Breaking new ground together BIM4Project: BIM and GIS! Strengthen each other in construction projects?
31

BIM4Project: BIM and GIS! - Geospatial World Forum...Ballast Nedam develops future-proof buildings and infrastructure with a smart view of cost efficiency, technology and worldwide

Jan 26, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Breaking new ground together

    BIM4Project: BIM and GIS! Strengthen each other in construction projects?

  • About Ballast Nedam

    2

    CoolTower

    Rotterdam

    Rijkskantoor de Knoop

    Utrecht

    Blankenburg connection

    Rotterdam

    Ballast Nedam develops future-proof buildings and

    infrastructure with a smart view of cost efficiency,

    technology and worldwide expertise.

    The projects on which Ballast Nedam focusses

    include the major part of our built environment and

    ensure diversification within the group.

    Ballast Nedam industrialises the construction

    process by using innovative modular concepts and

    standardising its approach.

    Ballast Nedam is part of the Renaissance Group.

    Hospital Nobo Otrobanda

    Curaçao

  • Orderbook

    > €1,5

    billion Number of employees

    1800 Revenue in 2017

    > € 700

    million Sportcampus

    The Hague

  • The evolution of our logo

    4

  • 5

  • 6

  • 7

  • 8

  • 9

  • 10

  • 11

  • 12

    GIS

  • Functionalities used: viewing information

    13

    - Design => BIM + GIS

    - Environment => GIS

    - Research => GIS

    - Temporary works => GIS + BIM

    - Method of Statement and schedule => BIM (+GIS)

    GIS: DESIGN FINAL SITUATION 2D

  • Functionalities used: viewing information

    14

    - Design => BIM + GIS

    - Environment => GIS

    - Research => GIS

    - Temporary works => GIS + BIM

    - Method of Statement and schedule => BIM (+GIS)

    BIM: DESIGN FINAL SITUATION 3D

  • Functionalities used: viewing information

    15

    - Design => BIM + GIS

    - Environment => GIS

    - Research => GIS

    - Temporary works => GIS + BIM

    - Method of Statement and schedule => BIM (+GIS)

    GIS: DESIGN TEMPORARY SITUATION 2D

  • Functionalities used: viewing information

    16

    - Design => BIM + GIS

    - Environment => GIS

    - Research => GIS

    - Temporary works => GIS + BIM

    - Method of Statement and schedule => BIM (+GIS)

    BIM: DESIGN TEMPORARY SITUATION 3D + MACHINERY

  • Functionalities used: viewing information

    17

    GIS: METHOD OF STATEMENT 2D – VIRTUAL BUILDING

  • Functionalities used: viewing information

    18

    - Design => BIM + GIS

    - Environment => GIS

    - Research => GIS

    - Temporary works => GIS + BIM

    - Method of Statement and schedule => BIM (+GIS)

    BIM: METHOD OF STATEMENT 3D + MACHINERY – VIRTUAL BUILDING

  • Functionalities used: viewing information

    19

    - Design => BIM + GIS

    - Environment => GIS

    - Research => GIS

    - Temporary works => GIS + BIM

    - Method of Statement and schedule => BIM (+GIS)

    GIS: FIELD RESEARCH 2D

  • Functionalities used: viewing information

    20

    - Design => BIM + GIS

    - Environment => GIS

    - Research => GIS

    - Temporary works => GIS + BIM

    - Method of Statement and schedule => BIM (+GIS)

    GIS: ENVIRONMENTAL 2D

  • Functionalities used: connecting & delivering information

    21

    - Design => BIM + GIS

    - Environment => GIS

    - Research => GIS

    - Temporary works => GIS + BIM

    - Method of Statement and schedule => BIM (+GIS)

    GIS: COST OF CLOSING LANES 2D

  • Functionalities used: connecting & delivering information

    22

    - Design => BIM + GIS

    - Environment => GIS

    - Research => GIS

    - Temporary works => GIS + BIM

    - Method of Statement and schedule => BIM (+GIS)

    BIM: CONNECTING SCHEDULE 3D

  • Functionalities used: connecting & delivering information

    23

    - Design => BIM + GIS

    - Environment => GIS

    - Research => GIS

    - Temporary works => GIS + BIM

    - Method of Statement and schedule => BIM (+GIS)

    GIS: CONNECTING DRIVE NAVIGATION INFORMATION

  • Functionalities used: gathering information

    24

    GIS: QUALITY MEASUREMENTS 2D

  • Functionalities used: analyzing information

    25

    GIS: ANALYZING COMPLAINTS 2D

  • Functionalities used: analyzing information

    26

    BIM: ANALYZING CLASHES 3D

  • Application landscape Ballast Nedam

    27

  • GIS & BIM4Project: DO’s

    28

    BIM +

    GIS

    Assign a BIM-leader, GIS-Leader and Information Manager in

    your project as coreteam for informationmanagement

    Uniform your Systems Breakdown Structure (SBS) and Work

    Breakdown Structure (WBS) for connecting information

    Use a Configuration Management Database (CMDB) to manage

    your project datastructures

    Own created 3D-files always have clone 2D-files: metadata in

    visual representations based on uniform projectdata structures

  • NEAR FUTURE…..

    29

  • Breaking new ground together with GIS&BIM4Project at Geospatial World Forum