Wel come VIPs visit Became x IDC ( May 14, 2010) 1/3. 1/3. Binh Binh Duong province Duong province 2/3. Becamex IDC and its k ey pro jects 3/3. BinhDu ong New City .
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 1/30
Welcome VIPs visit Becamex IDC ( May 14, 2010)
1/3.1/3. BinhBinh Duong provinceDuong province2/3. Becamex IDC and its key projects3/3. BinhDuong New City.
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 2/30
HanoiHanoi
TayTay NinhNinh
Binh PhuocBinh Phuoc
Binh DuongBinh Duong
DongDong NaiNaiHCMCHCMC
PopulationPopulationViet Nam: ~ 86 mil., add. of 1.2 mil./year.70% of population is under 35 yrs old.Ha Noi (expansion): 6.5 mil.Ho Chi Minh: 7.5 mil.Binh Duong: 1.5 mil.
http://images.businessweek.com/ss/10/02/0224_best_profit_outlook_countries/2.htm
Best Profit Outlook By Country 2010Best Profit Outlook By Country 2010Vietnam- ranking # 1Profitability grade: 91*% companies expecting increased profits: 92%% companies expecting increased revenue: 95%% companies expecting to increase employment: 64%Overall optimism rank: No. 4
Thanks to Hanoi's moves to weaken the currency, Vietnam's exporters areoptimistic about 2010. On Feb. 11 the government allowed a depreciation of thedong for the second time since November. A cheaper currency should also helpIntel, which is building a $1 billion chip assembly and testing plant in thecountry. — Bruce Einhorn
*Note: Bloomberg BusinessWeek ranked countries based on a "profitability grade." This percent balance is the proportion of companies that expect profits to increase less those expecting profits to decrease.
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 3/30
§ Area : 2,695,5 Km2
§ Industrial land : 15, 000 ha
§ Population (people): ~ 1,500,000 (as April.1,09)- Working forces : 700,000
§ Admin units :- Capital town, 06 districts,89 communes & wards.
§ GDP growth per annum (1997-2007): 15%• Year 2009: ~ 10.23 % vs. 5.3% ( VN)
§ Domestic investment: ~ 8,000 projectswith capital of VND 55,000 Bil.
§ Foreign investment : 1,910 projectswith capital of ~ US$ 13.2 Bil from34 countries & territories .
By 8/2009: 3,555 By 8/2009: 3,555 expats expats working inside working inside IPs IPs ..
BÌNH DÖÔNG PRO
VINCE
Industrial:64,8%
Agri:5.5%Services:
29,7%
15 Industrial15 IndustrialParksParks
Economic Statistics 2008
13 Industrial13 IndustrialParksParks
By 2020, 39By 2020, 39 IPsIPs with totalwith totalland of 20,000 haland of 20,000 ha
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 4/30
ac
b
d
2
5
6
4
3
6 Main Districts:1. CENTER DIST.2. THỦ DẦU MỘT DIST.3. THUẬN AN DIST.4. DĨ AN DIST.5. BẾN CÁT DIST.6. TÂN UYÊN DIST.
4 Suburban Districts:
a. DẦU TIẾNG DIST.b. PHÚ GIÁO DIST.c. BÀU BÀNG DIST.d. NORTHERN TÂN UYÊNDIST.
Year 2020 Year 2020
Binh Duong ProvinceBinh Duong Province
Binh Duong CityBinh Duong City(tier 1)(tier 1)
1
GOOD TRANSPORTATIONSYSTEM1 – NATIONAL ROAD 13
2 – HIGHWAY MYPHUOC-TANVAN
3 – RING ROAD N3
4 - RING ROAD N4
5 – HOCHIMINH ROAD
6 – HOI NGHIA-ANTAY ROAD
1 2
5
3
4
6
Monorail
MyPhuoc-TanVanexpressway
Upgrade Hwy 13
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 5/30
TRANSPORTATIONTRANSPORTATION INFRASTRUCTUREINFRASTRUCTURE DEVELOPMENT
MY PHUOC – TAN VAN EXPRESS WAY
- 30 KMs
- VND 3,500 BIL., ( include 1,800 BIL. for
construction cost)- Aug.7,2009: Ground Breaking Ceremony, andwill be finished in 4 years.
BOT PROJECT HIGHWAY 13
- 62 KM- VND 700 BIL
- IPO in April 2007
- COMPLETED IN 2007
Success : The trademark ofVSIP has become the brandname of Vietnam and gained theprestige in the world market.
