APL – Subsea Mooring Connector January 28, 2010. Morten Paulsen
41

APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

Apr 30, 2018

Download

Documents

vanbao
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

APL

– S

ubse

a M

oorin

g C

onne

ctor

Janu

ary

28, 2

010.

Mor

ten

Paul

sen

Page 2: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

23

Febr

uary

201

02

AP

L In

trodu

ctio

n:A

dvan

ced

Prod

uctio

n an

d Lo

adin

g A

S (A

PL)

was

foun

ded

in 1

993

to d

evel

op a

nd

com

mer

cial

ize

the

STL

and

STP

syst

ems.

APL

is a

mar

ket l

eade

r in

deve

lopm

ent,

fabr

icat

ion

and

sale

of t

urre

t moo

ring

syst

ems

and

rela

ted

tech

nolo

gies

for t

he o

il an

d ga

s in

dust

ry.

The

mai

n de

velo

pmen

t/tec

hnol

ogy

offic

e is

in

Are

ndal

, Nor

way

. APL

als

o ha

s of

fices

in

Bra

zil,

USA

, Fra

nce,

Mal

aysi

a, C

hina

, Si

ngap

ore

and

UK

.

APL

is o

wne

d 10

0% b

y B

W O

ffsho

re a

nd is

pa

rt o

f the

BW

org

aniz

atio

n.

Page 3: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

33

Febr

uary

201

03

AP

L In

trodu

ctio

n:A

PL h

as g

row

n fr

om a

bout

10

empl

oyee

s in

the

star

t to

clos

e to

200

toda

y.

The

deve

lopm

ent o

f the

STL

tech

nolo

gy w

as a

resu

lt of

a d

eman

d in

the

mar

ket f

or lo

adin

g sy

stem

s w

ith h

igh

avai

labi

lity

in h

arsh

env

ironm

ents

. To

day

both

STL

and

STP

sys

tem

s ar

e w

ell e

stab

lishe

d as

the

wor

ld’s

firs

t st

anda

rized

turr

et s

yste

ms.

Wor

ld’s

firs

t offs

hore

LN

G

Reg

asifi

catio

n P

roje

ct

Page 4: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

43

Febr

uary

201

04

AP

L In

trodu

ctio

n:D

eriv

ed fr

om th

is te

chno

logy

, APL

dev

elop

ed th

e Si

ngle

Anc

hor L

oadi

ng

(SA

L) s

yste

m, S

ingl

e A

ncho

r Pro

duct

ion

(SA

P) s

yste

m, t

he S

AL

Yoke

(S

YS) s

yste

m, t

he B

uoy

Turr

et L

oadi

ng (B

TL) s

yste

m, t

he E

xter

nal T

urre

t Pr

oduc

tion

(ETP

) sys

tem

, and

Spr

ead

Moo

red

Tand

em (S

MT)

sys

tem

.

Our

cur

rent

pro

duct

rang

e al

so in

clud

es th

e B

ow L

oadi

ng S

yste

m (B

LS),

the

Ster

n D

isch

arge

Sys

tem

(SD

S), t

he V

olat

ile O

rgan

ic C

ompo

unds

R

ecov

ery

(VO

C re

c.) s

yste

m, t

he V

olat

ile O

rgan

ic C

ompo

unds

Ret

urn

(VO

C

ret.)

sys

tem

, Seq

uent

ial T

rans

fer o

f Tan

k A

tmos

pher

e (S

TTA

) sys

tem

and

G

as to

liqu

id (G

TL).

