Top Banner
Electromechanical, electronic and telecommunication contracting, maintenance and technical support projects ASEC scope of work and services can be classified as ASEC services can be broadly classified as: Installations, Testing, Pre-commissioning and Commissioning Design, Modification and Engineering Work Repair of Electrical Equipments Supervision of Installation of Electric Equipments Modification Activities, Upgrade of Electrical Networks Transformer Oil Filling, Processing and Filtration Replacement and Retrofitting of Electrical Equipments Relay Setting, Coordination Studies and Arc Flash Assessment Stability, Motor Starting and Harmonics Studies Energy Management Turn Key Projects Preventive Maintenance Maintenance, Refurbishment and Re-conditioning Engineering Support Instrumentation and Control solution and site Calibration The above is extended to the following products: Power Distribution Transformers Generation Stations HV, MV and LV Switch gears and Circuit Breakers All types of Motor Control Centers Control Systems, APS and DCS Sustainable and Renewable Energy Systems E E I C Contacts Eng Mohammad Farouk [email protected] +966 551 85 85 48 Eng Ahmed Seleem [email protected] +966 508 333 404 Dr Eng Nabil Khalil [email protected] +966 504 62 63 66
11

ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · [email protected] +966 508 333 404 Dr Eng Nabil Khalil [email protected]

Jul 09, 2018

Download

Documents

habao
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com

Electromechanical, electronic and telecommunication contracting, maintenance and technical support projects

ASEC scope of work and services can be classified as

ASEC services can be broadly classified as:

Installations, Testing, Pre-commissioning and Commissioning

Design, Modification and Engineering Work

Repair of Electrical Equipments

Supervision of Installation of Electric Equipments

Modification Activities, Upgrade of Electrical Networks

Transformer Oil Filling, Processing and Filtration

Replacement and Retrofitting of Electrical Equipments

Relay Setting, Coordination Studies and Arc Flash Assessment

Stability, Motor Starting and Harmonics Studies

Energy Management Turn Key Projects

Preventive Maintenance

Maintenance, Refurbishment and Re-conditioning

Engineering Support

Instrumentation and Control solution and site Calibration

The above is extended to the following products:

Power Distribution Transformers

Generation Stations

HV, MV and LV Switch gears and Circuit Breakers

All types of Motor Control Centers

Control Systems, APS and DCS

Sustainable and Renewable Energy Systems

E E I C

Contacts

Eng Mohammad Farouk [email protected]

+966 551 85 85 48

Eng Ahmed Seleem [email protected]

+966 508 333 404

Dr Eng Nabil Khalil [email protected]

+966 504 62 63 66

Page 2: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com

POWER SYSTEM TESTING AND COMISSIONING Testing and commissioning

The following are some of the projects from 2010 to 2015. The projects includes:

1- Switch gears upto 33 kV with all type of protection including 87L, 87T, 21 brand

names Areva, GE, SEL, Siemens and ABB.

2- Communication of the SCADA system related to switch gear and MCC

MV, LV networks, fire alarm and HVAC for Off Shore oil platforms at Khafji (KJO) Project consists of testing Y1b, Y2b and UTP platforms including transformers, HVAC system, LV & MV switch gears

and MCCs

MV switch gear for King Abdulla University (Aramco) Project consists of testing MV switch gear and MV ATS

LV MCC of Maccca Evacuation Center (Bin Laden)

Project consists of LV MCC, VFD and soft starters

Substation 6 and 10 for Yaserf Project (ARAMCO) Project consists of MV and LV switch gear and MCC, Power transformer. This includes 20 MV power transformer

testing and oil treatment

Jabal Omar (NESMA)

Project consists of MV/ LV switchgears, transformers, MCC, VHD and soft starters

Manifa (ARAMCO) Project consists of MV out door switch gear of 30 drilling sites

Shaiba (Aramco) Programming and testing of SEL relays along with there control schemes

Olaya Substation (SEC)

Programming and testing of Areva HV transformer relays

Sharq (/Sabic) Preventive maintenance testing of MV GE protective relays (Feeder, Motor and Transformer relays)

ALkharj and Khamis Mushait hospitals (Siemens) Testing and commissioning of substation battery system and charger

AlHammadi Hospital (Siemens) Testing and commissioning of to MV switch gears and 8 transformer along with programming their control system

Najran University MV switch gears (Siemens) Testing and commissioning of to 64 cell MV switch gears along with programming their control system

Kimya (Sabic) Testing of MV GE protective relays (Feeder, Motor and Transformer relays)

Qassim Boxite Mine and Ras Al Khair DAP projects (Maaden)

Testing of ABB protective relays (Feeder, Motor and Transformer relays) along with programming of the DCS system

Sharq/ SADAF (Sabic) Preventive maintenance testing of MV Square D switch gear and cables TD & PD testing

RC labor camp (CNC/Royal Commissioning @ Ras AL Khair) Testing and commissioning of the infrastructure works including substations and cabling networks. This includes 20 MV

power transformer testing and oil treatment.

