Top Banner
Baseline Analysis Report Integrated Tourism Master Plan for Lombok Vol.4 - Appendix Task D - Articulation of Environmental, Social, Socio-Economic and Cultural Heritage Opportunities and Constraints PT. AECOM Indonesia Ver.01 – 12 July 2019
39

Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

Aug 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

Baseline Analysis Report Integrated Tourism Master Plan for Lombok

Vol.4 - Appendix Task D - Articulation of Environmental, Social, Socio-Economic and Cultural Heritage Opportunities and Constraints

PT. AECOM Indonesia

Ver.01 – 12 July 2019

Page 2: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

Quality Information

Project Name : Integrated Tourism Master Plan for Lombok

Project No. : JKTD18082

Document Name : Baseline Analysis Report Vol.4 - Appendix

Prepared by Checked by Verified by Approved by

Rahayu Indah Komalasari

Aryo Kuncoro Sacha Schwarzkopf Utami Prastiana

Revision History

Version Submission Date Details Authorized Name Position

Ver. 01 12 July 2019 AR Dep. TL

Distribution List

#Hard Copies PDF Required Association/Company Name

Page 3: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

3

Disclaimer

AECOM devoted effort consistent with (i) the level of diligence ordinarily exercised by competent professionals practicing in the area under the same or similar circumstances, and (ii) the time and budget available for its work, to ensure that the data contained in this report is accurate as of the date of its preparation. This study is based on estimates, assumptions and other information developed by AECOM from its independent research effort, general knowledge of the industry, and information (including without limitation, any information pertaining to the financial parameters which includes but is not limited to the weighted average debt and equity, cost of equity, cost of debt and other similar information as contained in this study) as provided by and/or derived from consultations with the client and the client’s representatives and other third party(ies). AECOM has relied upon and presumed that such information is both accurate and complete. AECOM has not verified as it is not in the position to verify such information, and therefore AECOM is unable to accept any responsibility and/or liability for, the accuracy and completeness of any such information used in the preparation or presentation of this study. No responsibility is assumed whatsoever for inaccuracies in reporting by the Client, the Client’s agents and representatives, or any third – party data source used in preparing or presenting this study. AECOM further assumes no duty to update the information contained herein unless it is separately retained to do so pursuant to a written agreement signed by AECOM and the Client. AECOM’s findings represent its professional judgement. Therefore, neither AECOM nor its parent corporation, or its affiliates, (a) makes any warranty, expressed or implied, with respect to the use of any information, any calculations herein based on such information or the methods as disclosed in this document or (b) assumes any liability with respect to the use of any information, any calculations herein based on such information or the methods as disclosed in this document. Any recipient of this document, by their acceptance or use of this document, releases AECOM , its parent corporation, and its and their affiliates from any liability for direct, indirect, consequential or special loss or damage whether arising in contract, warranty, express or implied, tort or otherwise, and irrespective of fault, negligence and strict liability arising from the use of any information, any calculations herein based on such information or the methods as disclosed in this document.” This report may not be used in conjunction with any public or private offering of securities, debt, equity or other similar purpose where it may be relied upon to any degree by any person other than the Client. This study may not be used for purposes other than those for which it was prepared or for which prior written consent has been obtained from AECOM. Possession of this study does not carry with the right of publication or the right to use the name of “AECOM” in any manner without the prior written consent of AECOM. No party may abstract, excerpt or summarize this report

without prior written consent of AECOM. AECOM has served solely in the capacity of consultant and has not rendered any expert opinion in connection with the subject matter hereof. Any changes made to the study, or any use of the study not specifically identified in the agreement between the Client and AECOM or otherwise expressly approved in writing by AECOM, shall be at the sole risk of the party making such changes or adopting such use. This document was prepared solely for the use by the Client. No party may rely on this report except the Client or a party so authorized by AECOM in writing (including, without limitation, in the form of a reliance letter). Any party who is entitled to rely on this document may do so only on the document in its entirety and not on any excerpt or summary. Entitlement to rely upon this document is conditioned upon the entitled party accepting full responsibility and not holding AECOM liable in any way for any impacts on the forecasts or the earnings from this project resulting from changes in “external” factors such as changes in government policy, in the pricing of commodities and materials, price levels generally, competitive alternatives to the project. The behavior of consumers or competitors and changes on the owners’ policies affecting the operation on their projects This document may include “forward – looking statements”. These statements relate to AECOM’s expectations, beliefs, intentions or strategies regarding the future. These statements may be identified by the use of words like “anticipate,” “believe”, “estimate”, expect”, “intend”, “may”, “plan”, “project”, “will”, “should”, “seek” and similar expressions. The forward – looking statements reflect AECOM’s views and assumptions with respect to future events as of the date of this study and are subject to future economic conditions, and other risks and uncertainties. Actual and future results and trends could be differed materially from those set forth in such statements due to various factors, including, without limitation, those discussed in this study. These factors are beyond AECOM’s ability to control or predict. Accordingly, AECOM makes no warranty or representation that any of the projected values or results contained in this study will actually be achieved. This Study is qualified in its entirety by, and should be considered in light of, these limitations, conditions and considerations.

