Advanced Process Modeling Fundamental of Business Process [IS611083] Lecturer : 1. Dwi Mustika K, S.Kom., M.Kom (DMK) 2. Yudha Saintika, S.T., M.T.I (YUS)
41

Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Mar 20, 2019

Download

Documents

dodien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Advanced Process Modeling

Fundamental of Business Process [IS611083]

Lecturer : 1. Dwi Mustika K, S.Kom., M.Kom (DMK)

2. Yudha Saintika, S.T., M.T.I (YUS)

Page 2: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Sub Capaian Pembelajaran MK

“Mahasiswa mampu memahami konsep pemodelan proses yang penting maupun pemodelan proses lanjutan

menggunakan BPMN”

Page 3: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Sub Capaian Pembelajaran MK

We are still here !!

Page 4: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Review Tugas

Page 5: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

• What is the difference between data objects and data stores?

• What is the difference between pools and lanes?

Quick recap from Week 4

Page 6: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

• Process Decomposition

• Process Reuse

• Handling Event

Agenda

Page 7: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

PROCESS DECOMPOSITION

Page 8: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Process decomposition

8

Page 9: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Process decomposition

An activity in a process can be decomposed into a “sub-process”

Use this feature to:1. Improve understanding by breaking down large models

2. Identify parts that should be:

• repeated

• executed multiple times in parallel

• interrupted, or

• compensated

Collapsed

Sub-process

Expanded Sub-process

TaskTask

Activities

Page 10: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Example: Sub-Process

Process

Invoice

Process Invoice

Check Invoice

Mismatches

Enter Invoice /

Credit Note

Details

mismatch

exists

no

mismatches

Block Invoice

Invoice

received

Process

Payment

10

Page 11: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Identify possible sub-processes

11

Acquire raw materials

Ship and invoice

Page 12: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Solution

Page 13: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

The refactored model

Page 14: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Check Credit

Record

Receive and

Validate

Order...

Enter Order

Order

received

...Check Credit

Contact

customer

account rep.

Clear Order

Credit not

available

...

Level 3

Level 4

Level 5

Process

Inquiry and

Quote

Credit

available

Example: Modelling process hierarchies

Page 15: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Chain of (high-level) processes an organisation performs in order to achieve a business goal, e.g. deliver a product or service to the market.

Value chain modelling

“is predecessor

of”

Business

process

Page 16: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Linking value chains with process models

Process

model for

this process

is available

Page 17: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

When should we use sub-processes?

Page 18: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Guidelines: modeling levels

Use sub-processes when the model becomes too large:• Hard to understand

• Increased error probability

Level 1 – start with value chain

Level 2 – add main decisions and handoffs (lanes)

Level 3+ – add procedural aspects:• Parallel gateways

• Data objects, data stores

• Exception handling

• And as much detail as is relevant

Decomposition drivers:• Logical: group elements meaningfully (e.g. common business object)

• Structural: up to 30 nodes (activities, events, gateways)

Page 19: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

PROCESS REUSE

Page 20: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

By default, a sub-process is “embedded” into its parent process (i.e. it is stored within the same file)

In order to maximize reuse, it is possible to “extract” the sub-process and store it as a separate file in the process model repository

Such a sub-process is called “global” model, and is invoked via a “call” activity

Call

activity

(normal)

activity

Process Reuse

Page 21: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Call activity is the

default choice to

maximize

reusability

Example: process reuse

Page 22: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Sub-processes: syntax

Sequence flows cannot cross sub-process boundaries• Use start/end events

Message flows can cross sub-process boundaries• To indicate messages emanating from/incoming into the

sub-process

Start with at least one start event

• If multiple, first occurring will trigger the sub-process

Finish with at least one end event• The sub-process will complete once all tokens have reached

an end event. May need an (X)OR-split after sub-process to understand what end event(s) have been reached

Page 23: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Example: sub-process with multiple end events

Quote-to-order

Page 24: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Handling Events

Page 25: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

A Purchase Order (PO) handling process starts when a PO is received. The PO is first registered. If the current date is not aworking day, the process waits until the following working day before proceeding. Otherwise, an availability check is performed and a PO response is sent back to the customer.

How do we model this scenario?

PO handling

Page 26: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

In BPMN, events model something instantaneous happening during the execution of a process

They affect the process flow:• Start

• Intermediate

• End

Events handling

Page 27: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

BPMN event types

Untyped Event – Indicates that an instance of the

process is created (start) or completed (end),

without specifying the cause for creation/completion

Start Message Event – Indicates that an instance

of the process is created when a message is

received

End Message Event – Indicates that an instance of

the process is completed when a message is sent

Intermediate Message Event – Indicates that an

event is expected to occur during the process. The

event is triggered when a message is received or

sent

Catching

EndIntermediateStart

Page 28: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Listings

Judiciary

Check P&E Judge Availability

Check Court

Calendar

Request

Sittings ListCourt Calendar

Received

For all Judges

Resolve P&E

Judge

Availability

Change P&E

Schedules

P&E Court

Court

Administra-

tion

Court Calendar

Change Request

Yearly

Schedule

Sent

Sittings List

Received

Start event

(receive)

Intermediate

catching event

(receive)

End event

(send)

Example: message events

Page 29: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Comparison with sending/receiving tasks

Receive

invoice

Send invoice

Send invoice

Invoice

received

Invoice

sent

Invoice

sent

=

=

=

Receive

invoice

Invoice

received

Page 30: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Use message events only when the corresponding activity would simply send or receive a message and do nothing else

So, when to use what?