Page 5: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

53

Febr

uary

201

05

AP

L gl

obal

pre

senc

e:

Rec

ruitm

ent c

ente

rs

Mex

ico

Nor

way N

iger

ia

Latv

ia

Indi

a

BW O

ffsho

re o

ffice

s

Fran

ce

Bra

zil

US

A

Scot

land

Rus

sia

BW O

ffsho

re u

nits

APL

Tech

nolo

gy

Berm

uda

Chi

na

Philip

pine

s

Sing

apor

eM

alay

sia

Page 6: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

63

Febr

uary

201

06

Turn

key

sol

utio

ns:

Prod

uctio

n sy

stem

s

Sub

mer

ged

Turre

t Pro

duct

ion

(STP

) for

FP

SO

Sub

mer

ged

Turre

t Loa

ding

(STL

) fo

r FSO

Ext

erna

l Tur

ret P

rodu

ctio

n (E

TP)

for F

PS

O

SA

L Y

oke

Sys

tem

(SY

S) f

or

FPS

O

Har

sh e

nviro

nmen

t FP

SO

Term

inal

sys

tem

s Sub

mer

ged

Turre

t Loa

ding

(STL

) for

LN

G a

nd S

huttl

e Ta

nker

s

Sin

gle

Anc

hor L

oadi

ng (S

AL)

for

Shu

ttle

Tank

ers

Buo

y Tu

rret L

oadi

ng (B

TL) f

or

Shu

ttle

Tank

ers

BLS

and

SD

S s

yste

ms

for S

huttl

eTa

nker

s

Page 7: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

73

Febr

uary

201

07

Ref

eren

ces:

Shel

l, F

ulm

arSta

toil,

Hei

dru

nBP,

Har

din

gSta

toil,

Ym

eH

ydro

, N

jord

BSta

toil,

Åsg

ard C

Conoco

Phill

ips,

Ban

ffConoco

Phill

ips,

Bay

u U

ndan

Exc

eler

ate,

Gulf G

atew

aySta

toil,

Volv

e,

Exc

eler

ate,

Nort

h E

ast

Gat

eway

Suez

LN

G N

A,

Nep

tune

STL

™ -

Sub

mer

ged

Turr

et L

oadi

ng

Page 8: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

83

Febr

uary

201

08

STL

™ -

Sub

mer

ged

Turr

et L

oadi

ng

(Hei

drun

)

Page 9: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

9

Sub

sea

Moo

ring

Con

nect

or

Rea

son

for d

evel

opm

ent

Eas

ier a

nd s

afer

con

nect

ion

of S

TL/S

TP m

oorin

g lin

es.

Avo

id e

xpen

sive

div

er in

stal

latio

n.

Con

nect

all

lines

usi

ng R

OV

.

Dev

elop

a s

tand

ard

conn

ectio

n th

at c

an b

e us

ed fo

r mos

t of A

PL

inst

alla

tions

/ sy

stem

s.

3 Fe

brua

ry 2

010

9

Page 10: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

10

Sub

sea

Moo

ring

Con

nect

or

Gen

eral

Des

crip

tion

The

Sub

sea

Moo

ring

Con

nect

or c

ompr

ises

a m

ale

and

a fe

mal

e co

nnec

tor

that

are

pul

led

toge

ther

and

lock

ed w

ith a

hor

se s

hoe

lock

.

Tota

l wei

ght i

s 3.

4 to

nnes

(dry

) and

it is

3.4

m lo

ng.

The

conn

ecto

r for

ms

a pe

rman

ent p

art o

f the

moo

ring

line

and

is d

esig

ned

and

qual

ified

for t

he fu

ll M

BL

of th

e lin

es a

nd th

e to

tal l

ifetim

e of

the

moo

ring

syst

em.

Offe

rs R

OV

ass

iste

d su

bsea

mat

ing

with

a li

mite

d te

nsio

n in

the

moo

ring

line.

Con

nect

ion

/ mat

ing

is d

one

usin

g a

spec

ially

des

igne

d w

inch

tool

. Thi

s to

ol

is o

pera

ted

by R

OV

.

The

win

ch to

ol c

an a

lso

do th

e re

vers

e op

erat

ion,

mea

ning

dis

conn

ect t

he

moo

ring

line

if ne

eded

.

Con

nect

ors

are

deve

lope

d fo

r an

MB

L up

to 1

5000

kN

.

Con

nect

or fo

r MB

L fro

m 1

5000

– 2

0000

kN is

bei

ng d

evel

oped

(equ

al d

esig

n,

but d

iffer

ent m

ater

ial).

The

conn

ecto

r has

bee

n th

roug

h a

qual

ifica

tion

prog

ram

spe

cifie

d by

DN

V.