Development orientation: VSIPwill continuously invest & developinto other provinces.
DEVELOPMENT ORIENTATION -VSIPMarking the success : On 2006,VSIP organized the 10thanniversary of establishmentwith the presence of two PrimeMinisters: Nguyen Tan Dung &Ly Hien Long.
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 6/30
Bac Ninh Province (2)700 Ha Integrated Township andIndustrial Park (launched in 2007)
Haiphong City (3)1,600 Ha Integrated Township andIndustrial Park ~ USD 1 bil. (GroundBreaking on Jan. 13, 2010)
VIET NAM - SINGAPOREINDUSTRIAL PARK
Binh Duong Province (1)VSIP I : 500 Ha (launched in 1996)VSIP II: 344 Ha (launched in 2005)VSIP II Exp: 1,700 Ha (launched in 2007)
PCI in year 2009PCI in year 2009
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 7/30
1/3.1/3. BinhBinh Duong provinceDuong province2/3. Becamex IDC and its keyprojects3/3. BinhDuong New City
PROFILE & ACTIVITIES
BECAMEX IDC CORPORATION
PROCESS & MANUFACTURING
CIVIL ENGINEERING, INDUSTRIAL CONSTRUCTION &
TRANSPORTATIONINFRASTRUCTURE, INDUSTRIAL PARKS AND RESIDENTIAL AREAS
- JOINT VENTURE, JOINT STOCK & INVESTMENT
- BANKING & FINANCE
- SECURITIES AND STOCK EXCHANGE
- HEALTH CARE, EDUCATIONAL, CULTURAL & SPORTS PROJECTS
- COMMUNITY PROJECTS
FORM OF BUSINES : HOLDING INC.
SUBSIDIARIES/AFFILIATES : 28
REGISTERED CAPITAL : VND 4,500 BIL
EQUITY : VND 25,000 BIL
EMPLOYEE : 2, 500 STAFFs
CHAIRMAN & CEO : MR. NGUYEN VAN HUNG
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 8/30
SYSTEM OF SUBSIDIARIESBECAMEX IDC CORP. www.becamex.com.vn
FINANCIAL FIELD:1. The First Securities JS Company (FSC)2. Phươ ng Nam commercial JS Bank (HCM City)CONSTRUCTION– TRADING–REAL SESTATE –
SERVICES FIELD:3. Construction & Transportation JS Company (BCC)4. Trading & Development JS Company (TDC)5. Trading & Development JS Company (ITC)6. Mineral & Construction Company7. BD Environmental & Water Supply Company8. Urban development JS Company (Becamex UDJ)9. Technical-infra Development JS Co.,(Becamex IJC)10.Technology & telecommunication JS Co.(VNTT)11.Investment consultant services JS Co.(Becamex ISC)12.Lien Viet JS company13.Anh Sao Duong Communications JS companyPHARMACERTICAL FIELD :
1. Binh Duong Pharmacertical & Health Material JS Co.,2. Savi pharmacertical JS Company (Savipharm)HEALTHCARE – EDUCATION:1. Binh Duong Hospital JS Company2. University of South-Eastern Region.
