Page 1
BACK UP DATA
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG INSTALASI UNIT GAWAT DARURAT (UGD)
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : UITSET DAN PASANGAN BOUWPLANK
VOLUME REALISASI : M1
MENGETAHUI,
RUMAH SAKIT UMUM DAERAH SABU
KABUPATEN SABU RAIJUA
PEJABAT PEMBUAT KOMITMEN
MERRY Ch. MORU, SST
Penata Muda III/B
Nip. 19741225 199803 2 001
Page 2
RUMAH SAKIT UMUM DAERAH (RSUD)
PEMBANGUNAN RUANG INSTALASI UNIT GAWAT DARURAT (UGD)
UITSET DAN PASANGAN BOUWPLANK
DI SETUJUI, DI BUAT OLEH,
KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
CV. PUTRA TIMOR RAYA CV. BAKU SARANA
(Perwakilan Sabu Raijua)
SILVESTER PRIMUS VELYKS DETHAN
Inspector Pelaksana
Page 3
DI BUAT OLEH,
KONTRAKTOR PELASANA
CV. BAKU SARANA
VELYKS DETHAN
MERRY Ch. MORU, SST
Penata Muda III/B
Nip. 19741225 199803 2 001
Page 4
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : UITSET DAN PASANGAN BOUWPLANK
VOLUME REALISASI : 135,70 M1
PANJANG LEBAR
(M) (M) (M1)
3 4 5=3+4
V = (2 x P + 2 X L) 43,85 24,00 135,70
Keterangan
V = Volume
P = Panjang
L = Lebar
J U M L A H 135,70
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 6
RUMUS
BACK UP DATA
DIMENSIVOLUME
SKETSA
Page 5
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : GALIAN PONDASI DAN GALIAN SALURAN KELILING BANGUNAN
VOLUME REALISASI : 414,00 M3
RUMUS :
V = L x l x H
Keterangan
V = Volume
L = Panjang
l = Lebar
H = Tinggi
PANJANG TINGGI LEBAR
(M) (M) (M) (M3)
1 3 4 5=3+4
1 GALIAN PONDASI JALUR 343,65 1,00 1,20 412,38
2 GALIAN PONDASI ROLAG 10,80 0,30 0,50 1,62
414,00
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 6
DIMENSI GALIAN
J U M L A H
BACK UP DATA
NO URAIAN PEKERJAAN GALIANVOLUME
SKETSA
Page 6
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : URUGAN TANAH BEKAS GALIAN
VOLUME REALISASI : 141,93 M3
RUMUS :
V = 2 sisi timbunan x A x L
A = 0.50 x (a + b) x H
Keterangan
V = Volume a = Lebar penampang atas urugan
A = Luas Penampang b = Lebar penampang Bawah urugan
L = Panjang
H = Tinggi
LUAS
LEBAR ATAS LEBAR BAWAH TINGGGI PANJANG PENAMPANG
(M) (M) (M) (M) (M2) (M
3)
1 3 4 5 6 7
URUGAN BEKAS GALIAN PONDSI MENERUS 0,39 0,20 0,70 343,65 0,21 141,93
141,93
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 8
J U M L A H
DIMENSI TIMBUNAN
BACK UP DATA
NO URAIAN URUGANVOLUME
SKETSA
Page 8
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : URUGAN PASIR BAWAH PONDASI
VOLUME REALISASI : 41,24 M3
RUMUS :
V = L x l x H
Keterangan
V = Volume
L = Panjang
H = Tinggi
l = Lebar
PANJANG LEBAR TINGGI
(M) (M) (M2) (M
3)
1 3 6 7 8
URUGAN PASIR BAWAH PONDASI 343,65 1,20 0,10 41,24
41,24
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 9
J U M L A H
DIMENSI URUNGAN PASIR
BACK UP DATA
NO URAIAN PEKERJAANVOLUME
SKETSA
Page 9
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : URUGAN TANAH PENINGGI PEIL LANTAI
VOLUME REALISASI : 104,92
RUMUS :
V = A Rata2 x H
A Rata2 = 0,50 x (A1 + A2)
Keterangan
V = Volume
A rata2 = Luasan rata-rata
A1 = Lasan sisi atas
A2 = Lusan sisi bawah
H = Tinggi
LUAS LUASAN LUASAN TINGGI
SISI ATAS SISI BAWAH RATA-RATA
(M2) (M2) (M2) (M1) (M3)
1 3 6 8
A 28,37 25,66 27,01 0,32 8,64
B 2,41 3,30 2,85 0,32 0,91
C 20,10 17,47 18,79 0,32 6,01
D 20,48 18,11 19,29 0,32 6,17
E 11,73 10,01 10,87 0,32 3,48
F 15,81 13,71 14,76 0,32 4,72
G 2,15 1,50 1,83 0,32 0,59
H 2,15 1,50 1,83 0,32 0,59
I 15,81 13,71 14,76 0,32 4,72
J 15,16 13,61 14,38 0,32 4,60
K 13,55 11,55 12,55 0,32 4,02
L 23,22 20,87 22,04 0,32 7,05
M 1,50 2,15 1,83 0,32 0,59
N 3,16 32,22 17,69 0,32 5,66
O 15,16 13,61 14,38 0,32 4,60
P 15,81 13,71 14,76 0,32 4,72
Q 2,15 1,50 1,83 0,32 0,59
R 2,15 1,50 1,83 0,32 0,59
S 15,81 13,71 14,76 0,32 4,72
T 2,15 1,50 1,83 0,32 0,58
U 35,12 32,22 33,67 0,32 10,77
V 12,57 11,04 11,80 0,32 3,78
W 35,12 32,22 33,67 0,32 10,77
X 2,15 1,50 1,83 0,32 0,59
Y 5,41 4,60 5,00 0,32 1,60
Z 12,81 11,25 12,03 0,32 3,85
104,92
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 9
J U M L A H
BACK UP DATA
NO KODE POSISI PENEMPATAN URUGANVOLUME
SKETSA
Page 10
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : URUGAN PASIR BAWAH LANTAI
VOLUME REALISASI : 63,32 M3
RUMUS :
V = A x H
Keterangan
V = Volume
A = Luasan
H = Tinggi
LUAS TINGGI VOLUME
URUGAN URUGAN URUGAN
(M2) (M1) (M3)
1 3 8
A 12,05 0,15 1,81
B 23,60 0,15 3,54
C 23,60 0,15 3,54
D 31,15 0,15 4,67
E 31,15 0,15 4,67
F 15,81 0,15 2,37
G 2,15 0,15 0,32
H 2,15 0,15 0,32
I 15,81 0,15 2,37
J 15,16 0,15 2,27
K 13,55 0,15 2,03
L 23,22 0,15 3,48
M 1,50 0,15 0,23
N 3,16 0,15 0,47
O 15,16 0,15 2,27
P 15,81 0,15 2,37
Q 2,15 0,15 0,32
R 2,15 0,15 0,32
S 15,81 0,15 2,37
T 2,15 0,15 0,32
U 35,12 0,15 5,27
V 12,57 0,15 1,89
W 35,12 0,15 5,27
X 2,15 0,15 0,32
Y 5,41 0,15 0,81
Z 12,81 0,15 1,92
SELASAR KELILING BANGUNAN 77,51 0,10 7,75
