BHARAT HEAVY ELECTRICALS LIMITED CORPORATE RESEARCH & DEVELOPMENT DIVISION VIKASNAGAR, HYDERABAD - 500 093, INDIA ENQUIRY PHONES:23774494 (EXCHANGE) DIRECT:23882104/23882204/ 23778474/23776772 FAX : 91 40 23770698 RD:DP:MPX:F-04 Enquiry No: 500990551 Enq Date: Due Date: 01-SEP-09 29-SEP-09 ----------------------------------------------------------------------------- PLEASE SUBMIT YOUR QUOTATION IN SEALED COVER SUPERSCRIBED WITH ENQUIRY NO, ENQUIRY DATE AND DUE DATE SUBJECT TO OUR TERMS AND CONDITIONS ENCLOSED, FOR THE FOLLOWING MATERIALS SO AS TO REACH US ON OR BEFORE THE DUE DATE BY 12 NOON. THE TENDERS WILL BE OPENED AT 2 PM ON THE SAME DAY | | | | | | | | | | | | To - - PLEASE GIVE REFERENCE OF ENQ NUMBER , ENQ .DATE AND DUE DATE IN ALL YOUR CORRESPONDENCE FOR PROMPT ACTION. IN CASE IF YOU ARE NOT MAKING THE OFFER PLEASE POST A REGRET LETTER AND RETURN THE DOCUMENTS. SL NO DESCRIPTION / SPECIFICATION UNIT QTY 1 MANUFACTURE, SHOP ASSEMBLY, SHOP TESTING AND SUPPLY OF A CENTRIFUGAL PUMP ALONG WITH BASE PLATE, FLEXIBLE COUPLING, INTEGRAL LUBE OIL SYSTEM AND RELATED ACCESSORIES, E.G. INSTRUMENTATION THE ABOVE EQUIPMENT SHOULD BE SUPPLIED TO MEET THE REQUIREMENTS ENVISAGED AS PER TECHNICAL SPECIFICATION NO. COE CP 3(b,g,h) ENCLOSED. NO 1 - Pin Email : . Attn. Please submit your offer in Two parts as per enclosed "General Terms and Conditions of enquiry & Contract for the purchase of Goods/ Services" in separate sealed covers as detailed below: 1) First cover shall contain a) Technical & Commercial bid, b) Compliance Statement, c) Un-priced Price bid, i.e. a copy of the Price bid with the price(s) columns left blank. 2) Second Cover containing Price bid. If the Price bid is found to be different from the un-Priced Price bid in any way, the offer will be rejected. 3) Unsigned offers are liable for rejection. 4) VENDORS SHALL QUOTE FOR ALL ITEMS. ALL PARTIAL / INCOMPLETE OFFERS SHALL NOT BE PROCESSED. ORDER SHALL BE PLACED ON BASIS OF TOTAL COST TO BHEL.. Note: 1) ALL OFFERS MUST INCLUDE NAME OF CONTACT PERSON, PHONE NO, FAX NO, EMAIL ID. UNSIGNED/INCOMPLETE OFFER(S) ARE LIABLE FOR REJECTION. 2) Taxes & Duties quoted will be taken for cost evaluation & order placement and no change will be entertained later except in the case of changes made by the Government. 3) Changes in Taxes and Duties because of the changes in Turnover etc. will be to the supplier's account. 4) In case any Taxes/duties exempted, a self declaration for the same may be attached to the offer. 5) GUARANTEE CERTIFICATE : REQUIRED 6) MANUFACTURER'S TEST CERTIFICATE : REQUIRED 7) ERECTION & COMMISSIONING : REQUIRED 8) ACCESSORIES : REQUIRED 9) SPARES : REQUIRED REVERSE AUCTION: Delivery By: 31-JAN-10
26

BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

Apr 28, 2018

Download

Documents

NguyễnÁnh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

BHARAT HEAVY ELECTRICALS LIMITEDCORPORATE RESEARCH & DEVELOPMENT DIVISION

VIKASNAGAR, HYDERABAD - 500 093, INDIA

ENQUIRY

PHONES:23774494 (EXCHANGE)DIRECT:23882104/23882204/ 23778474/23776772FAX : 91 40 23770698

RD:DP:MPX:F-04

Enquiry No:

500990551

Enq Date: Due Date:

01-SEP-09 29-SEP-09

-----------------------------------------------------------------------------PLEASE SUBMIT YOUR QUOTATION IN SEALED COVERSUPERSCRIBED WITH ENQUIRY NO, ENQUIRY DATEAND DUE DATE SUBJECT TO OUR TERMS ANDCONDITIONS ENCLOSED, FOR THE FOLLOWINGMATERIALS SO AS TO REACH US ON OR BEFORE THEDUE DATE BY 12 NOON. THE TENDERS WILL BEOPENED AT 2 PM ON THE SAME DAY

||||||||||||

To

-

-

PLEASE GIVE REFERENCE OF ENQ NUMBER , ENQ .DATE AND DUE DATE IN ALL YOUR CORRESPONDENCEFOR PROMPT ACTION. IN CASE IF YOU ARE NOT MAKING THE OFFER PLEASE POST A REGRET LETTER ANDRETURN THE DOCUMENTS.

SL NO DESCRIPTION / SPECIFICATION UNIT QTY

1 MANUFACTURE, SHOP ASSEMBLY, SHOP TESTING AND SUPPLY OF ACENTRIFUGAL PUMP ALONG WITH BASE PLATE, FLEXIBLE COUPLING, INTEGRALLUBE OIL SYSTEM AND RELATED ACCESSORIES, E.G. INSTRUMENTATION

THE ABOVE EQUIPMENT SHOULD BE SUPPLIED TO MEET THE REQUIREMENTSENVISAGED AS PER TECHNICAL SPECIFICATION NO. COE CP 3(b,g,h) ENCLOSED.

NO 1

-

Pin

Email :

.Attn.

Please submit your offer in Two parts as per enclosed "General Terms and Conditions of enquiry & Contract for the purchaseof Goods/ Services" in separate sealed covers as detailed below: 1) First cover shall contain a) Technical & Commercial bid, b) Compliance Statement, c) Un-priced Price bid, i.e. a copy of thePrice bid with the price(s) columns left blank. 2) Second Cover containing Price bid. If the Price bid is found to be different from the un-Priced Price bid in any way, the offer will be rejected.3) Unsigned offers are liable for rejection.4) VENDORS SHALL QUOTE FOR ALL ITEMS. ALL PARTIAL / INCOMPLETE OFFERS SHALL NOT BEPROCESSED. ORDER SHALL BE PLACED ON BASIS OF TOTAL COST TO BHEL..

Note: 1) ALL OFFERS MUST INCLUDE NAME OF CONTACT PERSON, PHONE NO, FAX NO, EMAIL ID.UNSIGNED/INCOMPLETE OFFER(S) ARE LIABLE FOR REJECTION.

2) Taxes & Duties quoted will be taken for cost evaluation & order placement and no change will be entertained later except inthe case of changes made by the Government. 3) Changes in Taxes and Duties because of the changes in Turnover etc. will be to the supplier's account. 4) In case any Taxes/duties exempted, a self declaration for the same may be attached to the offer.5) GUARANTEE CERTIFICATE : REQUIRED6) MANUFACTURER'S TEST CERTIFICATE : REQUIRED7) ERECTION & COMMISSIONING : REQUIRED8) ACCESSORIES : REQUIRED9) SPARES : REQUIRED

REVERSE AUCTION:

Delivery By:

31-JAN-10

Page 2: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

BHARAT HEAVY ELECTRICALS LIMITEDCORPORATE RESEARCH & DEVELOPMENT DIVISION

VIKASNAGAR, HYDERABAD - 500 093, INDIA

ENQUIRY

PHONES:23774494 (EXCHANGE)DIRECT:23882104/23882204/ 23778474/23776772FAX : 91 40 23770698

RD:DP:MPX:F-04

AS WE ARE ENGAGED IN R&D ACTIVITY "C" FORM WILL NOTBE ISSUED

KAKKAR PK

Sr Manager

Yours faithfully for BHARAT HEAVY ELECTRICALS LTD

BHEL RESERVES THE RIGHT TO PROCURE ABOVE ITEMS THROUGH REVERSE AUCTION.

