User Requirement Specifications for Advanced Traffic Management System Equipments
1. CCTV Cameras The
Closed
Circuit
Television
(CCTV)
Surveillance
shall
comprise
video
camera,
its
housing
and
pan, and Tilt Heads. The video camera shall be mounted at a height so as to cover the target
length of highway and the housing shall be able to withstand adverse weather conditions. It
shall have a 360 degree angular travel in the horizontal plane and a tilt of 90 degrees down
from 0 degrees horizontal. It shall have zoom lens with minimum power of 30 X, auto iris and
infrared filter, infrared compatibility for night operation and remotely selectable operating
modes. It shall have compatibility with co‐axial cable/optical fibre cable.
The CCTV camera shall have the following minimum features / capabilities:
1. Suitable design
to
provide
absolute
PTZ
performance
and
extreme
weather
operability
2. Ruggedized vandal‐proof housing to deliver performance in harsh conditions,
3. Viewing range of 1 km radius,
4. Tilt Range of 90° down from 0° Horizontal & 360° angular travel in the horizontal plane.
5. Day‐night IR filter for brilliant daytime colour and excellent night vision under low light
and infrared illumination
6. Total zoom 300X (30X optical, 10X digital)
7. Closed loop speed control with Integral pan / tilt motor drive to enable smooth, precise
pan‐tilt
for
fine
control
and
accurate
tracking,
even
at
high
zoom
levels
8. Flat glass window with wiper and internal heater for better optical performance in rainy,
humid environments
9. Waterproof, weather‐sealed and corrosion resistant
10. Image Sensor: 1/4” colour CCD
11. Horizontal Resolution: 525 TV lines
12. Sensitivity: 0.01 Lux or suitable for highway application in night
13. Resolution: NTSC / PAL
14. Minimum
Illumination
0.7
Lux
@
F1.4
|
Zero
Lux
under
IR
illumination
15. Focus system: Auto and manual focus
16. Communication RS485 / RS422
17. Base Mounting options
18. The complete field camera unit shall be IP66 rated
19. 1 Channel Video Server
8/13/2019 Atms (Sdbot)
http://slidepdf.com/reader/full/atms-sdbot 2/21
Page 2 of 21
20. Network Video Recorder with 6 TB storage
21. Pole and mounting
a. GUI (Graphical User Interface) The CCT ‐ GUI enables the field camera units to be managed by the operator efficiently and
effectively. The same GUI also provides the supervisory control and management report facility.
The GUI shall be divided into two screen areas:
1. Video feeds
2. Event Status area
The size, shape and location of the two screen areas shall be adjustable.
The labeling of locations of the field camera unit is programmable at system installation stage,
during system
commissioning.
The
locations
can
have
a specific
name
relating
to
their
area.
b. Function The CCT for CCTV system must operate in accordance to the following requirements:
1. Display the events that are logged on a continuous basis
2. All data and general alarm conditions must be logged to a database.
3. Database must have query facilities
4. Storage capacity for all alarm messages, three (3) years at any point in time
5. Storage capacity for video information, with 6 TB storage. 6. The CCTV‐CCT should
on a regular basis, log event of any problem for each individual field camera unit in the
CCT as an event log.
2. VMS SPECIFICATIONS (HARDWARE) The design for the Variable Message Signs (VMS) will be modular with sign panels using LEDs I High
‐Gain
Trans
‐Reflective
LCDs
for
outdoor
ambient
lights.