Page 31: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Start Timer Event – Indicates that an instance of the

process is created at certain date(s)/time(s), e.g. start

process at 6pm every Friday

Intermediate Timer Event – Triggered at certain date(s)/

time(s), or after a time interval has elapsed since the

moment the event is enabled (delay)

EndIntermediateStart

Temporal events

Page 32: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Example: temporal events

Start

event

Intermediate

catching event

Prepare

callover list3 weeks prior

to callover

day

1 week prior

to callover

day

Contact

partiescallover day

Prepare

callover

material

Hold

callover

callover

held

Intermediate

catching event

In a small claims tribunal, callovers occur once a month to set down the matter for the upcoming trials. The process for setting up a callover starts three weeks prior to the callover day, with the preparation of the callover list containing information such as contact details of the involved parties and estimated hearing date. One week prior to the callover, the involved parties are notified of the callover date. Finally, on the callover day, the callover material is prepared and the callover is held.

Page 33: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Coming back to our scenario…

Register PO

PO

Received

Next working day

weekend/

holiday

Check

Availability

Send PO

Responseweekday

PO

fulfilled

A Purchase Order (PO) handling process starts when a PO is received. The PO is first registered. If the current date is not a working day, the process waits until the following working day before proceeding. Otherwise, an availability check is performed and a PO response is sent back to the customer.

PO handling

Page 34: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Multiple start events

The first start event that occurs will trigger an instance of the process

Notify

Purchasing

Officer

PO Response

Received

Error Message

Received

Friday

afternoon

Process PO

Response

Page 35: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

A restaurant chain submits a purchase order (PO) to replenish its warehouses every Thursday. The restaurant chain’s procurement system expects to receive either a “PO Response” or an error message. However, it may also happen that no response is received at all due to system errors or due to delays in handling the PO on the supplier’s side. If no response is received by Friday afternoon or if an error message is received, a purchasing officer at the restaurant chain’s headquarters should be notified. Otherwise, the PO Response is processed normally.

Let’s consider this process at a restaurant chain

Stock replenishment

Page 36: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Solution: event-based decision

36

Stock replenishment

Page 37: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Recap: message and timer events

Untyped: indicate start point, state changes or final states.

Message: Receiving and

sending messages.

Timer: Cyclic timer events,

points in time, time spans or

timeouts.

Start EndIntermediate

Catching Throwing

Page 38: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Buatlah diagram dekomposisi untuk proses “mengevaluasi PO bermasalah” pada tugas

individu 1 kemarin!

Level 2 Proses Mengevaluasi PO Bermasalah:

Proses ini dimulai ketika terjadi PO bermasalah. Berdasarkan data status PO yang belum

selesai dari Gudang, maka divisi Logistik akan meminta data PO kepada bagian Purchasing. Data

ini kemudian dievaluasi dengan cara melakukan konfirmasi dengan Perusahaan Supplier. Evaluasi

yang dilakukan meliputi kasus:

1. Supplier belum menerima PO.

2. Barang belum dikirim tetapi PO sudah diterima oleh Supplier.

3. Barang baru dikirim sebagian.

4. Dari barang yang sudah dikirim ada sebagian yang dikembalikan ke supplier karena rusak

(return).

5. Supplier sedang tidak dapat menyediakan barang tersebut.

Untuk semua kemungkinan tersebut, dari point 2 sampai 4 maka divisi logistik akan meminta

konfirmasi dari supplier tentang kesanggupan penyelesaian PO tersebut. Sedangkan untuk point 1

dan 5 maka divisi Logistik akan meneruskan hasil evaluasi tersebut ke bagian Purchasing untuk

ditindaklanjuti.

Latihan di Rumah

Page 39: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

Petunjuk Pengerjaan

1. Gunakan kelompok dalam Mata Kuliah SFB (Sistem Fungsional Bisnis)untuk mengerjakan tugas kelompok ini.

2. Tema/Topik akan diadakan secara pengundian. Tema yang tersediaadalah: E-Ticketing, Reservasi Hotel, Obyek Wisata, Kuliner, UKM,

3. Buatlah Value Chain dari organisasi yang kalian tentukan & buatlahdiagram proses bisnis dalam notasi BPMN untuk masing-masing prosesyang terdapat dalam value chain tersebut!. Gunakan semua notasi yangsudah diketahui hingga pertemuan minggu ini.

4. Presentasikan tugas tersebut dengan memuat konten: Latar Belakang,Struktur Organisasi, Value Chain, dan Diagram Proses Bisnis

TUGAS 1 Kelompok

Page 40: Advanced Process Modeling - yudha.dosen.ittelkom-pwt.ac.idyudha.dosen.ittelkom-pwt.ac.id/wp-content/uploads/sites/73/2018/02/... · Barang belum dikirim tetapi PO sudah diterima oleh

PREPARE FOR QUIZ NEXT WEEK ,

KEEP SPIRIT GUYSSS!!!