SUBSIDIARIES–JOINT EFFORT
Capital contribution ofBecamex on Subsidiaries
913916
1,829
Becamex Share Othershareholders
Total
SYSTEM OF SUBSIDIARIES
BECAMEX IDC CORP.Projects – Subsidiaries ( ha
of land)
1. Viet Nam – Singapore IP
Residential & Industrial development
2. My Phuoc Industrial City3. Thoi Hoa Residential & IP4. Bau Bang Residential & IP5. Binh Duong New Township6.Tan Uyen Residential & IP
844
3,429
2,200
956
4,196
1,850
VSIP MPIP Thoi Hoa BauBang
BD Township TanUyen
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 9/30
Master plan:Phase 1 :
Industry: 377 Ha
Service : 53 HaPhase 2 :
Industry : 471 HaService : 328 Ha
Phase 3:Industry : 1,000 HaService : 1,200 Ha
Phase 4 :Industry : 200 HaService : 756 Ha
KCN &ÑT MP2
KCN &ÑT MP3
KCN &ÑT MP1
KCN &ÑT THÔÙI HOØA
Natual Land in BinhDuong
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 10/30
INVESTMENTCAPITAL(MIL USD)
NUMBER OFPROJECTS
2,252301TOTAL
17115OTHER COUNTRIES1082FRANCE9
2205THAILAND8
103HOLLAND733613USA6201ENGLAND5
16053VIETNAM420527JAPAN360574KOREA2487108TAIWAN1
TIL 05/2008
NATION
RESULTS IN INVESTMENT ATTRACTION OF MPIPRESULTS IN INVESTMENT ATTRACTION OF MPIP
SAFETYSAFETYINVESTMENTINVESTMENT
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 11/30
STABILITY &SUSTAINABLE
DEVELOPMENT FORINVESTORS & LOCAL
PEOPLE
BECAMEX CITY CENTER- 6ha- 2,500 bil. VND project
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 12/30
ECOLAKES, My Phuoc
SetiaBecamex@Ecolake
• 226 ha developmentat My Phuoc -Valueof 839 mil. USD( ~ 10,000 units of allkinds)
• Villas, link house,condominium,commercial center,medical center, waterfeatures…
New Projects in Binh Duong ProvinceNew Projects in Binh Duong Province
MyPhuoc
EASTERN INTERNATIONAL UNIVERSITYEASTERN INTERNATIONAL UNIVERSITY
(26 HA(26 HA-- 24,000 STUDENTS INSIDE BINHDUONG TOWNSHIP)24,000 STUDENTS INSIDE BINHDUONG TOWNSHIP)
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 13/30
BECAMEX INTERNATIONAL HOSPITAL-1,000 BEDS/ 12.7 HA OF LAND- Start Construction in Q1/2010
(금 호 타이 어 M OU 체 결 식) (오 리 온제 과 투 자 계 약 식 )
GS RETAIL DEPARTMENT STORE & SERVICE ( 9ha, Mỹ
Phư ớc 3)
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 14/30
1/3.1/3. BinhBinh Duong provinceDuong province2/3. Becamex IDC and its key projects
3/3. BinhDuong New City
fr design research 2008
MASTER PLAN
.
Binh Duong New City, Vietnam ▪ master plan review and urban design | BECAMEX IDC
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 15/30
7
1. TRUONG AN: 158 Ha
2. PHU GIA: 133 Ha
3. VSIP 2: 344 Ha
4. KIM HUY: 237 Ha5. SONG THAN 3: 533 Ha
6. ĐAI ĐANG: 274 Ha
7.BINH DUONG NEW CITY: 1.007 Ha8. SERVICES:650 Ha-02 GOLF COURSES-01 RACING CIRCUIT-01 FILM STUDIO
9. LOCAL RESIDENTIAL:650 Ha
Total: 4,196 HaTotal: 4,196 Ha
1
2
3
4
5
6
8
NEW TOWNSHIPNEW TOWNSHIP
OF INDUSTRY, URBAN AND SERVICESOF INDUSTRY, URBAN AND SERVICES
binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008
MASTER PLANMASTER PLAN
Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
You are here
Master Planwasconsulted byNUS.
Approved byJune. 22009.
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 16/30
binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008
MASTER PLANMASTER PLAN
Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
Political & AdminCentre
Commercial /Mixed Devt
Central Biz /Financial District
High TechBiz Park
Residential -Apartments
Residential -Low Rise
Residential –Street Row
Houses
Cultural Centre
EasternInternational
University (EIU)
SportsCentre
Central Park
Commercial (Office & Retail) :
1.25 mil sqm (excl High Tech Biz Park)
Residential :
4.25 mil sqm
Admin Centre, Public /Residential Facilities :
1.2 mil sqm
YEAR 2020 YEAR 2020
600,000 to 1 Million600,000 to 1 MillionPeoplePeople
(working & living)(working & living)
Development ControlDevelopment Control•For ALL investors
•Objective: Ensures that ALLdevelopments are carried outorderly and in accordance with theplanning intentions stipulated in theMaster Plan
•Strict control parameters still
allow flexibility in design•Strikes a balance betweenfacilitating developments whileminimizing adverse impact on theneighbouring properties & MasterPlan intent
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 17/30
Development ControlDevelopment Control (cont(cont’’d)d)
Controls ParametersControls Parameters• Macro
– Land Use
– Building Height
– Development Density
• Micro
– Use Quantum
– Floor to Floor Height
– Building Edge