The
sign
panel
should
be
such
that
a display is legible from a distance of about 200 m. For this purpose, panels shall have minimum
dimensions of 3m length x 1.8 m depth. The minimum height of the characters shall be 300
mm. The contrast ratio shall be more than 30 perpendicular to the bold face and more than 10
at an angle of ± 70 degrees to the perpendicular. The equipment shall be capable of storing
minimum 10 frames that can be triggered on receiving the tele‐command. The sign panels shall
be installed on the structure in such a manner that they are aesthetically pleasing and can
8/13/2019 Atms (Sdbot)
http://slidepdf.com/reader/full/atms-sdbot 3/21
Page 3 of 21
withstand wind pressures. The equipment shall be capable of storing minimum semi‐duplex
mode and other known forces. The minimum vertical clearance available at VMSs shall be 6.0 m
from the road surface. Power supply shall be fed from the integrator locations. Gantry “T” Type for both side VMS board (text + Graphics) detailed specifications Parameters Details
Dimensions 1800(H)X 3000(W)X225(D) mm (Display Area‐Full
Matrix,
Housing Enclosure: AlMg3/MS plate 3 mm thickness
Front plate: AlMg3/MS plate 3 mm thickness
Housing coating: electrostatic powder coating
(based on
polyester)
Front panel coating: low reflection black matt
paint
Service doors: AlMg3/MS plate 2 mm
thickness;
Locking system: quarter turn locking system
Earthing : Eathing with Copper Strip
Protection level IP55 (minimum)
Weather Proofing: CENELEC EN 60529: 1991: Degrees
of protection provided by enclosure (IP code) (IEC 529:
Multiple Access) depending upon the effective and economic operation of the particular mode
available at the site. The system shall be electric/solar power operated depending upon the
availability of source. The ATCC system shall consist of a piezo‐loop‐piezo configuration in a traffic lane, with a square
or rectangular loop to ensure proper coverage of the lane width systematically placed between
the piezo
sensors.
Supplier shall propose any other configuration, if required, for better results.
ATCC Features Active lightning protection.
Flexible configuration.
Digital chassis height detection.
Coincidence detection (lane straddle). Tidal flow and reverse direction recording. Comprehensive system performance monitoring.
Detail sensor diagnostics capability.
User‐friendly set‐up and complete diagnostics.
8/13/2019 Atms (Sdbot)
http://slidepdf.com/reader/full/atms-sdbot 14/21
Page 14 of 21
Provision for most popular data formats.
User‐modifiable parameter sets.
Comprehensive software support.
Low power consumption (solar charging supported).
ATCC Components The ATCC System shall consist of the following system components:
A. Piezo Sensors for axle counting (Class II 6' BL Piezo Sensor w/100' Lead In)
B. Vehicle Detector Loop
C. ATCC Controller and its enclosure
D.
In‐
built
Power
backup
E. VEHICLE TRAFFIC CLASSIFIER up to 6 Lanes Consisting of Road side Electronics‐Microprocessor
based, Complete 1 MB memory, which is suitable for our surveys. 16 Key watertight Keyboard
and display, with input for inductive Loop Sensors with field
F. UPP 9 Pin Serial Cable‐6'
G. PU200/S PIEZO INSTALLATION RESIN
H. UPP Power Supply AC/DC
I. Centurion Standard Software (Windows based)OR equivalent
J. Work Station for ATCC
K. UPP LNPC Loop Cable
L. Loop Cable with Loop Filler
M. Miscellaneous items required in Installation
ATCC Axle counter The axle counting sensors shall consist of two independent Piezoelectric Sensors of different
length across a travel lane, enabling detection of axles of all vehicle categories.
Two piezo
sensors
with
difference
in
lengths
by
1:2
ratio
shall
be
installed
in
opposite
arrangement to its previous or next piezo sensor row of a lane, so that the system can easily
differentiate between an axle with two wheels (normal axle) and an axle having only one wheel
(motorbike axle).
To protect from heavy traffic, the sensor shall be covered with a minimum of 10 mm resin
below the surface of the road and the resin of the installed sensor shall have minimum life span
of 5 years.
8/13/2019 Atms (Sdbot)
http://slidepdf.com/reader/full/atms-sdbot 15/21
Page 15 of 21
The temperature ranges of pavements in which the sensor shall work are ‐40 C to +80 C.
