Amgen TVEC Laboratory Project Name TVEC Laboratory Project Location Dun Laoghaire, Dublin Project Size 525m² Project Value €400,000.00 Project Duration 3 months Architect RKD Architects Engineer Callaghan Engineering Main Contractor Amgen Direct Design completed using AutoCAD 2D Cleanroom Classification BSL 2 Amgen Dun Laoghaire is a 37,000m² aseptic operations facility, specialising in secondary manufacturing activities: formaulation, filling and lyophilisation of syringe and vial products. Asgard completed the design and installation of this modern day laboratory. It comprises a fully glazed wall system complete with glazed doors to provide a high spec eye catching finish to the concept. Ceilings 525m² of lay-in metal tile & grid system. Partitions – 275m² of glazed partition systems incorporating a cleanroom head panel & connection mullion on all sides of the glazing. A 50 mm metal faced fully flush panelling system was also used to construct specific rooms internally. Doorsets – 2 nr fully glazed double door sets & 1 nr glazed emergency escape door. Furniture – Design, supply and installation of stainless steel furniture & hand wash/dryer units. Flooring – 525m² of Tarkett IQ Toro SC antistatic flooring in various colours. Other items – Supply & install free standing emergency safety.
1

Asgard Cleanroom Solutions Market Leaders in Cleanroom Design … · 2021. 1. 11. · Design completed using. AutoCAD 2D. Cleanroom Classification BSL 2. Amgen Dun Laoghaire is a

Apr 02, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Asgard Cleanroom Solutions Market Leaders in Cleanroom Design … · 2021. 1. 11. · Design completed using. AutoCAD 2D. Cleanroom Classification BSL 2. Amgen Dun Laoghaire is a

Amgen TVEC LaboratoryProject Name

TVEC Laboratory

Project LocationDun Laoghaire, Dublin

Project Size525m²

Project Value €400,000.00

Project Duration3 months

ArchitectRKD Architects

EngineerCallaghan Engineering

Main Contractor Amgen Direct

Design completed using AutoCAD 2D

Cleanroom Classification BSL 2

Amgen Dun Laoghaire is a 37,000m² aseptic operations facility, specialising in secondary manufacturing activities: formaulation, filling and lyophilisation of syringe and vial products.

Asgard completed the design and installation of this modern day laboratory. It comprises a fully glazed wall system complete with glazed doors to provide a high spec eye catching finish to the concept.

Ceilings – 525m² of lay-in metal tile & grid system.

Partitions – 275m² of glazed partition systems incorporating a cleanroom head panel & connection mullion on all sides of the glazing. A 50 mm metal faced fully flush panelling system was also used to construct specific rooms internally.

Doorsets – 2 nr fully glazed double door sets & 1 nr glazed emergency escape door.

Furniture – Design, supply and installation of stainless steel furniture & hand wash/dryer units.

Flooring – 525m² of Tarkett IQ Toro SC antistatic flooring in various colours.

Other items – Supply & install free standing emergency safety.