ADDENDUM TO INVITATION FOR BID (IFB) Issued By: Addendum No. 2 Date of this Addendum April 15, 2016 Number of Pages 3 Plus Attachments PURCHASING OFFICE BOARD OF EDUCATION OF PRINCE GEORGE’S COUNTY UPPER MARLBORO, MARYLAND 20772-9983 IFB No. 045-16 Date IFB Issued April 1, 2016 Date & Hour of Return of IFB April 29, 2016 @ 3:00 pm TITLE: Hollywood Elementary School Open Space Pod Conversion Construction Services PSC No. 16.068.15C The above IFB is amended as follows. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. The purpose of this Addendum is to Provide Modifications to the Project Manual. GENERAL: This Addendum is hereby made part of the Contract Documents for the above-referenced project. Its provisions supplement and/or supersede those of the previously issued drawings and specifications where contrary thereto. See link below for Hollywood ES Pod Conversion drawings and specifications for Addendum 2 via GP large file transfer site: https://grimmandparker.filetransfers.net/downloadBatchPublic.php?batchId=d266f27189a895da56d92ba08769569 2 The link will expire on 4/28/16, 10:22 am EST DRAWINGS M-0.1 1. REVISE reference from IBC 2015 to IEBC 2015. 2. REVISE reference from NFPA 2014 to NFPA 2013. MD-1.1 1. ADD few more Mechanical demo key notes. M-1.1 1. ADD Mechanical New work key notes. 2. ADD Horizontal concealed „FCU -A‟ unit in corridor. 3. ADD „RG-1‟ in Classrooms 1, 3, 9 and 11. 4. REBALANCE supply cfm in Classroom 15 in order to meet the load requirement. 5. RELOCATE New ACCU-1 from classroom-1 roof to Corridor roof. M-6.1 1. REVISE Ventilation schedule with respect to Classroom number. 2. ADD EG-2 in the Air devise schedule. M-7.1 1. REVISE HWS and HWR into DTS and DTR respectively in “Blower coil unit details”. M-8.1
33
Embed
AMENDMENT TO INVITATION FOR BID (IFB) - PGCPS · ADDENDUM TO INVITATION FOR BID (IFB) Issued By: Addendum No. 2 Date of this Addendum April 15, 2016 Number of Pages 3 Plus Attachments
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ADDENDUM TO INVITATION FOR BID (IFB)
Issued By:
Addendum No.
2
Date of this Addendum
April 15, 2016
Number of Pages
3 Plus Attachments
PURCHASING OFFICE
BOARD OF EDUCATION OF
PRINCE GEORGE’S
COUNTY
UPPER MARLBORO,
MARYLAND 20772-9983
IFB No.
045-16
Date IFB Issued
April 1, 2016
Date & Hour of Return of IFB
April 29, 2016 @ 3:00 pm
TITLE:
Hollywood Elementary School
Open Space Pod Conversion
Construction Services
PSC No. 16.068.15C
The above IFB is amended as follows. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
The purpose of this Addendum is to Provide Modifications to the Project Manual.
GENERAL:
This Addendum is hereby made part of the Contract Documents for the above-referenced project. Its provisions
supplement and/or supersede those of the previously issued drawings and specifications where contrary thereto.
See link below for Hollywood ES Pod Conversion drawings and specifications for Addendum 2 via GP large file
RELIEF AIR LOUVER WITH BACKDRAFTDAMPER/GRAVITY BALANCED DAMPER
BDD/GBD
1
DIFFUSER TYPEAIR VOLUME IN CFM
ALL WORK SHALL BE DONE IN ACCORDANCE WITH LATEST APPLICABLE CODES, REGULATIONS AND STANDARDS. CONTRACTORSHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS AND SHALL ARRANGE FOR ALL INSPECTIONS BY AUTHORITIES HAVINGJURISDICTION
APPROVAL AND SIGN-OFF BY ALL AUTHORITIES HAVING JURISDICTION IS REQUIRED AT THE COMPLETION OF PROJECT. SECUREPERMIT AND INSPECTION CERTIFICATES AND TRANSMIT SAME TO THE OWNER AT THE COMPLETION OF THE PROJECT.
PERFORM ALL WORK IN ACCORDANCE WITH THE FOLLOWING CODES AND STANDARDS:1. INTERNATIONAL MECHANICAL CODE: 20152. INTERNATIONAL ENERGY CONSERVATION CODE: 20153. INTERNATIONAL EXISTING BUILDING CODE: 20154. NFPA 70 NATIONAL ELECTRIC CODE: 20135. SMACNA DUCT CONSTRUCTION STANDARDS: (LATEST EDITIONS)6. NFPA 101 LIFE SAFETY CODE: 2015
CODES AND STANDARDS LISTED ARE MINIMUM STANDARDS. WHERE CONTRACT DOCUMENTS CALL FOR A HIGHER STANDARD,CONTRACT DOCUMENTS WILL TAKE PRECEDENCE OVER ALL REFERENCED CODES AND STANDARDS. IF CONTRACT DOCUMENTSCONFLICT WITH CODES OR STANDARDS, CONTRACTOR SHALL INFORM ARCHITECT/ENGINEER, IN WRITING, PRIOR TO QUOTE.
CONTRACTOR SHALL COMPLY WITH ALL OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) AND ENVIRONMENTALPROTECTION AGENCY (EPA) REQUIREMENTS.
CONTRACTOR SHALL COMPLY WITH RULES AND REGULATIONS OF ALL AFFECTED UTILITY COMPANIES.
DUCT WORK WITH TRANSITION
FLEXIBLE DUCT CONNECTOR
SUPPLY AIR DUCT TO RISE UP
SUPPLY AIR DUCT TO DROP DOWN
RETURN AIR DUCT TO RISE UP
RETURN AIR DUCT TO DROP DOWN
SQUARE ELBOW WITH TURNINGVANES
SUPPLY AIR DEVICE
RETURN OR EXHAUST AIR DEVICE
DUCTWORK WITH DUCT BRANCH
DUCTWORK WITH ROUND DUCT TAKE-OFF
OPEN END DUCT WITH CAP
ROUND DUCT TO RISE UP
ROUND DUCT TO DROP DOWN
FLEXIBLE ROUND DUCT
MANUAL VOLUME DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
FIRE DAMPER
NOTE: ALL ABBREVIATIONS MAY NOT APPEAR ON THE DRAWINGS.
1. NOTICE TO BIDDERS, CONTRACTORS, & (SUB)CONTRACTORS
THE MECHANICAL PORTION OF THE CONTRACT DOCUMENTS FOR THIS PROJECT ARE ONLY A PORTION OF A LARGER AND MORECOMPLETE SET OF DOCUMENTS DESCRIBING ALL OF THE WORK REQUIRED TO PROVIDE A COMPLETE PROJECT. THERE ARE ITEMSSHOWN ON EACH OF THE CONTRACT DOCUMENTS WHICH HAVE AN IMPACT ON THE QUANTITY OF MATERIALS AND THE AMOUNT OFLABOR TO BE PROVIDED BY THE DIVISION 23 (SUB)CONTRACTOR. THE DIVISION 23 (SUB)CONTRACTOR SHALL PERFORM CAREFULCOORDINATION WITH EACH OF THE CONTRACT DOCUMENTS AS REQUIRED TO PROVIDE AN ACCURATE BID AND TO SUBSEQUENTLYPROVIDE ALL OF THE MATERIALS AND LABOR NECESSARY FOR COMPLETE CONFORMANCE TO THE ENTIRE SET OF CONTRACTDOCUMENTS. FAILURE OF THE (SUB)CONTRACTORS TO COORDINATE WITH ALL OF THE CONSTRUCTION DOCUMENTS, BY VIRTUE OFTHIS NOTICE, SHALL NOT RELEASE THE GENERAL CONTRACTOR, THE DIVISION 23 MECHANICAL (SUB)CONTRACTOR OR THE DIVISION26 ELECTRICAL (SUB)CONTRACTOR FROM THE OBLIGATIONS OF PROVIDING ALL OF THE MATERIALS AND LABOR NECESSARY TOCOMPLETE THE REQUIREMENTS OF WORK INDICATED ON THE COMPLETE SET OF THE CONTRACT DOCUMENTS.
2. GENERAL NOTES
SYMBOLS, ABBREVIATIONS AND MECHANICAL GENERAL NOTES ARE COMPOSITE. ALL SYMBOLS, ABBREVIATIONS AND MECHANICALNOTES MAY NOT BE USED ON THIS PROJECT.WORK INDICATED ON THESE DRAWINGS IS DIAGRAMMATIC AND SHOULD NOT BE SCALED TO ESTABLISH LOCATION OF WORK. THEDRAWINGS ARE INTENDED TO CONVEY THE SCOPE OF WORK AND INDICATE GENERAL ARRANGEMENTS OF ENGINEERED SYSTEMS.THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND MAKE ADJUSTMENTS AS NECESSARY TO COMPLETETHE WORK.
FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND SERVICES FOR ALL WORK, IN ACCORDANCE WITH PROVISIONS OF THECONTRACT DOCUMENTS. ALTHOUGH SUCH WORK IS NOT SPECIFICALLY INDICATED, FURNISH AND INSTALL ALL SUPPLEMENTARY ORMISCELLANEOUS ITEMS, APPURTENANCES AND DEVICES INCIDENTAL TO OR NECESSARY FOR A SOUND, SECURE AND COMPLETEINSTALLATION, AT NO ADDITIONAL COST TO THE OWNER.
IT IS THE INTENTION OF THE CONTRACT DOCUMENTS TO CALL FOR FINISHED WORK, TESTED AND READY FOR OPERATION. ALLMATERIALS AND EQUIPMENT SHALL BE NEW, OF FIRST QUALITY AND COMPATIBLE WITH EXISTING SYSTEMS OR MATERIAL WHERETHEY INTERFACE, UNLESS OTHERWISE INDICATED.