63,32
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
NO KODE POSISI PENEMPATAN URUGAN SKETSA
2 9
Page 11
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : PASANGAN BATU KOSONG
VOLUME REALISASI : 44,03 M3
RUMUS :
V = L x l x H
Keterangan
V = Volume
L = Panjang
l = Lebar
H = Tinggi
PANJANG LEBAR TINGGI
(M) (M) (M) (M3)
1 3 4 5 6
1 PASANGAN BATU KOSONG 220,16 1,00 0,20 44,03
44,03
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 6
J U M L A H
BACK UP DATA
NO URAIAN PEKERJAAN GALIAN
DIMENSI GALIANVOLUME
SKETSA
Page 13
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : PASANGA PONDASI BATU KARANG
VOLUME REALISASI : 266,32 M3
RUMUS :
V = A x L
A = 0.50 x (a + b) x H
Keterangan
V = Volume a = Lebar penampang atas urugan
A = Luas Penampang b = Lebar penampang Bawah urugan
L = Panjang
H = Tinggi
PANJANG LUAS
LEBAR ATAS LEBAR BAWAH TINGGGI PASANGAN PENAMPANG
(M) (M) (M) (M1) (M2) (M3)
1 3 4 5 6 7
1 PASANGAN PONDSI MENERUS 0,30 0,80 0,70 335,99 0,39 258,71
2 PASANGAN PONDASI ROLAK 0,30 0,30 0,50 7,50 0,15 2,25
3 PASANGAN TERAS 0,30 0,70 0,70 7,66 0,35 5,36
351,15 266,32
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 8
J U M L A H
BACK UP DATA
NO URAIAN PEKERJAAN PASANGAN PONDASIVOLUME
SKETSA
DIMENSI PASANGAN
Page 14
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : PASANGA DINDING BATAKO (1Pc : 5 Prs)
VOLUME REALISASI : 60,88
RUMUS :
V = A x T
A bersih = A pasangan - A lubang kusen
A pasangan = L x H
Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi bersi
T = Tebal bersi
PANJANG TINGGI LUAS LUAS LUAS LUAS LUAS TEBAL VOLUME
PASANGAN PASANGAN PASANGAN LUBANG LUBANG LUBANG BERSIH PASANGAN PASANGAN
TEMBOK TEMBOK TEMBOK KUSEN KUSEN KUSEN PASANGAN TEMBOK TEMBOK
(M) (M) (M2) (M
2) (M
2) (M
2) (M
2) (M) (M
3)
1 4 5
1 A 3,55 3,40 12,07 - 1,66 1,66 10,41 0,12 1,25
2 B 4,58 3,40 15,56 - 1,66 1,66 13,90 0,12 1,67
3 C 1,50 1,95 2,93 - 0,45 0,45 2,47 0,12 0,30
4 D 1,63 3,40 5,53 - 1,24 1,24 4,28 0,12 0,51
5 E 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
6 F 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
7 G 1,50 3,40 5,10 - 0,45 0,45 4,65 0,12 0,56
8 H 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
9 I 4,83 3,40 16,41 - 6,35 6,35 10,05 0,12 1,21
10 J 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
11 K 4,83 3,40 16,41 - 6,35 6,35 10,05 0,12 1,21
12 L 5,80 3,40 19,72 - - - 19,72 0,12 2,37
13 M 1,65 1,95 3,22 - - - 3,22 0,12 0,39
14 N 1,33 1,95 2,58 1,56 2,12 0,56 2,02 0,12 0,24
15 O 1,65 1,95 3,22 - - - 3,22 0,12 0,39
16 P 4,05 3,40 13,77 - - - 13,77 0,12 1,65
17 Q 6,28 3,40 21,34 0,88 7,60 6,72 14,61 0,12 1,75
18 R 1,65 1,95 3,22 - - - 3,22 0,12 0,39
19 S 1,65 1,95 3,22 - - - 3,22 0,12 0,39
20 T 1,33 1,95 2,58 1,56 2,12 0,56 2,02 0,12 0,24
21 U 4,05 3,40 13,77 - - - 13,77 0,12 1,65
22 V 6,30 3,40 21,42 0,88 9,95 9,07 12,35 0,12 1,48
23 W 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32
24 X 1,33 1,95 2,58 - - - 2,58 0,12 0,31
25 Y 4,05 3,40 13,77 - - - 13,77 0,12 1,65
26 Z 1,65 1,95 3,22 - - - 3,22 0,12 0,39
27 1 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32
28 2 1,33 1,95 2,58 - - - 2,58 0,12 0,31
29 3 1,33 3,40 4,51 - - - 4,51 0,12 0,54
30 4 2,10 1,95 4,10 - - - 4,10 0,12 0,49
31 5 2,10 3,40 7,14 - - - 7,14 0,12 0,86
32 6 3,15 3,40 10,71 0,48 4 3,86 6,85 0,12 0,82
33 7 2,10 1,95 4,10 - - - 4,10 0,12 0,49
34 8 1,50 1,95 2,93 1,56 2,12 0,56 2,36 0,12 0,28
35 9 5,30 3,40 18,02 0,88 6,01 5,13 12,89 0,12 1,55
36 10 0,85 3,40 2,89 - - - 2,89 0,12 0,35
37 11 3,63 3,40 12,33 0,88 4,35 3,47 8,85 0,12 1,06
38 12 5,30 3,40 18,02 0,88 6,01 5,13 12,89 0,12 1,55
39 13 0,85 3,40 2,89 - - - 2,89 0,12 0,35
40 14 3,55 3,40 12,07 - 1,66 1,66 10,41 0,12 1,25
41 15 4,58 3,40 15,56 - 1,66 1,66 13,90 0,12 1,67
BACK UP DATA
NO KODE PENEMPATAN PASANG TEMBOK SKETSA
2 8
Page 15
RUMUS :
V = A x T
A bersih = A pasangan - A lubang kusen
A pasangan = L x H
Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi bersi
T = Tebal bersi
PANJANG TINGGI LUAS LUAS LUAS LUAS LUAS TEBAL VOLUME
PASANGAN PASANGAN PASANGAN LUBANG LUBANG LUBANG BERSIH PASANGAN PASANGAN
TEMBOK TEMBOK TEMBOK KUSEN KUSEN KUSEN PASANGAN TEMBOK TEMBOK
(M) (M) (M2) (M
2) (M
2) (M
2) (M
2) (M) (M
3)
1 4 5
NO KODE PENEMPATAN PASANG TEMBOK SKETSA
2 8
42 16 1,50 1,95 2,93 - 0,45 0,45 2,47 0,12 0,30
43 17 2,10 1,95 4,10 - - - 4,10 0,12 0,49
44 18 1,50 1,95 2,93 1,56 2,12 0,56 2,36 0,12 0,28
45 19 2,10 3,40 7,14 - - - 7,14 0,12 0,86
46 20 2,10 1,95 4,10 - - - 4,10 0,12 0,49
47 21 1,33 3,40 4,51 - - - 4,51 0,12 0,54
48 22 6,30 3,40 21,42 - 3,32 3,32 18,10 0,12 2,17
49 23 6,38 3,40 21,68 0,48 6,35 5,86 15,81 0,12 1,90
50 24 6,38 3,40 21,68 0,48 4,34 3,86 17,82 0,12 2,14
51 25 3,15 3,40 10,71 0,48 3,52 3,03 7,68 0,12 0,92