Email: [email protected]

PLEASE FILL UP THE ENCLOSED VENDOR REGISTRATION FORMAND SEND IT ALONG WITH YOUR QUOTATION. OTHERWISEYOUR QUOTATION WILL NOT BE CONSIDERED. (IGNORE THIS IFYOU HAVE ALREADY SUBMITTED THIS FORM)

Page 3: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

1

TECHNICAL SPECIFICATION FOR CENTRIFUGAL PUMP FOR PUMP TEST RIG 1.0 INTENT OF SPECIFICATION: The intent of specification is to procure SINGLE STAGE END SUCTION OVERHUNG

IMPELLER CENTRIFUGAL PUMP along with accessories. The pump shall be with radially split volute casing in Back Pull out Design.

2.0 SCOPE OF SUPPLY: Scope of supply shall include design, manufacture, testing, painting, despatch, Supervision of

erection & commissioning and testing at BHEL R & D Hyderabad. 2.1

SCOPE OF SUPPLY SHALL INCLUDE THE FOLLOWING ITEMS: a) Single stage End Suction Overhung Impeller centrifugal pump. b) Common Base Frame for above Pump and its Drive Motor (Drive Motor is in BHEL’S Scope; Motor support details Clause No. 12) c) Integral piping along with required Valve and Fittings for cooling water line, balance return & seal water lines. Seal water lines if applicable shall be provided with SS316 pipes & fittings. d) Flexible Spacer type metallic coupling (between pump & motor). e) Coupling guards. f) Counter flanges with bolts, nuts & gaskets for all terminal points like suction, discharge, CW Inlet, CW Outlet etc. g) Holding down bolts (with nuts if required) to secure pump to the base frame and foundation bolts

with nuts to secure base frame to the foundation. j) Suction strainer SIMPLEX BASKET TYPE of size D 300. k) Instrumentation mounted on local gauge board ( Optional for BHEL & to be quoted separately) l) 1 Set of special tools & tackles (These shall be listed out in the offer). m) Commissioning spares as listed out at Clause no. 10.0 of this specification. Item wise price

shall be quoted for these items.

NOTE: 1) All CW inlet, CW outlet, seal water inlet, seal water outlet, balance return & warm-up (if required) lines shall be provided with flanged joints only. Pipe unions are not acceptable. 2) Recommended spare parts for 2 years of operation to be quoted separately. BHEL reserve the Right to procure a part of the spares or none at all along with Main Pump.

PURCHASE SPECIFICATION Rev. 0

BFP, Coupling and Accessories Dt.03.8.2009

Item Code No 3 b,g,h Specification No. COECP 3b

Prepared by AMBRISH Approved by B R MANOHAR Turbomachinery Laboratory COE for Compressors and Pumps Corporate R&D Division, BHEL, Vikasnagar, Hyderabad 500093

Page 4: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

2

NOTE: Connecting Coupling is to be procured from Vendors listed out below.

FLEXIBOX LTD, UK EUROFLEX TRANSMISSION, HYDERABAD TRIVENI FLEXIBOX, BANGALORE RATHI TURBOFLEX, PUNE CUBIC TRANSMISSION, HYDERABAD

3.0 DESIGN REQUIRMENTS: 3.1

OPERATING PARAMETERS: Sl. No. Parameters Value 1 Rated Flow 650 m3/hr. 2 Rated Head to be developed 150 m 3 Suction pressure available at Pump inlet Max. 1.5 Kg/cm2 4 Water temperature at Pump Inlet 400 C 5 NPSH available 16.0 m 6 Nominal speed 3000 rpm 7 Impeller Diameter (minm/maxm) 360/400 mm

NOTE:Other parameters should be provided by Vendor (In Enclosed Data Sheet).

3.2 CONSTRUCTION FEATURES

a) Pump shall be of horizontal construction, with radially split volute casing in back pull out design b) Pump shall be designed for continuous operation at the specified parameters. c) Pumps shall have stable performance characteristics at the operating speed and the discharge

heads shall continuously increase with the decreasing flow through the points of minimum flow. The head rise from design to shut off shall be minimum 15% and maximum 25% of the TDH developed at the pump design point.

d) The rotating element shall have no critical speed with in a safe margin of the operating speed. The critical speed shall not lie with in plus or minus 20% of the operating speed even with worn-out rings.

e) Rotating elements shall be dynamically balanced to G 2.5 of ISO 1940 f) Pump bearings shall be with ring oil lubrication (from oil sump provided on bearing housings). g) Mechanical seals [As per API 682] shall be of tungsten carbide/ carbon combination and shall be

designed for zero leakage. h) Casings shall be fitted with renewable type wearing rings.

PURCHASE SPECIFICATION Rev. 0

BFP, Coupling and Accessories Dt.03.8.2009

Item Code No 3 b,g,h Specification No. COECP 3b

Prepared by AMBRISH Approved by B R MANOHAR Turbomachinery Laboratory COE for Compressors and Pumps Corporate R&D Division, BHEL, Vikasnagar, Hyderabad 500093

Page 5: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

3

3.2 CONSTRUCTION FEATURES CONTD.

i) The static deflection of the rotor shall be less than minimum radial clearance at impeller wear rings/balancing device.

j) Suction Booster pumps are not provided. Pump will be receiving its suction directly from reservoir.

k) The Pump NPSH required shall not be more than 80% of NPSH available. l) Pumps shall be in Hydraulic balancing condition under all operating conditions from minimum

flow to 120% of design flow. Thrust bearing shall be capable of taking the residual thrust under all operating conditions even with worn clearances of the pump.

m) Acceptance tolerances on flow, head and efficiency shall be as per HIS 14th edition (No negative tolerance on head & efficiency is acceptable)

n) Flow glass indicator shall be provided in CW outlet lines of seal and jacket (as applicable). o) Drive motor provided by BHEL is 2 Pole,415 V, 3 Phase[Motor is in BHEL’S scope].

3.3 CONNECTING COUPLING FEATURES:

a) Coupling shall be of flexible type with spacer to facilitate easy removal of mechanical seal and

preferably shall not need any lubrication. b) Couplings shall be dynamically balanced as per ISO 1940, to grade G2.5. Balancing shall be done

before slotting the keyways. Certificate should be provided. c) Coupling shall be suitable for following movements/ offsets:

i. Axial movement of pump rotor due to thermal expansion: 0.25mm

ii. Axial movement of motor rotor due to magnetic shift : 3.5mm iii. Parallel offset during initial alignment

in horizontal plane 0.21 mm in vertical plane 0.30 mm

d) Couplings shall be supplied with finished bore and key ways. e) Construction of the coupling shall be such that in case of membrane failure, no component of the

coupling shall fly off while the equipment is in rotation. f) Membrane element shall be independently replaceable without requiring the replacement of the

spacer. g) Distance between shaft ends shall be selected in such a way that it shall be possible to remove/ fit

mechanical seals at DE of pump without disturbing pump and motor from their locations. Spacer shall be long enough to remove DE Mech. Seal from the gap between the shafts.

h) Drive end pump shaft and coupling side hub shall be provided with taper shaft (with nut on shaft) to facilitate quick removal of pump side hub.

i) Diameter of Motor Shaft is approximately 100 mm.

