Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy and Environment Technology Center New Energy and Industrial Technology Development Organization International Cooperative Demonstration Project Utilizing PV Power Generation Systems in Mongolia
26

Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

Dec 19, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

Applications of Photovoltaic Power Generation Systems in

NEDO Projects

January 29, 2007

Toshiharu Yagi

International Projects Management DivisionEnergy and Environment Technology Center

New Energy and Industrial Technology Development Organization

International Cooperative Demonstration Project Utilizing PV Power Generation Systems in Mongolia

Page 2: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

2

Outline

(1) PV Power Generation System Applications

(2) Building Integrated Photovoltaic (BIPV) and NEDO Projects in Japan

(3) Further Application of NEDO’s International Cooperative Demonstration Projects

Page 3: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

3

(1)  PV Power Generation Systems Application

Rooftops

Walls

Windows

Others

Rooftop installed

Sloped

Rooftop integrated*

Flat

Wall installed

Wall integrated*Window*

Ceiling*

Roof material type

Window roof*

Louver*

Monuments, etc.

A. Installation of PV modules**

B. Systems

Stand-alone systemsHybrid systems

Grid connected systems

Microgrids

Applications

Electrification

Water supply

Resolving power supply restrictionsEffective power utilization**Source: Japan Photovoltaic Energy Association (JPEA)

(2) BIPV and NEDO Projects

(3) International Cooperative Demonstration Projects

* BIPV

Rooftop integrated type

Type

Page 4: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

4

Outline

(1) PV Power Generation System Applications

(2) Building Integrated Photovoltaic (BIPV) and NEDO Projects in Japan

(3) Further Application of NEDO’s International Cooperative Demonstration Projects

Page 5: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

( 2 )- 1   NEDO’s activities for the introduction of Building Integrated Photovoltaic (BIPV)1. FY1993 - FY1996  R&D on integrating PV modules into construction materials to combine PV arrays with buildings and reduce system installation costs

2. FY1997 – FY2000  Further R&D on PV modules to develop new types of BIPV

3. FY1998 - Field testing of developed BIPV that has reached a certain technological level, to confirm performance and economic efficiency, as well as to improve reliability

Page 6: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

6

(2) – 2 PV power field tests

1. Objectives:   Cost reduction/standardization  Identification of performance/ economic efficiency as well as improvement of reliability  Subsidies: 50%

4. Domestic cumulative capacity

2. Cumulative installed capacity/ installation costs for field tests

3. BIPV component ratios (when adopted for field tests)

Fiscal Year

J\/W

Cumulative capacity         Installation cost

Fiscal Year

  Off grid

  On grid

Total  1,130MW

30% installed in public sector/

industrial sector

   

MW

   W

Yen/W

MW

kW

2. Cumulative installed capacity/ installation costs for field tests

8% 11% 5%

4%

20

24

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

FY2003 FY2004 FY2005 FY2006

Fiscal Year

Pro

ject

rati

o

0

5

10

15

20

25

30

Cu

mu

lati

ve c

ap

aci

ty (

MW

)

Efficiency improvementNew type of control

BIPVNew type of PV moduleTotal capacity

Page 7: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

7

(2) – 3 Roof top installations  Rooftops Rooftop

installed typeSloped

rooftops

Kameyama factories (5,150kW), Sharp Corporation

Saishunkan hilltop botanical garden plant(480kW)

Page 8: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

8

BIPV

Rooftop Rooftop integrated type

JR East Takasaki station (100kW)

(2) – 4 Roof top integrated

Rooftop

Tamiya Seisakusho, greenhouse (30kW)

Rooftop integrated type

Page 9: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

9

(2) – 5 BIPV wall integrated

BIPV

Walls Wall integrated type

Walls

Tuzuki post office, Yokohama (8.5kW)  

Kyocera Corporation headquarters (214kW) (rooftop: 57kW + wall:

157kW)

Wall integrated type

Page 10: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

10

(2) – 6 Others

BIPV

Windows Ceiling type Others Louver type

Panasonic center (16kW) Residential care

home for the elderly (2.2kW)

Page 11: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

11

Project for Supporting New Energy Operators (FY2001)

Rental apartments with PV power generation systems(Received the 10th METI Minister’s Awards (Gold Prize))

1. PV1.55 k W×43 households  ( 1.665 k W for common use space )   Total capacity: 66.165 k W

2. All electrification with ECO CUTE and IH cooking heaters

   

Page 12: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

12

““See-through Type See-through Type Photovoltaic Photovoltaic

Modules”Modules” 

“See-through type PV modules”

introduced for the first time in Kyushu, Japan, allow light to come in through the ceiling.