52 26 3,15 3,40 10,71 0,48 3,52 3,03 7,68 0,12 0,92
53 27 6,28 3,40 21,34 0,88 7,60 6,72 14,61 0,12 1,75
54 28 5,80 3,40 19,72 - - - 19,72 0,12 2,37
55 29 4,83 3,40 16,41 - 6,35 6,35 10,05 0,12 1,21
56 30 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
57 31 1,50 3,40 5,10 - 0,45 0,45 4,65 0,12 0,56
58 32 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
59 33 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26
60 34 1,50 3,40 5,10 - 0,45 0,45 4,65 0,12 0,56
61 35 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32
62 36 1,65 1,95 3,22 - - - 3,22 0,12 0,39
63 37 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32
64 38 1,65 1,95 3,22 - - - 3,22 0,12 0,39
65 39 1,65 1,95 3,22 - - - 3,22 0,12 0,39
66 40 1,33 1,95 2,58 1,56 2,12 0,56 2,02 0,12 0,24
67 41 1,33 1,95 2,58 - - - 2,58 0,12 0,31
68 42 1,33 1,95 2,58 - - - 2,58 0,12 0,31
69 43 6,30 3,40 21,42 - - - 21,42 0,12 2,57
70 44 4,05 3,40 13,77 - - - 13,77 0,12 1,65
71 45 4,05 3,40 13,77 - - - 13,77 0,12 1,65
72 46 2,35 3,40 7,99 0,88 4,35 3,47 4,52 0,12 0,54
73 47 (KUDA-KUDA PAS. BATU) 3,17 - 3,17 0,12 0,38
507,35 60,88
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
Page 16
BACK UP DATA
SKETSA
8
Page 18
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : PASANGA DINDING TRASRAM (1Pc : 2 Prs)
VOLUME REALISASI : 18,25
RUMUS :
V = A x T
A bersih = A pasangan - A lubang kusen
A pasangan = L x H
Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi bersi
T = Tebal bersi
PANJANG TINGGI LUAS LUAS LUAS TEBAL VOLUME
PASANGAN PASANGAN PASANGAN LUBANG BERSIH PASANGAN PASANGAN
TEMBOK TEMBOK TEMBOK KUSEN PASANGAN TEMBOK TEMBOK
(M) (M) (M2) (M2) (M2) (M) (M3)
1 4 5
1 A 3,55 0,55 1,95 - 1,95 0,11 0,21
2 B 4,58 0,55 2,52 - 2,52 0,11 0,28
3 C 1,50 2,00 3,00 - 3,00 0,11 0,33
4 D 1,63 0,55 0,89 - 0,89 0,11 0,10
5 E 1,33 2,00 2,65 - 2,65 0,11 0,29
6 F 1,33 2,00 2,65 - 2,65 0,11 0,29
7 G 1,50 0,55 0,83 - 0,83 0,11 0,09
8 H 1,33 2,00 2,65 - 2,65 0,11 0,29
9 I 4,83 0,55 2,65 - 2,65 0,11 0,29
10 J 1,33 2,00 2,65 - 2,65 0,11 0,29
11 K 4,83 0,55 2,65 - 2,65 0,11 0,29
12 L 5,80 0,55 3,19 - 3,19 0,11 0,35
13 M 1,65 2,00 3,30 - 3,30 0,11 0,36
14 N 1,33 2,00 2,65 1,56 1,09 0,11 0,12
15 O 1,65 2,00 3,30 - 3,30 0,11 0,36
16 P 4,05 0,55 2,23 - 2,23 0,11 0,25
17 Q 6,28 0,55 3,45 0,88 2,57 0,11 0,28
18 R 1,65 2,00 3,30 - 3,30 0,11 0,36
19 S 1,65 2,00 3,30 - 3,30 0,11 0,36
20 T 1,33 2,00 2,65 1,56 1,09 0,11 0,12
21 U 4,05 0,55 2,23 - 2,23 0,11 0,25
22 V 6,30 0,55 3,47 0,88 2,59 0,11 0,28
23 W 1,65 2,00 3,30 1,56 1,74 0,11 0,19
24 X 1,33 2,00 2,65 - 2,65 0,11 0,29
25 Y 4,05 0,55 2,23 - 2,23 0,11 0,25
26 Z 1,65 2,00 3,30 - 3,30 0,11 0,36
27 1 1,65 2,00 3,30 1,56 1,74 0,11 0,19
28 2 1,33 2,00 2,65 - 2,65 0,11 0,29
29 3 1,33 0,55 0,73 - 0,73 0,11 0,08
30 4 2,10 2,00 4,20 - 4,20 0,11 0,46
31 5 2,10 0,55 1,16 - 1,16 0,11 0,13
32 6 3,15 0,55 1,73 0,48 1,25 0,11 0,14
33 7 2,10 2,00 4,20 - 4,20 0,11 0,46
34 8 1,50 2,00 3,00 1,56 1,44 0,11 0,16
35 9 5,30 0,55 2,92 0,88 2,04 0,11 0,22
36 10 0,85 0,55 0,47 - 0,47 0,11 0,05
37 11 3,63 0,55 1,99 0,88 1,11 0,11 0,12
38 12 5,30 0,55 2,92 0,88 2,04 0,11 0,22
39 13 0,85 0,55 0,47 - 0,47 0,11 0,05
40 14 3,55 0,55 1,95 - 1,95 0,11 0,21
41 15 4,58 0,55 2,52 - 2,52 0,11 0,28
42 16 1,50 2,00 3,00 - 3,00 0,11 0,33
BACK UP DATA
NO SKETSA
2 8
KODE PENEMPATAN PASANG TEMBOK
Page 19
RUMUS :
V = A x T
A bersih = A pasangan - A lubang kusen
A pasangan = L x H
Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi bersi
T = Tebal bersi
PANJANG TINGGI LUAS LUAS LUAS TEBAL VOLUME
PASANGAN PASANGAN PASANGAN LUBANG BERSIH PASANGAN PASANGAN
TEMBOK TEMBOK TEMBOK KUSEN PASANGAN TEMBOK TEMBOK
(M) (M) (M2) (M2) (M2) (M) (M3)
1 4 5
NO SKETSA
2 8
KODE PENEMPATAN PASANG TEMBOK
43 17 2,10 2,00 4,20 - 4,20 0,11 0,46
44 18 1,50 2,00 3,00 1,56 1,44 0,11 0,16
45 19 2,10 0,55 1,16 - 1,16 0,11 0,13
46 20 2,10 2,00 4,20 - 4,20 0,11 0,46
47 21 1,33 2,00 2,65 - 2,65 0,11 0,29
48 22 6,30 0,55 3,47 - 3,47 0,11 0,38
49 23 6,38 0,55 3,51 0,48 3,02 0,11 0,33
50 24 6,38 0,55 3,51 0,48 3,02 0,11 0,33
51 25 3,15 0,55 1,73 0,48 1,25 0,11 0,14
52 26 3,15 0,55 1,73 0,48 1,25 0,11 0,14
53 27 6,28 0,55 3,45 0,88 2,57 0,11 0,28
54 28 5,80 0,55 3,19 - 3,19 0,11 0,35
55 29 4,83 0,55 2,65 - 2,65 0,11 0,29
56 30 1,33 2,00 2,65 - 2,65 0,11 0,29
57 31 1,50 0,55 0,83 - 0,83 0,11 0,09
58 32 1,33 2,00 2,65 - 2,65 0,11 0,29
59 33 1,33 2,00 2,65 - 2,65 0,11 0,29
60 34 1,50 0,55 0,83 - 0,83 0,11 0,09
61 35 1,65 2,00 3,30 1,56 1,74 0,11 0,19
62 36 1,65 2,00 3,30 - 3,30 0,11 0,36
63 37 1,65 2,00 3,30 1,56 1,74 0,11 0,19
64 38 1,65 2,00 3,30 - 3,30 0,11 0,36
65 39 1,65 2,00 3,30 - 3,30 0,11 0,36
66 40 1,33 2,00 2,65 1,56 1,09 0,11 0,12
67 41 1,33 2,00 2,65 - 2,65 0,11 0,29
68 42 1,33 2,00 2,65 - 2,65 0,11 0,29
69 43 6,30 0,55 3,47 - 3,47 0,11 0,38
