MSite Plan1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A101
No. Description Date
1 : 50
Site1
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
1
A103
Ceiling Luvers - Fixed between trusses.See A106
Treated Pine Trusses, Studs & Rafters
2815
218
2040
400
99.74
°10.00°
207Solar pannels
1059
361
540
157
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit 1 : 50
4/11
/201
5 12
:46:
04 P
MSection 11
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A102
No. Description Date
1 : 50
Section 11
Ceiling pitch - 99.74 degrees
Roof pitch - 10 degrees
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
1
A102
913
Truss widt
175
Timber stairs andbeams for elevatedbed
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit 1 : 50
4/11
/201
5 12
:46:
05 P
MSection 21
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A103
No. Description Date
1 : 50
Section 21
Chipboard floor board,with carpet layer above
Hardwoodbeam bolted tocolumn
Hardwood postwith steel stirrup
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
1200
0
700
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit 1 : 50
4/11
/201
5 12
:46:
05 P
MElevations West and East1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A104
No. Description Date
1 : 50
East1
1 : 50
West2
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit 1 : 50
4/11
/201
5 12
:46:
06 P
MElevation North1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A105
No. Description Date
1 : 50
North1
Site
0
Top of Posts
500
Top of Roof
4477
Finished Floor Level
668
Top of Walls
3326
Bottom of Roof
3402
16 15 14 13
1054 3767 1199
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit 1 : 50
4/11
/201
5 12
:46:
06 P
MElevation South1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A106
No. Description Date
1 : 50
South1
DN
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit 1 : 25
4/11
/201
5 12
:46:
07 P
MFurnished Floor Plan1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A107
No. Description Date
1 : 25
Finished Floor Level1
A105
1
A1041A104 2
A106
1
1
A102
1
A103
85 3023 100 2680 85
291 2410 321 580 1450 650
5972
273
1865
2138
8521
5485
85 3487 100 2200 100
212 1585 1790 984 624 592
100 14601290 300 740
8587
910
0
125
406
629
100
2365
4774
1160
879
2468
159
1836
184
2179
849
1A109
2A109
Living Bed & Office
Kitchen
Laundry
Bath
Elevated Bed
2106
8141
4
7
2119
20
9
100
100 x 100 Steel postswelded from the steel floor of container tothe roof for structural support
ScaleChecked by
Drawn by
Date
Project number
www.autodesk.com/revit 1 : 50
4/11
/201
5 12
:46:
07 P
MGround Floor1
Container House
Brzeski
4th November
Phillip R Brzeski
Checker
A108
No. Description Date
1 : 50
Finished Floor Level Detailed1
Walls -- Treated pine 70 mm stud- Interior paster board paint finish (gyprock)- Spray insulation within studsagainst container corrugation toaviod condensation in coldermonths
Floor -Kitchen, laundry & bath aretiled
Living, Bed/offic and elevatedbed are carpted
Windows & Front sliding door aredouble glazed
Containers are to be welded together
- Gaps between the floors of thecontainers are to be sealed withexpanding foam, then chiped boardflooring over the top
- Gaps between walls and roof are tohave a steel sheet welded coveringthe gap then waterproofing paintapplied over the top
Elevated bed -
- timber beams which support theelevated bed, are attached to the100 x 100 steel post within the wall