Project background ARISE Programme follows the success of 2 previous phases of the ASEAN-EU Programme for Regional Integration Support: – (APRIS 1) - September 2003 to September 2006; – (APRIS 2) - November 2006 to December 2010; and – (ARISE) - November 2012 to October ARISE will continue the specific, outcome-oriented support providedby APRIS 2 by: – Strengthening ASEAN’s overall management of the economic integration process; – Progressing the free flow of goods within ASEAN; and – Strengthening the capacity of the ASEAN Secretariat (ASEC) to support AEC implementation. 3
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

ATR, NTRs, Notification Procedures and NTMs Classificationin the Context of ATIGA’s Regulatory Transparency

Paolo R. VerganoInstitutional Strengthening Expert, ARISE

First Two-Day Regional Workshop30 April – 1 May 2014

Page 2: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

ARISE

• ASEAN Regional Integration Support from the EU

• Project Objectives:

– To Support ASEAN and AMS in achieving ASEAN economic integration;

– Contributing to the implementation of the AEC Blueprint and ATIGA for realisation of the ASEAN Economic Community; and

– Enhancing the Capacities of Member States in implementation of initiatives agreed by ASEAN towards AEC realisation.

2

Page 3: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Project background

• ARISE Programme follows the success of 2 previous phases of the ASEAN-EU Programme for Regional Integration Support:– (APRIS 1) - September 2003 to September 2006;– (APRIS 2) - November 2006 to December 2010; and– (ARISE) - November 2012 to October 2016.

• ARISE will continue the specific, outcome-oriented support providedby APRIS 2 by:– Strengthening ASEAN’s overall management of the economic

integration process;– Progressing the free flow of goods within ASEAN; and – Strengthening the capacity of the ASEAN Secretariat (ASEC) to

support AEC implementation.

3

Page 4: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

ARISE - Component 1: assistance on NTMs, NTRs and ATR

Page 5: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

The work conducted so far

Activity 1.1.2.1• The ‘Mapping Exercise’ on ASEAN disciplines on NTMs in light of the

establishment of the ATR/NTRs (Confidential and Non-confidential reports); and

• Proposal for a “Way Forward on the Establishment and Operationalization of the NTRs and ATR”.Activity 1.1.2.2

• Report on the “Definition of the ATR’s ‘Shell’ Architecture”;• Report on the “Definition of the IT requirements, specifications and

hardware/software needs for purposes of structuring the ATR interface and channelling the AMSs’ NTR facilities and information through it”;

• Report on the “Definition of key concepts and of a standard classification system for the ATR”; and

• Report on the “Standard notification procedures and forms”.

Page 6: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

The ongoing and prospective work

AWP2 (May 2014 – April 2015)

• Possible 2nd Regional Workshop, if need be;

• 10 two-day national workshops, if required by all AMSs, to train AMSs’ relevant authorities;

• Parallel IT work to structure the ATR interface and design the NTRs’ common software and IT interfaces; and

• Parallel work on ACT system (SOLVIT-like).

Page 7: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

The modus operandi and broader context

The methodology• External expertise and ASEC’s guidance and oversight;• Donors’ coordination (WB, USAID, UNCTAD, etc.);• Regular updates to AMSs within CCA; and• Need for AMSs’ endorsement of key principles and disciplines.

The broader context• AEC 2015;• ATIGA’s transparency obligations;• WTO transparency obligations; and• Existing AMSs’ repositories and operational/institutional

frameworks.

Page 8: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

ARISE’s assistance on NTMs, NTRs and ATR

• Transparency is a fundamental catalyst for economic development, cross-border investment and trade, and ASEAN integration;

• This is an area where the EU has considerable expertise and its assistance through the ARISE project is intended to contribute strengthening the overall ASEAN integration process management and build institutional capacity; and

• Transparency is also a critical tool to avoid ASEAN trade disputes (EDSM) and to foster economic development, ensuring that ASEAN remains an attractive FDI destination and can compete with other regional blocks.