70 44 4,05 0,55 2,23 - 2,23 0,11 0,25
71 45 4,05 0,55 2,23 - 2,23 0,11 0,25
72 46 2,35 0,55 1,29 0,88 0,41 0,11 0,05
18,25
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
(Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
Page 20
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : SALURAN KELILING BANGUNAN (1Pc : 2 Prs)
VOLUME REALISASI : 12,92 M3
V = A x L
A = A1 + A2 + A3
A1 = H1 x TI
A2 = H2 x T2
A3 = H3 x T3
Keterangan
V = Volume
L = Panjang saluran
A = Jumlah luas penampang
A1 = Luas penampang 1
A2 = Luas penampang 2
A3 = Luas penampang 3
H1 = Tinggi penampang 1
H2 = Tinggi penampang 2
H3 = Tinggi penampang 3
T1 = Tebal penampang 1
T2 = Tebal penampang 2
T3 = Tebal penampang 3
PANJANG LUAS LUAS LUAS LUAS VOLUME
SALURAN TINGGI TEBAL TINGGI TEBAL TINGGI TEBAL PENAMPANG PENAMPANG PENAMPANG PENAMPANG PASANGAN
KESELURUAN PENAMPANG PENAMPANG PENAMPANG PENAMPANG PENAMPANG PENAMPANG 1 2 3 TOTAL SALURAN
(M) (M) (M) (M) (M) (M) (M) (M2) (M2) (M2) (M2) (M3)
4 5
SALURAN KELILING BANGUNAN (1Pc : 2 Prs) 86,10 0,45 0,10 0,10 0,30 0,50 0,15 0,05 0,03 0,08 0,15 12,92
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA
2
URAIAN PEKERJAAN
DIMENSI PENAMPANG 1 DIMENSI PENAMPANG 2 DIMENSI PENAMPANG 3
RUMUS SKETSA
Page 21
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : PLESTERAN DINDING TRASRAM (1Pc : 2 Prs)
VOLUME REALISASI : 40,98 M2
RUMUS :
V = A. plesteran - A. Lubang Kusen
A plesteran = L x H
Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi
PANJANG TINGGI LUAS LUAS VOLUME
PLESTERAN PLESTERAN PLESTERAN LUBANG PLESTERAN
TEMBOK TEMBOK TEMBOK KUSEN TEMBOK
(M) (M) (M2) (M
2) (M
2)
1 4 5
1 A 3,75 0,55 2,06 - 2,06
2 B 6,60 0,55 3,63 - 3,63
3 C 1,50 0,55 0,83 - 0,83
4 D 1,80 0,55 0,99 - 0,99
5 E 1,50 0,55 0,83 - 0,83
6 F 1,50 0,55 0,83 - 0,83
7 G 1,80 0,55 0,99 - 0,99
8 H 1,50 0,55 0,83 - 0,83
9 I 5,10 0,55 2,81 - 2,81
10 J 1,50 0,55 0,83 - 0,83
11 K 5,10 0,55 2,81 - 2,81
12 L 5,80 0,55 3,19 - 3,19
13 10 1,00 0,55 0,55 - 0,55
14 11 4,00 0,55 2,20 0,88 1,32
15 13 1,00 0,55 0,55 - 0,55
16 14 3,55 0,55 1,95 - 1,95
17 15 6,60 0,55 3,63 - 3,63
18 16 1,50 0,55 0,83 - 0,83
19 21 1,50 0,55 0,83 - 0,83
20 28 6,00 0,55 3,30 - 3,30
21 29 5,10 0,55 2,81 - 2,81
22 30 1,50 0,55 0,83 - 0,83
23 31 1,50 0,55 0,83 - 0,83
24 32 1,50 0,55 0,83 - 0,83
25 33 1,50 0,55 0,83 - 0,83
26 34 1,50 0,55 0,83 - 0,83
26 46 2,50 0,55 1,38 0,88 0,50
40,98
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
NO KODE PENEMPATAN PLESTERAN TEMBOK SKETSA
2 8
Page 22
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : PASANGA DINDING BIASA (1Pc : 5 Prs)
VOLUME REALISASI : 913,95 M2
RUMUS :
V = A. plesteran - A. Lubang Kusen
A plesteran = L x H
Keterangan :
V = Volume
A = Luas
L = Panjang
H = Tinggi
PANJANG TINGGI LUAS LUAS VOLUME
PLESTERAN PLESTERAN PLESTERAN LUBANG PLESTERAN
TEMBOK TEMBOK TEMBOK KUSEN TEMBOK
(M) (M) (M2) (M2) (M2)
1 3 4 5 6 7
1 A 3,75 5,64 21,15 1,66 19,49
2 B 6,60 5,64 37,22 1,66 35,57
3 C 1,50 5,64 8,46 0,45 8,01
4 D 1,80 5,64 10,15 2,01 8,15
5 E 1,50 5,64 8,46 0,45 8,01
6 F 1,50 5,64 8,46 0,45 8,01
7 G 1,80 5,64 10,15 2,01 8,15
8 H 1,50 5,64 8,46 0,45 8,01
9 I 5,10 5,64 28,76 6,35 22,41
10 J 1,50 5,64 8,46 0,45 8,01
11 K 5,10 5,64 28,76 6,35 22,41
12 L 5,80 5,64 32,71 - 32,71
13 M 1,80 4,35 7,83 - 7,83
14 N 1,50 4,35 6,53 2,12 4,40
15 O 1,80 4,35 7,83 - 7,83
16 P 4,20 4,38 18,40 - 18,40
17 Q 6,60 4,38 28,91 7,60 21,30
18 R 1,80 4,35 7,83 - 7,83
19 S 1,80 4,35 7,83 - 7,83
20 T 1,50 4,35 6,53 2,12 4,40
21 U 4,20 4,38 18,40 - 18,40
22 V 6,60 4,38 28,91 9,95 18,96
23 W 1,80 4,35 7,83 2,12 5,71
24 X 1,50 4,35 6,53 - 6,53
25 Y 4,20 4,38 18,40 - 18,40
26 Z 1,80 4,32 7,78 - 7,78
27 1 1,80 4,35 7,83 2,12 5,71
28 2 1,50 4,35 6,53 - 6,53
29 3 1,50 4,38 6,57 - 6,57
30 4 2,25 4,35 9,79 - 9,79
31 5 2,25 4,38 9,86 - 9,86
32 6 3,30 4,38 14,45 4 10,11
33 7 2,25 4,35 9,79 - 9,79
34 8 1,65 4,35 7,18 2,12 5,06
35 9 5,60 4,38 24,53 6,01 18,52
36 10 1,00 5,64 5,64 - 5,64
37 11 4,00 5,64 22,56 3,47 19,09
38 12 5,60 4,38 24,53 6,01 18,52
39 13 1,00 4,38 4,38 - 4,38
BACK UP DATA
NO KODE PENEMPATAN PLESTERAN TEMBOK SKETSA
2 8
Page 23
RUMUS :
V = A. plesteran - A. Lubang Kusen
A plesteran = L x H
Keterangan :
V = Volume
A = Luas
L = Panjang
H = Tinggi
PANJANG TINGGI LUAS LUAS VOLUME
PLESTERAN PLESTERAN PLESTERAN LUBANG PLESTERAN
TEMBOK TEMBOK TEMBOK KUSEN TEMBOK
(M) (M) (M2) (M2) (M2)
1 3 4 5 6 7
NO KODE PENEMPATAN PLESTERAN TEMBOK SKETSA
2 8
40 14 3,55 5,64 20,02 1,66 18,36
41 15 6,60 4,38 28,91 1,66 27,25
42 16 1,50 4,38 6,57 0,45 6,12
43 17 2,25 4,35 9,79 - 9,79
44 18 1,65 4,35 7,18 2,12 5,06
45 19 2,25 4,38 9,86 - 9,86
46 20 2,25 4,35 9,79 - 9,79
47 21 1,50 5,64 8,46 - 8,46
48 22 6,60 5,64 37,22 3,32 33,91
49 23 6,60 4,38 28,91 6,35 22,56
