Top Banner
1 1 Potgietersrust Platinums Ltd Analyst and Fund Manager facility visit 09 November 2006
54

Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

Sep 08, 2018

Download

Documents

doanthuy
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

11

Potgietersrust PlatinumsLtd

Analyst and Fund Manager facility visit

09 November 2006

Page 2: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

2

Potgietersrust PlatinumsLtd

Agenda• Location & Infrastructure Layout• Safety & Sustainable Development• Geology• Resources and Reserves• Mining and development• Production • Operating Costs• Capital expenditure• HR

Page 3: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

33

Potgietersrust PlatinumsLtd

Location & InfrastructureLayout

Page 4: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

4

Potgietersrust PlatinumsLtd

%U

%U

%U

%U

%U

%U

%U

%U

%U

AMANDELBULT

UNION

BAFOKENG/RASIMONESTYLDRIFT JV

RUSTENBURG

POTGIETERSRUSTPLATINUMS LIMITED

TWICKENHAM

DER BROCHEN

LEBOWA PLATINUM MINES

ð

LIMPOPO

MPUMALANGA

GAUTENG

NORTH-WEST

RUSTENBURGPRETORIA

WITBANK

MOKOPANE (POTGIETERSRUS)

POLOKWANE (PIETERSBURG)

BELA BELA (WARMBATHS)

JOHANNESBURG

NORTHAM

PANDORA JV

BOOYSENDAL JV

MODIKWA

BURGERSFORT

LYDENBURG

PASCHASKRAAL JV

LegendBushveld Complex

Anglo Platinum

Anglo Platinum - Joint Venture

Impala Platinum Mines

Lonmin PLC

Northam Platinum Limited

Southern Era

Merensky

UG2

Platreef

UNKI PROJECT

Botswana

Zimbabwe

MozambiqueNamibia

±

Republicof

South AfricaPolokwane Smelter

0 2010

Kilometres

Page 5: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

5

Potgietersrust PlatinumsLtd

PPRust North Pit

Zwartfontein-South Pit

Sandsloot Pit

Tweefontein North

Tweefontein Hill

Page 6: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

6

Potgietersrust PlatinumsLtdAerial Photo - PPRust

SS

ZWS

PPRN

Page 7: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

77

Potgietersrust PlatinumsLtd

SSZWS

PPRN

Plant

NewPlant

TailingsNewTailings

Sterkwater

Ga-Sekhaolelo

Ga-Puka

Waste

Waste

Location of villages and infrastructure

Page 8: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

8

Potgietersrust PlatinumsLtd

Ore Flow Diagram

SandslootConcentrator

PPRust North Pit

Zwartfontein South Pit

Sandsloot Pit

Ore Flow Diagram

PPRust NorthConcentrator

Page 9: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

99

Potgietersrust PlatinumsLtd

Safety & Sustainable Development

Page 10: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

10

Potgietersrust PlatinumsLtd

Safety & Sustainable Development• Safety is our highest priority - target zero

– ISO 14001, OSHAS 18001 Certified– Mobile machinery, slope stability– Noise induced hearing loss

• Sustainable Development– Legacy

• Social• Environmental• Economic

• HIV/Aids– ART for employees plus spouses– Community initiatives

Page 11: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

11

Potgietersrust PlatinumsLtd

Fatalities

0

1

2

3

1999 2000 2001 2002 2003 2004 2005 2006

Page 12: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

12

Potgietersrust PlatinumsLtd

Lost Time InjuriesLost Time Injuries

0

5

10

15

20

25

30

35

40

No. of injuries

LTI's 36 21 14 9 6 3 11 5

1999 2000 2001 2002 2003 2004 2005 2006 H1

Page 13: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

13

Potgietersrust PlatinumsLtd

Total number of injuries

0

20

40

60

80

100

120

No. of injuries

Total 103 84 62 67 37 22 14

2000 2001 2002 2003 2004 2005 2006 YTD

Page 14: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

1414

Potgietersrust PlatinumsLtd

Geology

Page 15: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

15

Potgietersrust PlatinumsLtd

Page 16: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

16

Potgietersrust PlatinumsLtd

Core Drilling Statistics

Sandsloot (SS)11,6342001

SS, PN, TW79,4932005

SS, PPRN, Zwartfontein South (ZS)183,1652003

Main AreasMetresdrilledYear

PN, TW

SS, ZS, PN, Tweefontein (TW)

SS, PPRust North (PN)