3 Fe

brua

ry 2

010

10

Page 11: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

11

Sub

sea

Moo

ring

Con

nect

or

Tech

nica

l Des

crip

tion

The

Moo

ring

Con

nect

or c

onsi

sts

of th

ree

mai

n co

mpo

nent

s, m

ale

conn

ecto

r, fe

mal

e co

nnec

tor a

nd h

orse

sho

e lo

ck.

3 Fe

brua

ry 2

010

11

Mal

em

oori

ngco

nnec

tor

Conn

ecto

rho

rse

shoe

Moo

ring

Line

(To

STL

Buoy

)

Fem

ale

moo

ring

conn

ecto

r

Moo

ring

Chai

n

(To

anch

or)

Page 12: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

12

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

12

Mal

e C

onne

ctor

Has

a d

oubl

e pa

deye

for c

onne

ctio

n to

war

ds m

oorin

g w

ire c

lose

d so

cket

. (C

an b

e ch

ange

d so

it c

an fi

t oth

er in

terfa

ces)

Has

a g

uide

con

e w

ith c

ircul

ar s

hape

that

fits

into

the

fem

ale

conn

ecto

r. Th

e ci

rcul

ar s

hape

ens

ures

that

the

mal

e/fe

mal

e is

in

depe

nden

t of t

heir

rela

tive

orie

ntat

ion.

It is

equ

ippe

d w

ith a

rece

ss fo

r the

hor

se s

hoe

lock

.

At t

he e

nd to

war

ds th

e fe

mal

e, th

e m

ale

has

a cl

aw fo

r con

nect

ion

of w

inch

wire

.

Page 13: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

13

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

13

Fem

ale

Con

nect

or

Has

a s

ingl

e pa

deye

for c

onne

ctio

n to

war

ds m

oorin

g ch

ain

join

ing

shac

kle.

Has

a g

uide

con

e fo

r ent

erin

g of

the

mal

e co

nnec

tor.

Equ

ippe

d w

ith m

echa

nica

l loc

king

for t

he h

orse

sho

e lo

ck.

Incl

udes

ano

des

and

supp

ort p

oint

s fo

r the

sub

sea

win

ch to

ol.

Page 14: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

14

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

14

Hor

se S

hoe

Lock

Whe

n in

stal

led

in th

e m

achi

ned

track

in th

e fe

mal

e co

nnec

tor,

it lo

cks

the

mal

e in

side

the

fem

ale

conn

ecto

r. It

is s

elf l

ocke

d as

long

as

ther

e is

tens

ion

in th

e lin

e. In

add

ition

, it i

s m

echa

nica

lly lo

cked

w

ith tw

o lo

ckin

g bo

lts.

Sha

ped

like

a ho

rse

shoe

with

mac

hine

d tra

ck fo

r sel

f loc

king

.

Page 15: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

15

AP

L - S

ubse

a M

oorin

g C

onne

ctor

Page 16: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

16

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

16

Moo

ring

Win

ch s

yste

m

A R

OV

tool

for

conn

ectin

g th

e A

PL

Sub

sea

Moo

ring

Con

nect

or.

Dev

elop

ed b

y O

cean

eerin

g in

clo

se

colla

bora

tion

with

APL

.

Con

sist

s of

a S

uppo

rt U

nit a

nd a

Win

ch u

nit.

Supp

ortU

nit

Win

chU

nit

Win

chTr

ansp

ort

Fram

e

Page 17: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

17

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

17

Supp

ort U

nit

The

purp

ose

of th

e S

uppo

rt U

nit i

s to

sec

ure

and

stab

ilize

the

fem

ale

moo

ring

conn

ecto

r dur

ing

tie-in

. It i

s al

so th

e in

terfa

ce

adap

tor b

etw

een

the

fem

ale

conn

ecto

r and

the

Win

ch U

nit.

The

fem

ale

conn

ecto

r can

be

tilte

d or

par

tly b

urie

d in

mud

afte

r la

unch

ing,

and

stil

l be

pick

ed u

p by

the

Sup

port

Uni

t and

lifte

d/til

ted

to h

oriz

onta

l pos

ition

read

y fo

r mat

ing

with

mal

e co

nnec

tor.

