JUNE 19 TH 2018 ARLINGTON HIGH SCHOOL BUILDING PROJECT 1/4/2018 1 June Feedback Form Data Summary
J U N E 1 9 T H 2 0 1 8
ARLINGTON HIGH SCHOOL BUILDING PROJECT
1/4/2018 1
June Feedback Form Data Summary
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT
• Gather community feedback on design concepts as well as specific design attributes
• Gather feedback from general community – not just parents
• Continue to increase awareness about the project
• Gather feedback from 1,000 community members
Goals
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT
• 1,246 respondents• ~90% completed entire survey
• Some people completed more than one survey, estimated <5%
• June 4 Forum Attendees• 132 paper form respondents, no demographic questions asked
• Online – General Community• 983 respondents, June 4 forum attendees (37%), other (73%)
• Online – AHS staff and students• 93 respondents, Staff (33%), Students (67%)
3
Demographics
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 4
Demographics – Online General Community
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT
• Respondents felt
• Slightly positive about Options 1, 3
• Neutral about Option 2
• Negative about Option 4
• Strong desire for keeping at least some of the front green
• Liked historic and classic, New England look
• Felt neutral about minimizing costs5
High Level Summary
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT
• 378 online respondents left comments
• Many cited highest priority by far is best educational fit
• Those who want to keep historic buildings/build new feel quite strongly
• Strong desire for outdoor spaces (some front green, student learning and gathering spaces)
• ~3% cited they are unhappy with the process (too expensive, not enough transparency, poor process)
6
High Level Summary – Survey Comments
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT
Respondents felt• Slightly positive about Option 1• Slightly positive about Option 3• Neutral about Option 2• Negative about Option 4
7
All Options - Rating Summary
3.33.1
3.5
1.9
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Option 1 Option 2 Option 3 Option 4
Average Rating
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 8
All Options – Rating Summary
Option 1 Option 2 Option 3 Option 4
5 Like43 Neutral21 Dislike
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 9
Option 1 Feedback – Overall Rating 3.3
1 1.5 2 2.5 3 3.5 4 4.5 5
Limited swing space
Longest build time
Keep entire green
Keep Pit, Old Hall
Classic look
Average Rating for Attribute
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 10
Option 2 Feedback – Overall Rating 3.1
1 1.5 2 2.5 3 3.5 4 4.5 5
Fewer modulars
Keep some green
Build wings on front
Keep Pit, Old Hall
Some classic look
Average Rating for Attribute
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 11
Option 3 Feedback – Overall Rating 3.5
1 1.5 2 2.5 3 3.5 4 4.5 5
Fewer modulars
More optimal layout
Keep some green
Build wings on front
New building
Average Rating for Attribute
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 12
Option 4 Feedback – Overall Rating 1.9
1 1.5 2 2.5 3 3.5 4 4.5 5
Less optimal layout
6 story on Mass Ave
Shortest build time
Fields in back
Lose front green
New building
Average Rating for Attribute
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT
For each option, clustered responses into 3 groups:• Likes (rated option as 4 or 5)• Neutrals (rated option as 3)• Dislikes (rated option as 1 or 2)
Then looked at what each group listed for“What factor weighed most heavily in your rating?”
Examined results for big picture take-away points
13
Like / Neutral / Dislike Analysis
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT
582 Like - 233 Neutral - 360 Dislike
Take-away points from Likes/Neutral/Dislike analysis:
• 31% of all respondents like the classic look• 10% like keeping all of the green
• 12% dislike the longest build time
14
Option 1 Important Attribute Analysis
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 15
Option 1 Important Attribute Analysis
LIKES Neutrals DISLIKES
Classic look 362 56 54
Keep Pit, Old Hall 40 17 19
Keep entire green 117 35 28
Longest build time 10 71 146
Limited swing space 13 35 70
Non-respondents 40 19 43
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT
430 Like - 352 Neutral - 357 Dislike
Take-away points from Likes/Neutral/Dislike analysis:
• 14% of all respondents like fewer modulars• 11% like some classic look
• 14% dislike building wings on front
16
Option 2 Important Attribute Analysis
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 17
Option 2 Important Attribute Analysis
LIKES Neutrals DISLIKES
Some classic look 123 85 68
Keep Pit, Old Hall 15 22 22
Build wings on front 46 82 165
Keep some green 59 42 19
Fewer modulars 155 94 38
Non-respondents 32 27 45
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT
637 Like - 215 Neutral - 236 Dislike
Take-away points from Likes/Neutral/Dislike analysis:
• 23% of all respondents like cohesive, collaborative layout• 20% like brand new building
• 11% dislike brand new building
18
Option 3 Important Attribute Analysis
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 19
Option 3 Important Attribute Analysis
LIKES Neutrals DISLIKES
New building 225 57 122
Build wings on front 12 26 90
Keep some green 36 29 14
More optimal layout 256 56 19
Fewer modulars 67 22 8
Non-respondents 41 23 23
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT
140 Like - 149 Neutral - 831 Dislike
Take-away points from Likes/Neutral/Dislike analysis:
• 27% of all respondents dislike 6 story building on Mass. Ave.
• 22% dislike losing front green• 15% dislike less optimal layout
20
Option 4 Important Attribute Analysis
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 21
Option 4 Important Attribute Analysis
LIKES Neutrals DISLIKES
New building 38 14 38
Lose front green 2 16 248
Fields in back 20 6 6
Shortest build time 48 25 6
6 story on Mass Ave 11 18 304
Less optimal layout 14 51 168
Non-respondents 7 19 61
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 22
General Aspect Feedback
1 1.5 2 2.5 3 3.5 4 4.5 5
New England architecture
Urban architecture
Keep Fusco
Retain clock tower
Keep columns - interior
Keep exterior columns
Modern architecture
Keep some front green
Keep all front green
Minimize project costs
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 23
General Aspect Feedback – Ranked Most Important
0 50 100 150 200 250 300 350
New England architecture
Urban architecture
Keep Fusco
Retain clock tower
Keep columns - interior
Keep exterior columns
Modern architecture
Keep some front green
Keep all front green
Minimize project costs
Number of respondents
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 24
General Aspect Feedback – Ranked Least Important
0 20 40 60 80 100 120 140 160 180 200
New England architecture
Urban architecture
Keep Fusco
Retain clock tower
Keep columns - interior
Keep exterior columns
Modern architecture
Keep some front green
Keep all front green
Minimize project costs
Number of respondentsNote: this question was not asked on the paper form
6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 25
Questions?
Option 1 Option 2 Option 3 Option 4
5 Like43 Neutral21 Dislike