Page 3: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com

POWER SYSTEM CONDITION ASSESSMENT AND ENGINEERING

1- Power Transformers

Complete electrical parameters evaluations

Complete oil condition assessment including DGA

Insulation Dissipation Factors TIP UP Tests

Sweep Frequency Response Analysis

Thermography analysis

2- Power Cables

Sequence parameters evaluation

Tan delta TIP UP test

Partial discharge and phase resolving tests

Life time assessment

3- Switch gear Cables

CT and VT condition assessment

SF6 condition assessment

Protection relays tests

Circuit breaker condition assessment

Thermography analysis

4- Power System studies

Load flow and short circuit analysis

Protection system calculations

Harmonics analysis and solutions

Motor starting analysis and solutions

Surge arrestor insulation coordination and solutions

Arc flash studies and safety gear evaluation

Page 4: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com

Projects samples

A- Engineering

Shaiba ISF distribution network coordination study and arc flash assessment (EEIC/ Aramco)

Consists of three MV switch gears, 13 transformers, 2 generators, SEL relays and LV network

Najran Cement Factory coordination study and relay programming (Nesma)

Consists of 10 Crude oil generators, two Steam turbines and 15 MV switch gears along with their

loads of motors, transformers and static loads.

King Faisal Hospital, Riyadh coordination study(EEIC)

Consists of four MV switch gears, 12 RMUs, 16 transformers and their loads

Zakoum Oil Platform Abu Dhabi coordination study (Schneider UAE)

Qataria Steel Factory harmonics study and motor starting assessment (Kahramaa, Qatar)

Al Watania Steel Factory harmonics assessment (Kahramma, Qatar)

Grounding system, lightning protection and HVAC for NASCO Steel Factory (NASCO)

Jabal Omar Development Project(Nesma)

Load flow and coordination study for 23 transformers including MV and LV networks

B- Condition Assessment

Jabal Omar Development Project(Nesma)

Bus risers and transformers assessment using thermography

Jabal Omar Development Project(Nesma)

Harmonics monitoring for MV and LV panel boards

SABIC (Sharq)

MV Switch gear and MV power cables condition assessment including tan delta and partial

discharge

Dammam University

Power transformer condition assessment

Page 5: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com

Registerations

Aramco

Sabic

Square D

Siemens

Saudi Cement

Dragados

Ma’aden

Sepchim

Schneider UAE

Royal Commission of Jubail and Yanbu

Page 6: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com

Some of the equipments we have are:

3 units of three phase 6I/ 6V injection sets

1 unit single phase Injection set

3 Units combined substation tester: CT/ VT/ PT tester, Single phase injection, 4 kA primary

injection and 3kV hipot

3 unit single phase secondary injection

135kV AC hipot

60 kV VLF tester

120 kV DC Hipot testert

12 kV tan delta/ CT/VT/PT tester.

2 units 6kA primary injection

60 kV DC vacuum bottle tester

Circuit breaker analyzer

Three and single phase Energy analyzer

Battery testers 220V and 125V/ 100A

8 units IR 10 kV 10Tohm

Tan delta test set for transformers.

Tan delta and partial discharge test set for cables

Three phases and single phase transformer testers

2 units vibration analyzer

2 units tachometers

2 Micro ohmmeter 600A and 10A

Precision calibrator

Infrared thermography camera and contactless thermometers

Oil break down voltage testing

Page 7: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com
Page 8: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com
Page 9: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com
Page 10: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com
Page 11: ASEC scope of work and services can be classified as ASEC …asec-ksa.com/profile.pdf · 2016-06-16 · ahmad.saleem@asec-ksa.com +966 508 333 404 Dr Eng Nabil Khalil nabil.khalil@asec-ksa.com