8

Page 9: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

ARISE’s assistance on NTMs, NTRs and ATR

• The ATIGA does not provide for the timeline for the development of the ATR or in relation to the architecture/design of the ATR;

• Discussions at different levels of the ASEAN-AEC decision making mechanism have indicated that it is imperative to meet the commitments of the ATR in the ATIGA by 2015; and

• A network of AMSs’ National Trade Repositories (NTRs) is seen as the necessary precursor to the ATR and AMSs have been urged to look into the setting-up of the NTRs to support the eventual setting-up of the ATR at a regional level.

9

Page 10: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

ARISE’s assistance on NTMs, NTRs and ATR

• When the NTRs’ network is fully operational and based on a shared architecture modelled on the basis of the agreed ATR, the ATR will be effectively established and will link all the individual operating NTRs. For the NTRs and ATR to operate efficiently, the integration of government agencies at national levels must be organized and well-implemented; and

• The cooperation among AMSs (primarily within the Coordinating Committee on the Implementation of the ATIGA - the CCA), the ASEAN Secretariat and the ASEAN sectoral committees responsible for trade, customs, standards and technical regulations must be assisted and enhanced.

10

Page 11: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

The ASEAN: transparency, NTMs and NTRs/ATR

• ASEAN instruments refer to the three concepts of NTBs, NTMs and quantitative restrictions;

• Both the CEPT (Art. 1.2) and the ATIGA (Art. 2(k)) define NTBs as “measures other than tariffs which effectively prohibit or restrict import or export of products within Member States”;

• No definition of NTMs is provided, even though NTMs are explicitly mentioned in ATIGA (Articles 40 and 42) and the ATIGA clearly distinguishes between NTMs and NTBs; and

• AMSs have agreed that NTMs “applied to CEPT products should be transparent and would be considered as a non-tariff barrier only if these have the effect of prohibiting or restricting trade”.

11

Page 12: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

The ASEAN: transparency, NTMs and NTRs/ATR

• NTMs therefore capture all measures other than “ordinary customs duties”, “extra-ordinary duties and charges” (i.e., AD, CVD, etc.) and “other duties and charges”;

• The ASEAN Trade in Goods Agreements (ATIGA) requires that an ASEAN Trade Repository (ATR) be established;

• In particular, Article 13 of the ATIGA provides that:“An ASEAN Trade Repository containing trade and customs laws and procedures of all Member States shall be established and made accessible to the public through the internet” ... and that ...

12

Page 13: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

The ASEAN: transparency, NTMs and NTRs/ATR

• ... the ATR must contain the following trade-related information (indicative, non-exhaustive list):i. Tariff nomenclature;ii. MFN tariffs, preferential tariffs offered under the ATIGA and other

Agreements of ASEAN with its Dialogue Partners; iii. Rules of origin; iv. Non-tariff measures; v. National trade and customs laws and rules; vi. Procedures and documentary requirements; vii. Administrative rulings; viii. Best practices in trade facilitation applied by each Member State; and ix. List of authorised traders of AMSs.

13

Page 14: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

The ASEAN: transparency, NTMs and NTRs/ATR

• Finally, “The ASEAN Secretariat shall maintain and update the ASEAN Trade Repository based on the notifications submitted by Member States as set out in Article 11”;

• Relevance of ATIGA Article 11 on “Notification Procedures” and rationale behind the “Standard notification procedures and forms” developed by ARISE; and

• Linkage with ATIGA Article 40 on “Non-Tariff Measures”: obligation of transparency (Art. 40.2); obligation of notification (Art. 40.3, connected to Art. 11.3, 11.4, 11.5 and 11.6, further linked to Art.13.3); and obligation to develop the NTM database (Art. 40.4) to be included in the ATR (see proposal of NTM database developed by World Bank in cooperation with ARISE).