PURCHASE SPECIFICATION Rev. 0

BFP, Coupling and Accessories Dt.03.8.2009

Item Code No 3 b,g,h Specification No. COECP 3b

Prepared by AMBRISH Approved by B R MANOHAR Turbomachinery Laboratory COE for Compressors and Pumps Corporate R&D Division, BHEL, Vikasnagar, Hyderabad 500093

Page 6: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

4

3.4 SUCTION STRAINER FEATURES:

a) The Suction Strainer should be of SIMPLEX BASKET TYPE construction. b) The Basket shall be suitable for easy replacement in case of clogging. c) The Support Sheet and other internals not inferior than SS316 material. d) Fine Mesh Size shall be 350 microns. e) Outer shell shall be Carbon Steel Fabricated Construction. f) The maxm pressure drop across Strainer in clean condition 0.1kg/cm2 and 0.2 kg/cm2 in clogging

condition.

3.5

LOCAL INSTRUMENTATION DETAILS:

SL.No. Instrument Description Location Nos./pump Pump Suction 1 1. Pressure Gauge Pump Discharge 1

2. Pr. Transmitter (0-25 kg/cm2 ) Pump Discharge 1

3. Diff Pressure Gauge Range: 0- 0.5 kg/cm2 Max Diff Pr.- 0.15 kg/cm2

Suitable for static pressure of 15 kg/cm2 Suction Strainer Diff Pr. 1

4.

Diff Pressure Transmitter Range: 0- 0.5 kg/cm2

Max Diff Pr.- 0.1 kg/cm2

Set point for alarm: 0.15 kg/cm2

Suitable for static pressure of 15 kg/cm2

-do- 1

Pump Suction & Discharge (with suitable thermo wells) 2

5. Duplex 4-wire RTDs Pt 100 ohms Pump DE & NDE Bearings

2

NOTE: All the instruments shall be mounted on a Local Gauge Board and terminated at junction

box, which in turn shall be mounted on the pump base plate. Itemwise Instrumentation to be

quoted separately. BHEL reserve the right for procuring full or Part of the above items.

Make and Model No. of the Instruments offered should be furnished alongwith Technical

Bid

PURCHASE SPECIFICATION Rev. 0

BFP,coupling and accessories Dt.03.8.2009

Item Code No 3 b,g,h Specification No. COECP 3b

Prepared by AMBRISH Approved by B R MANOHAR Turbomachinery Laboratory COE for Compressors and Pumps Corporate R&D Division, BHEL, Vikasnagar, Hyderabad 500093

Page 7: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

5

4.0 MATERIALS OF CONSTRUCTION: 4.1 Pump:

Materials of construction shall not be inferior to those indicated below.

Impeller : 13% chromium steel casting – Steel – C.S C jotted Wearing Rings : 13% chromium steel with antigalling properties Shaft : 13% chromium steel forging Common base frame : Rigid fabricated steel

4.2 Connecting Coupling:

Materials of construction shall not be inferior to those indicated below.

Coupling hubs, adapters : BS 970 080 M40 & spacer Coupling bolts & nuts : BS 970 817 M40 screws for adapters Overload washers : BS 970 817 M40 Element blades : AISI 301

5.0 QUALITY REQUIREMENTS: 5.1 Pump:

a) Quality plan for material stage and in process stage shall be furnished as per the enclosed format

within 2 weeks of placing the purchase order. Quality plan will be approved by R&D, BHEL. Quality plan shall cover all critical components like casing, impeller, diffuser, shaft, Impeller & casing wear rings, casing bolts, thrust bearing etc.

b) Quality shall include the following tests.

i. Chemical and mechanical properties shall be checked for all the critical components.

ii. Ultrasonic test shall be conducted on all shafts on 100% area in material stage and dye penetrant inspection shall be conducted after finish machining of the shafts.

iii. RT & UT shall be conducted at material induction stage and Dye penetration test shall be conducted after finish machining on all impellers, casings &diffusers. RT shall be as per ASTM E 446.

iv. Dynamic balancing of the rotor shall be done to grade G2.5 of ISO 1940. v. Hydraulic testing of stator assy. shall be done at 2 times the design pressure or 1.5 times

the shut off pressure which ever is higher. Static suction head is18 mlc. vi. Dye Penetration examination shall be done on casing bolts before threading.

UT and MPI shall be conducted on Nozzle / casing weld joints (if Nozzles are welded).

PURCHASE SPECIFICATION Rev. 0

BFP, Coupling and Accessories Dt.03.8.2009

Item Code No 3 b,g,h Specification No. COECP 3b

Prepared by AMBRISH Approved by B R MANOHAR Turbomachinery Laboratory COE for Compressors and Pumps Corporate R&D Division, BHEL, Vikasnagar, Hyderabad 500093

Page 8: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

6

5.2 Connecting Coupling:

a) Quality plan as per the format indicating following items/ assemblies and their acceptance norms at material, in-process and final assembly stages shall be furnished for BHEL approval.

i. MATERIAL: MATL. SPECN. TEST QUANTUM

Coupling hubs, adapters & spacer BS 970 080 M40 Chemical Mechanical

UT

Each Melt Each HT batch

100%

Coupling Bolts & Nuts, screws for adapters

BS 970 817 M40 Chemical Mechanical UT

Each Melt Each HT batch

100% Over load washers BS 970 817 M40 -- --

Element Blades AISI301 Chemical Mechanical Each Melt Each HT batch

ii. IN- PROCESS: - TEST QUANTUM Coupling hubs, adapters & spacer

- LPI 100%

Coupling Bolts & Nuts, screws for adapters

- MPI 100%

Element assembly & stacking

- LPI 100%

Coupling assembly - Dynamic balancing 100%

b) All major parts of each coupling assembly i.e. coupling hubs, spacer, adopters etc, shall be identified with unique Sl Nos. to avoid mismatching during pump assembly and dis-assembly.

6.0 PERFORMANCE TESTING OF PUMPAT VENDOR WORKS: Test procedure shall be submitted for approval after placing of purchase order.

A. Performance shall be carried out on the pump at rated speed to demonstrate Flow Vs head, Flow Vs Power, and Flow vs. efficiency. Measurement shall be done on at least eight (8) different points from shut off point to 120% flow. Test tolerances shall be as per HIS. No negative tolerance on head and efficiency is permitted.

B. Vibration and noise levels shall be measured during the performance testing. Vibration level shall not exceed the satisfactory limits specified for group "T" machines of VDI2056. Sound pressure level at a distance of 1.5 meters above floor level in elevation and 1 meter horizontally from the base of equipment shall not be more than 85 dba.

PURCHASE SPECIFICATION Rev. 0

BFP, Coupling and Accessories Dt.03.8.2009

Item Code No 3 b,g,h Specification No. COECP 3b

Prepared by AMBRISH Approved by B R MANOHAR Turbomachinery Laboratory COE for Compressors and Pumps Corporate R&D Division, BHEL, Vikasnagar, Hyderabad 500093

Page 9: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

7

6.0 PERFORMANCE TESTING OF PUMP CONTD. :

C. Bearing temperatures and mechanical seal performance shall be recorded during the performance

testing.

D. NPSH(R) test shall be carried out on the pump for 3% and 1% head drop condition to determine Flow vs. NPSH(R) curve. Measurement shall be done at least 4 different flows i.e. 60%, 80%, 100% and 120%.