CLEAN UP ALL WASTE AND DEBRIS AT THE END OF EACH WORKING DAY AND AS REQUIRED TO KEEP ALL BUILDING AREAS CLEAN,CLEAR AND UNOBSTRUCTED. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL REMOVE ALL TOOLS, APPLIANCES,SURPLUS MATERIAL AND SCRAP FROM THE JOB SITE. SEE ARCH. DWGS. FOR WASTE DISPOSAL REQUIREMENTS.
AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL CLEAN THE ENTIRE JOB SITE, INCLUDING ALL NEW AND EXISTINGSURFACES OF BUILDING, EQUIPMENT AND SYSTEMS, LEAVING THE AREA THOROUGHLY CLEAN, CLEAR AND READY FOR OCCUPANCY.
ALL SPECIFIED EQUIPMENT AND SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
IN ADHERENCE WITH THE INTENT OF THESE CONTRACT DOCUMENTS, PROVIDE FINISHED WORK, TESTED AND READY FOROPERATION. WHEREVER THE WORD "PROVIDE" IS USED, IT SHALL MEAN "FURNISHED, INSTALL, BALANCE, ADJUST AND TEST,COMPLETE AND READY FOR USE".
ALL CEILING DEVICES (DIFFUSERS, LIGHTS, ETC.) SHALL COMPLY WITH BASE BUILDING STANDARDS.
CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING CONDITIONS AND COORDINATE WITH NEW PIPING, DUCTWORK, LIGHTING ANDPROPOSED CEILING HEIGHTS. SUBMIT A COORDINATION SHOP DRAWINGS FOR REVIEW PRIOR TO ORDERING, FABRICATING ORINSTALLING ITEMS.
3. MECHANICAL GENERAL NOTES:
ALL EQUIPMENT TO BE LOCATED IN THE CEILING PLENUM SHALL BE SUITABLE FOR INSTALLATION IN ACCORDANCE WITH APPLICABLECODES AND REGULATIONS.
ALL EQUIPMENT (INCLUDING DUCTWORK AND PIPING) SHALL BE SECURELY SUPPORTED FROM THE BUILDING STRUCTURE IN ANAPPROVED MANNER. EQUIPMENT SHALL NOT GENERATE NOISE GREATER THAN CATALOG RATINGS. ALL EQUIPMENT ANDAPPURTENANCES SHALL NOT TRANSMIT NOISE OR VIBRATION TO THE OCCUPIABLE SPACES.
DUCTWORK SHALL BE INSTALLED TIGHT TO THE UNDERSIDE OF THE SLAB/DECK UNLESS OTHERWISE NOTED.
PROVIDE FIRE SAFING APPROVED BY THE AUTHORITY HAVING JURISDICTION, AROUND ALL PIPING AND DUCTWORK PENETRATIONSTHROUGH BUILDING CONSTRUCTION TO MAINTAIN FIRE, SMOKE, AND SOUND RATINGS.
MECHANICAL EQUIPMENT, DUCTWORK, SUPPORTS, AND MATERIALS SHALL BE RELOCATED AS NECESSARY TO ACCOMMODATEINSTALLATION OF LIGHT FIXTURES AND SPRINKLER SYSTEM/PLUMBING PIPING.
THE CONTRACTOR SHALL FURNISH AND INSTALL ACCESS PANELS WHERE REQUIRED FOR ACCESS TO EQUIPMENT, VALVES,DAMPERS, CONTROLS, ETC. IN DUCTWORK AND/OR CONCEALED BEHIND FINISHES NOT INTENDED TO BE REMOVED; COORDINATEWITH THE ARCHITECT PRIOR TO ANY INSTALLATION.
MECHANICAL CONTRACTOR SHALL PROVIDE ALL MOTOR STARTERS, DISCONNECTS ETC. AS REQUIRED BY THE MECHANICALEQUIPMENT; THE ELECTRICAL CONTRACTOR SHALL INSTALL AND PROVIDE FINAL CONNECTIONS. WHERE THE MECHANICAL SYSTEMSCOME WITH INTEGRAL STARTERS, DISCONNECTS, ETC., THE ELECTRICAL CONTRACTOR SHALL PROVIDE FINAL CONNECTIONS.
ALL EQUIPMENT MUST BE INSTALLED SUCH THAT FACTORY REQUIRED CLEARANCES FOR SERVICEABILITY ARE MAINTAINED. NOTIFYTHE ENGINEER IMMEDIATELY SHOULD ANY EQUIPMENT HAVE ACCESS LIMITED BECAUSE OF FIELD CONDITIONS, EQUIPMENTORIENTATION, ETC. DO NOT INSTALL THIS EQUIPMENT UNTIL THE SITUATION HAS BEEN RESOLVED.
CONTRACTOR SHALL TEST FOR ACTUAL PERFORMANCE AND REPLACE FILTERS ON EXISTING MECHANICAL EQUIPMENT (IF APPLIES)SUCH AS FAN COIL UNITS, AIR HANDLING UNITS, CONDENSER UNITS, ROOFTOP UNITS, UNIT VENTILATORS, CONVECTORS,RADIATORS, AND ANY MECHANICAL EQUIPMENT USED TO RUN EXISTING HVAC SYSTEM. THIS WILL ALSO INCLUDE CLEANINGDUCTWORK AND PIPING SYSTEMS. EXISTING WATER LOOP SYSTEM SHALL BE FLUSHED/CLEANED AND REFURBISH/REPAIRDEFECTIVE VALVES.
4. DUCTWORK:
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY DUCTWORK DROPS, RISES OR TRANSITIONSREQUIRED FOR DUCT ROUTING IN THE CEILING PLENUM.
DUCTWORK SHALL BE FABRICATED WITH THE MATERIAL AS SPECIFIED IN THE 'DUCT WORK' SPECIFICATION, CONSTRUCTION ANDINSTALLATION IN ACCORDANCE WITH SMACNA STANDARDS AND SYSTEM REQUIREMENTS. SHEET METAL GAUGES SHALL CONFORMTO THE VIRGINIA MECHANICAL CODE (IMC), ASHRAE STANDARDS, UL AND SMACNA LISTED FIRE RESISTANCE DIRECTORYREQUIREMENTS AS APPLICABLE. DUCTWORK SIZES SHOWN ARE NET CLEAR INSIDE DIMENSIONS. FABRICATE SHEET METAL FORINTERNALLY LINED DUCTS TO ALLOW FOR THICKNESS OF INSULATION AND MAINTAIN NET CLEAR DIMENSIONS. CONTRACTOR SHALLVERIFY ACTUAL AVAILABLE DUCT SPACE PRIOR TO FABRICATION AND INSTALLATION OF DUCTWORK. SHOULD A CONFLICT OCCURTHE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND ENGINEER BEFORE CONTINUING. ALL RECTANGULAR DUCTWORK ELBOWS30° OR GREATER SHALL BE PROVIDED WITH DOUBLE RADIUS TURNING VANES.
ALL DUCTWORK SHALL BE FABRICATED FROM FIELD CONFIRMED CONDITIONS. NO ALLOWANCE PERMITTED FOR DUCTWORK NOTUSED. FLEX DUCTS SHALL BE A MAXIMUM OF 6 FEET IN LENGTH AND ALL FLEX DUCT TO BE EXTERNALLY INSULATED ONLY.
ALL NECESSARY ALLOWANCES AND PROVISIONS SHALL BE MADE BY CONTRACTOR FOR BEAMS, COLUMNS OR OTHEROBSTRUCTIONS OF THE BUILDING OR THE WORK OF OTHER CONTRACTORS, WHETHER OR NOT SAME IS INDICATED. WHERENECESSARY TO AVOID OBSTRUCTIONS, THE DUCTS SHALL BE TRANSFORMED, DIVIDED, OFFSET, RAISED OR LOWERED WITH THEREQUIRED FREE AREA BEING MAINTAINED IN ACCORDANCE WITH SMACNA STANDARDS.
PROVIDE FIRE DAMPERS IN HVAC AIR DISTRIBUTION SYSTEMS THAT PENETRATE FIRE RATED ASSEMBLIES IN ACCORDANCE WITH THEBUILDING CODES. FIRE DAMPERS SHALL BE TYPE B IN ALL SUPPLY/RETURN/EXHAUST/OUTSIDE AIR DUCTS THAT PENETRATE RATEDASSEMBLIES IN ADDITION TO ALL SECONDARY FIRE DAMPERS FOR CEILING/WALL AND FLOOR MOUNTED AIR DEVICES. COORDINATESPECIFIC FIRE RESISTIVE CONSTRUCTION REQUIREMENTS WITH THE FIRE RATED ASSEMBLIES INDICATED ON ARCHITECTURALDRAWINGS. THROUGH PENETRATIONS FIRESTOP SYSTEMS SHALL CONFORM TO UL LISTED FIRE RESISTANCE DIRECTORY OR OTHERMETHODS ACCEPTABLE TO LOCAL GOVERNING CODE AUTHORITIES.
PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS,VOLUME DAMPERS, MOTORIZED DAMPER, DUCT HEATERS, COILS, AND OTHER ITEMS LOCATED IN THE DUCTWORK WHICH REQUIRESERVICE AND/ OR INSPECTION.LABEL ACCESS WITH 1/2" LETTERING.
