Top Banner
Working Onsite Challenge or Fun?
16

Artur Varushyla (project manager) "Working on site: challenge or fun"

Dec 18, 2014

Download

Documents

 
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Artur Varushyla (project manager) "Working on site: challenge or fun"

Working Onsite

Challenge or Fun?

Page 2: Artur Varushyla (project manager) "Working on site: challenge or fun"

Why work onsite?

Page 3: Artur Varushyla (project manager) "Working on site: challenge or fun"

Why work onsite?

Pros• Improve Communication• Builds the TEAM• Improve Visibility

Cons• Destructions• Other side of Visibility

Page 4: Artur Varushyla (project manager) "Working on site: challenge or fun"

Who should work onsite?

Page 5: Artur Varushyla (project manager) "Working on site: challenge or fun"

Who should work onsite?

• Business Analyst?• System Analyst?• Developer?• Quality Assurance Engineer?• Project Manager?

Page 6: Artur Varushyla (project manager) "Working on site: challenge or fun"

Who should work onsite?

• Business Analyst• System Analyst• Developer• Quality Assurance Engineer• Project Manager

In fact it should be a person with all these skills developed or at least a person who can put those hats when dealing with requirements.

Page 7: Artur Varushyla (project manager) "Working on site: challenge or fun"

How to work onsite?

Page 8: Artur Varushyla (project manager) "Working on site: challenge or fun"

What can help?

• Background training & preparation• Studies of previous customer’s solutions• Studies of customer’s competitors• People already working with that company

Before the visit

Page 9: Artur Varushyla (project manager) "Working on site: challenge or fun"

What can help?

• Mind Mapping• Spreadsheets• Wiki

While Onsite

Page 10: Artur Varushyla (project manager) "Working on site: challenge or fun"

How to work onsite?

• Adapt to customer and his/her tools• Set expectations• Format of intermediate results• Format of the end results• Customer availability and meetings

• Ask right questions• Customers prefer to be smart and have

their ideas rather than yours suggestions

Page 11: Artur Varushyla (project manager) "Working on site: challenge or fun"

Everything said won’t work without

Page 12: Artur Varushyla (project manager) "Working on site: challenge or fun"

Dress CodeRapport

Page 13: Artur Varushyla (project manager) "Working on site: challenge or fun"

• Follow the dress code (polo or shirt, nice trousers and shoes)

• Be on time• Leave only after your working day is finished• Be friendly and polite• Smile

Rapport

Page 14: Artur Varushyla (project manager) "Working on site: challenge or fun"

• Listen carefully•Understand the business goals• Identify key stakeholders•Have lunch together• Study customers personalety

Rapport

Page 15: Artur Varushyla (project manager) "Working on site: challenge or fun"

Thank You!

Questions?

Page 16: Artur Varushyla (project manager) "Working on site: challenge or fun"

Artur Varushyla

Twitter: @artuxa

LinkedIn: http://linkedin.com/in/arthurvarushyla

Facebook: http://www.facebook.com/arthur.varushyla