The

two

adju

stab

le s

tabi

lizer

ski

s ar

e op

erat

ed h

ydra

ulic

ally

by

a 35

mm

QP

hot

-sta

b. T

hey

are

adju

sted

sep

arat

ely

by o

pera

ting

a th

ree

way

val

ve fo

r cho

osin

g le

ft or

righ

t ski

.

For e

xtre

me

soft

soil

cond

ition

s, w

here

it is

like

ly th

at th

e w

hole

co

nnec

tor i

s to

tally

bur

ied,

it is

reco

mm

ende

d to

use

mat

s un

dern

eath

. Als

o th

e si

ze o

f the

ski

s ca

n be

incr

ease

d.

The

Sup

port

Uni

t has

gui

des

for i

nter

faci

ng w

ith c

onne

ctor

and

for

inte

rfaci

ng w

ith W

inch

Uni

t.

Ope

ratin

g pr

essu

re: 5

0 to

210

bar

.

Wei

ght i

n w

ater

is 2

130

kg.

Page 18: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

18

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

18

Pict

ures

of S

uppo

rt U

nit

Actio

n ra

nge

skis

= 7

20m

m (h

eigh

t)

Page 19: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

19

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

19

Page 20: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

20

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

20

Page 21: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

21

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

21

Page 22: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

22

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

22

Win

ch U

nit

The

purp

ose

of th

e w

inch

uni

t is

to p

ull t

he m

ale

conn

ecto

r int

o th

e fe

mal

e co

nnec

tor a

nd in

stal

l the

hor

se s

hoe

in lo

cked

pos

ition

.

The

unit

has

thre

e hy

drau

lic fu

nctio

ns, a

ll op

erat

ed b

y R

OV

. Win

ch

pay

in/o

ut, l

evel

-win

d an

d ho

rse

shoe

up/

dow

n.

The

win

ch p

ay in

/out

is o

pera

ted

thro

ugh

a 43

mm

hig

hflo

w h

otst

ab.

The

leve

l-win

d an

d ho

rse

shoe

func

tions

are

ope

rate

d th

roug

h th

e sa

me

35m

m Q

P h

ot s

tab

as u

sed

for t

he S

uppo

rt U

nit.

The

win

ch h

as a

pul

l cap

acity

of 3

5 to

nnes

.

The

win

ch is

fitte

d w

ith a

Dyn

ema

fiber

rope

.

Wei

ght i

n w

ater

is 2

230

kg.

Siz

e: 2

551x

1538

x221

0mm

Page 23: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

23

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

23

Pict

ures

of W

inch

Uni

t Le

velw

ind

ROV

hand

le

Pull

inPi

n

Hor

sesh

oew

agon

ROV

pane

lw/

hydr

aulic

rece

ptac

les

Shea

ve

Lock

pin

w/R

OV

hand

le

WU

anch

orpo

int

inte

rfac

ing

with

conn

ecto

r

Page 24: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

24

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

24

Page 25: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

25

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

25

Page 26: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

26

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

26

Out

line

Inst

alla

tion

Met

hod

(STL

/STP

sys

tem

s):

1.In

stal

l Anc

hors

with

cha

in a

nd th

e fe

mal

e co

nnec

tor.

2.Pr

eten

sion

moo

ring.

3.D

eplo

y S

uppo

rt U

nit a

nd g

uide

it

dow

n to

inte

rface

with

the

fem

ale

conn

ecto

r.

Page 27: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

27

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

27

4.

Whe

n in

pos

ition

on

the

fem

ale

Con

nect

or, u

se R

OV

ar

m to

turn

the

4 lo

ck

hand

les

into

lock

ed

posi

tion.

5.

Dis

conn

ect l

ift ri

ggin

g an

d ke

ep

riggi

ng o

utsi

de a

ll in

terfa

ce

poin

ts to

avo

id in

terfe

renc

e w

ith

Win

ch U

nit d

ocki

ng.