– Elegant Facade / Corner Articulation Treatment (at major street
junctions only)
– Pedestrian Walkway
– Car Park Quantum & Entrance Locations
• Other applicable Local Codes
Power & Water Conservation
• Unique feature in line with the Government’s campaign
• Mandatory requirement for ALL developments
• 2 active and 2 passive conservation features of
investor’s choice
Development ControlDevelopment Control(cont(cont’’d)d)
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 18/30
Development ControlDevelopment Control (cont(cont’’dd))
Office +Retail
Usage
5,000 m2
(10%)
Retail GFA
5 – 8Storey
49,000 m2
(90%)19,000 m2A10
Storey HtOffice GFAPlot SizeLot No
binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008
GREEN AND BLUE PLANGREEN AND BLUE PLAN ur b an d e s i gn an al y s i s
Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 19/30
PEDESTRIAN NETWORK PLANPEDESTRIAN NETWORK PLAN ur b an d e s i gn an al y s i s
binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
arcaded walkway
cantilevered walkway
covered galleria
binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008
URBAN IMPRESSIONSBOULEVARD SOUTH ZONE
Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 20/30
COMMUNICATION CENTRECOMMUNICATION CENTRE
binh duong new city, vietnam▪master plan review and urban design | nus centre for design research 2008 IV-1Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
MapleTree
BCC
BCCUDJ
IJC
IJC
TDC
UNIVERSITY
UDJ
ITC
ITC
SIS
Waiting to sign contract
Signed contract
Under construction
Commercial discussion
VNTT
Projects under design
TDC
Đang thi công
Đã ký H Đ
Đang ký H Đ
Đang thảo luận ĐT
Đang thiết kế
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 21/30
•Under construction:
•IJC Aroma hi-rise apartments ( 17-20stories- ~ 80,000 m2 GFA; 499 units)
OnOn--going projects in BDNCgoing projects in BDNC
OnOn--going projects in BDNCgoing projects in BDNC•Under construction:
•TDC Plaza- hi-rise apartments ( 18-20 stories,
133,740 m2 GFA, 799 units)
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 22/30
•Under construction:
• BCC Shopping/House
complex-73,157 m2 GFA; 168
units of 4-5 stories
OnOn--going projects in BDNCgoing projects in BDNC
•Under Construction• Eastern International University( 26 ha, 24,000 students, ~ 250,000
m2 GFA). Ground Breaking on Aug.13, 2009- Phase 1: ~ 70,000 m2
GFA, recruiting for school year 2010-2011, ~ 1000-2000 students
OnOn--going projects in BDNCgoing projects in BDNC
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 23/30
•Under Arch. Design Selection process :
• Admin. and Political Centre( City Hall of BinhDuongProvince/City); ~ 315,000 m2 GFA – start construction in April, 2010
OnOn--going projects in BDNCgoing projects in BDNC
•Under Arch. Design process ( 1/500 approved)• High Tech City by MapleTree of Singapore ( 75 ha), ~ 710.000
GFA (m2), up to 20 stories
OnOn--going projects in BDNCgoing projects in BDNC
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 24/30
•Under Arch. Design:
• International School- KinderWorld Singapore- SIS(Kindergarten to High School)- 2.6 ha
•Opening in Aug. 2010 ( phase 1)
OnOn--going projects in BDNCgoing projects in BDNC
•Under detailed arch. Design:
• Office, commercial, entertainment, subway
• Designed by Ong & Ong (Singapore)
OnOn--going projects in BDNCgoing projects in BDNC
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 25/30
•Under detailed Arch. Design:
•Cultural Centre project ( 7 ha)
•Designed by Cendes International (Singapore)
OnOn--going projects in BDNCgoing projects in BDNC
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 26/30
Need more jointefforts/cooperation from
international and localinvestors and partners tomake this BinhDuong New
City come true SOONSOON
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 27/30
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 28/30
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 29/30
binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
PERSPECTIVESCEREMONIAL AXIS
binhduong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
PERSPECTIVESCIVIC AXIS
8/8/2019 BinhDuong New City_May 2010
http://slidepdf.com/reader/full/binhduong-new-citymay-2010 30/30
THANK YOUTHANK YOU
the New Destination for Allthe New Destination for All……
Contact: Le Simon QuocContact: Le Simon Quoc--Hung; Business Development Director.Hung; Business Development Director.
Email:Email: [email protected]@becamex.com.vn. 0917662288. 0917662288