6. CONTROLS:
PROVIDE AUTOMATIC TEMPERATURE CONTROL SYSTEM(S) FOR HVAC EQUIPMENT UNDER MECHANICAL WORK. CONTROL DEVICESSHALL BE PROVIDED BY UNIT MANUFACTURER UNLESS OTHERWISE NOTED. DEVICE(S) SHALL BE FULLY COMPATIBLE AND SUITABLEFOR INTENDED USE. COLOR CODED AND INSTALLED IN CONDUIT WHERE SUBJECT TO PHYSICAL DAMAGE OR WHERE REQUIRED TOAVOID PLENUM SPACES. EXTEND ALL LOW VOLTAGE WIRING UNBROKEN BETWEEN EACH CONTROL DEVICE AND EQUIPMENTTERMINAL STRIP. UNLESS OTHERWISE INDICATED, ALL THERMOSTATS, CARBON MONOXIDE AND HUMIDISTATS SHALL BE MOUNTED4'-0" ABOVE FINISHED FLOOR OR PER ADA REQUIREMENTS. ALL THERMOSTATS SHALL BE MOUNTED TO COORDINATE WITHARCHITECTURAL ELEMENTS AND SYSTEM FURNITURE. COORDINATE EXACT LOCATION AND REQUIREMENTS WITH FURNITURESYSTEM. COORDINATE WITH BUILDING OWNER FOR NECESSARY DETAILS AS REQUIRED. COORDINATE WITH FIRE STROBES, FIREPULLS AND LIGHT SWITCHES.
IF THERMOSTATS ARE LOCATED ON EXTERIOR WALLS OR EXTERIOR COLUMNS, PROVIDE FULLY INSULATED BACK BOX.
ALL NEW HVAC EQUIPMENT SHALL BE CONNECTED AND HAS CAPABILITY OF CONNECTING TO PGCPS BAS/EMS. CONTRACTOR SHALLCOORDINATE CONTROL INTEGRATION WITH PGCPS.
7. INSTRUCTION AND IDENTIFICATION:
WRITTEN INSTRUCTIONS IN A SINGLE BINDER DESCRIBING THE PROPER OPERATION AND MAINTENANCE OF EQUIPMENT ANDSYSTEMS SHALL BE PROVIDED TO THE OWNER AT THE COMPLETION OF THE WORK. THE CONTRACTOR SHALL DEMONSTRATE ANDINSTRUCT THE OPERATION OF SYSTEMS TO THE OWNER'S REPRESENTATIVE. ALL VALVES, CONTROLS, ETC., SHALL BEPERMANENTLY IDENTIFIED AND LABELED WITH METAL TAGS OR ENGRAVED NAMEPLATES AS APPLICABLE. COORDINATE WITH HVACZONE SCHEDULE.
UPON COMPLETION OF THE INSTALLATION, ALL AIR SYSTEMS SHALL BE ADJUSTED AND BALANCED TO PROVIDE THE AIR QUANTITIESINDICATED. CONTRACTOR SHALL PROVIDE VOLUME DAMPERS, SPLITTER DAMPERS AND/OR VOLUME EXTRACTORS AS INDICATED ORREQUIRED FOR BALANCING. BALANCING WORK SHALL BE PERFORMED BY A CERTIFIED BALANCING CONTRACTOR WHO IS A MEMBERIN GOOD STANDING OF AABC OR NEBB, BALANCING WORK SHALL BE IN COMPLIANCE WITH THE STANDARD PROCEDURE MANUALPUBLISHED BY THE TESTING AND BALANCING ORGANIZATION AFFILIATED WITH THE BALANCING CONTRACTOR. PRIOR TOACCEPTANCE OF THE AREA, CONTRACTOR SHALL SUBMIT TO THE ARCHITECT/ENGINEER ALL APPROPRIATE FIELD DATA ONSTANDARD FORMS OF THE TESTING AND BALANCING ORGANIZATION IN ACCORDANCE WITH STANDARD PROCEDURES.CONTRACTOR TO SUBMIT (6) SIX COPIES OF BALANCING REPORT.
THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OFACCEPTANCE BY THE OWNER AND SHALL REPAIR OR REPLACE AT NO ADDITIONAL COST TO THE OWNER ANY PART THEREOF WHICHMAY BECOME DEFECTIVE DURING THE PERIOD OF GUARANTEE, ORDINARY WEAR AND TEAR EXCEPTED. THE CONTRACTOR SHALL BERESPONSIBLE FOR AND PAY FOR ANY DAMAGES RESULTING FROM OR CAUSED BY DEFECTS IN HIS/HER WORK.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND INSTALLATION ALL NEW WORK IN ACCORDANCE WITH THE EXISTING MATERIALS,FINISHES AND METHODS. THE FINISHED WORK SHALL BE REASONABLY "IN-KIND" WITH THE EXISTING WORK UNLESS OTHERWISENOTED BY ARCHITECT.
CONTRACTOR TO PROVIDE TEMPORARY FILTERS ON ALL SYSTEMS DURING CONSTRUCTION. ALL FILTERS TO BE REPLACED PRIOR TOTURN OVER OF SPACE. THE CONTRACTOR SHALL BE RESPONSIBLE TO CHANGE FILTERS DURING CONSTRUCTION TO MAINTAINPROPER EQUIPMENT OPERATION.
ALL THE ELEMENTS WHICH ARE LOCATED WITHIN THE CEILING AIR PLENUMS SHALL BE PLENUM-RATED AND SHALL BE LISTED FORINSTALLATION IN SUCH AREAS.
CO
H
PS
#
#
BD
BAROMETRIC DAMPER
MECHANICAL DRAWING LIST
TITLESHEET
MD-1.1 PARTIAL PLANS - DEMOLITION
M-0.1 GENERAL NOTES, SYMBOLS & ABBREVIATIONS
M-1.1 PARTIAL PLANS - NEW WORK
DEMOLITION DUCT
POINT OF DISCONNECTION
POINT OF CONNECTION
M-6.1 MECHANICAL SCHEDULES
M-7.1 MECHANICAL DETAILS
GENERAL DEMOLITION NOTES
THE CONTRACTOR SHALL PROVIDE PROTECTION FOR ALL PARTS OF THE BUILDING, ITS CONTENTS, AND OCCUPANTSWHEREVER WORK UNDER THIS CONTRACT IS PERFORMED.
DEMOLITION SHALL INCLUDE REMOVAL OF EXISTING BUILDING CONSTRUCTION TO EXTENT REQUIRED TO PERFORM NEWCONSTRUCTION ACTIVITIES INDICATED IN CONTRACT DOCUMENTS.
THE DEMOLITION PROCEDURES SHALL PROVIDE FOR SAFE CONDUCT OF THE WORK, PROTECTION OF PERSONNEL,CAREFUL REMOVAL AND DISPOSITION OF MATERIALS SPECIFIED TO BE SALVAGED, PROTECTION OF PROPERTY TOREMAIN UNDISTURBED, COORDINATION WITH OTHER IN PROGRESS, AND TIMELY DISCONNECTION OF UTILITY SERVICES.
EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE. WORK DAMAGED BY THE CONTRACTOR SHALL BEREPLACED TO MATCH EXISTING WORK OR AS REQUIRED TO ACCOMMODATE NEW WORK INSTALLED UNDER THISCONTRACT.
EXISTING WORK SHALL BE CUT, DRILLED, ALTERED, REMOVED OR TEMPORARILY REMOVED AND REPLACED FORPERFORMANCE OF WORK UNDER THE CONTRACT. WORK REPLACED SHALL MATCH SIMILAR EXISTING WORK.STRUCTURAL MEMBERS OF CONCRETE OR STRUCTURAL STEEL SHALL NOT BE CUT OR ALTERED EXCEPT AS SHOWN,WITHOUT AUTHORIZATION OF THE OWNER. WORK REMAINING IN PLACE DAMAGED OR DEFACED DURING THIS CONTRACTSHALL BE RESTORED TO THE CONDITION AT TIME OF AWARD OF CONTRACT. CUT, ALTER, REMOVE OR TEMPORARILYREMOVED AND REPLACE EXISTING WORK FOR INSTALLATION OF MECHANICAL, PLUMBING AND ELECTRICAL WORK ANDOTHER CONSTRUCTION.
EXISTING CONDITIONS (I.E., PRESENCE AND LOCATION OF DUCTWORK, EQUIPMENT, PIPING AND MATERIALS, AS WELLAS EXISTING DUCT, PIPE AND EQUIPMENT SIZES) ARE BASED ON INFORMATION OBTAINED FROM AVAILABLE RECORDDRAWINGS AND FIELD SURVEYS AND ARE NOT WARRANTED TO BE COMPLETE. CONTRACTOR SHALL FIELD VERIFY EXACTSIZES, LOCATIONS, AND DATA PRIOR TO STARTING ALL WORK. MAJOR DISCREPANCIES DISCOVERED DURING THEDEMOLITION PHASE OF THE WORK SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION TO THE ENGINEER.
PRIOR TO COMMENCING OF DEMOLITION, THE FOLLOWING PROCEDURES SHALL BE DONE:1. ALL RETURN/EXHAUST AIR OPENINGS, INCLUDING TRANSFER DUCTS, SHALL BE PROVIDED WITH TEMPORARY AIR FILTERS
TO CONTAIN CONSTRUCTION DUST.2. CONTRACTOR SHALL VERIFY ALL EXISTING SYSTEMS TO BE REMOVED, DEMOLISHED, RELOCATED OR SHIFTED.
ALL DISCONNECTION POINTS SHOWN ARE APPROXIMATE OR SUGGESTED LOCATIONS. CONTRACTOR SHALL VERIFYLOGICAL POINTS OF DISCONNECTION AT THE PROJECT SITE.
ALL SALVAGEABLE MATERIAL/EQUIPMENT SHALL BE TURNED OVER TO THE BUILDING OWNER'S REPRESENTATIVES FORTHEIR DISCRETION.
ALL EXISTING EQUIPMENT TO BE RE-USED SHALL BE CLEANED, INSPECTED, AND PROVIDED WITH ALL NECESSARYADJUSTMENTS FOR FULL FUNCTIONAL SYSTEM.
ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241. (STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION,AND DEMOLITION)
COORDINATE SHUTDOWN OF ANY MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS REQUIRED AS PART OF THEDEMOLITION WORK PRIOR TO INTERRUPTION OF SERVICES.
