E 41.1-E e88fr15 1/3 Additional questionnaire for the construction of bridges No. 1. Title of contract 2. Site o flat o hilly o mountainous o built-up area o semi-built-up area o open area If project is in built-up or semi-built-up area, state minimum distance to and type of neighbouring structures. 3. Breakdown of values Item Value (currency ) Site installations and temporary work Workshops,stores, camps, etc. Earthwork and approaches Foundations Piers and abutments Falsework and cantilever formwork, etc. Superstructure and roadway Other work (railing, lighting, installations, etc.) Total value 4. Type of bridge o beam bridge o arch bridge o suspension bridge o truss bridge o cable-stayed bridge 5. Technical data a) Superstructure Length m ft Width m ft Number of spans Max. length of span m ft Max. height above grade m ft o steel o reinforced concrete o pre-stressed concrete o post-tensioned concrete o other (specify) b) Piers Max. height m ft o concrete o other materials (specify)
3
Embed
Additional questionnaire for the construction of …travel.jubileegeneral.com.pk/downloads/forms/proposal...E 41.1-E e88fr15 1/3 Additional questionnaire for the construction of bridges
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
E 41.1-E e88fr15 1/3
Additional questionnaire for the construction of bridges No.
1. Title of contract
2. Site� flat � hilly � mountainous
� built-up area � semi-built-up area � open area
If project is in built-up or semi-built-up area, state minimum distance to and type of neighbouring structures.
3. Breakdown of valuesItem Value (currency )
Site installations and temporary work
Workshops,stores, camps, etc.
Earthwork and approaches
Foundations
Piers and abutments
Falsework and cantilever formwork, etc.
Superstructure and roadway
Other work (railing, lighting, installations, etc.)
Total value
4. Type of bridge� beam bridge � arch bridge � suspension bridge
Is risk of flooding reduced by upstream dams? � yes � no
Details
Is there a flood warning system? � yes � no
Time lapse between warning andtime when flood reaches site hours
E 41.1-E e88fr15 3/3
Component Execution dats, anticipated period of work(months)
11. Construction schedule(unless separate sheet isattached)
Site installations and temporary work
Earthwork and approaches
Flood protection facilities
Foundations
Piers and abutments
Superstructures and roadway
Other work (railing, lighting, installations, etc.)
� yes � no12. Must traffic bemaintained duringconstruction of thebridge? Details
13. To what extent mightthe contract work bedestroyed in one lossevent?
14.What work will be doneby subcontractors?
15. Which contractors willwork independently of theinsured at the site or in itsimediate vicinity?What will be done by suchcontractors?
16. a) Where are theoffices, stores,workshops, camps, etc.located?Where are constructionplant and equipment andconstruction materialsstored?Give details or attachdrawings.
b) To what extent willthese facilities beprotected against flood?Give details.