14

Page 15: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

The WTO: overarching obligations and structures

• GATT disciplines and interpretative guidance on NTMs and transparency;

• Relevant WTO language in SPS and TBT Agreements calling for measures to be notified when they have a “significant effect on trade”;

• Difference vis-à-vis ATIGA (Art. 11.1 thereof, which calls for the notification of any action or measure that AMSs intend to take that (a) “may nullify or impair any benefit to other Member States, directly or indirectly” under the ATIGA or (b) “when the action or measure may impede the attainment of any objective” of the ATIGA); and

• “Presumption of Innocence” vs. “Presumption of Guilt”.15

Page 16: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

The WTO: overarching obligations and structures

• Art. X of the GATT and Art. 12 of the ATIGA on the “Publication and Administration of Trade Regulations”;

• Several WTO transparency and notification obligations are already complied with by AMSs, all of which are now WTO Members; and

• To avoid overlaps, duplication and additional costs relating to largely similar obligations under the WTO and the ATIGA, AMSs should (as much as possible) rely on the same mechanisms and authorities set up for the WTO or at least coordinate their WTO and ATIGA tasks.

16

Page 17: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Recommendations on ATR

The ATR must be:• Well-structured;• Comprehensive;• Accessible;• Easy-to-search; and• Reliable (if not legally-binding);

Key factors to be considered:• Effective and well-coordinated ‘inter-agency platform’ at AMSs’

level;• Internal ‘synergies’ (i.e., WTO notifications, NSWs, ad hoc trade

repositories);• ‘Architectural symmetry’ between ATR and NTRs’ interfaces; and• Definition of key concepts, categories and procedures.

Page 18: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Recommendations on ATR

‘Well-structured’:

• The ATR must be based on a framework that AMSs consider legally binding;

• It should be simple, logical, easy to maintain and update and based on the macro-areas of notification indicated in Article 13 of the ATIGA; and

• The regional architecture agreed for the ATR should then inform the structures of the individual AMSs’ NTRs.

18

Page 19: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Recommendations on ATR

‘Comprehensive’:

• The ATR must contain all trade-related information on the trade and customs laws and procedures of all AMSs;

• AMSs must display and apply the political will to systematically identify, collect, classify and ultimately notify all domestic measures that relate to trade; and

• Disciplines must be agreed and applied by AMSs with active and collective engagement in training and capacity building activities.

19

Page 20: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Recommendations on ATR

‘Accessible’:

• The ATR must be in English, based on standardised notification forms and equipped with enough information to provide users with sufficient elements to understand the trade-relevance of the measures contained therein;

• It must be based on efficient and reliable software that can easily connect to the NTRs and retrieve information; and

• The ATR must be public, non-fee-based and available on the internet.

20

Page 21: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Recommendations on ATR

‘Easy to search’:

• The ATR must be well organised, based on a shared classification, well cross-referenced with hyperlinks to other AMSs’ internet facilities and existing databases (i.e., NTRs) and be user-friendly;

• It must be based on efficient and reliable software that can easily connect to the NTRs and retrieve information; and

• The same structures, style and searchability functions should apply to the ATR and the NTRs of all AMSs.

21

Page 22: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Recommendations on ATR

‘Reliable’:

• The ATR must be complete, timely updated by AMSs (through their management of the NTRs and their notifications to the ATR) and based on a shared set of ASEAN templates, classification and categories; and

• Ideally, the SOPs related to the management of the NTRs and the notifications to the ATR should be legally binding, all AMSs should timely notify all of their trade-related measures, and cross-references to AMSs’ official journals, gazettes and national registers be provided.

