Amgen TVEC Laboratory Project Name TVEC Laboratory Project Location Dun Laoghaire, Dublin Project Size 525m² Project Value €400,000.00 Project Duration 3 months Architect RKD Architects Engineer Callaghan Engineering Main Contractor Amgen Direct Design completed using AutoCAD 2D Cleanroom Classification BSL 2 Amgen Dun Laoghaire is a 37,000m² aseptic operations facility, specialising in secondary manufacturing activities: formaulation, filling and lyophilisation of syringe and vial products. Asgard completed the design and installation of this modern day laboratory. It comprises a fully glazed wall system complete with glazed doors to provide a high spec eye catching finish to the concept. Ceilings – 525m² of lay-in metal tile & grid system. Partitions – 275m² of glazed partition systems incorporating a cleanroom head panel & connection mullion on all sides of the glazing. A 50 mm metal faced fully flush panelling system was also used to construct specific rooms internally. Doorsets – 2 nr fully glazed double door sets & 1 nr glazed emergency escape door. Furniture – Design, supply and installation of stainless steel furniture & hand wash/dryer units. Flooring – 525m² of Tarkett IQ Toro SC antistatic flooring in various colours. Other items – Supply & install free standing emergency safety.