  • Bill of Quantities Page:

    1

    Summary Project:

    Item No.

    Description Amount

    KShs

    1 Preliminaries and General Costs Items

    2 Setting Out

    4 Site Clearance

    5 Earthworks

    7 Excavation and filling for structures

    8 Road Drainage and Structure works

    10 Grading and Gravelling Works

    22 Dayworks

    Sub Total

    Add provisional sum of 10%of the Sub Total for Contingencies to be expended only with the express approval of the Engineer

    Carried to page on the Form of Tender

  • Bill of Quantities Page:

    2

    Bill 1 Preliminaries and General Costs

    Items Project:

    Item No.

    Description Unit Quantity Unit rate

    Ksh. Amount

    KSh.

    01-70-001

    Mobilisation Item

    01-50-001

    Insurance and Bonds Item

    01-60-009

    Provide and erect junction Publicity Signboards at beginning and end of contract site

    Sum Item

    01-61-001

    Provisional sum for materials investigation and testing as directed by the engineer

    Sum Item

    01-50-002

    Provisional sum for meetings and training of workers and staff on HIV/AIDS and cross cutting issues as directed by the engineer

    Sum Item

    01-50-004

    Provisional sum for field supervision and monitoring by road stakeholder committee and others as directed by the engineer

    Sum Item

    01-50-010

    Provision of HIV-AIDS prevention campaign material including the constant availability of condoms at the site

    Sum Item

    01-60-005

    Provision of safe drinking water on site for all workers

    Sum Item

    01-80-002

    Provision of protective clothing for workers and first aid kit as specified at all work locations

    Sum Item

    01-61-004

    Provisional Sum for daily traffic counts for duration of contract period

    Sum Item

    Bill 1: Total Carried forward to Summary:

  • Bill of Quantities Page:

    3

    Bill 2 Setting Out Project:

    Item No.

    Description Unit Quantity Unit rate

    Ksh. Amount

    KSh.

    02-001 Setting Out of Horizontal alignment m -

    Bill 2: Total Carried forward to Summary:

  • Bill of Quantities Page:

    4

    Bill 4 Site Clearance Project:

    Item No.

    Description Unit Quantity Unit rate Ksh.

    Amount KSh.

    04-50 Site Clearance -

    04-50-003

    Bush Clearing m2

    04-50-006

    Trees and Stumps removal Daywork -

    04-50-009

    Stripping and Grubbing m2 -

    04-50-008

    Boulder Removal Daywork -

    Bill 4: Total Carried forward to Summary:

    -

  • Bill of Quantities Page:

    5

    Bill 5 Earthworks Project:

    Item No.

    Description Unit Quantity Unit rate

    Ksh.

    Amount KSh.

    05-50-007

    Re-Establishment of the Vertical alignment (slotting)

    m -

    05-50-004

    Excavation and spread in soft material to formation level

    m3 -

    05-50-005

    Excavation and spread in hard material to formation level

    m3

    05-60-001

    Compaction in layers to Formation level m3

    Bill 5: Total Carried forward to Summary:

    -

  • Bill of Quantities Page:

    6

    Bill 7 Excavation and filling for structures

    Project:

    Item No.

    Description Unit Quantity Unit rate

    Ksh.

    Amount KSh.

    07-50-001

    Excavation of foundation for drainage structures in soft material

    m3

    07-50-002

    Excavation of foundation for drainage structures in hard material

    m3

    -

    -

    Bill 7: Total Carried forward to Summary:

  • Bill of Quantities Page:

    7

    Bill 8 Road Drainage and Structure works

    Project:

    Item No.

    Description Unit Quantity Unit rate

    Ksh.

    Amount KSh.

    08-50-005

    Ditch excavation for purpose of mitre drains, catch water drains, infiltration ditches, culvert outfall, water ways, water ponds etc

    m3

    08-60 Supply and Installation of Concrete pipe culverts haunched in concrete

    08-60-018

    450mm dia m

    -

    08-60-020

    600mm dia m

    -

    08-60-022

    900mm dia m

    08-60-024

    1200mm dia m

    08-70 Provide material and construct Scour checks

    -006 Stones

    No.

    -007 Wooden stakes

    No.

    -005 Concrete

    No.

    Provide material and construct At level scour checks of stones

    m3

    08-70 Provide material and construct minor drainage structures

    08-70-003

    Headwall and wing wall construction Masonry

    m2

    08-70-004

    Headwall and wing wall construction Concrete class 20/20

    m3

    08-70-012i

    Cascades and other minor structures in Masonry

    m2

    08-70-012ii

    Cascades and other minor structures in Concrete block

    m2

  • Bill of Quantities Page:

    7

    Bill 8 Road Drainage and Structure works

    Project:

    08-70-013

    Provide material and construct cascades and other minor drainage structures in concrete class 20/20

    m3

    08-80-002

    Gabion Installation No.