EXISTING MECHANICAL EQUIPMENT, PIPING AND MATERIALS AFFECTED BY DEMOLITION THAT ARE REQUIRED TO REMAININ SERVICE SHALL BE PROTECTED.
COMPLETE REMOVAL OF HVAC DUCTWORK, PIPING, AND EQUIPMENT INCLUDES (BUT IS NOT LIMITED TO) PIPEHANGERS, VALVES, INSULATION, CONTROL WIRING, DIFFUSERS, DAMPERS, EQUIPMENT BASE SUPPORT, ALL OTHERRELATED APPURTENANCES, ETC.
WHERE DUCTWORK, PIPING, AND EQUIPMENT ARE INDICATED TO BE REMOVED, REMOVE EXISTING CONCRETE INSERTSAND STRUCTURAL ATTACHMENTS, AND PATCH CONCRETE SURFACE TO MATCH ADJACENT.
EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT, PIPING, DUCTWORK, AND MATERIALS AFFECTED BY DEMOLITIONOR NEW WORK INSTALLATION AND REQUIRED TO REMAIN IN SERVICE SHALL BE REINSTALLED OR SUPPORTED ASREQUIRED IN ACCORDANCE WITH NEW WORK SPECIFICATION. ALL WORK SHALL BE COMPLETED AT NO ADDITIONALCOST.
ALL EXISTING EQUIPMENT, DUCTWORK, PIPING, AND MATERIALS NOT REQUIRED FOR USE, REUSE, OR REINSTALLATIONSHALL BE REMOVED. ALL OTHERS SHALL BE REMOVED BY THE CONTRACTOR FROM THE PREMISES.
AC AIR CONDITIONING UNIT
AF AIR FILTER
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
ARCH ARCHITECTURAL
AS AIR SEPARATOR
ATC AUTO TEMPERATURE CONTROL
BDD BACKDRAFT DAMPER
BHP BRAKE HORSE POWER
BLDG BUILDING
BLW BELOW
BP BOOSTER PUMP
BS BIRD SCREEN
BTUH BRITISH THERMAL UNIT PER HOUR
CAC CONTROL AIR COMPRESSOR
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHP CHILLED WATER PUMP
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
CLG CEILING
CO CLEAN OUT
CP CONDENSER WATER PUMP
CR CONDENSER WATER RETURN
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CS CONDENSER WATER SUPPLY
CV CONVERTER
CU CONDENSING UINT
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DI DIGITAL INPUT
DIA DIAMETER
DN DOWN
DO DAMPER OPERATOR
DO DIGITAL OUTPUT
DPS DIFFERENTIAL PRESSURE SWITCH
DWG DRAWING
EA EACH
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EQUIP EQUIPMENT
ET EXPANSION TANK
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
EXIST EXISTING
(E) EXISTING
EXT EXTERNAL
F FAHRENHEIT
FC FAN COIL UNIT
FD FIRE DAMPER
FL FLOOR
FPM FEET PER MINUTE
FT FEET
FT FLASH TANK
FTR FINNED TUBE RADIATOR
FZ FREEZE STAT
GPM GALLONS PER MINUTE
GWR GLYCOL WATER RETURN
GWS GLYCOL WATER SUPPLY
HC HEATING COIL
HP HORSE POWER / HEAT PUMP
HR HOUR
HS HUMIDITY SENSOR
HVSD HIGH VELOCITY SMALL DUCT SYSTEM
IN INCH
IU INDUCTION UNIT
KW KILOWATT
LAN LOCAL AREA NETWORK
LAT LEAVING AIR TEMPERATURE
LB POUNDS
LF LINEAR FEET
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH 1000 BTUH
MECH MECHANICAL
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MTD MOUNTED
MFG MANUFACTURER
MFGR MANUFACTURER
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NETWORK INTERFACE CARD
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
No. NUMBER
OA OUTSIDE AIR
OAT OUTSIDE AIR TEMPERATURE
P PUMP
PD PRESSURE DROP
PS PRESSURE SENSOR
PSI POUNDS PER SQUARE INCH
(R) RELOCATED
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RF RETURN FAN
RG RETURN GRILLE
RHC REHEAT COIL
RLA RELIEF AIR
RLF RELIEF FAN
RPM REVOLUTION PER MINUTE
S SWITCH
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SD SMOKE DETECTOR
SDHV SMALL DUCT, HIGH VELOCITY SYSTEM
SF SUPPLY FAN
SR SUPPLY REGISTER
SS STAINLESS STEEL
TS TEMPERATURE SENSOR
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
V VALVE (MOTORIZED)
VAV VARIABLE AIR VOLUME
VSD VARIABLE FREQUENCY/SPEED DRIVE
W WATT
WB WET BULB
WC WATER COLUMN
WPD WATER PRESSURE DROP
W/ WITH
W/O WITHOUT
VS VARIABLE SPEED CONTROLLER
1
2
3
4
5
DWG
M-8.1 MECHANICAL CONTROLS6
ADD
2
DATE DESCRIPTION
4-12-16 Revision 2
TT
TT
VD VD
2 2
VD
1
133
EF-4(E)
4
4
3
3
2
2
EX. 14x14 OPENING(480 CFM RA)
VDVD
VD
VD
FD
FD
VD
VD
VD
FD
FD
2 2
2 2
22
2 2
22x10
10x4
18x10 16x10
VD
VD3
44
4
3
DEMO KEY NOTES
1. REMOVE EXISTING BLOWER COIL, INCLUDING OUTDOOR UNIT ANDDUCTWORK (AS INDICATED ON PLANS), AND THERMOSTAT.
2. EXISTING UNIT VENTILATOR TO BE REMOVED WITH ITS ASSOCIATEDTHERMOSTAT, PIPING, SUPPORTS AND APPURTENANCES.
3. EXISTING PRV TO REMAIN. PRIOR TO DEMOLITION THE TAB SUB-CONTRACTOR SHALL RECORD AIR FLOW (CFM), STATIC PRESSURE AND FANMOTOR RPM AND AMP DRAW FOR USE DURING FUTURE TAB WORK.
4. PRIOR TO DEMOLITION THE SUB-CONTRATOR SHALL RECORD EXISTINGAIRFLOW (CFM) AT THIS POINT IN THE DUCT DISTRIBUTION SYSTEM FOR THEUSE DURING FINAL SYSTEM BALANCING.
1 POD 1 PLAN - DEMOLITIONSCALE: 1/8" = 1'-0"MD-1.1
2 POD 2 PLAN - DEMOLITION
SCALE: 1/8" = 1'-0"MD-1.1
3 POD 3, 4 PLANS - DEMOLITION
ADD
2
ADD
2
ADD
2
ADD
2
DATE DESCRIPTION
4-12-16 Revision 2
TT
T T
T
CLASSROOM 3RD
12
CLASSROOM 3RD
14
VD
3
2
CLASSROOM 5TH
13 CLASSROOM 5TH
15
UV-A
3
2
22
28x10
14x10 14x10
28x10
16x12
CD-3250
CD-3250
CD-3300
CD-3300
CD-1100
CD-3250
CD-3300
CD-3300
CD-3300
16x1
2
10ø10ø
10ø
16x12
EX. 25x25OA DUCT UP
EX. 25x25OA DUCT UP
UV-A
CD-1100
EX. RETURN GRILLEAND CONNECTION
BU -1BU -2
NEW CU-1ON ROOF NEW CU-2
ON ROOF
10ø 10ø 10ø
10ø 10ø
11
4 4
55
4
4
EX. EXHAUSTFAN NO 4
400 OA CFM400 OA CFM
5
CLASSROOM 6TH
17
CLASSROOM 6TH
16
3
3
2
2
14x1
4
T
T
UV-A
UV-A
FCU-A
CD-4400
18x6
20x12
400 OA CFM
400 OA CFMT
EX. 14x14 OPENING(450 CFM RA)
VD
VD
VD
CLASSROOM 4TH
GRADE
10
CLASSROOM 2ND
GRADE
08
CLASSROOM 4TH
GRADE
11
CLASSROOM
09CLASSROOM K
03
CLASSROOM K
01
CLASSROOM 1ST
02
CLASSROOM 1ST
04
ELEC
55B
TOILET
10A
TOILET
08A
3
3 3
33 3
ELEC
55A
EG-275
EG-275
TEACHERS
61
TEACHERS
60
STORAGE 5
62
TEACHERS
63
EG-2110
UV-A UV-A UV-A UV-A
UV-AUV-A UV-A
EG-275
EG-275
EG-2110
EG-2110
EG-2110
33
AC-1
EG-275
EG-275
UV-A
NEW ACCU-1UNIT ON ROOF
55
400 OA CFM 400 OA CFM 400 OA CFM 400 OA CFM
400 OA CFM
16x1018x10
400 OA CFM400 OA CFM400 OA CFM
RG-1325
RG-1325
RG-1325
RG-1325
6666
ADD
2ADD
2
ADD
2
ADD
2
NEW WORK KEY NOTES
1. CONTRACTOR TO PROVIDE NEW BLOWER UNIT AND ASSOCIATEDCONDENSING UNIT ON ROOF. CONTRACTOR TO ROUTE REFRIGERANTPIPING TO NEW CONDENSING UNIT ON ROOF. SIZING AND ROUTING AS PERMANUFACTURE RECOMMENDATION.
2. CONTRACTOR TO RELOCATE THERMOSTAT OR PROVIDE NEW THERMOSTATIF NOT FOUND IN FIELD. MOUNT BASE BUILDING STANDARD. MATCH 4'-0"AFF TO MEET ADA COMPLIANCE.