Page 4: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

4

Prepared for:

Badan Pengembangan Infrastruktur Wilayah Kementerian Pekerjaan Umum dan Perumahan Rakyat

Prepared by:

PT. AECOM Indonesia South Quarter Building Tower C 5th Floor Jl. R.A. Kartini Kav.8 Jakarta Selatan Jakarta - Indonesia aecom.com

© 2019 PT AECOM Indonesia. All Rights Reserved.

This document has been prepared by PT AECOM Indonesia (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM.

Page 5: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

5

Appendix

Tourism Suitability Assessment based on these 4 classifications:

1. Low Sensitivity / High Suitability: Allowed for commercial development and tourism activities 2. Medium Development / Medium Development Suitability: Allowed for limited strategic

development purposes and tourism activities 3. Medium Tourism / Medium Tourism Suitability: Allowed for limited tourism activities only 4. High Sensitivity / Low Suitability: Not allowed for any type of tourism activities and/or any

development

Suitability Assessment

Regency/city district DTW Catagory Area Suitability Classification

Mataram

Ampenan Kota tua ampenan Low 1.0711 Med - Dev / Med - Dev Suitability Med - Dev 2.0497 Med - Tou 0.0167 Selaparang Islamic center Low 0.4601 Med - Dev / Med - Dev Suitability Med - Dev 2.4757 Med - Tou 0.2017 Mayura Taman mayura Low 0.9298 Med - Dev / Med - Dev Suitability Med - Dev 2.1549 Med - Tou 0.0528

Lombok Utara

Pemenang Tiga Gili Low 0.1676 Med - Tou / Med - Tou Suitability Med - Dev 0.5990 Med - Tou 2.3710 Bayan Senaru Low 0.2938 Med - Dev / Med - Dev Suitability Med - Dev 1.7720 Med - Tou 1.0717

Bayan Pelawangan Senaru High 3.1375 High Sensitivity / Low Suitability

Tanjung Tanjung-Medana Med - Dev 0.0246 Med - Tou / Med - Tou Suitability Med - Tou 0.9677

Lombok Barat

Pemenang Pantai Senggigi Low 0.4264 Med - Dev / Med - Dev Suitability Med - Dev 1.4609 Med - Tou 1.2501 Suranadi Narmada Med - Dev 2.3294 Med - Dev / Med - Dev Suitability Med - Tou 0.8081 Lingsar Taman Lingsar Low 1.0166 Med - Dev / Med - Dev Suitability Med - Dev 1.9964 Med - Tou 0.1244 Narmada Suranadi Low 0.1515 Med - Dev / Med - Dev Suitability Med - Dev 1.5504 Med - Tou 1.4356 Sekotong Gili Nanggu Med - Tou 0.1799 Med - Tou / Med - Tou Suitability Sekotong Gili Gede Low 0.0116 Med - Tou / Med - Tou Suitability Med - Dev 0.2922 Med - Tou 2.8337 Sekotong Mekaki Bay High 0.2207 Med - Tou / Med - Tou Suitability Med - Tou 0.7322 Sekotong Pantai Nambung Med - Tou 2.6012 Med - Tou / Med - Tou Suitability Sekotong Bangko Bangko High 2.8438 High Sensitivity / Low Suitability

Page 6: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

6

Regency/city district DTW Catagory Area Suitability Classification

Med - Tou 0.3663

Lombok Tengah

Praya barat Pantai Selong Belanak Med - Dev 0.3256 Med - Tou / Med - Tou Suitability

Med - Tou 2.8119 Praya barat Pantai Mawi Low 0.1168 Med - Tou / Med - Tou Suitability Med - Dev 0.6698 Med - Tou 2.5155 Praya barat Pantai Mawun Med - Tou 3.1375 Med - Tou / Med - Tou Suitability Praya Batujai Med - Tou 3.1375 Med - Tou / Med - Tou Suitability Pujut Pantai Lancing Med - Tou 3.3874 Med - Tou / Med - Tou Suitability Pujut Are Guling High 3.1375 High Sensitivity / Low Suitability Pujut Tanjung Aan Low 0.5630 Med - Tou / Med - Tou Suitability Med - Dev 1.0307 Med - Tou 1.5438 Pujut Bukit Merese Med - Tou 2.2575 Med - Tou / Med - Tou Suitability Pujut Desa Ende Low 0.2835 Med - Dev / Med - Dev Suitability Med - Dev 1.5012 Med - Tou 1.3528 Pujut Desa Sade Low 0.3572 Med - Dev / Med - Dev Suitability Med - Dev 1.6784 Med - Tou 1.1020