50 24 6,60 4,38 28,91 4,34 24,57
51 25 3,30 4,38 14,45 3,52 10,94
52 26 3,30 4,38 14,45 3,52 10,94
53 27 6,60 4,38 28,91 7,60 21,30
54 28 6,00 5,64 33,84 - 33,84
55 29 5,10 5,64 28,76 6,35 22,41
56 30 1,50 5,64 8,46 0,45 8,01
57 31 1,50 5,64 8,46 0,45 8,01
58 32 1,50 5,64 8,46 0,45 8,01
59 33 1,50 5,64 8,46 0,45 8,01
60 34 1,50 5,64 8,46 0,45 8,01
61 35 1,80 4,35 7,83 2,12 5,71
62 36 1,80 4,32 7,78 - 7,78
63 37 1,80 4,35 7,83 2,12 5,71
64 38 1,80 4,35 7,83 - 7,83
65 39 1,80 4,35 7,83 - 7,83
66 40 1,50 4,35 6,53 2,12 4,40
67 41 1,33 4,35 5,76 - 5,76
68 42 1,50 4,35 6,53 - 6,53
69 43 6,60 4,38 28,91 - 28,91
70 44 4,20 4,38 18,40 - 18,40
71 45 4,20 4,38 18,40 - 18,40
72 46 2,50 4,38 10,95 3,47 7,48
913,95
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
Page 24
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : PLESTERAN PONDASI ( 1PC : 5PSR)
VOLUME REALISASI : 28,79 M2
PANJANG PANJANG PANJANG JUMLAH LUAS
PONDASI BIDANG BIDANG PANJANG PENAMPANG
KESELURUAN PLEST. 1 PLEST. 2 PLESTERAN TOTAL
(M) (M) (M) (M) (M2)
2 3 4 5 6
76,76 0,30 0,08 0,38 28,79
V = H x L
H = H1 +H2
Keterangan
V = Volume
L = Panjang plesteran pondasi
H = Jumlah panjang bidang vertikal
H1 = Panjang bidang vertikal 1
H2 = Panjang bidang vertikal 2
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA
RUMUS KETERANGAN
71
SKETSA
Page 25
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : ACIAN PONDASI
VOLUME REALISASI : 28,79 M2
PANJANG PANJANG PANJANG JUMLAH LUAS
PONDASI BIDANG BIDANG PANJANG PENAMPANG
KESELURUAN PLEST. 1 PLEST. 2 PLESTERAN TOTAL
(M) (M) (M) (M) (M2)
2 3 4 5 6
76,76 0,30 0,08 0,38 28,79
V = H x L
H = H1 +H2
Keterangan
V = Volume
L = Panjang acian pondasi
H = Jumlah panjang bidang vertikal
H1 = Panjang bidang vertikal 1
H2 = Panjang bidang vertikal 2
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
BACK UP DATA
SKETSA
RUMUS KETERANGAN
1 7
Page 26
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : ACIAN DINDING
VOLUME REALISASI : 954,93 M2
VOLUME VOLUME VOLUME
PLESTRAN PLESTRAN ACIAN
TRASRAM BIASA DINDING
(M) (M) (M2)
1 4 5
1 V = 40,98 913,95 954,93
2
3
4
5
6
7
8
9
10
11
12
58
59
60
61
62
63
64
65
66
67
68
69
72
954,93
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
NO RUMUS SKETSA
2 8
VOLUME PLESTERAN DIDING TRASRAM + VOLUME
PLESTERRAN DINDING BIASA
Page 27
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : SLOOF 20/25
VOLUME REALISASI : 17,56 M3
PANJANG VOLUME
SLOOF TINGGI LEBAR BETON
SLOOF SLOOF SLOOF
(M) (M) (M) (M3)
4 5 6 7
V = L x H x L 351,15 0,25 0,20 17,56
Keterangan
V = Volume
L = Panjang
H Tinggi Penampang
L = Lebar Penampang
17,56
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
DIMENSI SLOOF
BACK UP DATA
RUMUS POTONGAN PENAMPANG
2 8
SKETSA
Page 28
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : KOLOM PRAKTIS 15/15
VOLUME REALISASI : 4,86 M3
JUMLAH PANJANG VOLUME
KOLOM KOLOM TINGGI LEBAR BETON
PRAKTIS PRAKTIS KOLOM KOLOM KOLOM
(BUAH) (M) (M) (M) (M3)
4 5 6 7 8
V = Jumlah kolom x L x H x L 52 4,15 0,15 0,15 4,86
Keterangan
V = Volume
L = Panjang
H Tinggi Penampang
l = Lebar Penampang
4,86
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
RUMUS
DIMENSI KOLOM
POTONGAN PENAMPANG
2 9
SKETSA
Page 29
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : KOLOM STRUKTUR 20/25
VOLUME REALISASI : 4,57 M3
JUMLAH PANJANG VOLUME
KOLOM KOLOM TINGGI LEBAR BETON
STRUKTUR STRUKTUR KOLOM KOLOM KOLOM
(BUAH) (M) (M) (M) (M3)
4 5 6 7 8
V = Jumlah kolom x L x H x L 22 4,15 0,25 0,20 4,57
Keterangan
V = Volume
L = Panjang
H Tinggi Penampang
l = Lebar Penampang
4,57
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
RUMUS
DIMENSI KOLOM
POTONGAN PENAMPANG
2 9
SKETSA
Page 30
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : KOLOM BULAT DIA. 25 CM
VOLUME REALISASI : 0,41 M3
JUMLAH PANJANG DIAMETER LUAS VOLUME
KOLOM KOLOM KOLOM PENAMPANG BETON
BULAT BULAT BULAT KOLOM KOLOM
(BUAH) (M) (M) (M2) (M3)
4 5 6 8
V = Jumlah kolom x L x A 2,00 4,15 0,25 0,05 0,41
A = 1/4 x 22/7 x D2
Keterangan
V = Volume
A = Luas
L = Panjang
D = Diameter
0,41
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
RUMUS POTONGAN PENAMPANG
2 9
SKETSA
Page 31
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : RINGBALOK 15/20
VOLUME REALISASI : 10,53 M3
PANJANG VOLUME
RINGBALOK TINGGI LEBAR BETON
RINGBALOK RINGBALOK RINGBALOK
(M) (M) (M) (M3)
4 5 6 7
V = L x H x L 351,15 0,20 0,15 10,53
Keterangan
V = Volume
L = Panjang
H Tinggi Penampang
L = Lebar Penampang
10,53
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
RUMUS
DIMENSI SLOOF
SKETSA PENAMPANG
2 8
SKETSA
Page 32
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : BALOK LATAI 10/15
VOLUME REALISASI : 5,27 M3
PANJANG VOLUME
BALOK TINGGI LEBAR BETON
LATAI BALOK BALOK BALOK
