Top Banner
JUNE 19 TH 2018 ARLINGTON HIGH SCHOOL BUILDING PROJECT 1/4/2018 1 June Feedback Form Data Summary
25

ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

Oct 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

J U N E 1 9 T H 2 0 1 8

ARLINGTON HIGH SCHOOL BUILDING PROJECT

1/4/2018 1

June Feedback Form Data Summary

Page 2: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT

• Gather community feedback on design concepts as well as specific design attributes

• Gather feedback from general community – not just parents

• Continue to increase awareness about the project

• Gather feedback from 1,000 community members

Goals

Page 3: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT

• 1,246 respondents• ~90% completed entire survey

• Some people completed more than one survey, estimated <5%

• June 4 Forum Attendees• 132 paper form respondents, no demographic questions asked

• Online – General Community• 983 respondents, June 4 forum attendees (37%), other (73%)

• Online – AHS staff and students• 93 respondents, Staff (33%), Students (67%)

3

Demographics

Page 4: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 4

Demographics – Online General Community

Page 5: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT

• Respondents felt

• Slightly positive about Options 1, 3

• Neutral about Option 2

• Negative about Option 4

• Strong desire for keeping at least some of the front green

• Liked historic and classic, New England look

• Felt neutral about minimizing costs5

High Level Summary

Page 6: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT

• 378 online respondents left comments

• Many cited highest priority by far is best educational fit

• Those who want to keep historic buildings/build new feel quite strongly

• Strong desire for outdoor spaces (some front green, student learning and gathering spaces)

• ~3% cited they are unhappy with the process (too expensive, not enough transparency, poor process)

6

High Level Summary – Survey Comments

Page 7: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT

Respondents felt• Slightly positive about Option 1• Slightly positive about Option 3• Neutral about Option 2• Negative about Option 4

7

All Options - Rating Summary

3.33.1

3.5

1.9

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Option 1 Option 2 Option 3 Option 4

Average Rating

Page 8: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 8

All Options – Rating Summary

Option 1 Option 2 Option 3 Option 4

5 Like43 Neutral21 Dislike

Page 9: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 9

Option 1 Feedback – Overall Rating 3.3

1 1.5 2 2.5 3 3.5 4 4.5 5

Limited swing space

Longest build time

Keep entire green

Keep Pit, Old Hall

Classic look

Average Rating for Attribute

Page 10: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 10

Option 2 Feedback – Overall Rating 3.1

1 1.5 2 2.5 3 3.5 4 4.5 5

Fewer modulars

Keep some green

Build wings on front

Keep Pit, Old Hall

Some classic look

Average Rating for Attribute

Page 11: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 11

Option 3 Feedback – Overall Rating 3.5

1 1.5 2 2.5 3 3.5 4 4.5 5

Fewer modulars

More optimal layout

Keep some green

Build wings on front

New building

Average Rating for Attribute

Page 12: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 12

Option 4 Feedback – Overall Rating 1.9

1 1.5 2 2.5 3 3.5 4 4.5 5

Less optimal layout

6 story on Mass Ave

Shortest build time

Fields in back

Lose front green

New building

Average Rating for Attribute

Page 13: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT

For each option, clustered responses into 3 groups:• Likes (rated option as 4 or 5)• Neutrals (rated option as 3)• Dislikes (rated option as 1 or 2)

Then looked at what each group listed for“What factor weighed most heavily in your rating?”

Examined results for big picture take-away points

13

Like / Neutral / Dislike Analysis

Page 14: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT

582 Like - 233 Neutral - 360 Dislike

Take-away points from Likes/Neutral/Dislike analysis:

• 31% of all respondents like the classic look• 10% like keeping all of the green

• 12% dislike the longest build time

14

Option 1 Important Attribute Analysis

Page 15: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 15

Option 1 Important Attribute Analysis

LIKES Neutrals DISLIKES

Classic look 362 56 54

Keep Pit, Old Hall 40 17 19

Keep entire green 117 35 28

Longest build time 10 71 146

Limited swing space 13 35 70

Non-respondents 40 19 43

Page 16: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT

430 Like - 352 Neutral - 357 Dislike

Take-away points from Likes/Neutral/Dislike analysis:

• 14% of all respondents like fewer modulars• 11% like some classic look

• 14% dislike building wings on front

16

Option 2 Important Attribute Analysis

Page 17: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 17

Option 2 Important Attribute Analysis

LIKES Neutrals DISLIKES

Some classic look 123 85 68

Keep Pit, Old Hall 15 22 22

Build wings on front 46 82 165

Keep some green 59 42 19

Fewer modulars 155 94 38

Non-respondents 32 27 45

Page 18: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT

637 Like - 215 Neutral - 236 Dislike

Take-away points from Likes/Neutral/Dislike analysis:

• 23% of all respondents like cohesive, collaborative layout• 20% like brand new building

• 11% dislike brand new building

18

Option 3 Important Attribute Analysis

Page 19: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 19

Option 3 Important Attribute Analysis

LIKES Neutrals DISLIKES

New building 225 57 122

Build wings on front 12 26 90

Keep some green 36 29 14

More optimal layout 256 56 19

Fewer modulars 67 22 8

Non-respondents 41 23 23

Page 20: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT

140 Like - 149 Neutral - 831 Dislike

Take-away points from Likes/Neutral/Dislike analysis:

• 27% of all respondents dislike 6 story building on Mass. Ave.

• 22% dislike losing front green• 15% dislike less optimal layout

20

Option 4 Important Attribute Analysis

Page 21: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 21

Option 4 Important Attribute Analysis

LIKES Neutrals DISLIKES

New building 38 14 38

Lose front green 2 16 248

Fields in back 20 6 6

Shortest build time 48 25 6

6 story on Mass Ave 11 18 304

Less optimal layout 14 51 168

Non-respondents 7 19 61

Page 22: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 22

General Aspect Feedback

1 1.5 2 2.5 3 3.5 4 4.5 5

New England architecture

Urban architecture

Keep Fusco

Retain clock tower

Keep columns - interior

Keep exterior columns

Modern architecture

Keep some front green

Keep all front green

Minimize project costs

Page 23: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 23

General Aspect Feedback – Ranked Most Important

0 50 100 150 200 250 300 350

New England architecture

Urban architecture

Keep Fusco

Retain clock tower

Keep columns - interior

Keep exterior columns

Modern architecture

Keep some front green

Keep all front green

Minimize project costs

Number of respondents

Page 24: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 24

General Aspect Feedback – Ranked Least Important

0 20 40 60 80 100 120 140 160 180 200

New England architecture

Urban architecture

Keep Fusco

Retain clock tower

Keep columns - interior

Keep exterior columns

Modern architecture

Keep some front green

Keep all front green

Minimize project costs

Number of respondentsNote: this question was not asked on the paper form

Page 25: ARLINGTON HIGH SCHOOL BUILDING PROJECT€¦ · Limited swing space Longest build time Keep entire green Keep Pit, Old Hall Classic look Average Rating for Attribute. ARLINGTON HIGH

6/19/18ARLINGTON HIGH SCHOOL BUILDING PROJECT 25

Questions?

Option 1 Option 2 Option 3 Option 4

5 Like43 Neutral21 Dislike