    08-80-003

    Rockfill to Gabion boxes m3

    08-70-011

    Stone Pitching m2

    Provide planting material and plant grass

    m2

    Provide material and construct Check dams

    Stones m2

    Posts m

    Provide materials and construct gully head control structures

    Stones m3

    Posts m3

    08-80-002

    Gabion Installation No.

    08-80-003

    Rockfill to Gabion boxes m3

    Bill 8: Sub-Total Carried forward to Summary:

  • Bill of Quantities Page:

    8

    Bill 10

    Grading and Gravelling Works Project:

    Item No.

    Description Unit Quantity Unit rate

    Ksh.

    Amount KSh.

    10-50-002

    Heavy grading with Watering and compaction Including side ditch and backslope

    m2 -

    -

    10-50-003

    Heavy grading with no compaction Including side ditch and backslope

    m2

    10-50-004

    Light grading (carriageway only) m2

    10-50-006

    Light Manual reshaping (Carriageway only) m

    2 -

    -

    10-50-007

    Heavy manual reshaping including side ditch and backslope

    m2

    10-60-001

    Gravel patching including excavation and free haul

    m3

    10-70-002

    Gravelling including excavation and free haul

    m3

    10-70-005

    Compaction of reshaped carriageway and gravel surface

    m2

    10-80-005

    Overhaul of gravel m3-Km

    Opening new gravel pit

    10-80-002

    Removal of topsoil and overburden to stockpile

    m3

    10-80-006

    Reinstatement of borrow pit and planting of trees and vegetation

    m2

    Bill 10: Total Carried forward to Summary:

    -

  • Bill of Quantities Page:

    9

    Bill 22

    Dayworks Project:

    Item No.

    Description Unit Quantity Unit rate

    Ksh. Amount

    KSh.

    Plant and Equipment -

    22-63-008

    D4 - Dozer Hr -

    22-63-009

    D6 - Dozer Hr -

    22-63-011

    D8 - Dozer Hr -

    22-63-017

    Wheel loader CAT 955 or Equivalent Hr

    22-63-014

    Motor Grader Hr

    22-64-008

    Grader -Tractor towed Hr

    22-64-006

    Dead weight Roller (4 tonnes) -Tractor towed

    Hr

    22-62-014

    Water Bowser Self propelled 5000lt Hr

    22-64-009

    Water Bowser - Tractor towed 5000lt Hr

    22-10 3.0 ton Truck Hr

    22-11 5.0 ton Truck Hr

    22-12 7.0 ton Truck Hr

    22-13 Tractor + Trailer (3m3) Hr

    22-14 1 ton Pickup Van Hr

    22-15 Concrete mixer - 100lt Hr

    22-16 Concrete Poker Vibrator Hr

    22-17 Power saw Hr

    Labour

    22-50-001

    Unskilled Labour day

    22-50-001

    Mason day

    22-50-001

    Carpenter day

    22-50-001

    Driver assistant (Turn boy) day

    22-50-001

    Store keeper day

  • Bill of Quantities Page:

    9

    Bill 22

    Dayworks Project:

    Item No.

    Description Unit Quantity Unit rate

    Ksh. Amount

    KSh.

    22-50-001

    Foreman day

    22-50-001

    Overseer day

    22-50-001

    Inspector day

    Materials

    22-70-005

    Cement bags

    22-70-001

    Fine Aggregates m3

    22-70-003

    Coarse aggregates m3

    22-71-004

    Mild steel less than 16mm dia. tonnes

    22-71-011

    High Yield steel less than 16mm dia. tonnes

    Timber 4x2 m

    Timber 6x2 m

    Timber 6x1 m

    Gabion Mesh m2

    Rock fill m3

    Bill 22: Total Carried forward to Summary:

    -

  • Additional erosion control work

    Bill of Quantities Page:

    Bill Work related to erosion control

    Project:

    Item No.

    Description Unit Quantity Unit rate

    Ksh.

    Amount KSh.

    Grassing

    -Provide planting materials m2

    -Planting grass day -

    Infiltration ditches

    m3 -

    Soak away ponds

    m3

    Artificial waterways

    m3

    Provide and install at level scour check

    - provide stones m3

    - excavation for the structure

    m3

    - place stones m3

    Provide and install check dams i. Stone walls

    ii. Stones and posts

    -Provide stones m3

    -Provide posts m

    -Excavate for structure m3

    -Place stones m3

  • Provide and install gully head protection

    i. Stone protection (low head, less than 1 m)

    ii. sloping & stone and post lining (high head, more than 1 m)

    iii. drop structures of stones and posts (sloped gully heads and

    knick points)

    iv. gabion drop structure (wide gully head)

    -Provide stones m3

    -Provide posts m

    -Install posts No

    -Provide gabion boxes No

    -Excavate foundation for structure m3

    -Place stones m3