SW Admiral Way Safety Project Project Open House Emily Ehlers and Dawn Schellenberg May 21, 2015 1
21

Admiral Way project presentation

Jul 17, 2016

Download

Documents

WestSeattleBlog

West Seattle Blog upload of SDOT slide deck from Admiral Way Safety Project open house at Alki Elementary on May 21, 2015.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Admiral Way project presentation

SW Admiral Way Safety Project

Project Open House

Emily Ehlers and Dawn Schellenberg

May 21, 2015 1

Page 2: Admiral Way project presentation

SDOT’s mission & vision

Mission: delivering a high-quality transportation system

for Seattle

Vision: connected people, places, and products

Page 3: Admiral Way project presentation

SDOT’s 5 core values

Safe

Interconnected

Affordable Vibrant

Innovative

Create a city that is:

Page 4: Admiral Way project presentation

Presentation

overview

• City’s safety vision

• Traffic data

• Project goals

• Proposed improvements

• Next steps

4

Page 5: Admiral Way project presentation

Vision Zero

5

seattle.gov/visionzero

Eliminate traffic deaths and serious injuries through

street designs, public education, enforcement patrols

Page 6: Admiral Way project presentation

Why speed matters

6

Drivers’ Field of Vision

15 mph

Drivers’ Field of Vision

30 mph

Page 7: Admiral Way project presentation

Why speed matters

7

Page 8: Admiral Way project presentation

Traffic calming

• Radar speed signs

• Safer street design

– Lane reduction

– Lane width reduction

• Speed cushions

(dependent on grade)

W Nickerson St before

W Nickerson St after

15th Avenue S before

15th Avenue S after

Page 9: Admiral Way project presentation

Seattle’s bicycle vision

Create a network to

make riding a bike a

comfortable part of

daily life for people

of all ages and

abilities

Recommendations from Seattle’s Bicycle Master Plan

Page 10: Admiral Way project presentation

Project area

Page 11: Admiral Way project presentation

Speed data

11

31.1 33.4

35.8 37.2

32.4 31.2

32.6

37.9 37.5

32.4

0

5

10

15

20

25

30

35

40

e/o 45th Ave SWe/o 48th Ave SWe/o 51st Ave SWe/o SW Stevens Ste/o 61st Ave SW

SW Admiral Way 85th % Speed

(February 2015)

EB

WB

Page 12: Admiral Way project presentation

Volume data

12

7,085

5,963

5,340

4,352

2,765

7,336

6,013

5,137

4,154

3,471

0

1000

2000

3000

4000

5000

6000

7000

8000

e/o 45th Ave SWe/o 48th Ave SWe/o 51st Ave SWe/o SW Stevens Ste/o 61st Ave SW

SW Admiral Way ADT

(Feburary 2015)

Eastbound

Westbound

Page 13: Admiral Way project presentation

People biking on SW Admiral Way

55

27

49

13

26

41 39

94

56

81

50

62

69 68

0

10

20

30

40

50

60

70

80

90

100

Bicycle Counts over 1 Week in April 2015

SW Admiral Way -

Both Directions (at

SW Stevens St)

SW Admiral Way -

Both Directions (at

48th Ave SW)

Page 14: Admiral Way project presentation

Collision locations (2011-2014)

– 1 pedestrian collision (2012)

– 2 bicycle collisions (both in 2011)

– 45 vehicle-only collisions

Page 15: Admiral Way project presentation

Parking use

• December 2014 study

results

• Second study being

conducted in July

Maximum

occupancy

33%

Empty

spaces 67%

Existing On-street Parking Spaces

Page 16: Admiral Way project presentation

Project goals

• Encourage slower speeds

• Reduce collisions

• Provide a comfortable and

predictable bike connection

between Alki and California

Ave business district

• Accommodate on-street

parking

Page 17: Admiral Way project presentation

Proposed improvements

• Narrow lanes

• Improve pedestrian crossings

• Provide another travel option

Page 18: Admiral Way project presentation

Parking changes

(no parking change) (no parking change)

Page 19: Admiral Way project presentation

Next steps

Date Action

April 14

Admiral Neighborhood

Association briefing

May 6 SW District Council briefing

May 21 Open house

May - July 2nd parking study and final design

Fall Planned implementation

2016 Evaluation

19

Page 20: Admiral Way project presentation

Questions?

Contact Emily Ehlers

[email protected] | (206) 684-8264

http://www.seattle.gov/transportation/SWAdmiralWaySafetyProject.htm