E. Strip down examination shall be carried out on the pump to check for damage/rubbing of

components after carrying out performance test & NPSH (R) test.

7.0 PAINTING PRESERVATION & PACKING: 7.1 PUMP:

a) Two coats of heat resistant air drying epoxy paint shall be applied to the external surfaces. b) All exposed machined surfaces shall be applied with temporary rust preventive suitable for 1-year

storage. c) Consignment shall be properly packed to withstand the transit risks. Liberal quantities of silica gel

shall be placed in the packing box to avoid corrosion due to ingress moisture.

7.2 Connecting Coupling:

a) Rust preventive preservative suitable for the component protection for a period of 2 years shall be applied.

b) Packing case shall be properly stiffened to avoid disintegration / damage during transport. c) Adequate quantity of indicating type silica gel in bleached and finished plain weave cloth bag

each containing 0.5 kg per cubic meter volume of the case shall be placed in the packing case to avoid rusting and corrosion due to the ingress of moisture.

8.0 GUARANTEE AND CERTIFICATES:

Pump:

The Pump & accessories shall be guaranteed for a period of 12 months after commissioning, or 18 month after receipt for trouble free operation.

Certificates shall include the stage inspection checks at sub supplier also.

PURCHASE SPECIFICATION Rev. 0

BFP, Coupling and Accessories Dt.03.8.2009

Item Code No 3 b,g,h Specification No. COECP 3b

Prepared by AMBRISH Approved by B R MANOHAR Turbomachinery Laboratory COE for Compressors and Pumps Corporate R&D Division, BHEL, Vikasnagar, Hyderabad 500093

Page 10: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

8

8.0 GUARANTEE AND CERTIFICATES CONTD. :

Connecting Coupling: Following certificates shall be furnished along with the consignment in 5 copies.

Compliance certificate for materials of construction & dimensions as per approved drawings.

Dynamic balancing certificate. Certificates shall include the stage inspection checks at sub supplier also.

9.0 LIST OF COMMISSIONING SPARES:

One set consisting of the following:

a) Mechanical Seal (DE) : 1 No b) Bearings incl. thrust brg of one pump : 1 set

NOTE: Price shall be quoted separately item wise of commissioning spares. 10.0 DRGS/DATA TO BE FURNISHED:

A. Along with TECHNICAL BID a) Outline Drawing b) Sectional assembly drawing with part list and Material of Construction c) Technical write-up giving description of pump & its salient features. d) List of instruments offered (to be quoted separately). e) Priced offer for mandatory and recommended spares in separate price bid (to be quoted separately

item wise). f) Technical Data Sheet g) Estimated Performance Curve.

B. After the Placement of ORDER a) General arrangement drawing showing pump, motor common base frame with over all

dimensions, foundation details, suction/discharge nozzle details, weights, foundation loading, details etc.

b) Design characteristic curves for Q vs. H, Q vs. P & Q vs. efficiency & Q Vs NPSH(R) c) Allowable forces & moments on suction/discharge nozzles. d) Thermal moments of suction /discharge nozzles. e) Minimum recirculation flow for the safe operation of pump. f) Lube oil Qty. required for pump & motor bearing sumps. g) List of special tools. h) OPERATION and MAINTAINCE MANUAL i) Maximum and design axial thrust, Maximum and design residual thrust coming onto thrust

bearing. j) Final Data Sheet k) Test Procedure at Vendor Works

PURCHASE SPECIFICATION Rev. 0

BFP, Coupling and Accessories Dt.03.8.2009

Item Code No 3 b,g,h Specification No. COECP 3b

Prepared by AMBRISH Approved by B R MANOHAR Turbomachinery Laboratory COE for Compressors and Pumps Corporate R&D Division, BHEL, Vikasnagar, Hyderabad 500093

Page 11: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

9

11.0 ERECTION AND COMMISSIONING 11.1 The following activities under erection and commissioning are in vendor scope.

Fixing of Pump and Motor in the base plate. Alignment of Pump and Motor axis and assembly of Flexible coupling and

Torquemeter. Base Frame setting, alignment and securing base frame with foundation bolts. Placement of Primary Instrumentation and lead connection to junction box. Fixing of Local panel, energisation and checking of Parameters with primary

Signal connection. Foundation bolts and the grounding details to be furnished by Vendor so that the

same are embedded while carried out the Civil Foundation by BHEL 11.2 BHEL’S SCOPE

Piping connection for inlet and Outlet nozzle. A Crane would be provided for carrying out installation. 440 V power supply connection to Power panel, VFD and Motor.

12.0 MOTOR SUPPORT DETAIL’S

PURCHASE SPECIFICATION Rev. 0

BFP, Coupling and Accessories Dt.03.8.2009

Item Code No 3 b,g,h Specification No. COECP 3b

Prepared by AMBRISH Approved by B R MANOHAR Turbomachinery Laboratory COE for Compressors and Pumps Corporate R&D Division, BHEL, Vikasnagar, Hyderabad 500093

630

780

800980

Shaft of Motor

MOTOR SUPPORT

Φ 35

Page 12: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

Dismantle & Inspect After Test

PERFORMANCECurve No.

Cu SS CS Tubing Pipe

Rated

Bracket Other, Specify:Centre Line Foot

Nozzles Size LocationRating Facings

ToxicCharacteristics

Provided By

AbrasiveMounted By

Stages

Solids

Mounted By

Duty Intermittent Continuous

% Over Design

SPEC No.

ISSUE

DATE

PAGE OF

No. SpareNo. Operating

SUPPLIER MFR.:

SERVICE:

CLIENT:

EQUIPMENT No.:

PLANT:

LOCATION:

CONSTRUCTION

LubricationCouplingDriver Half Mtd. by

Packing

Bearing-Type

TypeFluid/Service

CorrosiveNo. of Motors Req'dNo. of Turbines Req'dMultiple UnitsCONDITIONS OF SERVICE, EACH PUMP

TemperatureSpecific GravityVapour Pressure

Corr./Erosion Caused ByCold Start Temp. @ Sp. Gr.

FlammableProvided By

Total Head

Max. Rated

Multistage No.

Motor No.

Suction

Mount

Pressure

Discharge

Dia.Connect

Mount

Pressure GreaseMfr. GuardModel

PurchaserMfr. and Type Size/No. of Rings

Max-Allowable

Total RequiredHorizontal Inline Vertical

Total Flow

Viscosity

Suction Press.Differential PressureDifferential HeadNPSH AvailableCorrosion Allowance

& Viscosity

Axial RadialSplit Suction Type Single DoubleHydro Test Pressure

Vent Drain Cage

Between Bearings Overhung

Ring Oil Flood Oil Mist Flinger

Pump Manufacturer Driver Manufacturer

Max. Min. Type

Normal Flow Rated Flow Disch. Press.

MECHANICAL SEAL

Rotary Unit

Manufacturer

SingleModel Number

Seal Ring

Auxiliary Seal Quench Fluid

External Seal FlushAuxiliary Seal Plan API-610

Seal Flush Plan API-610Shaft Packing Throttle Bushing

Press.Flow

Supplied By

By:

By:

Double Inside Outside Balanced Unbalanced

Cu SS CS Tubing Pipe

EnclosureElevationS.F.

MOTOR DRIVERHpMfr. Type:

Rated Ambient Temp.NEMA Design

Full Load AmpsInsul ClassSpace Heaters

Volts/Phase/HzFrameRPM

REV DATE COMMENT

Turbine

MotorGear

WEIGHTSREMARKSCode Requirements and Specifications

Pump & Base

Data Sheet No.

