APPOINTMENT OF A PANEL OF 3 SERVICE PROVIDERS TO SUPPLY LAPTOPS, THIN CLIENTS, MONITORS AND DESKTOPS FOR A PERIOD OF 3 YEARS WITH AN OPTION TO EXTEND FOR 2 YEARS Briefing Session : 15 APRIL 2014 RFB : RFB 2013/00048 Closing Date : 05 MAY 2014 @ 11H00
22
Embed
APPOINTMENT OF A PANEL OF 3 SERVICE PROVIDERS TO SUPPLY LAPTOPS, THIN CLIENTS, MONITORS AND DESKTOPS FOR A PERIOD OF 3 YEARS WITH AN OPTION TO EXTEND FOR.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
APPOINTMENT OF A PANEL OF 3 SERVICE PROVIDERS TO SUPPLY LAPTOPS, THIN CLIENTS, MONITORS AND
DESKTOPS FOR A PERIOD OF 3 YEARS WITH AN OPTION TO EXTEND FOR 2 YEARS
Briefing Session : 15 APRIL 2014
RFB : RFB 2013/00048
Closing Date : 05 MAY 2014 @ 11H00
Table of Contents
1. Welcome and Introduction
2. Background
3. Scope of Work
4. RFB Timelines
5. Bid Evaluation
6. Pricing Schedule and BBBEE
7. RFB submission and contact details
8. Q&A
Welcome and Introduction
Procurement
Procurement Specialist
Legal Department
Senior Legal Advisor
ICT
IT Representative
4
1. Welcome and Introduction
2. Background
3. Scope of Work
4. RFP Timelines
5. Bid Evaluation
6. Pricing Schedule and BBBEE
7. RFP submission and contact details
8. Q&A
Table of Contents
Background
5
Core Outcomes
Our Vision and Mission
RAF Mandate as per Road Accident Fund Act 1996( Act
56 of 1996)
RAF Is liable for:
A) Past and Funeral Hospital, Medical and related Expenses
B)Funeral Expenses,
C) Past and Future loss of Support,
D)Past and Future Loss of Earnings, and
E) General Damages
Background Cont…
6
As an organ of state, RAF’s mandate outlines its obligations towards the state and its people by ensuring we adhere to:
Our Vision
To provide the highest standard care to road accident victim's to restore balance in social system providing cover appropriate cover to all road users within borders RSA.
Our Mission
To rehabilitate person injured, compensate for injuries or death and indemnify wrongdoers as result of motor vehicle accident in timely, caring and sustainable support.
Our Values
• Ubuntu• Solution Focus• Pride in what we do• Excellence and Efficiency
RFB Timelines
ACTIVITY DUE DATE
RFB Advertisement in Sunday Times 6 APRIL 2014
Tender documents on RAF website 4 APRIL 2014
RFB Advertisement in Government Bulletin 4 APRIL 2014
Compulsory briefing session 15 APRIL 2014
Questions relating to RFB Answers to be uploaded on the RAF website
23 APRIL 2014 @ 16H0025 April 2014 @ 11H00
RFP Closing Date 05 MAY 2014 @11H00
Notice to bidders JUL/AUG 2014*
1. Welcome and Introduction
2. Background
3. RFB Timelines
4. Scope of Work
5. Bid Evaluation
6. Pricing Schedule and BBBEE
7. RFB submission and contact details
8. Q&A
Table of Contents
Scope of Work
Refer to Scope of Work in RFB Document
10
1. Welcome and Introduction
2. Background
3. Scope of Work
4. RFP Timelines
5. Bid Evaluation Process
6. Pricing Schedule and BBBEE
7. RFP submission and contact details
8. Q&A
Table of Contents
Pre-Qualification
Gate 0Gate 0
BEE 10 points
Gate 2Gate 2
Price 90 points
• Tax Clearance Certificate SBD 2• Invitation to Bid SBD 1• Response to Bid Letter• GCC Bidders Supply Chain Practices• Declaration of interest SBD 4• Mandatory Questionnaire• Preference Point Claim form- SBD 6.1• Declaration of Bidder’s Past SCM Practices – SBD 8• Certificate of Independent Bid Determination – SBD 9
• Tax Clearance Certificate SBD 2• Invitation to Bid SBD 1• Response to Bid Letter• GCC Bidders Supply Chain Practices• Declaration of interest SBD 4• Mandatory Questionnaire• Preference Point Claim form- SBD 6.1• Declaration of Bidder’s Past SCM Practices – SBD 8• Certificate of Independent Bid Determination – SBD 9
• Experience of the company • Service Delivery: • National Footprint • Multiple brand offering
• Experience of the company • Service Delivery: • National Footprint • Multiple brand offering
Technical Analysis 100 points
Gate 1Gate 1
• The price will be as per pricing schedule provided and must be in a separate sealed envelope.
• BEE certificate
• The price will be as per pricing schedule provided and must be in a separate sealed envelope.
• BEE certificate
Bid Evaluation Process
1. Welcome and Introduction
2. Background
3. Scope of Work
4. RFP Timelines
5. Bid Evaluation
6. Pricing Schedule and BBBEE
7. RFP submission and contact details
8. Q&A
Table of Contents
RAF BBBEE Requirements13
Turnover Classification Submission Requirement
Below R5 million p.a Exempted Micro
Enterprise (EME)
BEE Rating Certificate or Letter from
Auditors/Accounting Officer to verify that
accredited EME and percentage of black
ownership.
Between R5 million and R35
million p.a
Qualifying Small
Enterprise (QSE)
BBBEE Rating Certificate from an Accredited
Rating Agency
Above R35 million p.a Large Entity (LE) BBBEE Rating Certificate from an Accredited
Rating Agency
Joint Venture (JV) – BEE certificate must be consolidated
http://www.thedti.gov.za/bee/notice32467.pdf Notice from the Minister of Trade & Industry on the accredited verification agencies.
http://www.sanas.co.za/directory/bbee_default.php List of SANAS Accredited Verification Agencies on behalf of the DTI.
BID DECLARATION 6.1 Bidders who claim points in respect of B-BBEE Status Level of Contribution must complete the following: 7. B-BBEE STATUS LEVEL OF CONTRIBUTION CLAIMED IN TERMS OF PARAGRAPHS 1.3.1.2 AND 5.1 7.1 B-BBEE Status Level of Contribution: …………. = ……………(maximum of 10 or 20 points)
(Points claimed in respect of paragraph 7.1 must be in accordance with the table reflected in paragraph 5.1 and must be substantiated by means of a B-BBEE certificate issued by a Verification Agency accredited by SANAS or a Registered Auditor approved by IRBA or an Accounting Officer as contemplated in the CCA).
8 SUB-CONTRACTING 8.1 Will any portion of the contract be sub-contracted? YES / NO (delete which is not applicable)
8.1.1 If yes, indicate: (i) what percentage of the contract will be subcontracted? ............……………….…% (ii) the name of the sub-contractor? ………………………………………………………….. (iii) the B-BBEE status level of the sub-contractor? …………….. (iv) whether the sub-contractor is an EME? YES / NO (delete which is not applicable)
BBBEE Key Sections to complete in SBD
15
B-BBEE Contributor Level Number of Points
(80/20 system) Number of Points
(90/10 system)
1 20 10
2 18 9
3 16 8
4 12 5
5 8 4
6 6 3
7 4 2
8 2 1
Non-Compliant Contributor 0 0
Points Awarded for BBBEE Contribution
Bidders must complete Annexure G: Pricing schedule, which must be submitted in a