ATCC Vehicle Detector Loop Vehicle
Detector
Loop
shall
be
square
or
rectangular
in
shape
to
ensure
proper
coverage
of
the
lane width and shall be placed systematically between the piezo sensors.
Loop detectors shall be provided for interface to these detector loops. Loop detectors shall be
installed in the ATCC Controller cabinet.
Detector loop shall be of readymade type with minimum of 4 turns of AWG #18 wire,
encapsulated in a protective PVC jacket. Loops shall be spliced to the shielded twisted lead‐in
cable in a junction box prior to the equipment cabinet, if required. Supplier shall avoid splicing /
joint in lead‐in cable as much as possible. However, if jointing is required, the joints shall not be
buried, or covered with epoxy in the road or shoulder area.
Loops and
lead
‐in
cables
shall
be
tested
in
reference
to
earth
ground
with
a Megger
and
resistance shall be greater than 200 mega ohms. The loop shall be checked for inductance and
shall meet the loop amplifier manufacture’s specification.
The temperature ranges of pavements in which the loops shall work are ‐40 C to +80 C.
ATCC Controller The specifications for the ATCC Controller are as follows:
A. Communication
Controller area network bus design for option to add sensor interface boards.
On‐board Ethernet interface
Two RS‐232 interface
Remote administration via Telnet or web based program
Remote file download
B. Storage
Non‐volatile local storage for vehicle information to prevent data loss during power
outages
C. Software
Shall be capable of simultaneous processing of 6 lanes of traffic data.
User‐definable classification scheme and parameters.
D. Local user interface
Display with application‐specific Keypad
8/13/2019 Atms (Sdbot)
http://slidepdf.com/reader/full/atms-sdbot 16/21
Page 16 of 21
E. Enclosure
19” rack mount
Powder coated
IP 66 rated
ATCC Power backup Capable of feeding power to ATCC Controller, to perform its full function up to 48 hours of
continuous power outage.
ATCC General Requirements The ATCC Controller and software shall provide the following minimum functions:
A. The recording and display unit shall work accurately between ‐200 C to +600 C.
B. Perform data collection, data storage, file management and report generation functions
for collected vehicle information.
C. Insert sequence numbers for vehicle records.
D. The Controller shall provide a facility for viewing current vehicle records of a single or
multiple lane and sensor diagnostics directly, without any ancillary equipment.
E. The Controller system shall be of modular design to aid in system maintenance,
troubleshooting and in‐field servicing.
F. All components of the Controller, including inductive loop detectors, shall contain
necessary electrical protection to prevent damage from electrical surges, spikes and the
effects of lightning.
G. The Controller shall be of durable, industrial design and construction and enable
continuous operation, with automated start‐up in the event of power outage and
restoration.
H. All sensor and ancillary equipment connections shall be conveniently located in the
Controller front panel. All connections, where possible, shall be plug‐in, quick connect
style.
I. All wires from axle sensors, loops, data transmission lines etc shall be terminated on
separate terminals inside the ATCC Controller, for easy removal of controller electronics
during maintenance. The terminals shall be identified by terminal number. These
terminals shall be easily accessible. All cables shall be long enough to easily reach these
terminals. Terminals, splices, or any other type of connections prior to these terminals
shall not be allowed except for splicing of a loop to a shielded twisted loop lead‐in cable.
8/13/2019 Atms (Sdbot)
http://slidepdf.com/reader/full/atms-sdbot 17/21
Page 17 of 21
J. All AC power connections shall be shielded to prevent electrical shock.
K. Free space in the bottom of the cabinet shall be a minimum of 12 inches to allow the
pulling of cables without removing any equipment. The Controller shall be set on
shelves or mounted with support bracket underneath. The arrangement shall provide
easy access to the keypad and view of the display.
LED status indicator for correct / faulty operation of ATCC Controller, with different colours
Pavement Quality concrete for ATCC shall be executed by MRMPL.