Page 13: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

13

Outline

(1) PV Power Generation System Applications

(2) Building Integrated Photovoltaic (BIPV) and NEDO Projects in Japan

(3) Further Application NEDO’s International Cooperative Demonstration Projects

Page 14: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

14

( 3 )-1  Project objectives

NEDO conducts domestic research activities to resolve technical issues for the introduction of dispersed power sources such as PV power generation systems.

Overseas project implementation aims to contribute to host countries’ sustainable development.

Environmentally friendly photovoltaic power generation systems can provide nearly unlimited energy and require minimal, uncomplicated maintenance. Expanding photovoltaic power generation is essential for oil-alternative energy development.

To develop practical uses for PV power generation systems, it is necessary to enhance systems from the perspective of cost reductions and improved reliability through verification tests. International cooperative verification is expected to obtain data under host countries’ distinctive climatic and social systems that cannot be replicated in Japan.

Background

International Cooperative Demonstration Project Utilizing Photovoltaic Power Generation Systems

Page 15: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

15

( 3 )- 2 Project scheme

Japanese side

Japanese work sharing responsibilities:Surveys/planning,design/ manufacturing of primary equipment, transportation to the host country, construction, installation, commissioning, adjustment and demonstration

Others (cooperation in holding seminars for maintenance of equipment)

Host country work sharing responsibilities:Cooperation in basic surveys, cooperation in design of equipment (including layouting), involvement in demonstrative operations/equipment maintenance

Others (tax exemptions, securement of lands/methods for accessing project sites)

Memorandum of Understanding (MOU)

Agreement on basic provisions of the project

Concretization

Detailed agreement on practical project matters, if

necessary

Implementation of specified work

NEDO

Work Entrustment

Entrusted Company

Implementers(Municipal governments, power companies,

research institutes, universities, state-owned enterprises)

Responsible Government Organizations

Instructions for Cooperation

Host country side

Implementation Document(ID)

Page 16: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

16

59

106

11

1213

14

15

( 3 )- 3  Project sites

BeijinBeijingg

BangkoBangkokk

Abundant solar radiation with rainy seasons

Abundant solar radiation with much less rain

Page 17: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

17

Off Off GridGrid

On Grid

(3 ) – 4 PV systems

Large-scale   PV

(3) Deviation due to complicated pattern of tidal current

④ Hybrid   -  Mini   Grid

② SHS

③ BCS

① Water Pumping

④ Village electrification system⑤ Grid connecting

system for Industrials For

Residential

(1) Elevatedvoltage

PC (2) Islanding

Page 18: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

18

( 3 )- 5   Past projects

Water-pumping PV system ([1] Nepal)

Portable PV system

( [2] Mongolia ) Battery charging station PV system

([3] Thailand )Village electrification

([4] Malaysia )

PV + micro hydroPV + micro hydro

(( [5] Vietnam/[9] [5] Vietnam/[9] CambodiaCambodia ))PV + pumping-upPV + pumping-up

(( [11] Laos[11] Laos ))PV + wind powerPV + wind power

(( [7] Myanmar[7] Myanmar/[14] /[14] ChinaChina ))PV + biogasPV + biogas

(([10] Cambodia[10] Cambodia ))PV + diesel powerPV + diesel power

Public/industrial Public/industrial useuse

(( [12]Beijing/[12]Beijing/[15]Bangkok[15]Bangkok))

Stand-alone systems

Hybrid systems Grid connected systems1992-1998 1998-2006 2003-2006

(( [6] Thailand/[8][6] Thailand/[8] Mongolia/Mongolia/[7]Myan[7]Myanmarmar/[13] China)/[13] China)

Period: 1992-2006

Host countries: 9

# of projects: 15

Systems: 3 types

Total:

Page 19: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

19

【7】 Demonstrative Research on a Grid-connected Photovoltaic Power Generation System (PV + wind power + DEG) in Myanmar 1999-2004

1. Project site location: 200km west of Yangon, facing Bay of Bengal

2. Principal industries: agriculture, fishery, tourism (resort/beaches)   3. Site conditions: coastal area, power supply restriction due to a rotating system for operation       Power supply significantly increased

5. Results:  Stable power supply during rapid changes of the climate or load

  Demand Side M anagemen t by an icemaker

PV power generation: 80 k W, wind power generation: 40kW, DEG: 60kW, ballast load: 24kW

Power plant Demand side

PV

Inverter

Wind power

Icemaker

DEG Village

Hotel

Inverter

Batteries

4. System configuration:

Page 20: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

20

【 10 】 Demonstrative Research Project on Combined Power Generation Units for Grid-connected System (PV + biogas) in Cambodia 2002-2004