Unit/Area

Contract No.

Requisition No.

Up Down

oCMax. atFlowPressurePump ThrustLength Below Mounting Flange

Packing Cooling Injection RequiredSight Flow Indicator Required

oCMax. atPressureFlowTotal Cooling Water Required

AUXILIARIESC.W. Pipe Plan API-610

Cu SS CS Tubing Pipe

MATERIALSPump CasingWear RingsImpellerShaftShaft SleevesStuffing Box BushingGlandsGasketsBase Plate

INSPECTION AND TESTINGNon Witness Perf.Non Witness Hydro

Witness Perf.Witness Hydro

NPSH RequiredShop Inspection

Witness NPSH

Specification

RPMEff.Max. BHP Rated ImpellerMax. Head Rated ImpellerMin. Continuous FlowRotation (Viewed from Cplg. End)Cold Start BHP

NPSHR (Water)

Rated Power

DATA SHEET

CENTRIFUGAL PUMP

575655545352515049484746454443424140

181716151413121110987654321

363534333231302928272625242322212019

393837

PEDS - 03.01 (10/9/97) REVISION 00COPYRIGHT © 2007 DKL ENGINEERING, INC.

Other, Specify: % Solids

Max.

Case

Impeller

Type

(PEDS 01.04)

Constant Speed Variable Speed

Page 13: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

BHARAT HEAVY ELECTRICALS LIMITED CORPORATE R&D DIVISION, VIKAS NAGAR, HYDERABAD – 50 0 093, AP, India

Ph: 0091-40 – 23778474, FAX: 0091-40 – 23770698

General Terms and Conditions of Enquiry & Contract for the Purchase of Goods/ Services

1. The quotation and any order resulting from this enquiry shall be governed by these General Terms and Conditions of enquiry and contract for the supply of goods and the supplier quoting against this enquiry shall, unless specifically stipulates any different terms or conditions, be deemed to have read and agreed to the same.

2. Sealed quotations in double cover with tenderer’s distinctive seal, superscribing enquiry number, date and due date

are to be submitted so as to reach on or before due date & time, addressed to Additional General Manager(MM), Bharat Heavy Electricals Limited, Corporate Research & Development Division, Vikasnagar, Hyderabad, Andhra Pradesh, India – PIN–500 093, India.

In the case of Two-part bid , each inner cover shall clearly be labeled as a) Technical & Commercial Bid containing technical data/ drawings/ catalogues/ quality plans along with commercial terms and conditions & copy of the price bid with the price columns left blank (unpriced price bid), b) Price bid containing prices quotes. Installation and/or Commissioning charges shall be spelt out in absolutely lucid terms, taking into account total charges, rather than quoting vaguely, such as charges per man-day or charges per engineer per day etc. If the price bid was found later to be different from the unpriced price bid in any way, the offer will be rejected summarily.

3. Tender/ Technical bid Opening: Unless specified otherwise, tenders/ technical bids will be opened on appointed

date and time as mentioned in the enquiry or as communicated changed date/time, if any, in the presence of such of those tenderers who may be present.

4. Delayed/ Late Tender: Tenders, which have been posted by registered post through the postal department in time

before opening date but received after tender opening, shall be treated as regular tenders. Other tenders received after tender opening time shall be treated as late tenders and normally they may be rejected.

5. The Quotation should be free from overwriting and erasures. Corrections and additions, if any, must be attested.

Supplier should indicate in the quotation dimensions (Size), weight, rate etc., in the metric system unless the enquiry calls for different unit.

6. Validity of Quotation : All quotations shall be kept open for acceptance for a period of ninety days from the date

of opening of Tenders/ Technical bid and this shall be deemed to be an express condition of all quotations. The rate shall be quoted in both figures and in words.

7. In the case of Two-part bid, the vendor should furnish technical clarifications, if any, within stipulated time

mentioned, failing which, it will be construed that the vendor is not interested in the tender and BHEL shall not consider the offer for further evaluation.

8. Revision of Pricebid: In the event of any bidder, after finalizing the technical specifications and scope of supply,

opting to revise and submit their latest price bid, then BHEL reserves the right to open their original / previous price bid also while evaluating revised bid.

9. Pricebid Opening: Unless specified otherwise in the enquiry, the Price bids of technically qualified vendors shall

be opened with prior intimation in the presence of such of those tenderers who may be present.

10. Conformity to Specifications: The material should be of the best quality and shall be conforming to our specification given in our enquiry. Unless otherwise agreed upon by BHEL, no payment shall be due by BHEL in respect of any sample. Offers without details of specifications/ applicable catalogues will not be considered and are liable to be rejected.

11. Terms of Delivery: All suppliers shall quote the lowest prices on ex-works and FOB/FCA basis. Foreign

suppliers will also indicate their Indian agent’s name and address with percentage of agency commission out of the quoted price, if any. Name and Address of the supplier’s Bankers address should also be given. Indian suppliers for the indigenously manufactured/ imported stock shall quote on Ex-works /Free-on-Rail/Road /FOR-destination basis, indicating packing & forwarding charges, if any, separately.

12. Taxes and Duties: Unless specified otherwise in the enquiry, BHEL do not provide “C” or “D” Form as it is

engaged in R&D. All Indian suppliers shall clearly mention Sales Tax/ VAT, Excise Duty, and Service Tax etc, if any, payable in addition to the quoted price and indicate applicable rates/ percentage, item-wise. It will be paid

Page 14: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

only if Registration Number under State(TIN)/ Central Sales Tax or Service Tax is specifically mentioned in the Bill/Invoice. Vendors without a Sales Tax/VAT registration and applicable Service Tax registration will not be considered.

13. Insurance: Insurance will be arranged by BHEL in case of Ex-Works as well as FOB basis supplies.

14. Terms of Payment: Full payment will be made within 30 days after receipt, inspection and acceptance of the

material (and where involved, Erection and commissioning of the material/ equipment at BHEL/Destination) by Crossed cheque and no Bank commission charges are admissible. The Cheque will be sent by registered post and BHEL is in no way responsible if loss occurs due to delay by postal authorities and cheques falling into improper hands or through forgery or fraud. Suppliers having RBI-SEFT-enabled accounts can seek payment though Electronic Fund transfer. For foreign suppliers, the preferred payment term will be on Sight Draft basis and bank charges inside India will be to BHEL account and outside India will be to supplier’s account.

15. Suppliers shall quote competitive price and best delivery for all the items mentioned in the enquiry. BHEL reserves

the right to reject partial quotations and to place order on overall landed cost basis. Correct date of effecting supplies in the event of an order should be indicated in the offer. If the supplier’s quoted terms are different from BHEL standard payment terms, interest @10.5% per annum (or as indicated in the enquiry) will be loaded to the quoted prices for difference of payment period.

16. Packing: The supplier shall be responsible for the goods being properly and adequately packed so as to prevent

any loss, damage or deterioration during transit and indicate packing charges, if any, separately.

17. Part/ Split Ordering : BHEL reserves right to Order part of the item/ quantity of the enquiry and split the order among qualified vendors.

18. In case the goods enquired are on Rate Contract basis with any other unit of BHEL, such fact should be clearly

indicated in the quotation giving full particulars of Rate Contract number, validity and price and also your willingness to comply with order if placed against such Rate Contract. A true copy of Rate contract signed by the supplier should be sent with the quotation.

19. Inspection: On receipt, the goods shall be subjected to inspection and also test, if necessary, and our decision

regarding the acceptability of the goods shall be final and binding on the suppliers.