41,7552006 H1

80,4452004

50,4362002

Page 17: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

17

Potgietersrust PlatinumsLtd

N

PPRust North - Geological Model 2005

• Size of grid

Page 18: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

18

Potgietersrust PlatinumsLtd

Pit sections and designs

Page 19: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

19

Potgietersrust PlatinumsLtd

Example Section through Sandsloot

Page 20: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

20

Potgietersrust PlatinumsLtd

Final Pit design for Sandsloot

•Width : 600m

•Length : 1,700m

•Depth : 270m

Page 21: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

21

Potgietersrust PlatinumsLtd

Example section through Zwartfontein South pit

Page 22: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

22

Potgietersrust PlatinumsLtd

Final Pit design for Zwartfontein South

•Width : 690m

•Length : 1,655m

•Depth : 265m

Page 23: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

23

Potgietersrust PlatinumsLtd

Example Section through PPRust North

Page 24: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

24

Potgietersrust PlatinumsLtd

Final Pit design for PPRust North

•Width : 1,100m

•Length : 5,800m

•Depth : 350m

Page 25: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

2525

Potgietersrust PlatinumsLtd

Resources and Reserves

Page 26: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

26

Potgietersrust PlatinumsLtdResource & Reserve Statement

Sandsloot (31/12/2005)

Resource Category Tons (‘000) PGE (g/t) 4E Oz (‘000)Measured 35,620 2.48 2,830Indicated 26,010 3.08 2,580Inferred 54,530 2.55 4,480

Total Resource 116,150 2.65 9,890

Reserve Category Tons (‘000) PGE (g/t) 4E Oz (‘000)Proved 15,230 2.79 1,370

Probable 7,100 3.19 730Total Reserve 22,330 2.92 2,100

Page 27: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

27

Potgietersrust PlatinumsLtdResource & Reserve Statement

Zwartfontein South (31/12/2005)

Resource Category Tons (‘000) PGE (g/t) 4E Oz (‘000)Measured 31,630 2.3 2,340Indicated 23,270 2.6 1,940Inferred 65,330 2.02 4,250

Total Resource 120,230 2.21 8,530

Reserve Category Tons (‘000) PGE (g/t) 4E Oz (‘000)Proved 17,130 3.61 1,980

Probable 8,36 3.63 980Total Reserve 25,490 3.62 2,970

Page 28: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

28

Potgietersrust PlatinumsLtdResource & Reserve Statement

PPRust North (31/12/2005)

Resource Category Tons (‘000) PGE (g/t) 4E Oz (‘000)Measured 97,960 2.07 6,510Indicated 216,540 2.67 18,550Inferred 413,260 1.91 25,370

Total Resource 727,760 2.16 50,430

Reserve Category Tons (‘000) PGE (g/t) 4E Oz (‘000)Proved 256,890 3.19 26,350

Probable 43,580 3.24 4540Total Reserve 300,470 3.2 30,880

Page 29: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

29

Potgietersrust PlatinumsLtdResource & Reserve Statement

Total PPRust (31/12/2005)

Resource Category Tons (‘000) PGE (g/t) 4E Oz (‘000)Measured 206,140 2.58 17,080Indicated 715,030 2.46 56,490Inferred 1,472,510 1.79 84,530

Total Resource 2,393,670 2.05 158,100

Reserve Category Tons (‘000) PGE (g/t) 4E Oz (‘000)Proved 289,250 3.19 29,710

Probable 59,050 3.29 6240Total Reserve 348,290 3.21 35,940

Page 30: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

30

Potgietersrust PlatinumsLtd

4E Prill split history

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Platinum 45.93% 43.80% 43.45% 43.76% 42.06%Palladium 45.34% 47.31% 47.90% 47.76% 49.20%Rhodium 3.37% 3.38% 3.32% 3.21% 3.23%Gold 5.36% 5.51% 5.33% 5.28% 5.52%

2002 2003 2004 2005 2006 YTD

Page 31: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

31

Potgietersrust PlatinumsLtd

4E Prill split per pit (life of pit)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Platinum 41.21% 42.94% 41.97%Palladium 47.78% 47.04% 48.41%Rhodium 3.63% 3.27% 3.04%Gold 7.38% 6.74% 6.58%

Sandsloot Zwartfontein South PPRust North

Page 32: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

32

Potgietersrust PlatinumsLtd

Ni & Cu content (life of pit)

0%

5%

10%

15%

20%

25%

Nickel 17.39% 19.47% 21.43%Copper 9.23% 9.62% 11.53%

Sandsloot Zwartfontein South PPRust North

Page 33: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

3333

Potgietersrust PlatinumsLtd

Mining & Development

Page 34: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

34

Potgietersrust PlatinumsLtd

Pit Layout - Sandsloot• Life of mine : 3 years• 20,000,000t in 2006• 55,000t per day• bench height 15m• current depth 255m• planned depth 270m• current length 1,700m• current width 600m• ramp gradient 10%• ramp width 35m• stripping ratio 7.9:1

Page 35: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

35

Potgietersrust PlatinumsLtd

Pit Layout – Zwartfontein South• Life of mine : 8 years• 30,000,000t in 2006• 82,000t per day• bench height 10m• current depth 110m• planned depth 245m• current length 1,300m• current width 430m• ramp gradient 10%• ramp width 35m• stripping ratio 11:1

Page 36: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

36

Potgietersrust PlatinumsLtd

Pit Layout – PPRust North• Life of mine : >30 years• 16,500,000t in 2006• 45,000t per day• bench height 15m• current depth 30m• Planned depth 350m• current length 300m• planned length 5,800m• current width 200m• planned width 1,100m• ramp gradient 10%• ramp width 40m• stripping ratio 8:1