3. CONTRACTOR TO PROVIDE NEW UNIT VENTILATOR. CONTRACTOR TO FIELDVERIFY PRIOR PURCHASE.CONTRACTOR COORDINATE UNIT OUTDOOR AIROPENING WITH EXISTING WALL OPENING AND BALANCE TO NEW OA CFMSHOWN.CONTRACTOR TO PROVIDE SHEET METAL DUCT TO MATCH WALLOPENING. INSTALL BIRD CAGE ON THE OUTSIDE EDGE OF WALL
4. EXISTING PRV TO REMAIN. PRIOR TO DEMOLITION THE TAB SUB-CONTRACTOR SHALL RECORD AIR FLOW (CFM), STATIC PRESSURE AND FANMOTOR RPM AND AMP DRAW FOR USE DURING FUTURE TAB WORK.
5. UPON COMPLITION OF NEW CONSTRUCTION BALANCE THE ALL AIROUTLETS AND NEW/EXISTING AHU'S AND FANS YO PROVIDDE AIRQUANTITIES INDICATED.
6. 12x12 TRANSFER DUCT WITH WIRE MESH SCREEN (TYPICAL).
NOTES:1. OUTDOOR AIR CONDITION : 95°F DB & 75°F WB.2. BASIS OF DESIGN : SUMMER 75°F DB & 50% RH; WINTER 70°F DB.3. INSTALL PER MANUFACTURERS RECOMMENDATIONS WITH ALL REFRIGERANT PIPING CONSEALED IN WALLS.4. PROVIDE CONDENSATE PIPING WITH P-TRAP TO THE NEAREST FLOOR DRAIN.5. CONDENSING UNITS SHAL BE MOUNTED ON EQUIPMENT RAIL.6. REFRIGERANT TYPE SHALL BE R-410A.7. REFRIGERANT PIPING SHALL BE LONG LINE APPLICATION IF THE INDOOR & OUTDOOR UNITS PIPING SPAN ARE MORE THAN 100 FEET LONG.
ROOF MOUNTED AIR CONDITIONING OUTDOOR UNIT SCHEDULE
UNIT MARK LOCATIONELECTRICAL DATA
BASIS OF DESIGN REMARKSVOLTS/PH/HZ FLA MCA
ACCU-1 ROOF 208/1/60 0.35 13 MITSUBISHI: PUY-A12NHA3 SEE NOTES 1-5
NOTES:
1. INSTALL PER MANUFACTURERS RECOMMENDATIONS WITH ALL REFRIGERANT PIPING CONSEALED IN WALLS.
2. PROVIDE CONDENSATE PIPING WITH P-TRAP TO THE NEAREST FLOOR DRAIN.
3. CONDENSING UNITS SHAL BE MOUNTED ON EQUIPMENT RAIL.
4. REFRIGERANT TYPE SHALL BE R-410A.
5. REFRIGERANT PIPING SHALL BE LONG LINE APPLICATION IF THE INDOOR & OUTDOOR UNITS PIPING SPAN ARE MORE THAN 100 FEET LONG.
VENTILATION COMPLIANCE SCHEDULE (IMC-2015)
ROOM #ZONE
NAMEOCCUPANCY CATEGORY
PEOPLE OA
RATE
(CFM/P)
AREA OA
RATE
(CFM/SF)
OCCUPANCY DENSITYFLOOR
AREA
(SF)
BREATHING ZONE
OUTDOOR
AIRFLOW (CFM)
ZONE AIR
DISTRIBUTION
EFFECTIVENESS
ZONE OUTDOOR
AIRFLOW
(CFM)
DESIGN OUTDOOR
AIRFLOW (CFM) PROVIDED
BYCOMPLY CODE
OCCUPANT LOAD
RATE
(#/1000 SF)
OCCUPANCY
Rp Ra "O" Pz Az VbzEz
Voz Vpz
2 CLASSROOM CLASSROOM (AGE 9+) 10 0.12 35 30 850 402 1 402 450 UV - A MET
3 CLASSROOM CLASSROOM (AGE 9+) 10 0.12 35 29 926 401 1 401 450 UV - A MET
NOTES:1.COLOR AS SPECIFIED BY ARCHITECT.2.PROVIDE NEW WALL LOUVER/GRILLE FOR FRESH AIR INTAKE.3.PROVIDE INTEGRATED THERMOSTAT CONTROL WITH TEMPERATURE, FAN SPEED.4.UNITS SHALL BE PROVIDED WITH AUTOMATIC RETURN AND FRESH AIR INTAKE DAMPERS.5.UNITS SHALL BE PROVIDED WITH DDC CONTROLLER CAPABLE OF INTEGRATING INTO PGCPS EXISTING BUILDING ENERGY MANAGEMENT SYSTEM.6.PROVIDE SHUT-OFF VALVES CIRCUIT SETTER, AND TEST PORTS.
AIR DEVICE (DIFFUSER, GRILLE) SCHEDULE
DESIGNATIONCFM
RANGE
PD
(WG)MAX NC NECK SIZE (IN) FLEX DUCT DIA (IN)
MAX FLEX DUCT
LENGTH (FT)MODULE SIZE DEVICE TYPE
BASIS OF DESIGNREMARKS
MFGR MODEL
CD-1 0-100 0.1 18 6 6 6 24" X 24" LAY-IN-SUPPLY TITUS TMS NOTES 1-7
CD-2 101-200 0.1 18 8 8 6 24" X 24" LAY-IN-SUPPLY TITUS TMS NOTES 1-7
CD-3 201-300 0.1 18 10 10 6 24" X 24" LAY-IN-SUPPLY TITUS TMS NOTES 1-7
CD-4 301-400 0.1 18 12 12 6 24" X 24" LAY-IN-SUPPLY TITUS TMS NOTES 1-7
RG-1 0-400 0.1 18 12 X 12 NA NA 24" X 24" LAY-IN-RETURN TITUS TMS NOTES 1-7
NOTES:1.ALL SUPPLY DIFFUSERS SHALL BE PROVIDED WITH ADJUSTABLE PATTERN FOR VERTICAL AND HORIZONTAL DISCHARGE PATTERN.2.DIFFUSER SHALL BE CONSTRUCTED OF 24 GAUGE STEEL.3.PROVIDE OPPOSED BLADE DAMPER.4.DIFFUSER SHALL BE TESTED IN ACCORDANCE WITH ANSI/ASHRAE STANDARD 70-2006.5.PROVIDE PLASTER FRAME FOR ALL AIR DEVICES LOCATED IN GYP BOARD CEILING.6.PROVIDE AND INSTALL OPPOSED BLADE DAMPERS ON ALL SQUARE DIFFUSERS LOCATED IN GYP BOARD CEILING.7.PROVIDE DRYWALL MOUNTING CLIPS FOR DIFFUSERS IN DRYWALL OR PLASTER CEILINGS.
FAN COIL UNIT SCHEDULE
UNIT MARK LOCATION
SUPPLY FAN COOLING DATA HEATING DATA ELECTRICAL DATABASIS
NOTES:1.COLOR AS SPECIFIED BY ARCHITECT.2.PROVIDE INTEGRATED THERMOSTAT CONTROL WITH TEMPERATURE, FAN SPEED.3.UNITS SHALL BE PROVIDED WITH DDC CONTROLLER CAPABLE OF INTEGRATING INTO PGCPS EXISTING BUILDING ENERGY MANAGEMENT SYSTEM.4.PROVIDE SHUT-OFF VALVES CIRCUIT SETTER, AND TEST PORTS.
EG-2 0-90 0.1 15 NA NA NA 6" X6" EXHAUST GRILLE TITUS 350-RL NOTES 1-7
1 CLASSROOM CLASSROOM (AGE 9+) 10 0.12 35 30 926 411 1 411 450 UV - A MET
EX. OPERATOR WORKSTATION(LOCATION SHALL BE COORDINATEDWITH PGCPS AUTHORITY)
EX. BACNET IP BLN
1NOT TO SCALE
SYSTEM ARCHITECTURE
T
T
T
T
RETURN AIRSUPPLY AIR TOSPACE
FILTER FAN
DUALTEMP.COIL
V-1TS-2
TS-1
OUTSIDE AIR
RETURN AIRSUPPLY AIR TOSPACE
FILTER FAN
DXCOIL
V-1TS-2
TS-1
OUTSIDE AIR
D
X
HEATINGCOIL
V-2
H
W
GENERALREQUIREMENTS
BU-1 BU-2 CU-1
NOTE:
A. THIS DIAGRAM IS INTENDED TO BE A GENERAL DESIGN OVERVIEW AND IN NO WAYDESIGNATES AN EXACT NUMBER OF CONTROLLERS, FIELD PANELS, AND POINTS ORDEVICES.
UV/FCU
CU-2
UV-A
UV-A
UV-A
UV-A
UV-A
UV-A
UV-A
UV-A
UV-A
UV-A
UV-A
UV-A
SEQUENCE OF OPERATION - UNIT VENTILATOR UNIT
A. CYCLE OF OPERATION:
1. UNOCCUPIED TIME: DURING THE NIGHT AND WEEKEND AND ANY OTHER TIME DETERMINED BY PROGRAMMABLE THERMOSTAT, THE FAN
SHALL BE OFF. WHENEVER THE FAN IS OFF, THE CONTROL VALVE SHALL BE POSITIONED TO THE OPEN POSITION AND THE CONTROL VALVE
AND OUTSIDE AIR DAMPER SHALL BE FULLY CLOSED. DURING THE UNOCCUPIED TIME, THE FAN SHALL OPERATE ONLY WHEN REQUIRED BY
THE NIGHT-LOW-LIMIT AND MORNING WARM-UP PERIODS.
2. NIGHT-LOW-LIMIT OPERATION: DURING THE UNOCCUPIED TIME, IF THE SPACE TEMPERATURE DROPS BELOW THE NIGHT-LOW-LIMIT SETPOINT
(55°F, ADJUSTABLE) AND THE HEATING SYSTEM IS OPERATIONAL, THE FAN SHALL START ON HIGH SPEED AND THE CONTROL VALVE SHALL
POSITION FULL OPEN TO THE COIL.