Pujut Gerupuk/Batu Payung Low 0.1276 Med - Dev / Med - Dev Suitability

Med - Dev 2.2080 Med - Tou 0.8725

Pujut Sentra Perikanan Awang Med - Tou 0.0620 Med - Tou / Med - Tou Suitability

Batukliang Aik Berik Low 0.4340 Med - Dev / Med - Dev Suitability Med - Dev 1.8436 Med - Tou 0.8598

Batukliang Benang Kelambu dan Benang Stokel Med - Dev 2.4278 Med - Tou / Med - Tou Suitability

Med - Tou 0.7097

Lombok Timur

Jerowaru Pink Beach (Tangsi) Med - Tou 1.8591

Med - Tou / Med - Tou Suitability

Jerowaru Pink Beach (Telone) Med - Dev 1.0499

Med - Tou / Med - Tou Suitability

Med - Tou 2.0416 Jerowaru Pantai Surga Low 0.0624 Med - Tou / Med - Tou Suitability Med - Dev 0.5494 Med - Tou 2.5257 Sembalun Gunung Rinjani High 3.1375 High Sensitivity / Low Suitability Sembalun Lembah Sembalun Med - Tou 3.1375 Med - Tou / Med - Tou Suitability

Pringgasela Tete Batu dan Otak kokok High 3.1375 High Sensitivity / Low Suitability

Sambelia Gili Sulat Med - Dev 3.1375 Med - Dev / Med - Dev Suitability Pringgaraya Gili Kondo Med - Tou 3.0675 Med - Tou / Med - Tou Suitability

Tourism Readiness Assessment based on:

Ministry of Tourism 3A (Attraction, Accesibility, Amenities) Disaster Risk Tourism Development Plan Compability Spatial Plan Compability Land Ownership

Page 7: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

7

Location Scale of Service Area Detail Plan Availability

Ministry of Tourism 3A (Attraction, Accesibility, Amenities) Scoring

Regency District DTW

Attractions Accessibility Amenities Type of Attractio

ns

Attractiveness

Accessibility ROW ROA Amenities Quality Scoring

Quality Scoring

Mataram Ampenan

Kota tua ampenan

Heritage trail, Culinary

2 Lack of signage 2 3

Adequate ammenities (Urbanized Area)

3 2

Selaparang

Islamic center Religious 2 Good road

infrastructure 3 3

Adequate ammenities (Urbanized Area)

3 2

Mayura Taman mayura

Religious, Heritage 1 Lack of

signage 3 3

Adequate ammenities (Urbanized Area)