20. Consequences of Failure To Deliver: The time stipulated for delivery of goods shall be deemed to be the essence of the contract and delivery must be completed within the stipulated date/s. In the event of supplier’s failure to supply the goods by the stipulated date/s, BHEL shall be entitled to levy a penalty of ½% per week for the delayed no of weeks or part thereof for the undelivered portion of PO subject to a maximum of 10% total order value.

21. Withdrawal from the Contract: In case the supplier withdraws the quotation after its acceptance by BHEL or

fails to supply the goods as per the terms and conditions of contract, or at any time repudiated the contract wholly or in part, BHEL shall be at liberty to cancel the Purchase Order and to recover from the supplier the extra cost and other loss incidental to the breach of contract on the part of the supplier.

22. Guarantee/ Warranty certificate and Manufacturer’s Test report: Invariably in all cases where it is so

stipulated, the supplier should furnish Guarantee/ Warranty certificate valid for a period of 18 months from date of supply or 1 year from the date of receipt, acceptance and commissioning(or more, if provide by oem) whichever earlier and manufacturer’s Test report along with the goods, failing which, BHEL shall have the right to reject the goods.

23. All ferrous/ non-ferrous items shall be colour coded as per bureau of Indian standards/ or IS standards/ BHEL

Standards.

24. Recovery of Dues: BHEL shall recover any amount due from the supplier or any amount outstanding to the credit of the supplier with BHEL R&D unit or any other BHEL unit(s) and/or by legal action.

25. Arbitration & Forum for Legal Proceedings : All disputes arising in connection with indigenous/ foreign

supplies shall be settled through arbitration held at Hyderabad, AP, India and arbitration shall be appointed by Arbitration Tribunal of the Federation of Andhra Pradesh Chambers of Commerce and Industry, Hyderabad, AP, India. The Courts at Secunderabad/ Hyderabad, AP, India shall have jurisdiction in respect of any suit or other legal proceeding arising from or relating to this contract

The rights and remedies of BHEL stated in these General terms and conditions shall be in addition and supplemental to its rights and remedies under law and custom or usage of trade or business and shall in no way be deemed to limit, curtail, supercede or derogate from its said rights and remedies.

Page 15: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

BHARAT HEAVY ELECTRICALS LIMITED CORPORATE R&D Division

Vikasnagar, Hyderabad – 500093, India.

Suppliers’ compliance statement to basic conditions of enquiry

(In case Order to be placed on Indian supplier in Indian currency)

Condition BHEL R& D’s terms Supplier’s compliance (indicate Yes/No. if ‘No’, state terms desired)

1) Validity of offer 90 days from the tender opening date

2) Delivery requirements

Free delivery at our stores or FOR destination (as indicated in the enquiry)

3)Warranty Unless specifically mentioned in the enquiry, all supplied items to be provided with warrantee for one year (or more, if provided by the OEM) from the date of acceptance/commissioning. In case of equipment involving erection and commissioning, warrantee shall be for 18 months from the date of dispatch or 12 months from the date of commissioning, whichever is earlier

4) Terms of payment

Full payment will be made within thirty days after receipt, inspection and acceptance of the material at BHEL R&D (and where involved, erection and commissioning of the material/equipment at BHEL/destination), by Crossed Cheque and no Bank commission charges are admissible.

5) Taxes & Duties Unless specifically mentioned in the enquiry, we do not provide ‘C’ or ‘D’ form. Supplier to specify rates of taxes and duties element wise and related percentages.

6) Penalty for late delivery

0.5% per week beyond the delivery date as mentioned in the Purchase order on undelivered portion subject to a maximum of 10% of the total order value

* BHEL R&D reserves the right to reject any offer due to non-compliance with the above conditions and/or non-receipt of this form in duly filled condition

* Any other elements of cost in addition to the above may please be specified in detail

(Signature and Stamp/Seal of Vendor)

Page 16: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

1

BHARAT HEAVY ELECTRICALS LTD. Corp. R&D DIVISION

VIKAS NAGAR, HYDERABAD-500 093 (INDIA)

VENDOR REGISTRATION FORM

[FORM TO BE SUBMITTED* BY THE BIDDER ALONG WITH TECHNICAL-BID]

Before filling please refer to instructions on page-4

1.0 VENDOR PROFILE:

1.1 & 1.2 Name and address of the vender: ____________________________________________________________________________________________________________________________________

Phone Nos.:Fax No.:Email:

1.4 Local representative of the vender in India/ Hyderabad:

Phone Nos.:Fax No.:Email:Contact person:Mobile No.:

2.0 & 2.1 Type of Organisation:

PROPRIETORSHIP COMPANY SISTER CONCERN ANY OTHER (Please specify)

PARTNERSHIP CORPORATION Small Scale Industry

Page 17: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

2

3.0 Annual Turn Over:Name and address of the Banker:

Sr.No. Bank Address

4.0 REGISTRATION PARTICULARS

4.1 IT Permanent Account No.(PAN):

4.2 & 4.3 State and central sales tax Registration No.:

4.4 ED/ Service Tax Registration No.:

PF Account No.:

Labour Licence No.:

ESI Account No.:

5.2 Contact person:Mobile No. :

5.3 Total Number of employees:

WorkersGraduates (Engr./Scientists/Mgmt/Fin.)

Consultants

Sup./Skilled Semiskilled Unskilled

6.0 Wish to register for supplies/ services other than one bidding

for :

Sr.No. Service/Supplies Capacity1 2 3 4 5 6 7

Page 18: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

3

6.1 Reference list :

(Only recognized public and private sector companies, attach if printed copy available)

Sr.No. Customer Volume / Year1 2 3 4 5 6 7

7.0 & 8.0 Infrastructure / facilities :

Sr.No. Facility (with specifications) Age/ Year procured1 2 3 4 5 6 7 8 9 10

9.0 Registration with other BHEL Unit/Units:

Sr.No. 9.1.1 Unit 9.1.2 Registration No.1 2 3 4

Page 19: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

4

Any Other information :

Declaration:

The information furnished above is true and authentic.

(CEO / Propritor) SEAL:

Date:

The competent authority reserves the right to accept or reject the registration. Registered vendors will be informed by mail / email, as convenient. Contact Sr.DGM (MM) for clarification/ additional information on registration. A separate communication will be sent to you in case of non-registration, citing reasons thereof.

Instructions1. Answer all items, use NA for items not applicable. 2. BHEL units do not require this registration. 3. Submit the form in duplicate. 4. Use additional sheets for want of space if required. 5. Attach copies of latest document s in respect of items 4.0 (Registration no.s) 6. Photographs of registered office and the chief executive/proprietor shall be furnished. 7. Use A4 sheets for this document and the enclosures.

* REGISTERED BIDDERS, HAVING BHEL (R&D) REGISTRATION NO./ HAVE SUBMITTED THIS FORMAT EARLIER, NEED NOT FURNISH THIS INFORMATION SECOND TIME (UNLESS DESIRE TO UPDATE IT).

Page 20: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have
Page 21: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

BHARAT HEAVY ELECTRICALS LIMITED CORPORATE R&D Division IMPORTED

Vikasnagar, Hyderbad – 500093.

Suppliers’ compliance statement to basic conditions of enquiry

(In case Order to be placed on the Principal and foreign currency)

Condition BHEL R& D’s terms Supplier’s compliance (indicate Yes/No. if ‘No’, state terms desired)

01) Validity of offer

90 days from the tender opening date ( or as per enquiry)

02) Delivery requirements

FCA – Nearest International Airport (or as indicated in the enquiry)

03)Warranty Unless specifically mentioned in the enquiry, all supplied items to be provided with warrantee for one year (or more, if provided by the OEM) from the date of acceptance/ commissioning. In case of equipment involving erection and commissioning, warrantee shall be for 18 months from the date of dispatch or 12 months from the date of commissioning, whichever is earlier

04) Terms of payment

Sight draft. All bank charges inside India will be to BHEL R&D account and out side India will be to suppliers account. Documents through State Bank of India, HAL Complex, Balanagar, Hyderabad, AP, India-500 042.