3. OCCUPIED TIME: THE FAN SHALL RUN CONTINUOUSLY AND THE OUTSIDE AIR DAMPER SHALL BE IN ITS MINIMUM OPEN POSITION, SUBJECT
TO THE TEMPERATURE. THE UNIT FAN SHALL OPERATE CONTINUOUSLY DURING THE OCCUPIED TIME.
B. TEMPERATURE CONTROL:
1. HEATING CYCLE: WHEN THE SPACE TEMPERATURE IS BELOW THE HEATING SETPOINT (70°F ADJUSTABLE), THE CONTROL SYSTEM SHALL
MODULATE THE HEATING BY CONTROL VALVE. THE OUTSIDE AIR DAMPER SHALL REMAIN IN ITS MINIMUM OPEN POSITION. THE FAN SHALL
OPERATE AT LOW SPEED UNLESS THE CONTROL VALVE IS FULLY OPEN TO THE COIL AND THE SPACE TEMPERATURE IS STILL BELOW THE
HEATING OCCUPIED SETPOINT. IF THAT IS THE SITUATION, THE FAN SHALL BE SWITCHED TO MEDIUM SPEED. IF THE SPACE TEMPERATURE
REMAINS 10F OR MORE BELOW THE HEATING SETPOINT, THE FAN SHALL BE SWITCHED TO HIGH SPEED.
2. VENTILATING CYCLE: UNIT CAPACITY IS CONTROLLED BY VARYING THE HEATING ELEMENT OUTPUT, IF THE ROOM TEMPERATURE RISES
ABOVE THE THERMOSTAT SETTING, THE CONTROL VALVE IS TURNED OFF AND AN INCREASING AMOUNT OF OUTSIDE AIR IS ADMITTED UNTIL
OUTSIDE AIR IS BEING DELIVERED.
3. COOLING CYCLE: THERMOSTAT SHALL MODULATE COOLING BY CONTROL VALVE AND FAN SPEED TO MAINTAIN SPACE TEMPERATURE SET
POINT OF 75°F (ADJUSTABLE).
AI - ANALOG INPUT
AO - ANALOG OUTPUT
BI - BINARY INPUT
BO - BINARY OUTPUT
DI - DIGITAL INPUT
DO - DIGITAL OUTPUT
CB - DIGITAL SERIAL
COMMUNICATION BUS
UVCONTROLLER
SU
PP
LY
FA
NS
TA
RT
/ST
OP
DO
SU
PP
LY
FA
N S
TA
TU
S
CO
NT
RO
L V
ALV
E
SU
PP
LY
AIR
TE
MP
ER
AT
UR
E S
EN
SO
R
SP
AC
E T
EM
PE
RA
TU
RE
SE
NS
OR
DI AO AI AI
UNIT VENTILATOR (UV) CONTROL DIAGRAM
CONTRACTOR SHALL COORDINATE COMPLETE CONTROLS INTEGRATION WITH EQUIPMENTMANUFACTURERS PRIOR TO EQUIPMENT BEING RELEASED. DIAGRAM IS SINGLE LINE ANDDOES NOT REPRESENT ACTUAL NUMBER OF POINTS OR THE NUMBER OF CONDUCTORS.CONTRACTOR IS THE CONTROLS INTEGRATOR AND SHALL SUPPLY ALL PARTS, LABOR,PROGRAMS, AND INTELLECTUAL PROPERTY WHICH MAY NOT HAVE BEEN SUPPLIED BY THEMANUFACTURER.
AI - ANALOG INPUT
AO - ANALOG OUTPUT
BI - BINARY INPUT
BO - BINARY OUTPUT
DI - DIGITAL INPUT
DO - DIGITAL OUTPUT
CB - DIGITAL SERIAL
COMMUNICATION BUS
UVCONTROLLER
SU
PP
LY
FA
NS
TA
RT
/ST
OP
DO
SU
PP
LY
FA
N S
TA
TU
S
CO
NT
RO
L V
ALV
E
SU
PP
LY
AIR
TE
MP
ER
AT
UR
E S
EN
SO
R
SP
AC
E T
EM
PE
RA
TU
RE
SE
NS
OR
DI AO AI AI
BLOWER COIL UNIT CONTROL DIAGRAM
CONTRACTOR SHALL COORDINATE COMPLETE CONTROLS INTEGRATION WITH EQUIPMENTMANUFACTURERS PRIOR TO EQUIPMENT BEING RELEASED. DIAGRAM IS SINGLE LINE ANDDOES NOT REPRESENT ACTUAL NUMBER OF POINTS OR THE NUMBER OF CONDUCTORS.CONTRACTOR IS THE CONTROLS INTEGRATOR AND SHALL SUPPLY ALL PARTS, LABOR,PROGRAMS, AND INTELLECTUAL PROPERTY WHICH MAY NOT HAVE BEEN SUPPLIED BY THEMANUFACTURER.
CO
NT
RO
L V
ALV
E
AO
SEQUENCE OF OPERATION - BLOWER COIL UNIT
A. CYCLE OF OPERATION:
1. UNOCCUPIED TIME: DURING THE NIGHT AND WEEKEND AND ANY OTHER TIME DETERMINED BY PROGRAMMABLE THERMOSTAT, THE FAN
SHALL BE OFF. WHENEVER THE FAN IS OFF, THE HEATING VALVE SHALL BE POSITIONED TO THE OPEN POSITION AND THE COOLING VALVE AND
OUTSIDE AIR DAMPER SHALL BE FULLY CLOSED. DURING THE UNOCCUPIED TIME, THE FAN SHALL OPERATE ONLY WHEN REQUIRED BY THE
NIGHT-LOW-LIMIT AND MORNING WARM-UP PERIODS.
2. NIGHT-LOW-LIMIT OPERATION: DURING THE UNOCCUPIED TIME, IF THE SPACE TEMPERATURE DROPS BELOW THE NIGHT-LOW-LIMIT SETPOINT
(55°F, ADJUSTABLE) AND THE HEATING SYSTEM IS OPERATIONAL, THE FAN SHALL START ON HIGH SPEED AND THE HEATING VALVE SHALL
POSITION FULL OPEN TO THE COIL.
3. OCCUPIED TIME: THE FAN SHALL RUN CONTINUOUSLY AND THE OUTSIDE AIR DAMPER SHALL BE IN ITS MINIMUM OPEN POSITION, SUBJECT
TO THE TEMPERATURE. THE UNIT FAN SHALL OPERATE CONTINUOUSLY DURING THE OCCUPIED TIME.
B. TEMPERATURE CONTROL:
1. HEATING CYCLE: WHEN THE SPACE TEMPERATURE IS BELOW THE HEATING SETPOINT (70°F ADJUSTABLE), THE CONTROL SYSTEM SHALL
MODULATE THE HEATING CONTROL VALVE. THE OUTSIDE AIR DAMPER SHALL REMAIN IN ITS MINIMUM OPEN POSITION. THE FAN SHALL
OPERATE AT LOW SPEED UNLESS THE CONTROL VALVE IS FULLY OPEN TO THE COIL AND THE SPACE TEMPERATURE IS STILL BELOW THE
HEATING OCCUPIED SETPOINT. IF THAT IS THE SITUATION, THE FAN SHALL BE SWITCHED TO MEDIUM SPEED. IF THE SPACE TEMPERATURE
REMAINS 10F OR MORE BELOW THE HEATING SETPOINT, THE FAN SHALL BE SWITCHED TO HIGH SPEED.
2. VENTILATING CYCLE: UNIT CAPACITY IS CONTROLLED BY VARYING THE HEATING ELEMENT OUTPUT, IF THE ROOM TEMPERATURE RISES
ABOVE THE THERMOSTAT SETTING, THE CONTROL VALVE -2 IS TURNED OFF AND AN INCREASING AMOUNT OF OUTSIDE AIR IS ADMITTED UNTIL
OUTSIDE AIR IS BEING DELIVERED.
3. COOLING CYCLE: THERMOSTAT SHALL MODULATE COOLING CONTROL VALVE AND FAN SPEED TO MAINTAIN SPACE TEMPERATURE SET POINT
OF 75°F (ADJUSTABLE).
1. PROVIDE ALL SOFTWARE, HARDWARE, LICENSING, KEYS, AND PERIPHERALS TO FULFILL REQUIREMENTS. CONTRACTOR AS THE MASTER CONTROLS INTEGRATOR, SHALL BE RESPONSIBLE FOR ALL CONTROLS
INTEGRATION, REGARDLESS OF THE EXISTING EQUIPMENT, CONTROLS, AND CONDITIONS.
2. AS SPECIFIED, UNITS SHALL HAVE THEIR OWN FACTORY-INSTALLED SELF-CONTAINED CONTROL SYSTEMS WITH INDEPENDENT DDC AND ASSOCIATED CONTROLLERS CONTAINED IN A UNIT-MOUNTED CONTROL
PANEL. PROGRAMS AND LOGIC REQUIRED FOR THE FUNCTIONS AND SEQUENCE OF OPERATIONS (SOO) DESCRIBED IN THE CONTRACT DOCUMENTS SHALL RESIDE WITHIN THE UNIT-MOUNTED CONTROLLER(S).