(M) (M) (M) (M3)
4 5 6 7
V = L x H x L 351,15 0,10 0,15 5,27
Keterangan
V = Volume
L = Panjang
H Tinggi Penampang
L = Lebar Penampang
5,27
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
RUMUS
DIMENSI SLOOF
SKETSA PENAMPANG
2 8
SKETSA
Page 33
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : LANTAI RABAT BETON CAMPURAN 1Pc : 3Psr : 5Krl
VOLUME REALISASI : 7,29 M3
RUMUS :
V A x T
A L x l
Keterangan
V = Volume L Panjang
A = Luasan l Lebar
T = Tebal
PANJANG LEBAR LUAS TEBAL VOLUME
RABAT RABAT RABAT RABAT RABAT
(M) (M) (M2) (M) (M3)
3 4 5 6 7
A 4,73 0,98 4,61 0,10 0,46
B 5,63 0,98 5,48 0,10 0,55
C 2,48 0,98 2,41 0,10 0,24
D 19,95 0,98 19,45 0,10 1,95
E 6,98 0,98 6,80 0,10 0,68
F 6,98 0,98 6,80 0,10 0,68
G 19,95 0,98 19,45 0,10 1,95
H 2,48 0,98 2,41 0,10 0,24
I 5,63 0,98 5,48 0,10 0,55
J 4,73 0,98 4,61 0,10 0,46
7,29
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
KODE POSISI PENEMPATAN RABAT BETON SKETSA
2 8
Page 34
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : LANTAI TEGEL KERAMIK UKURAN 20 x 20
VOLUME REALISASI : 21,37 M2
VOLUME
NO KERAMIK
(M2)
1 3
1 KM/WC RUANG BERSALIN 1 3,15
2 KM/WC RUANG BERSALIN 2 3,15
3 KM/WC RUANG DOKTER 2,15
4 KM/WC RUANG ADMINISTRASI 2,15
5 KM/WC RUANG RAWAT INAP 1 2,15
6 KM/WC RUANG RAWAT INAP 2 2,15
7 KM/WC RUANG RAWAT INAP 3 2,15
8 KM/WC RUANG ISOLASI 1 2,15
9 2,15
21,37
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
NAMA RUANGAN
2
KM/WC RUANG ISOLASI 2
BACK UP DATA
SKETSA
6
Page 35
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : LANTAI TEGEL KERAMIK KM/WC UKURAN 30 x 30
VOLUME REALISASI : 327,82 M2
VOLUME
NO KERAMIK
(M2)
1 3
1 TERAS 13,12
2 RUANG BERSALIN 1 23,60
3 RUANG BERSALIN 1 23,60
4 CORIDOR 56,75
5 RUANG DOKTER 15,81
6 RUANG ADMINISTRASI 15,81
7 RUANG RAWAT INAP 1 35,12
8 RUANG RAWAT INAP 2 35,12
9 TERAS 5,41
10 RUANG RAWAT INAP 2 35,12
11 RUANG ISOLASI 1 15,81
12 RUANG ISOLASI 2 15,81
13 RUANG NEONATUS 23,22
14 NURSE STATION 13,55
327,82
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
NAMA RUANGAN SKETSA
2 6
Page 36
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : DINDING KERAMIK 20/25 CM
VOLUME REALISASI : 505,66 M2
RUMUS :
V = A pas. Keramik - A lubang kusen
A pas.keramik = L x H
Keterangan
V = Volume
A = Luas
L = Panjang
H = Tinggi
PANJANG TINGGI LUAS LUAS VOLUME
NO PASANGAN PASANGAN PASANGAN LUBANG PASANGAN
KERAMIK KERAMIK KERAMIK KUSEN KERAMIK
(M) (M) (M2) (M
2) (M
2)
1 3 4 5 6 7
1 RUANG BERSALIN 1 21,60 1,81 39,10 4,31 34,79
2 KM/WC RUANG BERSALIN 1 7,20 1,84 13,25 1,44 11,81
3 RUANG DOKTER 18,00 1,81 32,58 4,59 27,99
4 KM/WC RUANG DOKTER 5,89 1,84 10,84 1,44 9,40
5 RUANG ADMINISTRASI 15,15 1,81 27,42 2,22 25,20
6 KM/WC RUANG ADMINISTRASI 5,89 1,84 10,84 1,44 9,40
7 RUANG RAWAT INAP 1 24,60 1,81 44,53 9,05 35,47
8 KM/WC RUANG RAWAT INAP 1 5,89 1,84 10,84 1,44 9,40
9 RUANG RAWAT INAP 2 24,60 1,81 44,53 8,11 36,41
10 KM/WC RUANG RAWAT INAP 2 5,89 1,84 10,84 1,44 9,40
11 CORIDOR 53,00 1,81 95,93 29,73 66,20
12 RUANG RAWAT INAP 3 24,60 1,84 45,26 8,19 37,08
13 KM/WC RUANG RAWAT INAP 3 5,89 1,81 10,66 1,41 9,25
14 RUANG ISOLASI 1 18,00 1,84 33,12 4,64 28,48
15 KM/WC RUANG ISOLASI 1 5,89 1,81 10,66 1,41 9,25
16 RUANG ISOLASI 2 18,00 1,84 33,12 4,64 28,48
17 KM/WC RUANG ISOLASI 2 5,89 1,81 10,66 1,41 9,25
18 RUANG NEONATUS 20,10 1,81 36,38 3,18 33,20
19 NURSE STATION 17,10 1,81 30,95 2,37 28,58
20 RUANG BERSALIN 2 21,60 1,81 39,10 4,31 34,79
21 KM/WC RUANG BERSALIN 2 7,20 1,84 13,25 1,44 11,81
505,66
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
NAMA RUANGAN SKETSA
2 8
Page 37
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : KUSEN ALUMUNIUM
VOLUME REALISASI : 515,80 M1
RUMUS :
V = = L x JUMLAH KUSEN
Keterangan :
L = Panjang
PANJANG JUMLAH VOLUME
KUSEN KUSEN KUSEN
(M) (BUAH) (M1)
1 3 4
1 P1 10,74 2 21,48
2 P2 10,74 2 21,48
3 P3 7,70 9 69,3
4 PJ1 15,26 3 45,78
5 PJ2 16,16 2 32,32
6 PJ3 16,16 2 32,32
7 PJ4 12,18 1 12,18
8 PJ5 12,18 1 12,18
9 J1 17,52 4 70,08
10 J2 9,84 10 98,4
11 BV1 8,04 8 64,32
12 BV2 4,38 2 8,76
13 BV3 2,72 10 27,20
515,80
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
NO SKETSA
5
TYPE
KUSEN
2
Page 38
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : DAUN JENDELA+BOVEN PANEL KACA
VOLUME REALISASI : 66,49 M2
RUMUS :
V = = A x JUMLAH DAUN JENDELA & BOVEN x JUMLAH KUSEN
A = L x l
Keterangan :
A = Luasan
L = Panjang
l = Lebar
LUAS JUMLAH JUMLAH VOLUME
PANJANG LEBAR DAUN DAUN KUSEN KUSEN
(M) (M) (M2) (BUAH) (BUAH) (M2)
1 3 4
1 P1 0,75 0,50 0,38 2 2 1,50
2,10 0,76 1,60 2 2 6,38
2 P2 0,75 0,50 0,38 2 2 1,50
3 P3 0,70 0,50 0,35 1 9 3,15
4 PJ1 0,74 0,86 0,64 2 3 3,82
0,74 0,50 0,37 3 3 3,33
5 PJ2 0,60 0,86 0,52 2 1 1,03
0,60 0,50 0,30 2 1 0,60
0,80 0,50 0,40 1 1 0,40
6 PJ3 0,60 0,86 0,52 2 2 2,06
0,60 0,50 0,30 2 2 1,20