3 2

Lombok Utara

Pemenang

Tiga Gili

Marine Tourism 3

Unorganized boat, inadequate port

1 1 Lack of water supply

1 3

Bayan Senaru

Waterfall, Hiking, Traditional village

3 Damage road 1 2 Lack of water supply

1 2

Bayan

Pelawangan Senaru

Camping, Hiking 3 Inadequate

infrastructure 1 1 No amenities 1 1

Tanjung

Tanjung-Medana

Regatta, Fisherman village

1 Inadequate road quality, damaged road

3 2 Inadequate amenities 3 3

Lombok Barat

Pemenang

Pantai Senggigi

Beach, Culinary 2 Adequate road

quality 3 3 Adequate amenities 3 3

Suranadi

Narmada

Heritage, Culinary 2 Adequate road 3 3

Low quality of amenities

2 2

Lingsar Taman Lingsar

Agrotourism, Religious

1 Inadequate road 1 2 Inadequate

amenities 1 1

Narmada

Suranadi

Heritage, Religious 2 Adequate road 2 3 Inadequate

amenities 1 2

Sekotong

Gili Nanggu

Marine Tourism 3 Inadequate

port 1 3 Inadequate amenities 1 1

Sekotong

Gili Gede

Marine Tourism 3 Inadequate

port 2 3 Inadequate amenities 1 1

Sekotong

Mekaki Bay Beach 3

Adequate road surface, poor road infrastructure

3 2 No amenities 1 1

Page 8: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

8

Regency District DTW

Attractions Accessibility Amenities Type of Attractio

ns

Attractiveness

Accessibility ROW ROA Amenities Quality Scoring

Quality Scoring

Sekotong

Pantai Nambung

Beach 2 No road access 2 2 No

amenities 1 1

Sekotong

Bangko Bangko

Surfing 2

Poor road surface, damaged road, poor infrastructure

1 1 No amenities 1 1

Lombok Tengah

Praya barat

Pantai Selong Belanak

Marine Tourism, horse riding

2

Inadequate road infrastructure, limited access

2 2 Inadequate amenities 1 3

Praya barat

Pantai Mawi

Marine tourism, surfing

2 Poor access, poor road surface

2 1 No amenities 1 1

Praya barat

Pantai Mawun

Marine tourism, beach

3 Poor road infrastructure 2 2 Inadequate

amenities 1 1

Praya barat

Jogo Hills

No attraction 1 N/A 1 1 N/A 1 1

Praya Batujai Waterdam 1

Poor road infrastructure, narrow road

1 2 Inadequate amenities 1 1

Pujut Pantai Lancing

Marine tourism, beach

1 Poor road infrastructure 1 2 Inadequate

amenities 1 1

Pujut Are Guling

Beach, Paragliding

1 Poor access 2 1 No amenities 1 1

Pujut Tanjung Aan

Marine tourism 3

Poor road surface and infrastructure

2 2 No amenities 1 1

Pujut Bukit Merese

Hills, island hopping

3 Damaged road, blocked access

2 2 Inadequate amenities 1 1

Pujut Desa Ende

Traditional village 3

Good access, lack of parking area

3 3 Sufficient amenities 3 3

Pujut Desa Sade

Traditional village 3

Good access, sufficient parking area

3 3 Sufficient amenities 3 3

Pujut

Gerupuk/Batu Payung

Unique natural feature

1

Poor road access, no pedestrian access

1 1 No amenities 1 1

Pujut

Sentra Perikanan Awang

Traditional market, culinary

1

Narrow road, inadequated road infrastructure

2 2 No tourism facilitties 1 1

Batukliang

Aik Berik

Waterfall, hiking 1 Poor road

access 1 1 Inadequate amenities 1 1

Batukliang

Benang Kelam

Waterfall, hiking 2 Poor road

access 2 1 Inadequate amenities 2 3

Page 9: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

9

Regency District DTW

Attractions Accessibility Amenities Type of Attractio

ns

Attractiveness

Accessibility ROW ROA Amenities Quality Scoring

Quality Scoring

bu dan Benang Stokel

Lombok Timur

Jerowaru

Pink Beach (Tangsi)

Island hopping, marine tourism

3 Poor road access, unpaved road

1 1 No amenities 1 1

Jerowaru

Pink Beach (Telone)

Island hopping, marine tourism

3 Poor road access, unpaved road

1 1 No amenities 1 1

Jerowaru

Pantai Surga

Marine tourism 1

Poor road access, no road infrastructure unpaved road

1 1 Inadequate amenities 1 1

Sembalun

Gunung Rinjani

Hiking, camping 3

Damaged road, poor pedestrian road

1 1 No amenities 1 2

Sembalun

Lembah Sembalun

Hotspring, argotourism

3

Damaged road, poor pedestrian road

2 2 Inadequate amenities 1 3

Pringgasela

Tete Batu dan Otak okok

Spring water 3

Narrow road, inadequate road infrastructure

2 1 Sufficient amenities 3 2

Sambelia

Gili Sulat

Island hopping, camping

3 Informal boat 1 1 No amenities 1 1

Pringgaraya

Gili Kondo

Island hopping 3 Informal boat 1 1 No

amenities 1 1

Page 10: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

10

Disaster Risk Scoring

Regency/city district DTW Earthquake risk

Tsunami and volcano risk

Mataram Ampenan Kota tua ampenan 1 2 Selaparang Islamic center 1 3 Mayura Taman mayura 1 3

Lombok Utara

Pemenang Tiga Gili 1 2 Bayan Senaru 2 3

Bayan Pelawangan Senaru 2 3

Tanjung Tanjung-Medana 1 3

Lombok Barat

Pemenang Pantai Senggigi 1 2 Suranadi Narmada 2 3 Lingsar Taman Lingsar 1 3 Narmada Suranadi 1 3 Sekotong Gili Nanggu 1 1 Sekotong Gili Gede 1 2 Sekotong Mekaki Bay 1 1 Sekotong Pantai Nambung 2 2 Sekotong Bangko Bangko 1 2

Lombok Tengah

Praya barat Pantai Selong Belanak 2 1

Praya barat Pantai Mawi 1 2 Praya barat Pantai Mawun 1 1 Praya barat Jogo Hills 1 3 Praya Batujai 2 1 Pujut Pantai Lancing 1 1 Pujut Are Guling 1 1 Pujut Tanjung Aan 1 1 Pujut Bukit Merese 1 1 Pujut Desa Ende 1 3 Pujut Desa Sade 1 3

Pujut Gerupuk/Batu Payung 1 1

Pujut Sentra Perikanan Awang 2 2

Batukliang Aik Berik 3 3

Batukliang Benang Kelambu dan Benang Stokel 2 3

Lombok Timur

Jerowaru Pink Beach (Tangsi) 2 1

Jerowaru Pink Beach (Telone) 2 1

Jerowaru Pantai Surga 2 2 Sembalun Gunung Rinjani 1 1 Sembalun Lembah Sembalun 1 3

Pringgasela Tete Batu dan Otak kokok 2 2

Sambelia Gili Sulat 2 1 Pringgaraya Gili Kondo 2 1

Page 11: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

11

Tourism Development Plan Compability Scoring

Regency/city district DTW Regulation Scoring

Mataram Ampenan Kota tua ampenan

KPPN Mataram Kota dsk (RIPPARNAS 2010-2025), KSPD Mataram Metro dsk (RIPPARDA NTB)