22

Page 23: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Recommendations on ATR

To achieve these objectives the following 5 aspects need to be taken into account:

1)The need that AMSs establish and regularly convene an effective, comprehensive and well-coordinated inter-agency platform. ARISE (alone or in cooperation with other donors) can and will assist these bodies to build the necessary capacity for notifications of NTMs and management of NTRs;

2)The need to establish, to the extent possible, synergies with activities conducted by AMSs vis-à-vis WTO transparency obligations and with respect to pre-existing transparency tools and frameworks;

23

Page 24: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Recommendations on ATR

3) The need to define key concepts found in the ATIGA (i.e., NTMs, trade-relevance) to improve the process of identification, collection and classification of measures to be notified and to frame the list of Article 13 of the ATIGA, which is indicative in nature;

4) The need to ensure correspondence between the architecture of the ATR and that of AMSs’ NTRs. To achieve this, a single classification must be used. The recommendation is made that the 2012 UNCTAD’s NTM classification (eventually fine-tuned) be adopted an used by all AMSs; and

5) The resources (databases and portals) available in AMSs are currently unable to meet all ATR’s requirements.

24

Page 25: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Definition of the ATR’s ‘Shell’ Architecture

• ATR as a web portal, a single point of access to AMSs’ trade-related information (on their NTRs);

• Information accessible by ‘topic’ or by ‘country’;• ATR’s server ‘parked’ on ASEC’s ASEAN website and maintained by

the ASEC;• The actual trade-related information of all AMSs will be ‘parked’ in

each individual AMS’s NTR;• ‘Topic’ structure based on shared classification (i.e., based in part on

UNCTAD’s 2012 NTM Classification);• Restricted log-in section for AMSs’ notifications under Article 11 of

the ATIGA; and• Link to ACT system.

Page 26: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Trade-related information by ‘topic’

Page 27: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

ATR’s ‘Mock-Up’ Home-Page

Page 28: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

ATR’s ‘Mock-Up’ Topics Page

Page 29: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Issuing Ministry

Regulation Reference Description Source URL

ASEAN Trade Repository URL

Reason NTM Code NTM Name Start Date End Date HS Code Product Description

Notification Year

1 2 3 4 5 6 7 8 9 10 11 12 13 Specify:

type of measure (law, decree, directive, etc.); title; number and signing date

Indicate the relation to trade of the measure

Encode specific URL with link to the actual measure (in English if available)

Not yet available (it will provide link to the actual notification form submitted to the ASEAN Secretariat)

Describe with sufficient detail (2-3 sentences) the measure's objectives, specifying relevant articles

Use UNCTAD's NTM classification (Feb 2012), as available in Annex D of the WB's Toolkit on NTMs: https://openknowledge.worldbank.org/bitstream/handle/10986/6019/683590PUB0EPI007902B009780821395103.pdf?sequence=1

Use name corresponding to the NTM code

Indicate date of entry into force of the measure

If the measure is temporary, indicate the end date, otherwise indicate "permanent"

Indicate the HS code/s corresponding to the products covered by the measure

List the product categories corresponding to the HS codes

Indicate year of notification to ASEAN Secretariat

Proposed NTM Classification Template

Page 30: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Calendar of upcoming events

• 30 April - 1 May 2014: Two-day Regional Workshop held by ARISE on ATR/NTRs structure, shared definitions, classification categories and notification forms and procedures;

• 11-13 June 2014: 15th CCA meeting in Chiang Mai, Thailand and discussion by AMSs of ARISE’s proposed structure for ATR/NTRs, definition of key concepts, standardized classification system and template notification forms;

• August 2014: Progress report made to 28th AFTA Council;

• September-October 2014: Possible 2nd Regional Workshop;

• November 2014: 16th CCA meeting in Vientiane, Lao PDR; and

• October 2014 - April 2015: National Workshops held in AMSs.

Page 31: ATR, NTRs, Notification Procedures and NTMs Classification in the Context of ATIGAs Regulatory Transparency Paolo R. Vergano Institutional Strengthening.

Thank YouASEAN Regional Integration Support from the EU

ASEAN Secretariat Jl. Sisingamangaraja 70A, Jakarta 12110 – Indonesia

Tel: (+62 21) 726 2991, 724 3372 ext. 852Fax: (+62 21) 739 8234

E-mail: [email protected] http://arise.asean.org