6. Mobile Communication System (MCS) Will be provided by using GSM/CDMA Mobile phones by the client. Only interfacing with ECB
system shall be included in scope of work of Agency.
7. Control Centre
Central Control Room (Control Centre): The Central Control Room (CCR) shall be the repository
of all the data acquired from the field and their processing, storing, and archiving. All the
information for real time monitoring of the Project Highway shall be generated at the CCR and
the relevant information shall be disseminated to the users through Variable message signs,
and to the operation and management teams through mobile radio communication system for
appropriate intervention. Another important function to be performed at the Control centre
shall be the operation and management of the A TMS itself along with its various sub systems.
CCR shall have the following minimum equipment, hardware and software:
1. A Central Computer Server with integrated ATMS and ATMS software (SCADA)
2. A Traffic Manager's Terminal for operation of the integrated traffic management system
3. Call system equipment comprising Operator PC along with sub‐systems and digital voice
recorder.
4. Mobile radio terminal comprising Operator PC and engineering terminal
5. Computers for Network Management Systems (NMS) for Fiber Optic Communication
System.
6. CCTV Console
Equipment
7. Computers for VMS,AVCC,MET, Traffic Control
8. A large size screen (Video Wall)
9. A line Printer
10. A Power Supply and back up system
8/13/2019 Atms (Sdbot)
http://slidepdf.com/reader/full/atms-sdbot 18/21
Page 18 of 21
Control Center Components The Control Center shall consist of the following system components:
a. Server with Windows 7 OS and Oracle database, RAID 5 with 17" TFT, Keyboard and
mouse
b. Administrator workstation
c. 120" Video Wall
d. Rack 42" for mounting Server and other equipments
e. Printer
f. Power Cable & Lane Cable
g. Computers for Network Management Systems (NMS) for Fiber Optic Communication
System.
h. Computers for
VMS,AVCC,MET,
Traffic
Control
i. Min 6 KVA UPS with one hour backup .shall be as per actual requirements+ 30%
j. Network Switch 16 Port
k. Cabling Work
Notes : 1) All equipments & components shall be safe guarded against power fluctuation as per
prevailing condition of Gujarat & Maharashtra. 2) Necessary OFC duct will be laid in median only with HDPE pipe. 3) Warranty for the equipments supplied and installed will be for 24 months from the date
of satisfactory commissioning of the system. 4) The work will be completely on turnkey basis. Civil work of control room with power
supply at one location in the control room shall be provided by MRMPL. Power supply for functioning of equipment (excluding ECBs’) along the project length at predetermined locations at outer edge of carriageway shall be provided by MRMPL. Rating of power requirement for all such locations will have to be specified by successful bidder specifically.
5) The scope of work shall also include all such items which are not specifically mentioned in the scope, but which are necessary for the satisfactory completion of the entire scope of work unless otherwise specifically excluded from the scope. Any crossing of constructed road shall be through pipe laid by trenchless technology.
8/13/2019 Atms (Sdbot)
http://slidepdf.com/reader/full/atms-sdbot 19/21
Page 19 of 21
Bill of Quantities Sr. No. Description Unit Quantity 1 Providing & installation of CCTV Systems
including PTZ
video
cameras,
its
housing
and
pan, and Tilt heads, Pole & Mounting, Channel
Video Server, Network Video Recorder with 6
TB storage including all the required
peripherals, all leads & lifts, transportation,
material, manpower, taxes (including WCT, VAT
& Service tax) etc. complete on turnkey basis as
per attached “User requirement specifications
for Advanced Traffic Management System
Equipments” & instruction of Authorized
representative
of
MRMPL.
No. 10
2 Providing & installation of Variable Message
Signs (VMS) Systems for Text & Graphics
including “T” type Gantry for both side VMS
board of size 1800 (H) X 3000 (W) x 225 (D) mm
(Display area‐full area matrix), VMS Software,
Copper Strip for Earthing, Data cable, Power
cable, VMS Work station, Control Center
Cabling including all the required peripherals,
all leads & lifts, transportation, material,
manpower,
taxes
(including
WCT,
VAT
&
Service tax) etc. complete on turnkey basis as
per attached “User requirement specifications
for Advanced Traffic Management System
Equipments” & instruction of Authorized
representative of MRMPL.