3

Selaparang Islamic center KSPD Mataram Metro dsk (RIPPARDA NTB) 2

Mayura Taman mayura KSPD Mataram Metro dsk (RIPPARDA NTB) 2

Lombok Utara Pemenang Tiga Gili KSPN Senggigi - Tiga Gili, KSPD I 3

Bayan Senaru KSPN Senggigi - Tiga Gili, KSPD IV 3

Bayan Pelawangan Senaru

KSPN Senggigi - Tiga Gili, KSPD IV 3

Tanjung Tanjung-Medana KSPN Senggigi - Tiga Gili 3

Lombok Barat Pemenang Pantai Senggigi KSPN Senggigi - Tiga Gili, KSPD I 3

Suranadi Narmada KSPD Lingsar, Narmada and its surroundings 2

Lingsar Taman Lingsar KSPD Lingsar, Narmada and its surroundings 2

Narmada Suranadi KSPD Lingsar, Narmada and its surroundings 2

Sekotong Gili Nanggu KSPD Sekotong and its surroundings 2

Sekotong Gili Gede KSPD Sekotong and its surroundings 2

Sekotong Mekaki Bay KSPD Sekotong and its surroundings 2

Sekotong Pantai Nambung KSPD Sekotong and its surroundings 2

Sekotong Bangko Bangko KSPD Sekotong and its surroundings 2

Lombok Tengah Praya barat Pantai Selong Belanak

KSPN Pantai Selatan Lombok, KSPD Zona Selatan RIPPARDA LOTENG (C.3)

3

Praya barat Pantai Mawi KSPN Pantai Selatan Lombok, KSPD Zona Selatan RIPPARDA LOTENG (C.3)

3

Praya barat Pantai Mawun KSPN Pantai Selatan Lombok 3 Praya barat Jogo Hills N/A 1

Praya Batujai KSPD Zona Tengah Lombok Tengah (B.2) 2

Pujut Pantai Lancing KSPN Pantai Selatan Lombok, KSPD Zona Selatan Lombok Tengah (C.3)

3

Pujut Are Guling KSPD Sekotong and its surroundings 2

Pujut Tanjung Aan KSPN Pantai Selatan Lombok, KSPD Zona Selatan Lombok Tengah (C.3)

3

Pujut Bukit Merese KSPD Zona Selatan Lombok Tengah (C.3) 3

Pujut Desa Ende KPPN Praya Sade (RIPPARNAS 2010 - 2025), 3

Page 12: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

12

Regency/city district DTW Regulation Scoring KSPD Zona Selatan Lombok Tengah (C.1)

Pujut Desa Sade

KPPN Praya Sade (RIPPARNAS 2010 - 2025), KSPD Zona Selatan Lombok Tengah (C.1)

3

Pujut Gerupuk/Batu Payung KSPN Pantai Selatan Lombok 3

Pujut Sentra Perikanan Awang

KPPN Praya Sade (RIPPARNAS 2010 - 2025), KSPD Zona Selatan Lombok Tengah

3

Batukliang Aik Berik KPD RIPPARDA Lombok Tengah (Zona Utara) 2

Batukliang Benang Kelambu dan Benang Stokel

KPD RIPPARDA Lombok Tengah (Zona Utara) 2

Lombok Timur Jerowaru Pink Beach (Tangsi)

KSPN Pantai Selatan Lombok, Prioritas 1 SKW 4 RIPPARDA LOTIM

3

Jerowaru Pink Beach (Telone)

KSPN Pantai Selatan Lombok, Prioritas 1 SKW 4 RIPPARDA LOTIM

3

Jerowaru Pantai Surga KSPN Pantai Selatan Lombok, Prioritas 1 SKW 4 RIPPARDA LOTIM

3

Sembalun Gunung Rinjani KSPD Rasimas Sembalun Dsk (RIPPARDA NTB), Prioritas 1 SKW 1 RIPPARDA LOTIM

2

Sembalun Lembah Sembalun

KSPD Rasimas Sembalun Dsk (RIPPARDA NTB) 2

Pringgasela Tete Batu dan Otak okok

KSPD Rasimas Sembalun Dsk (RIPPARDA NTB), Prioritas 1 SKW 2 RIPPARDA LOTIM

2

Sambelia Gili Sulat KSPD Rasimas Sembalun Dsk (RIPPARDA NTB), Prioritas 1 SKW 4 RIPPARDA LOTIM

2

Pringgaraya Gili Kondo Prioritas 1 SKW 4 RIPPARDA LOTIM 2

Page 13: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

13

Spatial Plan Compability Scoring

Regency/city District DTW RTRW (Land Use) Scoring

Mataram

Ampenan Kota tua ampenan

Cultural Heritage Conservation Area (RTRW), Tourism AMC Strategic Corridor

2

Selaparang Islamic center Public Services Area (RTRW), Tourism AMC Strategic Corridor 2