05) Agency commission

Pl specify percentage charges, if any. Indian agency/agent commission will be in Indian Currency only.

06) Erection/ Commission

As per enquiry

07) Documentation As per enquiry

08) Insurance BHEL will arrange Insurance based on intimation to our Insurance agency, United India Insurance Co., DO-2, Secunderabad, AP, India.

09) Penalty for late delivery

0.5% per week beyond the delivery date as mentioned in the Purchase order on undelivered portion subject to a maximum of 10% of the total order value

* BHEL R&D reserves the right to reject any offer due to non-compliance with the above conditions and/or non-receipt of this form in duly filled condition

* Any other elements of cost in addition to the above may please be specified in detail

(Signature and Stamp/ Seal of Vendor)

Page 22: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

BHEL CORPORATE R & D VIKAS NAGAR- HYDERABAD - 500 093

ANDHRA PRADESH – INDIASUPPLIER REGISTRATION FORM

(FOREIGN SUPPLIER)

ALL COLUMNS SHOULD BE PROPERLY FILLED IN THE SPACE PROVIDED FOR. WHEREVER IT IS NOT APPLICABLE PLEASE WRITE “NOT APPLICABLE”. INCOMPLETE OR INCORRECT FORMS MAY NOT BE CONSIDERED.

1.0 GENERAL INFORMATION:

1.1….NAME OF COMPANY

1.2….DETAILS OF HEAD OFFICE:

ADDRESS : TELEPHONE : FAX : .EMAIL : .WEB SITE :

1.3….DETAILS OF FACTORY/WORKS: ADDRESS : TELEPHONE : FAX : .EMAIL : .WEB SITE :

1.4….DETAILS OF MARKETING AGENT

ADDRESS : TELEPHONE : .FAX : .EMAIL : .WEB SITE :

1.5 CHIEF EXECUTIVE NOTE: PLEASE ATTACH SEPARATE SHEETS, IF SPACE FOUND IS INADEQUATE

AUTHORISED SIGNATORY

Page 23: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

BHEL CORPORATE R & D VIKAS NAGAR – HYDERABAD – 500 093 ANDHRA PRADESH – INDIA

SUPPLIER REGISTRATION FORM

(FOREIGN SUPPLIER)

1.6 CONTACT PERSON(S) FOR PRODUCT OFFERED

NAME(S) OFFICIAL CAPACITY ADDRESS: TELEPHONE FAX E-MAIL

1.7 YEAR OF ESTABLISHMENT

1.8 PRODUCTION CAPACITY PER ANNUM

1.9 PARTICULARS OF PRODUCT INCLUDING SPECIFICATION AND RANGE OFFERED FOR REGISTRATION ( ATTACH BROUCHERS AND CATALOGUE)

1.10 NAME(S) OF BANKERS

1.11 BANKER’S CERTIFICATE

1.12 PORT OF LOADING

1.13 NEAREST AIRPORT

1.14 NAME OF THE INDIAN AGENT, IF ANY WITH AUTHORISATION LETTER

1.15 ANY OTHER INFORMATION:

AUTHORISED SIGNATORY

Page 24: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

BHEL CORPORATE R & D VIKAS NAGAR – HYDERABAD – 500 093 ANDHRA PRADESH – INDIA

SUPPLIER REGISTRATION FORM

(FOREIGN SUPPLIER)

2.0 FINANCIAL INFORMATION

2.1…TOTAL CAPACITY

2.2…ANNUAL TURN OVER FOR LAST 3 YEARS

2.3…WHEHER CREDIT LICENSE ACCEPTABLE YES/NO

3.0 QUALITY MANAGEMENT SYSTEMS ENCLOSED FORMAT PART-B

3.1 EXPERIENCE LIST FOR SAME/SIMILAR ITEMS TO BE ENCLOSED

4.0…..FUTURE EXPANSION PLANS: (GIVE DETAILS)

5.0 LIST OF ENCLOSURES: INCLUDING BROUCHERS, CATALOGUES, TECHNICAL LITERATURE etc…

6.0 ANY OTHER INFORMATION

SIGNATURE OF SUPPIER NAME DESIGNATION DATE …….OFFICIAL SEAL

AUTHORISED SIGNATORY

Page 25: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

SLNO SCOPE COMMERCIAL TERMS BHEL STANDARD TERM AS OFFERED LOADING FACTOR FOR NON COMPLIANCE TO BHEL STANDARD TERMS

SAME NIL

PAYMENT AGAINT PROFORMA INVOIVE / DESPATCH DOCUMENT OR CASH ON DELIVERY (COD) / CASH AGAINST PROOF OF DESPATCH

11% PER ANNUM INTEREST ON THE TOTAL PO VALUE FOR ONE MONTH

ADVANCE PAYMENT WITH BANK GUARANTEE 11% PER ANNUM INTEREST ON THE TOTAL VALUE FOR OFFERED DELIVERY PERIOD (Rounded off to nearest month) + 1 MONTH

PART ADVANCE PAYMENT WITH SUPPORTING BANK GUARANTEE AND BALANCE WITH IN 30 DAYS

11% PER ANNUM INTEREST ON ADVANCE FOR OFFERED DELIVERY PERIOD (Rounded off to nearest month) + 1 MONTH

PART ADVANCE PAYMENT WITH SUPPORTING BANK GUARANTEE AND BALANCE ON RECEIPT OF MATERIAL

11% PER ANNUM INTEREST ON ADVANCE FOR OFFERED DELIVERY PERIOD (Rounded off to nearest month) + 1 MONTH AND 11% PER ANNUM INTEREST ON BALANCE AMOUNT FOR ONE MONTH

SAME NIL

100% PAYMENT WITH IN 30DAYS AFTER COMPLETION OF SUPPLIES AND ERECTION AND

COMMISIONING

NIL (PBG WILL NOT BE INSISTED FROM THE SUPPLIER)

90% PAYMENT AGAINT PROFORMA INVOICE/ DESPATCH DOCUMENT OR CASH ON DELIVERY (COD) / CASH AGAINST DESPATCH AND BALANCE 10% WITH IN 30 DAYS OF E&C

11% PER ANNUM INTEREST ON 90% OF THE VALUE OF PO FOR ONE MONTH

90% PAYMENT AGAINT PROFORMA / DESPATCH DOCUMENT OR CASH ON DESPATCH (COD) / CASH AGAINST DESPATCH AND BALANCE 10% AFTER COMPLETION OF E&C

11% PER ANNUM INTEREST ON TOTAL PO VALUE FOR ONE MONTH

90% ADVANCE PAYMENT WITH BANK GUARANTEE AND BALANCE 10% WITH IN 30 DAYS OF E&C

11% PER ANNUM INTEREST ON 90% OF THE TOTAL VALUE FOR DELIVERY PERIOD(ROUNDED OF TO THE NEAREST MONTH) + 1 MONTH

PART ADVANCE (x%) PAYMENT WITH SUPPORTING BANK GUARANTEE AND (90 - x) % PAYMENT ON RECEIPT OF MATERIAL AND 10% PAYMENT WITH IN 30 DAYS AFTER E&C