Page 28: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

28

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

28

6.

The

fem

ale

conn

ecto

r can

now

be

lifte

d fro

m th

e so

il an

d til

ted

so it

is re

ady

for c

onne

ctio

n w

ith m

ale.

Th

is is

don

e w

ith th

e R

OV

usi

ng h

otst

ab a

nd tu

rnin

g th

e ba

ll va

lve

with

the

RO

V a

rm.

Page 29: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

29

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

29

7.

Inst

all t

he H

orse

Sho

e in

the

Win

ch U

nit.

Dep

loy

the

Win

ch U

nit

and

guid

e it

with

the

RO

V u

ntil

conn

ecte

d w

ith th

e S

uppo

rt Fr

ame.

Th

e un

its a

re fi

tted

with

sev

eral

gui

des

that

mak

es th

e co

nnec

tion

easy

.

Page 30: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

30

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

30

8.

Whe

n fu

lly d

ocke

d on

to th

e S

uppo

rt U

nit,

turn

the

lock

ing

hand

les

to lo

cked

pos

ition

by

the

RO

V a

rm.

Page 31: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

31

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

31

9.

One

RO

V d

ocke

d to

Win

ch

Uni

t whi

le s

econ

d R

OV

gra

bs

fiber

rope

. Gra

b ov

er s

hrin

k fit

ted

prot

ectiv

e sl

eeve

. O

pera

tion

can

be p

erfo

rmed

w

ith o

ne R

OV

onl

y, b

ut tw

o is

re

com

men

ded.

Page 32: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

32

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

32

10. O

ne R

OV

pay

s ou

t on

win

ch

whi

le s

econ

d R

OV

gui

des

rope

to

mal

e co

nnec

tor.

Page 33: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

33

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

33

11. O

ne R

OV

pul

ling

in m

ale

conn

ecto

r whi

le s

econ

d R

OV

is o

bser

ving

.

12. P

ull i

n m

ale

conn

ecto

r unt

il fu

lly d

ocke

d. In

dica

tion

ring

on m

ale

to b

e vi

sibl

e.

Page 34: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

34

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

34

13. L

ower

the

hors

e sh

oe in

to

lock

ed p

ositi

on b

y us

ing

RO

V

hots

tab.

14. U

se th

e R

OV

arm

to re

leas

e th

e ho

rse

shoe

hin

ge a

rm.

Page 35: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

35

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

35

15. P

ay o

ut o

n w

inch

to re

leas

e te

nsio

n an

d re

leas

e ro

pe fr

om

mal

e co

nnec

tor c

law

.

Page 36: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

36

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

36

16. U

se th

e R

OV

arm

to

mec

hani

cally

lock

the

Hor

se

Sho

e in

pla

ce u

sing

a lo

ck

key.

Not

e th

at th

e ho

rse

shoe

is

sel

f loc

ked,

and

this

m

echa

nica

l loc

k is

onl

y fo

r ex

tra s

afet

y.

Page 37: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

37

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

37

17. T

he A

PL

Sub

sea

Moo

ring

Con

nect

or is

now

fully

con

nect

ed. T

he W

inch

un

it an

d S

uppo

rt un

it ca

n no

w b

e re

mov

ed a

nd b

e re

ady

for a

noth

er

conn

ectio

n. N

ote

that

the

oper

atio

n is

reve

rsib

le. M

eani

ng th

e co

nnec

tor

can

be d

isco

nnec

ted

usin

g th

e sa

me

tool

and

tech

nolo

gy.

Page 38: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

38

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

38

Alte

rnat

ive

inst

alla

tion

proc

edur

e:

The

desc

ribed

inst

alla

tion

met

hod

is th

e ba

sic

met

hod

inst

allin

g ev

eryt

hing

se

para

tely

. It i

s al

so p

ossi

ble

to in

stal

l the

Sup

port

Uni

t and

Win

ch U

nit o

n th

e Fe

mal

e co

nnec

tor b

efor

e la

y-do

wn

of c

onne

ctor

. The

inst

alla

tion

vess

el

mus

t the

n pi

ck u

p th

e ch

ain

and

brin

g th

e en

d to

the

deck

for c

onne

ctin

g of

co

nnec

tor a

nd to

ol. T

his

met

hod

will

save

tim

e.