Mayura Taman mayura Cultural Heritage Conservation Area (RTRW) 2

Lombok Utara

Pemenang Tiga Gili Hutan Konservasi 1 Bayan Senaru Hutan Produksi Tetap 2

Bayan Pelawangan Senaru Hutan Konservasi 1

Tanjung Tanjung-Medana Kawasan Pariwisata 3

Lombok Barat

Pemenang Pantai Senggigi Kawasan Pariwisata 3

Suranadi Narmada Tujuan Wisata Alam, Kawasan Perkebunan (RTRW LOBAR) 3

Lingsar Taman Lingsar kawasan pariwisata 3 Narmada Suranadi kawasan pariwisata 3 Sekotong Gili Nanggu kawasan pariwisata 3 Sekotong Gili Gede kawasan pariwisata 3

Sekotong Mekaki Bay Tujuan Wisata Alam, Kawasan Perkebunan 3

Sekotong Pantai Nambung Kawasan Perkebunan 2

Sekotong Bangko Bangko Hutan konservasi 1

Lombok Tengah

Praya barat Pantai Selong Belanak Kawasan Perkebunan 2

Praya barat Pantai Mawi Taman Wisata Alam 3 Praya barat Pantai Mawun Kawasan Perkebunan 2 Praya barat Jogo Hills Kawasan Perkebunan 2

Praya Batujai Kawasan Pertanian Tanaman Pangan 2

Pujut Pantai Lancing Tujuan Wisata Alam 3 Pujut Are Guling Tujuan Wisata Alam 3

Pujut Tanjung Aan Kawasan Pertanian tanaman Pangan 2

Pujut Bukit Merese Kawasan Perkebunan 2

Pujut Desa Ende Kawasan Pertanian tanaman Pangan 2

Pujut Desa Sade Kawasan Pertanian tanaman Pangan 2

Pujut Gerupuk/Batu Payung

Kawasan Pertanian tanaman Pangan 2

Pujut Sentra Perikanan Awang

Kawasan Perkebunan 2

Batukliang Aik Berik Kawasan Perkebunan 2

Batukliang Benang Kelambu dan Benang Stokel

Kawasan Hutan Lindung 1

Lombok Timur Jerowaru Pink Beach

(Tangsi) Kawasan Lindung 1

Jerowaru Pink Beach (Telone) Kawasan Lindung 1

Page 14: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

14

Regency/city District DTW RTRW (Land Use) Scoring Jerowaru Pantai Surga Kawasan Sempadan Pantai 2

Sembalun Gunung Rinjani Kawasan Hutan Konservasi 1

Sembalun Lembah Sembalun Kawasan Hutan Lindung 1

Pringgasela Tete Batu dan Otak kokok Kawasan Hutan Konservasi 1

Sambelia Gili Sulat Kawasan Hutan Lindung 1 Pringgaraya Gili Kondo Kawasan Hutan Lindung 1

Page 15: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

15

Land Ownership Scoring

Regency/city district DTW Land Status Scoring

Mataram Ampenan Kota tua

ampenan Mostly ownership rights 2

Selaparang Islamic center Mostly unregistered 2 Mayura Taman mayura Mostly ownership rights 2

Lombok Utara

Pemenang Tiga Gili Mostly ownership and building rights 2

Bayan Senaru Mostly ownership rights and unregistered 2

Bayan Pelawangan Senaru Mostly unregistered 2

Tanjung Tanjung-Medana

Mostly ownership rights and unregistered 2

Lombok Barat

Pemenang Pantai Senggigi

Mostly ownership rights and unregistered 2

Suranadi Narmada Mostly ownership rights 2 Lingsar Taman Lingsar Mostly ownership rights 2 Narmada Suranadi Mostly ownership rights 2 Sekotong Gili Nanggu Mostly unregistered 2

Sekotong Gili Gede Mostly ownership rights and unregistered 2

Sekotong Mekaki Bay Mostly building rights 2

Sekotong Pantai Nambung Mostly ownership rights 2

Sekotong Bangko Bangko Mostly unregistered 2

Lombok Tengah

Praya barat Pantai Selong Belanak

Mostly ownership and building rights 2

Praya barat Pantai Mawi Mostly ownership rights 2

Praya barat Pantai Mawun Mostly ownership rights and unregistered 2

Praya barat Jogo Hills Mostly unregistered 2 Praya Batujai Mostly usage rights 3 Pujut Pantai Lancing Mostly ownership rights 2

Pujut Are Guling Mostly ownership rights and unregistered 2

Pujut Tanjung Aan Mostly management rights 3 Pujut Bukit Merese Mostly management rights 3 Pujut Desa Ende Mostly management rights 2