0,80 0,50 0,40 1 2 0,80
7 PJ4 0,70 0,86 0,60 1 1 0,60
0,70 0,50 0,35 1 1 0,35
0,80 0,50 0,40 1 1 0,40
8 PJ5 0,70 0,86 0,60 1 1 0,60
0,70 0,50 0,35 1 1 0,35
0,80 0,50 0,40 1 1 0,40
9 J1 0,90 0,86 0,77 2 4 6,19
0,90 0,50 0,45 2 4 3,60
10 J2 0,60 0,86 0,52 2 10 10,32
0,60 0,50 0,30 2 10 6,00
11 BV1 0,90 0,50 0,45 2 8 7,20
12 BV2 0,60 0,50 0,30 2 2 1,20
13 BV3 0,70 0,50 0,35 1 10 3,50
66,49
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
DIMENSI
BACK UP DATA
NO
TYPE
SKETSAKUSEN
2 5
Page 39
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : PASANG JENDELA, BOVEN KACA MATI
VOLUME REALISASI : 8,50 M2
RUMUS :
V = = A x JUMLAH JENDELA & BOVEN KACA MATI x JUMLAH KUSEN
A = L x l
Keterangan :
A = Luasan
L = Panjang
l = Lebar
LUAS JUMLAH JUMLAH VOLUME
PANJANG LEBAR DAUN DAUN KUSEN KUSEN
(M) (M) (M2) (BUAH) (BUAH) (M2)
1 3 4
9 J1 0,90 0,86 0,77 1 4 3,10
0,90 0,50 0,45 1 4 1,80
11 BV1 0,90 0,50 0,45 1 8 3,60
8,50
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 5
J U M L A H
BACK UP DATA
NO
TYPE DIMENSI
SKETSAKUSEN
Page 40
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : PASANG KACA PADA PINTU ALUMUNIUM
VOLUME REALISASI : 1,60 M2
RUMUS :
V = = A x JUMLAH DAUN PINTU x JUMLAH KUSEN
A = L x l
Keterangan :
A = Luasan
L = Panjang
l = Lebar
LUAS JUMLAH JUMLAH VOLUME
PANJANG LEBAR DAUN DAUN KUSEN KUSEN
(M) (M) (M2) (BUAH) (BUAH) (M2)
1 3 4
1 P2 0,76 0,15 0,11 2 2 0,46
2 PJ1 0,76 0,15 0,11 2 3 0,68
3 PJ2 0,76 0,15 0,11 1 1 0,11
4 PJ3 0,76 0,15 0,11 1 1 0,11
5 PJ4 0,76 0,15 0,11 1 1 0,11
6 PJ5 0,76 0,15 0,11 1 1 0,11
1,60
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 5
J U M L A H
BACK UP DATA
NO
TYPE DIMENSI
SKETSAKUSEN
Page 41
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : DAUN PINTU ALUMUNIUM
VOLUME REALISASI : 24,36 M2
RUMUS :
V = = A x JUMLAH DAUN PINTU x JUMLAH KUSEN
A = L x l
Keterangan :
A = Luasan
L = Panjang
l = Lebar
LUAS JUMLAH JUMLAH VOLUME
PANJANG LEBAR DAUN DAUN KUSEN KUSEN
(M) (M) (M2) (BUAH) (BUAH) (M2)
1 3 4
1 P2 2,10 0,76 1,60 2 2 6,38
2 PJ1 2,10 1,52 3,19 1 3 9,58
3 PJ2 2,10 0,80 1,68 1 1 1,68
4 PJ3 2,10 0,80 1,68 1 2 3,36
5 PJ4 2,10 0,80 1,68 1 1 1,68
6 PJ5 2,10 0,80 1,68 1 1 1,68
24,36
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 5
J U M L A H
BACK UP DATA
NO
TYPE DIMENSI
SKETSAKUSEN
Page 42
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : DAUN PINTU KM/WC
VOLUME REALISASI : 13,23 M2
RUMUS :
V = = A x JUMLAH DAUN PINTU x JUMLAH KUSEN
A = L x l
Keterangan :
A = Luasan
L = Panjang
l = Lebar
LUAS JUMLAH JUMLAH VOLUME
PANJANG LEBAR DAUN DAUN KUSEN KUSEN
(M) (M) (M2) (BUAH) (BUAH) (M2)
1 3 4
1 P3 2,10 0,70 1,47 1 9 13,23
13,23
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 5
J U M L A H
BACK UP DATA
NO
TYPE DIMENSI
SKETSAKUSEN
Page 43
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : RANGKA ATAP
VOLUME REALISASI : 552,52 M2
RUMUS :
V = 0,50 x (a + b) x H
Keterangan :
V = Volume
a = Panjang sisi atas
b = Panjang sisi bawah
H = Tinggi
TINGGI VOLUME
ATAS BAWAH
(M) (M) (M2) (M2)
1 3
1 PIAS A 5,30 22,20 9,75 134,06
2 PIAS B 5,30 22,20 9,75 134,06
3 PIAS C 16,90 0,00 9,75 82,39
4 PIAS D 12,91 10,61 1,00 11,76
5 PIAS E 12,91 10,61 1,00 11,76
6 PIAS F 10,61 10,61 4,88 51,78
7 PIAS G 10,61 10,61 4,88 51,78
8 PIAS H 10,61 4,88 2,70 20,91
9 PIAS I 6,40 4,88 2,70 15,23
10 PIAS J 5,48 2,28 5,00 19,40
11 PIAS K 5,48 2,28 5,00 19,40
552,52
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 5
J U M L A H
ATAP
BACK UP DATA
NO
KODE PANJANG SISI
SKETSAPIAS
Page 44
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : ATAP GENTENG METAL ROOF 0,30
VOLUME REALISASI : 552,52 M2
RUMUS :
V = 0,50 x (a + b) x H
Keterangan :
V = Volume
a = Panjang sisi atas
b = Panjang sisi bawah
H = Tinggi
TINGGI VOLUME
ATAS BAWAH
(M) (M) (M2) (M2)
1 3
1 PIAS A 5,30 22,20 9,75 134,06
2 PIAS B 5,30 22,20 9,75 134,06
3 PIAS C 16,90 0,00 9,75 82,39
4 PIAS D 12,91 10,61 1,00 11,76
5 PIAS E 12,91 10,61 1,00 11,76
6 PIAS F 10,61 10,61 4,88 51,78
7 PIAS G 10,61 10,61 4,88 51,78
8 PIAS H 10,61 4,88 2,70 20,91
9 PIAS I 6,40 4,88 2,70 15,23
10 PIAS J 5,48 2,28 5,00 19,40
11 PIAS K 5,48 2,28 5,00 19,40
552,52
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
(Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 5
J U M L A H
BACK UP DATA
NO
KODE PANJANG SISI
SKETSAPIAS
ATAP
Page 45
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : BUBUNG METAL ROOF 0,30
VOLUME REALISASI : 83,66 M1
VOLUME
(M1)
1
1 BUBUNGAN A 12,98
2 BUBUNGAN B 12,98
3 BUBUNGAN C 5,30
4 BUBUNGAN D 12,98
5 BUBUNGAN E 12,98
6 BUBUNGAN F 10,35
7 BUBUNGAN G 5,31
8 BUBUNGAN H 5,31
9 BUBUNGAN I 5,48
83,66
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
(Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 5
J U M L A H
BACK UP DATA