No. 06
3 Providing & erection of Emergency Call Boxes
including yellow colour powder coated M.S.
ECB housing, loud speaker, micro phone, push‐
button, LED Indicator, processing electronics,
battery pack
with
48
hours
back
up,
solar
panel,
termination assembly, control room software,
control cabling, OFC cabling work in Median
including all the required peripherals, all leads
& lifts, transportation, material, manpower,
taxes (including WCT, VAT & Service tax) etc.
complete on turnkey basis as per attached
“User requirement specifications for Advanced
No. 240
8/13/2019 Atms (Sdbot)
http://slidepdf.com/reader/full/atms-sdbot 20/21
Page 20 of 21
Traffic Management System Equipments” &
instruction of Authorized representative of
MRMPL.
4 Providing & erection of MET Systems including,
Ambient Temperature Sensor, Wind speed and
direction sensor, Road surface temperature
sensor, Relative humidity sensor, Visibility
sensor, Data logger, Solar panel & battery,
NEMA‐4 enclosure & mast accessories, cable
and accessories required in control room, G.I.
pipe for mounting, Chainlink fencing (2.5 m
height) along with anti‐intrusion barbed wire
coils mounted on top including all the required
peripherals, all leads & lifts, transportation,
material, manpower, taxes (including WCT, VAT
& Service
tax)
etc.
complete
on
turnkey
basis
as
per attached “User requirement specifications
for Advanced Traffic Management System
Equipments” & instruction of Authorized
representative of MRMPL.
No. 02
5 Providing & erection of Automatic Traffic
Counter‐cum‐Classifier (ATCC) including Piezo
Sensors for axle counting, Vehicle detector
loop, ATCC controller and its enclosure, In‐built
Power backup, Vehicle Traffic classifier, UPP 9
pin Serial
Cable
‐6’,
PU200/S
Piezo
installation
resin, UPP Power supply AC/DC, ATCC software,
work station for ATCC, UPP LNPC Loop cable,
Loop cable with Loop filler including all the
required peripherals, all leads & lifts,
transportation, material, manpower, taxes
(including WCT, VAT & Service tax) etc.
complete on turnkey basis as per attached
“User requirement specifications for Advanced
Traffic Management System Equipments” &
instruction of
Authorized
representative
of
MRMPL.
No. 02
6 *Mobile Communication System (MCS) : Will be
provided by using GSM/CDMA Mobile phones
by the client & Interfacing with ECB system
including all the required peripherals, all leads
& lifts, transportation, material, manpower,
No. Nil*
8/13/2019 Atms (Sdbot)
http://slidepdf.com/reader/full/atms-sdbot 21/21
Page 21 of 21
taxes (including WCT, VAT & Service tax) etc.
shall be included in scope of work of Agency.
7 Control Centre : Includes Server with Windows
7 OS and oracle database, RAID 5 with 17” TFT,
Keyboard and mouse, Administration
workstation, 120” Video Wall, Rack 42” for
mounting Server and other equipments,
Printer, Power cable & Lane Cable, Computers
for Network Management Systems (NMS) for
Fiber Optic Communication System, Computers
for VMS, AVCC, MET, Traffic Control, Min 6 KVA
ups with one hour backup, Network Switch 16
port, Cabling work including all the required
peripherals, all leads & lifts, transportation,
material, manpower, taxes (including WCT, VAT
& Service
tax)
etc.
complete
on
turnkey
basis
as
per attached “User requirement specifications
for Advanced Traffic Management System
Equipments” & instruction of Authorized
representative of MRMPL.
No. 01
* Interfacing with ECB system shall be included in scope of work of Agency.