Pujut Desa Sade Mostly ownership rights and unregistered 2

Pujut Gerupuk/Batu Payung Mostly management rights 3

Pujut Sentra Perikanan Awang

Mostly ownership rights and unregistered 2

Batukliang Aik Berik Mostly unregistered rights 2

Batukliang Benang Kelambu dan Benang Stokel

Mostly unregistered rights 2

Lombok Timur

Jerowaru Pink Beach (Tangsi) Mostly ownership rights 2

Jerowaru Pink Beach (Telone) Mostly ownership rights 2

Jerowaru Pantai Surga Mostly unregistered 2

Sembalun Gunung Rinjani Mostly unregistered 2

Page 16: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

16

Regency/city district DTW Land Status Scoring

Sembalun Lembah Sembalun Mostly unregistered 2

Pringgasela Tete Batu dan Otak okok Mostly ownership rights 2

Sambelia Gili Sulat Mostly unregistered 2 Pringgaraya Gili Kondo Mostly unregistered 2

Page 17: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

17

Location, Scale of Service Area, and Detail Plan Availability Scoring

Regency/city district DTW Location Scale of service

Detailed Plan

Mataram Ampenan Kota tua ampenan 3 3 1 Selaparang Islamic center 3 3 1 Mayura Taman mayura 3 3 1

Lombok Utara

Pemenang Tiga Gili 3 2 1 Bayan Senaru 2 2 1

Bayan Pelawangan Senaru 2 1 1

Tanjung Tanjung-Medana 3 3 1

Lombok Barat

Pemenang Pantai Senggigi 3 3 1 Suranadi Narmada 3 3 1 Lingsar Taman Lingsar 3 3 1 Narmada Suranadi 3 3 1 Sekotong Gili Nanggu 3 3 2 Sekotong Gili Gede 3 3 2 Sekotong Mekaki Bay 3 2 2 Sekotong Pantai Nambung 3 2 1 Sekotong Bangko Bangko 3 2 2

Lombok Tengah

Praya barat Pantai Selong Belanak 3 3 3

Praya barat Pantai Mawi 3 3 1 Praya barat Pantai Mawun 3 3 1 Praya barat Jogo Hills 1 1 1 Praya Batujai 2 2 1 Pujut Pantai Lancing 2 2 1 Pujut Are Guling 3 2 1 Pujut Tanjung Aan 3 3 3 Pujut Bukit Merese 3 3 3 Pujut Desa Ende 3 3 3 Pujut Desa Sade 3 3 3

Pujut Gerupuk/Batu Payung 1 2 1

Pujut Sentra Perikanan Awang 3 2 1

Batukliang Aik Berik 3 1 1

Batukliang Benang Kelambu dan Benang Stokel 3 2 1

Lombok Timur

Jerowaru Pink Beach (Tangsi) 2 2 2

Jerowaru Pink Beach (Telone) 2 2 2

Jerowaru Pantai Surga 3 3 2 Sembalun Gunung Rinjani 3 2 1 Sembalun Lembah Sembalun 3 2 1

Pringgasela Tete Batu dan Otak kokok 1 2 1

Sambelia Gili Sulat 1 1 1 Pringgaraya Gili Kondo 1 1 1

Page 18: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

18

Tourism Readiness Assessment

Regency/city district DTW Result

Mataram Ampenan Kota tua ampenan 2,22 Priority Selaparang Islamic center 2,24 Priority Mayura Taman mayura 2,1 Priority

Lombok Utara

Pemenang Tiga Gili 1,93 Priority Bayan Senaru 2,16 Priority Bayan Pelawangan Senaru 1,87 Not allowed Tanjung Tanjung-Medana 2,34 Priority

Lombok Barat

Pemenang Pantai Senggigi 2,48 Priority Suranadi Narmada 2,36 Less Priority Lingsar Taman Lingsar 1,8 Less Priority Narmada Suranadi 2,15 Less Priority Sekotong Gili Nanggu 2,04 Priority Sekotong Gili Gede 2,18 Priority Sekotong Mekaki Bay 2,08 Priority Sekotong Pantai Nambung 1,86 Less Priority Sekotong Bangko Bangko 1,56 Not allowed

Lombok Tengah

Praya barat Pantai Selong Belanak 2,14 Priority

Praya barat Pantai Mawi 1,99 Priority Praya barat Pantai Mawun 2,01 Priority Praya barat Jogo Hills 1,37 Not allowed Praya Batujai 1,66 Less Priority Pujut Pantai Lancing 1,72 Less Priority Pujut Are Guling 1,63 Not allowed Pujut Tanjung Aan 2,18 Less Priority Pujut Bukit Merese 2,18 Less Priority Pujut Desa Ende 2,63 Priority Pujut Desa Sade 2,63 Priority