1. Project site location: 2 hour drive from Phnom Penh in the direction of Sihanoukville

2. Principal industry: agriculture

3. Site conditions: plain field, non-electrified area with one village of 210 households                  

5. Results:  Interconnected operation control absorbing unstable PV power output auxiliary machinery

  Effectiveness of a hybrid system with biomass gas power generation

PV power generation: 50kW, biogas power generation: 70kW (biogas rated output: 303m3/day )

Power plant Demand side

PV

Inverter

Inverter

Village

Tapioca

plant

Cattle  houseBiomass

gasification plant

GEG

Methane gas

4. System configuration:

Electrified

Page 21: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

21

【11】 Demonstrative Research Project on Small-scale Pumping Up Power Generation System with Photovoltaic in Laos 2003 - 2005

5. Results:Battery alternative effect by pumping up power generation

Establishment of maintenance scheme

PV power generation: 100kW, hydro power generation: 70kW, lifting pump: 7.5kW pump× 8

1. Project site location: 30km northwest of Luang Prabang

2. Principal industry: rice cultivation

3. Site conditions: mountainous/non-electrified area with 10 villages (approx. 900 households with 5000 persons)    

Approx. 500 households were electrified.

Power plant Demand side

Village

Village

Village

MH

Water flow

pond

4. System configuration:

pumping

PV

Lifting

pump

Inverter

Page 22: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

22

【15】 Development of Islanding Prevention Methods Under Clustered PV Conditions and Improvement of Electricity Quality in Thailand 2004 - 20061. Project site location: 30km west and

20km north of Bangkok

2. Industry: rice vermicelli manufacturing plant and Thailand Environment Institute

3. Site conditions: suburbs of Bangkok

5. Results:  New methods for islanding prevention

  Technology development and demonstration of voltage control

  Output characteristics of amorphous PV under high temperature

PV power generation: 155kW. Batteries: 70kWh

Commercial power

plant

Rice vermicelli manufacturing plant and

TEI

Power plant

Substation

Load

a-Si  PV

Bulk

PV

PC

PC

4. System configuration:

Batt

eri

es

Invert

er

Page 23: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

23

(3) - 6 Research results① Diversification of hybrid PV power generation systems:

  Particularly, various combinations of hybrid/mini-grid systems. Data acquisition (DEG, biogas engine, micro-hydro and wind power)

② Technical issues in energy utilization:

  Effective utilization of PV power output (combined with other power sources, monitoring capacity of storage batteries, DSM), battery-free systems (PV+ hydro pumped to reservoir), improvement of battery cycle life (advanced storage batteries)

③ Resolving technical power grid connection problems when integrating large-scale dispersed power sources:

  Identification of impact on power grids, establishment of    operational control systems using storage batteries and two- way inverters, stabilizing power output interconnection by isolating erratic power output, new method for islanding detection, and supply of reactive power, etc.

Page 24: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

24

( 3 )- 7 Project implementation objectives

  Stabilization of micro-grid operation  Power supply less affected by brownouts/blackouts

Capacitors to control momentary power fluctuations

  ・  Small-scale power grids  ・  Large-scale power grids  Development of design supporting tools Support for improvement of maintenance skills

International Cooperative Demonstration Project for Stabilized and Advanced Grid-connection PV Systems

Updated scheme of International Cooperative Demonstration Project Utilizing Photovoltaic Power Generation Systems

Page 25: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

25

Results of International Cooperative Results of International Cooperative Demonstration Project Utilizing Demonstration Project Utilizing Photovoltaic Power Generation SystemsPhotovoltaic Power Generation Systems

(5)  Project results

Reliability/durability of stand-alone systems were confirmed

Planning and implementation of 100,000 ger electrification in Mongolia Introduction of battery charging station in Thailand Operation control of each type

of hybrid system was verifiedDevelopment of design Development of design support toolssupport toolsSupport for improvement of Support for improvement of maintenance skillsmaintenance skills

Support for introduction planSupport for establishment of maintenance scheme Dissemination of PV Dissemination of PV

power generation power generation systemssystems

Implementation and results of demonstrative research on grid connection technology   Identification of impact/verification of PV output variations, new methods for islanding detection, application of Japanese grid-connection technology guidelines, etc.Stabilization of micro-grid, Stabilization of micro-grid, high-quality power supply, high-quality power supply, application of capacitors, application of capacitors, integrated control systems, integrated control systems, etc. etc.

Shared knowledge of grid-Shared knowledge of grid-connection technologiesconnection technologies Introduction and Introduction and

dissemination of grid-dissemination of grid-connected systemsconnected systems

Results for Japan

Contributions to host countries

Page 26: Applications of Photovoltaic Power Generation Systems in NEDO Projects January 29, 2007 Toshiharu Yagi International Projects Management Division Energy.

26

Thank you for your attention.