Top Banner
Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009
31

Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Dec 31, 2015

Download

Documents

Randell Pierce
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio

Manager Tool

Jason TurgeonUS Environmental Protection Agency

4/30/2009

Page 2: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Maximum Ozone Levels in 2007

Page 3: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.
Page 4: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.
Page 5: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Image: USAF Defense Meteorological Satellite Program

Page 6: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Industry Average O&M BudgetsWastewater Plant

staffing46%

Chemicals 4%

maintenance3%

Other7%

solids12%

energy28%

Page 7: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Hartford WPCF Energy Cost vs. Use

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

Cost, millions

BTUs, 10 1̂1

Page 8: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

New Regulations May

New Regulations May

Drive Energy Use

Drive Energy Use

Page 9: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Successful Energy Management

Page 10: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.
Page 11: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.
Page 12: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

www.energystar.gov/benchmark

Page 13: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Portfolio Manager

Page 14: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

What Does it Do?

Jason TURGEON
Uses 1999 Commercial Building Energy Consumption Survey (CBECS) dataCompares subject building to similar buildingsProvides a statistically normalized score from 1 to 100Calculates annual energy use intensity (kBtu/sq. ft)Normalizes data for weather and climateSecurely hosts user’s database of building data
Page 15: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Single Parameter ComparisonsWastewater Treatment Plants

AwwaRF Survey, 2004 Data, 300 observations

0

10

20

30

40

50

60

0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450

Annual Energy Cost ($/MG)

Nu

mb

er

of

Pla

nts

Wastewater Treatment PlantsAwwaRF Survey, 2004 Data, 279 observations

0

5

10

15

20

25

30

Annual Electricity Use (kWh/MG)

Nu

mb

er

of

Pla

nts

Courtesy WEF/Steve Carlson

Page 16: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Energy Use per Flow vs. Facility Size

0

5

10

15

20

25

30

35

40

0.0 10.0 20.0 30.0 40.0 50.0 60.0

Facility Size (Average MGD)

Sou

rce

Ene

rgy

Use

d to

Tre

at 1

Gal

lon

per

Day

(kB

tu/G

PD

)

Higher Energy use than average = Low Score

Average Energy Use = Average Score (50)

Lower Energy Use than Average = High Score

Normalization: lineposition adjusted

Page 17: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Energy Use and Cost vs Flow at similar sized plantsFY 2006 data

$124 $131

$242

$202

$315

$409

0.0

2.0

4.0

6.0

8.0

10.0

12.0

2.3 1.9 1.7 1.9 2.1 2

Average Daily Flow (MGD)

kBtu

/GP

D

$0

$50

$100

$150

$200

$250

$300

$350

$400

$450

$/M

GD

Source Energy per Flow(kBtu/GPD)

Energy Cost per MG ($/MG)

Page 18: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Plan

Page 19: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

ENERGY PERFORMANCE RATING

MAINTAIN

INVEST

10075501

ADJUST

Now What?

Page 20: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.
Page 21: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Do

Page 22: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Do!

Page 23: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

DO!!!

Page 24: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Check

Page 25: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Act

Page 26: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.
Page 27: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.
Page 28: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.
Page 29: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.
Page 30: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

Photo CreditsSome photos used under Creative Commons licenses. Thanks to the following flickr users:•The End is Near: Delayed Gratification •Pile of Money: noahwesley•Fear of Commitment: Leslie Duss•Inspection: kquedquest •People Looking at Map: threelayercake•Jumping Swimmers: Hidden side •Plumber: NoMoTo•Roller Coaster: Sven Werk•Downward Trend: nogwater •Target: Matthew McVickar •Award: shannonmary•Fine Current Adjustment Dial: thespacesuitcatalyst•Apples and Oranges: rebel prince•Bad Apple: atypically_me•Basketball: sgoogle•Building with Cactus: ralphTQ•Building with Snow: Justin Russell•Calculator: Tube Design•Changed Priorities: redvers•Padlock: Zebble•Dial 1-100: Leo Reynolds•Swiss Army Knife: Kaptain Kobold•Green Jobs in Pittsfield: greenjobsnow.org•Firefighter: djarvinen•Two Tankers: SeraphimC

Page 31: Benchmarking Wastewater Treatment Plant Energy Use with ENERGY STAR’s Portfolio Manager Tool Jason Turgeon US Environmental Protection Agency 4/30/2009.

… …it’s not sustainableit’s not sustainable

If it’s not energy efficient …If it’s not energy efficient …

Contact Us

EPA New England

Jason Turgeon

[email protected]

617-918-1637

Gina Snyder

[email protected]

617-918-1837

www.epa.gov/

region01/eco/energy