Pujut Gerupuk/Batu Payung 1,61 Less Priority

Pujut Sentra Perikanan Awang 1,84 Less Priority

Batukliang Aik Berik 1,69 Less Priority

Batukliang Benang Kelambu dan Benang Stokel 1,95 Less Priority

Lombok Timur

Jerowaru Pink Beach (Tangsi) 1,79 Less Priority Jerowaru Pink Beach (Telone) 1,79 Less Priority Jerowaru Pantai Surga 1,76 Less Priority Sembalun Gunung Rinjani 1,67 Not allowed Sembalun Lembah Sembalun 2,02 Priority

Pringgasela Tete Batu dan Otak kokok 1,96 Not allowed

Sambelia Gili Sulat 1,58 Less priority Pringgaraya Gili Kondo 1,58 Less priority

Page 19: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

19

Carrying Capacity and Hazard Assessment

Regency/City District DTW Carrying Capacity

Hazard Assessment Category

Mataram Ampenan Kota tua

ampenan 1 1 Conditional

Selaparang Islamic center 1 1 Conditional Mayura Taman mayura 1 1 Conditional

Lombok Utara

Pemenang Tiga Gili 1 1 Conditional Bayan Senaru 1 1 Conditional

Bayan Pelawangan Senaru 2 1 Not

Applicable Tanjung Tanjung-Medana 1 2 Conditional

Lombok Barat

Pemenang Pantai Senggigi 3 2 Ideal Suranadi Narmada 3 1 Ideal Lingsar Taman Lingsar 2 1 Conditional Narmada Suranadi 2 2 Ideal Sekotong Gili Nanggu 1 1 Conditional Sekotong Gili Gede 1 1 Conditional Sekotong Mekaki Bay 2 1 Conditional Sekotong Pantai Nambung 1 1 Conditional

Sekotong Bangko Bangko 2 2 Not Applicable

Lombok Tengah

Praya barat Pantai Selong Belanak 2 2 Ideal

Praya barat Pantai Mawi 1 2 Conditional Praya barat Pantai Mawun 1 1 Conditional

Praya barat Jogo Hills 1 1 Not Applicable

Praya Batujai 1 1 Conditional Pujut Pantai Lancing 1 2 Conditional

Pujut Are Guling 1 2 Not Applicable

Pujut Tanjung Aan 1 1 Conditional Pujut Bukit Merese 2 1 Conditional Pujut Desa Ende 2 1 Conditional Pujut Desa Sade 1 1 Conditional

Pujut Gerupuk/Batu Payung 3 1 Ideal

Pujut Sentra Perikanan Awang 1 1 Conditional

Batukliang Aik Berik 2 1 Conditional

Batukliang Benang Kelambu dan Benang Stokel

2 2 Ideal

Lombok Timur

Jerowaru Pink Beach (Tangsi) 3 1 Ideal

Jerowaru Pink Beach (Telone) 2 1 Conditional

Jerowaru Pantai Surga 2 2 Ideal

Sembalun Gunung Rinjani 1 2 Not Applicable

Sembalun Lembah Sembalun 3 2 Ideal

Pringgasela Tete Batu dan Otak kokok 3 1 Not

Applicable Sambelia Gili Sulat 3 2 Ideal Pringgaraya Gili Kondo 1 1 Conditional

Page 20: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

20

List of Map

Page 21: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

21

1. Figure 1 Natural Environmental Sensitivity Map

Page 22: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

22

2. Figure 2 Hydrology Sensitivity Map

Page 23: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

23

3. Figure 3 Slope Sensitivity Map

Page 24: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

24

4. Figure 4 Indigeneous People Location

Page 25: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

25

5. Figure 5 Cultural Heritage Location

Page 26: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

26

6. Figure 6 Suitability Mapping Results

Page 27: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

27

7. Figure 7 Suitability and Carrying Mapping Results

Page 28: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

28

8. Figure 8 Natural Hazard Map

Page 29: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

29

9. Figure 9 Suitability and Natural Hazard Mapping Results

Page 30: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

30

10. Figure 10 Poverty Map

Page 31: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

31

11. Figure 11 Communicable Diseases Prevalency Map

Page 32: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

32

12. Figure 12 Health Facilities Amount Map

Page 33: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

33

13. Figure 13 Vulnerability to Crime Map

Page 34: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

34

14. Figure 17 Existing Notable Tourism Area in Lombok Island

Page 35: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

35

15. Figure 18 Tourism Attraction/DTW Suitablity Mapping Assessment

Page 36: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

36

16. Figure 19 Key priority areas of ITMP Lombok

Page 37: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

37

17. Figure 20 Carrying Capacity assessments Map

Page 38: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

38

18. Figure 21 Hazard Assessment Map

Page 39: Baseline Analysis Reportp3tb.pu.go.id/uploads_file/20191231045417.20190712_BaselineAnal… · Baseline Analysis Report Integrated Tourism Master Plan for Lombok. Vol.4 - Appendix

39

19. Figure 22 Key priority areas of ITMP Lombok