NO
KODE
SKETSABUBUNGAN
ATAP
Page 46
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : LISTPLANK PAPAN KELAS 2 UKURAN 2 X 2,50/30
VOLUME REALISASI : 108,72 M1
VOLUME
(M1)
1
1 LISTPLANK A 16,90
2 LISTPLANK B 22,20
3 LISTPLANK C 1,50
4 LISTPLANK D 6,60
5 LISTPLANK E 3,75
6 LISTPLANK F 1,83
7 LISTPLANK G 9,24
8 LISTPLANK H 1,83
9 LISTPLANK I 3,75
10 LISTPLANK J 6,60
11 LISTPLANK K 1,50
12 LISTPLANK L 22,20
13 LISTPLANK M 10,82
14
15
108,72
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 5
J U M L A H
BACK UP DATA
NO
KODE
SKETSALISTPLANK
ATAP
Page 47
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : PLAFOND TRIPLEKS 3 MM DAN RANGKA
VOLUME REALISASI : 469,05 M2
VOLUME
NO PLAFOND
(M2)
1 3
1 RUANG BERSALIN 1 23,60
2 KM/WC RUANG BERSALIN 1 3,15
3 RUANG DOKTER 15,81
4 KM/WC RUANG DOKTER 2,15
5 RUANG ADMINISTRASI 15,81
6 KM/WC RUANG ADMINISTRASI 2,15
7 RUANG RAWAT INAP 1 35,12
8 KM/WC RUANG RAWAT INAP 1 2,15
9 RUANG RAWAT INAP 2 35,12
10 KM/WC RUANG RAWAT INAP 2 2,15
11 CORIDOR 56,75
12 RUANG RAWAT INAP 3 35,12
13 KM/WC RUANG RAWAT INAP 3 2,15
14 RUANG ISOLASI 1 15,81
15 KM/WC RUANG ISOLASI 1 2,15
16 RUANG ISOLASI 2 15,81
17 KM/WC RUANG ISOLASI 2 2,15
18 RUANG NEONATUS 23,22
19 NURSE STATION 13,55
20 RUANG BERSALIN 2 23,60
21 KM/WC RUANG BERSALIN 2 3,15
22 TERAS DEPAN 12,51
23 TERAS BELAKANG 5,40
24 SELASAR KELILING GEDUNG 120,48
469,05
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
NAMA RUANGAN SKETSA
2 6
Page 48
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : LIST KAYU PROFIL
VOLUME REALISASI : 434,44 M2
PANJANG
NO LIST
PLAFOND
(M)
1 3
1 RUANG BERSALIN 1 21,60
2 KM/WC RUANG BERSALIN 1 7,20
3 RUANG DOKTER 18,00
4 KM/WC RUANG DOKTER 5,89
5 RUANG ADMINISTRASI 15,15
6 KM/WC RUANG ADMINISTRASI 5,89
7 RUANG RAWAT INAP 1 24,60
8 KM/WC RUANG RAWAT INAP 1 5,89
9 RUANG RAWAT INAP 2 24,60
10 KM/WC RUANG RAWAT INAP 2 5,89
11 CORIDOR 49,70
12 RUANG RAWAT INAP 3 24,60
13 KM/WC RUANG RAWAT INAP 3 5,89
14 RUANG ISOLASI 1 18,00
15 KM/WC RUANG ISOLASI 1 5,89
16 RUANG ISOLASI 2 18,00
17 KM/WC RUANG ISOLASI 2 5,89
18 RUANG NEONATUS 20,10
19 NURSE STATION 17,10
20 RUANG BERSALIN 2 21,60
21 KM/WC RUANG BERSALIN 2 7,20
22 TERAS MUKA 14,00
23 TERAS BELAKANG 5,40
24 SELASAR KELILING 86,36
434,44
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
NAMA RUANGAN SKETSA
2 4
Page 49
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : LISTPLANK PAPAN KELAS 2 UKURAN 2 X 2,50/30
VOLUME REALISASI : 57,62 M2
PANJANG LEBAR VOLUME
BIDANG CAT BIDANG CAT
(M) (M) (M2)
1
1 LISTPLANK A 16,90 0,53 8,96
2 LISTPLANK B 22,20 0,53 11,77
3 LISTPLANK C 1,50 0,53 0,80
4 LISTPLANK D 6,60 0,53 3,50
5 LISTPLANK E 3,75 0,53 1,99
6 LISTPLANK F 1,83 0,53 0,97
7 LISTPLANK G 9,24 0,53 4,90
8 LISTPLANK H 1,83 0,53 0,97
9 LISTPLANK I 3,75 0,53 1,99
10 LISTPLANK J 6,60 0,53 3,50
11 LISTPLANK K 1,50 0,53 0,80
12 LISTPLANK L 22,20 0,53 11,77
LISTPLANK M 10,82 0,53 5,73
57,62
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
2 5
J U M L A H
BACK UP DATA
NO
KODE
SKETSALISTPLANK
ATAP
Page 50
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : CAT DINDING
VOLUME REALISASI : 954,93 M2
VOLUME VOLUME VOLUME
CAT DINDING CAT DINDING CAT
TRASRAM BIASA DINDING
(M) (M) (M2)
2 3 4
V = 40,98 913,95 954,93
954,93
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
VOLUME CAT DIDING TRASRAM + VOLUME CAT DINDING
BIASA
J U M L A H
BACK UP DATA
RUMUS SKETSA
1 5
Page 51
INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)
NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU
LOKASI : RUMAH SAKIT UMUM DAERAH
TAHUN ANGGARAN : 2011
NAMA ITEM PEKERJAAN : CAT PLAFOND DAN LIST PLAFOND
VOLUME REALISASI : 490,77 M2
VOLUME
NO PLAFOND
(M2)
1 3
1 RUANG BERSALIN 1 23,60
2 KM/WC RUANG BERSALIN 1 3,15
3 RUANG DOKTER 15,81
4 KM/WC RUANG DOKTER 2,15
5 RUANG ADMINISTRASI 15,81
6 KM/WC RUANG ADMINISTRASI 2,15
7 RUANG RAWAT INAP 1 35,12
8 KM/WC RUANG RAWAT INAP 1 2,15
9 RUANG RAWAT INAP 2 35,12
10 KM/WC RUANG RAWAT INAP 2 2,15
11 CORIDOR 56,75
12 RUANG RAWAT INAP 3 35,12
13 KM/WC RUANG RAWAT INAP 3 2,15
14 RUANG ISOLASI 1 15,81
15 KM/WC RUANG ISOLASI 1 2,15
16 RUANG ISOLASI 2 15,81
17 KM/WC RUANG ISOLASI 2 2,15
18 RUANG NEONATUS 23,22
19 NURSE STATION 13,55
20 RUANG BERSALIN 2 23,60
21 KM/WC RUANG BERSALIN 2 3,15
22 TERAS DEPAN 12,51
23 TERAS BELAKANG 5,40
24 SELASAR KELILING GEDUNG 120,48
25 LIST PLAFOND 21,72
490,77
MENGETAHUI, DI SETUJUI, DI BUAT OLEH,
RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA
KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA
PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)
MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN
Penata Muda III/B Inspector Pelaksana
Nip. 19741225 199803 2 001
J U M L A H
BACK UP DATA
NAMA RUANGAN SKETSA
2 6