CONTROLLERS AND ASSOCIATED PROGRAMS SHALL OPERATE COMPLETELY INDEPENDENTLY, AND SHALL ALSO BE CONNECTED TO AND INTEROPERATING WITH THE FACILITY'S BUILDING AUTOMATION SYSTEM
(BAS) USING BACNET PROTOCOL OR AN OPEN-SOURCE NON-PROPRIETARY DDC PROTOCOL APPROPRIATE FOR THE EXISTING SYSTEMS, AND APPROVED BY THE OWNER AND ENGINEER PRIOR TO PROJECT
IMPLEMENTATION. NO SPECIALIZED OR PROPRIETARY HARDWARE, SOFTWARE, FIRMWARE, OR MIDDLEWARE SHALL BE REQUIRED TO ACCOMPLISH SET-POINT ADJUSTMENTS, TO FULFILL THE SOO, TO ALTER THE
PROGRAMMED SOO, OR TO EXPAND THE HVAC SYSTEMS OR CONTROLS BY THE END USER AFTER PROJECT TURN-OVER. CONTRACTOR SHALL PROVIDE TWO (2) DIGITAL AND TWO (2) HARD COPIES OF THE
COMPLETE AS-PROGRAMMED CONTROL LOGIC, IN EACH OF THE RESPECTIVE DDC SYSTEM'S NATIVE PROGRAMMING LANGUAGE. ONE HARD COPY SHALL BE AFFIXED INSIDE UNIT CONTROLLER ENCLOSURE, AND
ONE HARD COPY AND TWO DIGITAL COPIES SHALL BE PROVIDED WITHIN THE OFFICIAL BUILDING OPERATION PLAN (BOP). COMPLETE COMMISSIONING, SERVICE, AND PROGRAMMING INSTRUCTION MANUALS
SHALL BE SUPPLIED TO THE END USER PRIOR TO FINAL ACCEPTANCE. PERFORMANCE OF THE SELF-CONTAINED CONTROL SYSTEMS SHALL BE TOTALLY INTEGRATED WITH THE BAS FOR FULL AND SEAMLESS
OPERATION, INCLUDING CAPABILITY TO READ, TREND, AND ARCHIVE ALL DATA POINTS AND CHANGE ALL SETPOINTS FROM THE CENTRAL OPERATORS WORK STATION. BAS SHALL BE PROGRAMMED TO
ANNUNCIATE APPLICATION AND POINT SPECIFIC ALARMS VIA TEXT MESSAGE AND EMAIL.
3. PROVIDE NECESSARY CONTROL DEVICES, CONTROLLERS, SYSTEM'S INTEGRATION AND PROGRAMMING REQUIRED TO ACCOMPLISH THE SPECIFIED SEQUENCES OF OPERATION AND ALL DELIVERABLES.
ABSENCE OF FEATURES, FUNCTIONS, SAFETIES, OR SYSTEM OPERATING REQUIREMENTS NOT SPECIFICALLY DETAILED WITHIN THIS SOO, SHALL NOT RELIEVE THE CONTR
AAV AIR ADMITTANCE VALVEABV ABOVEAD AREA DRAINADA AMERICAN DISABILITY ACTAFF ABOVE FINISHED FLOORAP ACCESS PANELARCH ARCHITECTURALASME AMERICAN SOCIETY OF MECHANICAL ENGINEERSASPE AMERICAN SOCIETY OF PLUMBING ENGINEERSASSE AMERICAN SOCIETY OF SANITARY ENGINEERS
BLDG BUIDINGBLW BELOWBTU BRITISH THERMAL UNITBTUH BRITISH THERMAL UNIT PER HOURBWV BACK WATER VALVE
CA COMPRESSED AIRCFM CUBIC FEET PER MINUTECLG CEILINGCO CLEAN OUTCONT CONTINUATIONCW COLD WATER
E EXISTINGEA EACHEQUIP EQUIPMENTERD EMERGENCY ROOF DRAINERD(G) EMERGENCY ROOF DRAIN-GREEN ROOFEST EMERGENCY STORMET EXPANSION TANKETR EXISTING TO REMAIN
F WATER FILTERFCO FLOOR CLEAN OUTFD FLOOR DRAINFL FLOORFS FLOW SWITCHFT FEETFM FORCED MAIN
GAL GALOONGCO GRADE CLEAN OUTGD GARBAGE DISPOSALGD GARAGE DRAINGH GARDEN HYDRANTGPM GALLONS PER MINUTE
HB HOSE BIBHDPE HIGH DENSITY POLYETHYLENEHP HORSE POWERHW HOT WATER SUPPLYHWR HOT WATER RETURNHPCW HIGH PRESSURE COLD WATERHWSH HOT WATER STORAGE/HEATER
IN INCHINV INVERT
KW KILOWATT
LAV LAVATORY
MAX MAXIMUMMBH THOUSAND BTU PER HOURMECH MECHANICALMFR MANUFACTURERMGCV MASTER GAS CONTROL VALVEMIN MINIMUMMS MOP SINKMTD MOUNTED
N NEWNC NORMALLY CLOSEDNFWH NON FREEZE WALL BHYDRANTNG NATURAL GASNIC NOT IN CONTRACTNO. NUMBERNO NORMALLY OPENNT ACID NEUTRALISATION TANK
ORD OVERFLOW ROOF DRAINORD(G) OVERFLOW ROOF DRAIN-GREEN ROOFOSD OPEN SITE DRAIN
P PUMPPD PLANTRER DRAINPDD POOL DECK DRAINPDI PLUMBING AND DRAINAGE INSTITUTEPH PHASE(ELECTRICAL)PRV PRESSURE REDUCNG VALVEPSI POUNDS PER SQUARE INCH
RCV RISER CONTROL VALVEREF REFRIGERATORRD ROOF DRAINRD(G) ROOF DRAIN-GREEN ROOFRH ROOF HYDRANTRPM REVOLUTIONS PER MINUTERR RAIN WATER REUSERW RAIN WATERRWC RAIN WATER CONDUCTOR
SA SHOCK ABSORBERSAN SANITARY/WASTE PIPESF SQUARE FEETSFU SUPPLY FIXTURE UNITSS STAINLESS STEELSS SERVICE SINKST STORM WATERST(G) STORM-FROM GREEN ROOFSTRUC STRUCTURAL
2015 WSSC PLUMBING AND FUEL GAS CODE2015 INTERNATIONAL MECHANICAL CODE2015 INTERNATIONAL ENERGY CONSERVATION CODE
BACK WATER VALVE
DESIGN CRITERIA
DETAIL NUMBER
DETAIL NUMBER
WHERE THE DETAIL IS DRAWN
WHERE THE DETAIL IS DRAWN
WHERE THE DETAIL REFERENCED
DETAIL ANNOTATIONS
DOMESTIC WATER RISER DESIGNATION
SANITARY WATER RISER DESIGNATION
STORM RISER DESIGNATION
GAS RISER DESIGNATION
EQUIPMENT DESIGNATION
REVISION NUMBER
ANNOTATIONS
POINT OF DEMOLITION
POINT OF CONNECTION
HORIZONTAL CLEANOUT
WALL HYDRANT
HOSE BIB
MISCELLANEOUS
GAS METER
WATER METER
WATER FILTER
VACCUM BREAKER
TEMPERATURE AND PRESSURE RELIEF VALVE
TRAP PRIMER
DIRT LEG
BREAK PIPE BELOW
GREEN STORM RISER DESIGNATION
VENT RISER DESIGNATION
EMERGENCY STORM RISER DESIGNATION
EMEREGENCY GREEN STORM RISER DESIGNATION
ROOF HYDRANT
GARDEN HYDRANT
RH
GH
A
GM
TP
CO
WH
HB
F
M
NOTE: ALL ABBREVIATIONS MAY NOT APPEAR ON THE DRAWINGS.
NOTE: ALL ABBREVIATIONS MAY NOT APPEAR ON THE DRAWINGS.
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2015 WSSC PLUMBING AND FUEL GAS CODE AND THE AUTHORITY HAVING JURISDICTION.
2. CONTRACTOR SHALL FIELD VERIFY SIZES AND LOCATIONS OF EXISTING PIPES AND EQUIPMENT PRIOR TO STARING WORK.
3. PROVIDE ISOLATION VALVES OR SERVICE STOPS FOR ALL PLUMBING FIXTURES.
4. ALL WORK SHALL BE COORDINATED WITH ALL TRADES PRIOR TO INSTALLATION. COORDINATE PIPING INSTALLATION WITH NEWPARTITIONS AND CEILING HEIGHTS.
5. WORK REQUIRED BELOW THE RENOVATED SPACE OR WITHIN A SPACE OCCUPIED BY A DIFFERENT TENANT SHALL BE COORDINATEDAND SCHEDULED WITH OWNER/LANDLORD PRIOR TO START OF WORK.
6. ALL SANITARY DRAINAGE PIPING 3" AND LARGER SHALL BE INSTALLED WITH A MINIMUM SLOPE OF 1/8" FALL PER 1'-0" OF RUN OTHERWISE NOTED.
7. ALL SANITARY DRAINAGE PIPING 2" AND LESS SHALL BE INSTALLED WITH A MINIMUM SLOPE OF 1/4" FALL PER 1'-0" OF RUN OTHERWISE NOTED.
8. ALL STORM DRAINAGE PIPE SHALL BE INSTALLED WITH A MINIMUM SLOPE OF 1/8" FALL PER 1'-0" OF RUN OTHERWISE NOTED.
9. TEST HOT AND COLD WATER PIPING HYDROSTATICALLY AT PRESSURE OF 100 P.S.I. FOR A PERIOD OF (4) HOURS WITHOUT EVIDENCE OF PRESSURE LOSS
10. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS.
11. MAKE FINAL CONNECTIONS AFTER FIXTURES AND EQUIPMENT ARE SET IN PLACE. ALL REQUIRED TRIM, FAUCETS AND MINOR ITEMSNECESSARY FORA COMPLETE FUNCTIONING INSTALLATION, SUCH AS STRAINERS, TRAPS, TAILPIECES, ESCUTCHEONS, ETC., SHALL BE FURNISHED AND INSTALLEDBY THE CONTRACTOR IN ACCORDANCE WITH EQUIPMENT REQUIREMENTS. ALL FAUCETS TO BE HEAVILY CHROME-PLATED..
12. TEST PIPING PRIOR TO INSTALLATION OF PIPE INSTALLATION. REMAKE ANY LEAKING JOINTS AND RETEST. "STOP LEAK" ADDITIVES SHALL NOT BE PERMITTED.