11% PER ANNUM INTEREST ON THE ADVANCE AMOUNT FOR THE DELIVERY PERIOD(ROUNDED OF TO THE NEAREST MONTH)+ 1 MONTH AND 11% PER ANNUM INTEREST ON (90-X)% PAYMENT FOR ONE MONTH

PART ADVANCE (x%) PAYMENT WITH BANK GUARANTEE AND (90 - x) % PAYMENT ON RECEIPT OF MATERIAL AND 10% PAYMENT AFTER E&C

11% PER ANNUM INTEREST ON THE ADVANCE AMOUNT FOR THE DELIVERY PERIOD(ROUNDED OF TO THE NEAREST MONTH)+ 1 MONTH AND 11% PER ANNUM INTEREST ON BALANCE AMOUNT

A. FOR INDIGENOUS PURCHASES

A.1

A.2

PA

YM

EN

T T

ER

MS

PA

YM

EN

T T

ER

MS

(T

HE

SU

PP

LIE

R M

US

T S

UB

MIT

T A

PE

RF

OR

MA

NC

E

BA

NK

GU

AR

AN

TE

E (

PB

G)

FO

R 1

0% O

F T

HE

BA

SIC

VA

LU

E O

F T

HE

O

RD

ER

VA

LID

FO

R W

AR

RA

NT

Y P

ER

IOD

.)

SU

PP

LY

OF

EQ

UIP

ME

NT

SU

PP

LY

OF

EQ

UIP

ME

NT

INC

LU

DIN

G E

&C

100% PAYMENT, WITH IN 30 DAYS FROM THE DATE OF RECEIPT AND ACCEPTANCE OF MATERIAL

90% PAYMENT, WITH IN 30 DAYS FROM THE DATE OF RECEIPTAND ACCEPTANCE OF MATERIAL . BALANCE 10% WITH IN 30 DAYS OF COMPLETION OF E&C AND ON SUBMISSION OF PERFORMANCE BANK GUARANTEE (PBG) FOR 10% OF BASIC PO VALUE.

NOTE : IN CASE OF DEVIATION TO BHEL TENDER SPECIFIED TERMS, LOADING FACTOR INDICATED IN FOLLOWING TABLE WILL BE APPLIED TO QUOTED PRICE WHILE EVALUATING THE LOWEST QUOTE ( )

BHEL R&D RD:DP:MPX:F-22

LOADING FACTORS

LOADING FACTORS_290509.xls 1/2

Page 26: BHARAT HEAVY ELECTRICALS LIMITED PHONES:23774494 … Enq 500990551 for...CENTRIFUGAL PUMP ALONG ... 4 Water temperature at Pump Inlet 400 C 5 NPSH ... The rotating element shall have

SLNO SCOPE COMMERCIAL TERMS BHEL STANDARD TERM AS OFFERED LOADING FACTOR FOR NON COMPLIANCE TO BHEL STANDARD TERMS

A.1

SAME NIL

100% PAYMENT AFTER RECEIPT AND ACCEPTANCE OF MATERIAL AT BHEL R&D BY

WIRE TRANSFER. (DESPATCH DOCUMENTS WILL BE SENT TO BHEL R&D DIRECTLY ALONG

WITH BANK DETAILS)

NIL

LC PAYMENT 11% PER ANNUM INTEREST ON THE BASIC VALUE FOR ONE MONTH

ADVANCE BY WIRE TRANSFER WITH BANK GUARANTEE

11% PER ANNUM INTEREST ON THE BASIC VALUE FOR DELIVERY PERIOD + 1 MONTH

PART ADVANCE (x% ) PAYMENT WITH SUPPORTING BANK GUARANTEE AND BALANCE PAYMENT AFTER RECEIPT OF MATL

11% PER ANNUM INTEREST ON THE ADVANCE AMOUNT FOR THE DELIVERY PERIOD+ 1 MONTH AND 11% PER ANNUM INTEREST ON BALANCE AMOUNT FOR ONE MONTH

SAME NIL

LC PAYMENT FOR 90% OF THE ORDER VALUE + 10% AFTER E&C WITH IN 30 DAYS

11% PER ANNUM INTEREST ON 90% OF BASIC VALUE FOR ONE MONTH

90% OF BASIC VALUE AS ADVANCE BY WIRE TRANSFER WITH BANK GUARANTEE AND BALANCE 10% AFTER E&C BY WIRE TRANSFER WITH IN 30 DAYS

11% PER ANNUM INTEREST ON 90% OF THE BASIC VALUE FOR DELIVERY PERIOD + 1 MONTH

x% OF TOTAL VALUE AS ADVANCE PAYMENT WITH BANK GUARANTEE AND BALANCE (I.E. 90-X)AFTER RECEIPT OF MATL BY WIRE TRANSFER AND 10% AFTER COMPLETION OF E&C

11% PER ANNUM INTEREST ON THE ADVANCE AMOUNT FOR THE DELIVERY PERIOD+ 1 MONTH AND 11% PER ANNUM INTEREST ON BALANCE AMOUNT OF 90% OF ORDER VALUE (I.E. 90-X%)

C.1 PERFORMANCE BANK GUARANTEE

PBG FOR 10% OF THE BASIC PO VALUE SHALL BE FURNISHED IN BHEL PRESCRIBED FORMAT. IF NOT AGREED 10% OF THE BASIC MATERIAL COST

AGREED NIL

IF NOT AGREED 10% OF THE BASIC MATL COSTIF AGREED FOR 5% 5% OF THE BASIC MATERIAL COSTOTHER THAN THE ABOVE 10% MINUS THE AGREED MAX PERCENTAGE OF THE

BASIC MATERIAL COST WILL BE LOADED.

B. FOR FOREIGN PURCHASES (IMPORTED)

LD CLAUSED.1

B.2

B.1S

UP

PL

Y O

F E

QU

IPM

EN

TS

UP

PL

Y O

F E

QU

IPM

EN

T IN

CL

UD

ING

E&

C

C. PERFORMANCE BANK GUARANTEE, PBG ( COMMON FOR INDIGENOUS AND IMPORTS)

D. PENALTY (COMMON FOR INDEGENOUS & IMPORTS)

IN THE EVENT OF DELAY IN AGREED CONTRACTUAL DELIVERY, PENALTY OF 0.5% ( HALF PERCENT) PER WEEK BUT LIMITED TO A MAX OF 10% VALUE OF UNDELIVERED PORTION OF BASIC MATERIAL COST WILL BE APPLICABLE

AGAINST SIGHT DRAFT ON PRESENTATION OF DESPATCH DOCUMENTS VIZ INVOICE, AWB ETC TO OUR BANKERS (ALL BANK CHARGES INSIDE INDIA TO BHEL ACCOUNT AND OUTSIDE INDIA WILL BE TO THE SUPPLIER'S ACCOUNT)

90% PAYMENT WILL BE MADE WITH IN 30 DAYS FROM THE DATE OF RECEIPT OF MATERIAL ON ACCEPTANCE AND BALANCE 10% WITH IN 30 DAYS OF COMPLETION OF E&C AND ON SUBMISSIONOF PERFORMANCE BANK GUARANTEE FOR 10% OF BASIC VALUE

.

PA

YM

EN

T T

ER

MS

.

. .

.

.

PA

YM

EN

T T

ER

MS

(T

HE

SU

PP

LIE

R

MU

ST

SU

BM

ITT

A P

ER

FO

RM

AN

CE

B

AN

K G

UA

RA

NT

EE

(P

BG

) F

OR

10%

O

F T

HE

BA

SIC

VA

LU

E O

F T

HE

OR

DE

R

VA

LID

FO

R W

AR

RA

NT

Y P

ER

IOD

.)

LOADING FACTORS_290509.xls 2/2