Page 39: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

39

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

39

Test

ing

and

His

tory

:A

qua

lific

atio

n pr

ogra

m h

as b

een

perfo

rmed

in c

olla

bora

tion

with

DN

V.

The

conn

ecto

r has

gon

e th

roug

h fu

ll sc

ale

stre

ngth

and

fatig

ue te

stin

g in

ad

ditio

n to

sm

all s

peci

men

fatig

ue te

stin

g. A

ll te

stin

g w

as p

erfo

rmed

at

DN

V la

b’s

in O

slo

and

Ber

gen.

Con

nect

ion

test

ing

usin

g th

e to

ol a

nd a

full

scal

e co

nnec

tor w

as d

one

dry

at th

e O

cean

eerin

g fa

cilit

y in

Jåt

tåvå

gen.

Inte

rface

test

ing

betw

een

Sup

port

unit,

win

ch u

nit a

nd c

onne

ctor

per

form

ed a

t the

sam

e tim

e.

In a

dditi

on to

the

abov

e fu

ll sc

ale

test

ing,

the

conn

ecto

r and

tool

s w

ere

mod

eled

in th

e si

mul

atio

n pr

ogra

m M

imic

. Sim

ulat

ion

was

then

per

form

ed

of th

e co

mpl

ete

inst

alla

tion

proc

edur

e to

che

ck a

cces

s fo

r RO

V, v

isib

ility

and

so o

n. T

his

wor

k w

as d

one

by O

cean

eerin

g.

Two

STL

buo

ys w

as in

stal

led

this

sum

mer

(200

9) o

utsi

de B

osto

n on

the

Nep

tune

fiel

d. W

ater

dep

th w

as 8

0m a

nd th

e so

il w

as v

ery

soft.

9 o

ff co

nnec

tors

was

inst

alle

d w

ith g

reat

suc

cess

. Des

ign

appr

oval

was

re

ceiv

ed fr

om D

NV

on

the

conn

ecto

rs.

Page 40: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

40

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

40

Adv

anta

ges

of th

e Su

bsea

Moo

ring

Con

nect

or:

Allo

w s

ubse

a co

nnec

tion

with

low

tens

ion

in m

oorin

glin

es (t

ypic

ally

10-

25

tonn

es).

No

oper

atio

ns in

volv

ing

pers

onne

l wor

king

with

wire

s un

der h

igh

tens

ion.

No

dive

r ass

ista

nce

need

ed.

Com

pare

d to

a c

onve

ntio

nal d

eck

conn

ectio

n, th

e S

ubse

a M

oorin

g C

onne

ctor

sig

nific

antly

redu

ce ri

sk fo

r dam

age

to m

oorin

glin

e du

ring

inst

alla

tion.

Allo

w c

onne

ctio

n us

ing

stan

dard

anc

hor h

andl

er. D

ynam

ic p

ositi

onin

g is

no

t req

uire

d.

No

heav

y pu

rpos

e m

ade

inst

alla

tion

equi

pmen

t req

uire

d on

the

inst

alla

tion

vess

el.

No

heav

y lif

t or A

-fram

e re

quire

d. T

ypic

ally

a S

WL

20-3

0 to

nnes

cra

ne

requ

ired

for o

verb

oard

ing

of fe

mal

e co

nnec

tor.

Allo

w in

stal

latio

n in

sea

stat

es u

p to

Hs

3m. S

ea s

tate

lim

itatio

n is

mai

nly

limite

d by

RO

V la

unch

/reco

very

ope

ratio

ns a

nd o

verb

oard

ing

of to

ols.

Page 41: APL – Subsea Mooring Connector qualified for the full MBL of the lines and the total lifetime of the mooring system. ... points to avoid interference with Winch Unit docking. 28

41

Sub

sea

Moo

ring

Con

nect

or

3 Fe

brua

ry 2

010

41

Than

k yo

u fo

r you

r atte

ntio

n,

any

ques

tions

?