13. AFTER FINAL TESTING FOR LEAKS, ALL NEW POTABLE WATER LINES SHALL BE THOROUGHLY FLUSHED BY THE PLUMBING CONTRACTOR TO REMOVE FOREIGNMATERIAL. BEFORE PLACING THE SYSTEM IN SERVICE, CONTRACTOR SHALL ENGAGE A QUALIFIED SERVICE ORGANIZATION TO STERILIZE THE NEW WATER LINESIN ACCORDANCE WITH APPLICABLE REGULATIONS. A CERTIFICATE OF COMPLIANCE SHALL BE PROVIDED TO THE OWNER.
14. SUBMIT OPERATING AND MAINTENANCE MANUALS AND WARRANTY CERTIFICATES TO OWNER.
15. THE CONTRACTOR SHALL NOT CORE DRILL CONCRETE SLABS WITHOUT THE KNOWLEDGE AND WRITTEN CONSENT OF THE STRUCTURAL ENGINEERAND THE BUILDING OWNER AND SHALL X-RAY PRIOR TO ANY CORE DRILLING. X-RAYING AND CORE DRILLING SLABS SHALL BE SCHEDULEDWITH THE BUILDING OWNER, INCLUDE COSTS OF X-RAYING IN BID.
16. CONTRACTOR ASSUMES RESPONSIBILITY FOR PROPER ARRANGEMENT OF PIPE, FIXTURES, ETC TO CONNECT APPROVED EQUIPMENT IN APROPER AND APPROVED MANNER. CONTRACTOR SHALL FOLLOW EQUIPMENT MANUFACTURER'S DETAILED INSTRUCTIONS AND THE CONTRACT DOCUMENTS.NOTIFY THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH ALL WORK. NO EQUIPMENT INSTALLATION OR CONNECTIONS SHALL BE MADE IN A MANNERTHAT VOIDS THE MANUFACTURER'S WARRANTY.
17. WATER HAMMER ARRESTERS SHALL BE INSTALLED IN FRONT OF ALL QUICK CLOSING VALVES SUCH AS MECHANICAL EQUIPMENTAND AUTOMATIC CLOTHES WASHERS.
18. CONTRACTOR SHALL REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS AND CUT SHEETS AS REQUIRED FOR INSTALLATION OF EQUIPMENT.
19. ALL FLOOR DRAIN TRAP SEALS SHALL BE MAINTAINED BY AN APPROVED TRAP PRIMER.
GENERAL PLUMBING DEMOLITION NOTES
1. WHERE EXISTING PLUMBING FIXTURES ARE INDICATED TO BE REMOVED, REMOVE EXISTING FIXTURE, TRIM, AND ALL ASSOCIATED PIPING AND HARDWARE.REMOVE SERVICE BRANCHES BACK TO NEAREST MAIN AND CAP. DEAD LEGS SHALL NOT EXCEED 2'-0" IN LENGTH.
2. DEMOLITION SHALL BE PERFORMED IN SUCH A MANNER THAT WILL NOT DAMAGE ADJOINING SURFACES OR EQUIPMENT INDICATED TO REMAIN.WHERE SURFACES MUST BE REMOVED TO COMPLETE DEMOLITION, THE CONTRACTOR SHALL REPLACE AND REPAIR THE SURFACES BACK TO THE ORIGINAL CONDITION.
3. WHERE DEMOLITION WOULD AFFECT THE STRUCTURAL INTEGRITY OF THE BUILDING, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEERPRIOR TO PROCEEDING WITH DEMOLITION
4. ALL REMOVED FIXTURES AND TRIM SHALL REMAIN THE PROPERTY OF THE OWNER AND THE CONTRACTOR SHALL STORE ON SITE OR REMOVE FROMSITE SAID FIXTURES AS DIRECTED BY THE OWNER.
5. THE CONTRACTOR SHALL COORDINATE ALL DEMOLITION REQUIRED WITH SYSTEMS THAT MUST REMAIN IN SERVICE DURING CONSTRUCTION .WHERE SYSTEMS MUST REMAIN IN SERVICE DURING CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE MEANS AND METHODS OF ISOLATING THE SYSTEMSTO BE REMOVED WITH THE SYSTEMS TO REMAIN IN SERVICE. MEANS AND METHODS SHALL INCLUDE TEMPORARY CAPS AND ISOLATION VALVES.
1. PRIOR TO ANY PLUMBING PIPING OR EQUIPMENT REMOVAL/DEMOLITION CONTRACTORSHALL ANALYZE AND INSPECT FOR PRESENCE OF HAZARDOUS MATERIALS. ANYHAZARDOUS MATERIALS SHALL BE DOCUMENTED, AND THE OWNER/ARCHITECTNOTIFIED. REFER TO SPECIFICATIONS FOR REMOVAL AND DISPOSAL OF HAZARDOUSMATERIAL.
2. THE PLUMBING CONTRACTOR SHALL PROVIDE ALL DEMOLITION INCIDENTAL TO ORREQUIRED FOR NEW AND RENOVATED CONSTRUCTION WHETHER OR NOT SPECIFICALLYNOTED.
3. DEMOLITION SHALL BE PERFORMED IN SUCH A MANNER THAT WILL NOT DAMAGEADJOINING SURFACES OR EQUIPMENT INDICATED TO REMAIN.
4. WHERE DEMOLITION WOULD AFFECT THE STRUCTURAL INTEGRITY OF THE BUILDING,THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO THEPROCEEDING WITH DEMOLITION.
5. THE PLUMBING CONTRACTOR SHALL REMOVE THE EXISTING FIXTURES AS NOTED OFTHE FOLLOWING DRAWINGS. REMOVE ALL PIPING NOT REQUIRED FOR RENOVATIONAND CAP AT NEAREST VALVE OR MAIN LINE. REMOVED FIXTURES AND TRIM SHALLREMAIN THE PROPERTY OF THE OWNER AND THE CONTRACTOR SHALL STORE ON SITEOR REMOVE FROM SITE SAID FIXTURES AS DIRECTED BY THE OWNER/ARCHITECT.
GENERAL PLUMBING DEMOLITION NOTES
1. EXISTING PLUMBING FIXTURES TO BE REMOVED AND REPLACED WITH NEW PERPLUMBING FIXTURE SCHEDULE WITH EXISTING PLUMBING CONNECTIONS TO REMAIN.REFER TO NEW WORK PLANS. COORDINATE WITH ARCHITECT/OWNER FOR DISPOSALOR STORAGE OF FIXTURE
2. EXISTING PLUMBING FIXTURES TO BE REMOVED. CUT AND CAP ASSOCIATED PIPINGBACK TO WALL / SLAB / CEILING.COORDINATE WITH ARCHITECT/OWNER FORDISPOSAL OR STORAGE OF FIXTURE.
1. PRIOR TO START OF WORK CONTRACTOR SHALL TRACE AND LOCATE ALL EXISTINGSANITARY, STORM, DOMESTIC CW & HW PIPING IN AREA OF WORK, AND AVOIDEXTENSIVE DEMOLITION OR DAMAGE TO CEILINGS SLABS AND WALLS.
2. CONTRACTOR IS RESPONSIBLE FOR PATCHING AROUND NEW WORK INSTALLATION,EXCAVATION AND DEMOLITION AREA. ALL PATCHING AND FINISHING WORK SHALL BECOORDINATED WITH ARCHITECT.
3. PRIOR TO START OF PLUMBING WORK ALL INTENDED STORM AND SANITARY PIPING TO BEREUSED SHALL BE FIELD VERIFIED (LOCATION AND SIZE). ALL BELOW SLAB REUSED PIPINGSHALL BE SNAKED AND VIDEO AUGER TO ANALYZE PIPING AND CHECK FOR DAMAGE ANDCLOGS. ALL DAMAGED PIPING SHALL BE REPLACED AND CLOGS CLEARED. CONTRACTORSHALL . PROVIDE WRITTEN REPORT TO ENGINEERS/ARCHITECT OF PIPING ANALYSIS.
4. COORDINATE WITH CIVIL ENGINEER FOR INSPECTION OF BUILDING STORM AND SANITARYDRAIN FROM BUILDING TO STREET MAIN.
5. CONTRACTOR IS RESPONSIBLE FOR PATCHING AROUND NEW WORK INSTALLATION,EXCAVATION AND DEMOLITION AREA. ALL PATCHING AND FINISHING WORK SHALL BECOORDINATED WITH ARCHITECT.
6. REFER TO ARCHITECTURAL PLANS FOR EXACT PLUMBING FIXTURE LAYOUT.
7. CONTRACTOR SHALL SANITIZE DOMESTIC SYSTEM AFTER PIPING WORK IS COMPLETE ANDPRIOR TO OCCUPANCY IN ACCORDANCE TO 2015 WSSC PLUMBING & FUEL GAS CODE.
8. ALL SANITARY AND STORM PIPING SHALL BE TESTED WITH PIPE FILL METHOD UPON MAJORCOMPLETION OF PIPING INSTALLATION.
9. CONTRACTOR SHALL REMOVE ALL DEBRIS FROM BUILDING AREA DRAINS.
10. CONTRACTOR SHALL INSPECT, TEST AND REPLACE ALL NONFUNCTIONAL PLUMBINGFIXTURE INTENDED TO REMAIN IF APPLICABLE .
GENERAL PLUMBING NEW WORK NOTES
1. PROVIDE NEW PLUMBING FIXTURES PER PLUMBING FIXTURE SCHEDULE. REUSE THEEXISTING PLUMBING ROUGH IN CONNECTIONS.
2. PROVIDE NEW PLUMBING FIXTURE PER PLUMBING FIXTURE SCHEDULE WITH MODIFIEDPLUMBING ROUGH IN CONNECTIONS.