Page 37: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

37

Potgietersrust PlatinumsLtd

Equipment list• Dump Trucks

– Caterpillar 785 Dump x 23– Caterpillar 793 x 1– Unit Rig MT 3700 x 6– Unit Rig MT 4000 x 1

• Shovels – O&K RH 200 x 4– O&K RH 340 x 3

• Drills– Drilltech 1190E x3– Pit Viper 351 x 2

Page 38: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

38

Potgietersrust PlatinumsLtd

PPRustPPRust’’ss Truck and Shovel operationTruck and Shovel operation

Page 39: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

39

Potgietersrust PlatinumsLtd

PPRustPPRust’’ss Truck and Shovel operationTruck and Shovel operation

Page 40: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

40

Potgietersrust PlatinumsLtd

PPRustPPRust’’ss Drill & Blast operationsDrill & Blast operations

Page 41: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

4141

Potgietersrust PlatinumsLtd

Production

Page 42: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

42

Potgietersrust PlatinumsLtd

Tons mined Tons mined

0

10

20

30

40

50

60

Mt

PPRust North - - - - 3.7

Zwartfontein South 1.2 16.8 27.7 31.3 18.1

Sandsloot 29.6 38.5 31.6 26.3 25.5 6.2

2001 2002 2003 2004 2005 2006 H1

• Ga-Pila relocation 2002 – increased stripping ratio• Zwartfontein South pit commenced 2002• PPRust North project 2006

Page 43: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

43

Potgietersrust PlatinumsLtd

Tons milled

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

Tons ('000)

Zwartfontein South 674 2,033 2,241 1,152

Sandsloot 4,270 4,375 3,693 2,437 2,294 1,073

2001 2002 2003 2004 2005 2006 H1

• Increased capacity from incremental process enhancements

Page 44: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

44

Potgietersrust PlatinumsLtd

Platinum ounces(equivalent refined production)

0

50,000

100,000

150,000

200,000

250,000

Zwartfontein South 50,870 91,475 100,565 51,208

Sandsloot 211,400 164,700 140,930 108,625 104,735 47,907

2001 2002 2003 2004 2005 2006 H1

• 2002 – Ga-Pila relocation and low grade intrusion• Variance expected as PPRust North pit is introduced

Page 45: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

45

Potgietersrust PlatinumsLtd

Built-up head grade (4E g/t)

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

4E g/ t

BUH grade 4.38 3.53 3.99 4.12 4.03 4.20

2001 2002 2003 2004 2005 2006 H1

• 2002 – Ga-Pila relocation and low grade intrusion• Variance expected as PPRust North pit is introduced

Page 46: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

4646

Potgietersrust PlatinumsLtd

Operating Costs

Page 47: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

47

Potgietersrust PlatinumsLtd

Cash on-mine costs (R/ton milled)

0.0

50.0

100.0

150.0

200.0

250.0

Rand

R/ton milled 139.0 147.0 183.0 191.3 219.3 222.9

2001 2002 2003 2004 2005 2006 H1

• Primary cost drivers: stripping ratio, US$ inflation• US$ inflation : US CPI, US$ commodity pices, Rand/US$

Page 48: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

48

Potgietersrust PlatinumsLtd

Cash on-mine costs (R/Pt Oz eq. ref.)

0

1,000

2,000

3,000

4,000

5,000

6,000

Rand

R / Pt oz equiv. ref ined 2,815 3,903 4,249 4,273 4,844 5,005

2001 2002 2003 2004 2005 2006 H1

• Primary cost drivers: stripping ratio, US$ inflation, concentrator capacity• US$ inflation : US CPI, US$ commodity pices, Rand/US$

Page 49: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

4949

Potgietersrust PlatinumsLtd

Capital expenditure

Page 50: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

50

Potgietersrust PlatinumsLtd

Capital Expenditure

0

50

100

150

200

250

300

350

400

Rm

Expansion 5.9 4.3 0 0 67.9 181.3

Ongoing 230.4 213.1 194.0 186.2 306.0 150.4

2001 2002 2003 2004 2005 2006 H1

• Variance due to equipment purchases and overburden stripping• Life of mine average ongoing capex R400m / annum

Page 51: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

5151

Potgietersrust PlatinumsLtd

Human Resources

Page 52: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

52

Potgietersrust PlatinumsLtd

Human Resources• Attraction and Retention

– Desirability of area e.g. schooling and health– Global open pit skills competition

• Employment Equity – well positioned– HDSA in management and women in mining

• Adult Basic Education– Employees – Community members

Page 53: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

53

Potgietersrust PlatinumsLtd

Key issues• Safety• Blending and recovery• Operating cost reduction• Optimise remaining life of existing pits• Integration of new pit

Page 54: Analyst and Fund Manager facility visit/media/Files/A/Anglo-American-Platinum/... · Analyst and Fund Manager facility visit 09 November 2006. 2 Potgietersrust Platinums Ltd Agenda

5454

Potgietersrust PlatinumsLtd

Analyst and Fund Manager facility visit

Questions