Addendum No. 1 Project No-MUX17.43 1 Date August 26, 2015 Project Title Miami University MUX17.43 | Upham Hall – Department Suite Renovation To All Plan Holders Purpose Modify the Bid Documents Distribution All Plan Holders Miami University Design Team TO ALL BIDDERS: This Addendum supplements and amends the original Plans and Specifications and shall be taken into account in preparing proposals and shall become a part of the contract documents. GENERAL CLARIFICATIONS: A. All furniture to be provided and installed by the University. Furniture Plan on Sheet A802 is for Reference Only. Potential upholstery Fabric under Finish Legend for University reference only. B. Any work that needs to be completed on the first floor near the museum must first be coordinated with the A/E and the University. Contractor to provide a schedule of when will occur. We need to be respectful of this space, keeping area clear, clean, and protect from water and dust infiltration. SPECIFICATIONS REVISIONS: Item 1. 00 31 26 EXISTING HAZARDOUS MATERIAL INFORMATION: Specification has been updated to include the existing building hazardous material reports. See attached. Item 2. 08 71 00 DOOR HARDWARE: Specification has been replaced from what was previously provided. This specification included the correct hardware sets; also refer to A700. Item 3. 12 24 13 ROLLER WINDOW SHADES: Added Inside Outfitters as an alternate manufacturer. DRAWING REVISIONS: Item 4. G001 Note indication of existing rating at the corridor walls Item 5. D102 Note areas of exterior soffit to be removed Updates to Coded Notes 021, 023, and 025 Updated General Demolition Note 11 Note Electrical Panel to remain Item 6. A102 Existing Electrical Panel to remain, review plan for new layout Refer to updated Coded Note 108 Return Diffuser on RCP to occur above ceiling, not within ceiling tile Item 7. A700 Hardware Set Added to Sheet, note updated to Set 08 Note updates to Door 200 and 202B under the Door and Hardware Schedule Addition of Glass Type G2 under Glass Type Legend
66

Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Jul 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

                              Addendum No. 1 Project No-MUX17.43    

             1 

Date August 26, 2015

Project Title Miami University MUX17.43 | Upham Hall – Department Suite Renovation

To All Plan Holders

Purpose Modify the Bid Documents

Distribution All Plan Holders Miami University Design Team

TO ALL BIDDERS:

This Addendum supplements and amends the original Plans and Specifications and shall be taken into account in preparing proposals and shall become a part of the contract documents.

GENERAL CLARIFICATIONS:

A. All furniture to be provided and installed by the University. Furniture Plan on Sheet A802 is for Reference Only. Potential upholstery Fabric under Finish Legend for University reference only.

B. Any work that needs to be completed on the first floor near the museum must first be coordinated with the A/E and the University. Contractor to provide a schedule of when will occur. We need to be respectful of this space, keeping area clear, clean, and protect from water and dust infiltration.

SPECIFICATIONS REVISIONS:

Item 1. 00 31 26 EXISTING HAZARDOUS MATERIAL INFORMATION: Specification has been updated to include the existing building hazardous material reports. See attached.

Item 2. 08 71 00 DOOR HARDWARE: Specification has been replaced from what was previously provided. This specification included the correct hardware sets; also refer to A700.

Item 3. 12 24 13 ROLLER WINDOW SHADES: Added Inside Outfitters as an alternate manufacturer.

DRAWING REVISIONS:

Item 4. G001 Note indication of existing rating at the corridor walls

Item 5. D102 Note areas of exterior soffit to be removed Updates to Coded Notes 021, 023, and 025

Updated General Demolition Note 11 Note Electrical Panel to remain

Item 6. A102 Existing Electrical Panel to remain, review plan for new layout Refer to updated Coded Note 108 Return Diffuser on RCP to occur above ceiling, not within ceiling tile

Item 7. A700 Hardware Set Added to Sheet, note updated to Set 08 Note updates to Door 200 and 202B under the Door and Hardware Schedule Addition of Glass Type G2 under Glass Type Legend

Page 2: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

                              Addendum No. 1 Project No-MUX17.43    

             2 

Item 8. A802 Note areas of paint finish alterations, as shown on plans Update to Paint P2 choice under the Finish Legend See noted 804 for coordination of Electrical Panel Refer to General Finish Note I in reference to Furniture

Item 9. FP100 Addition of Rated Assembly Details and noted location of rated penetration Item 10. H100 Refer to updated Coded Note 18 and location on plan for coordination

Updates of Coded Note 5 and 6 on plans, and updates to notes Updates to the Equipment Notes New Coded Notes 19, 20, 21 in regards to the finned radiation control work and HWR/HWS piping work.

Item 11. H200 Addition of sheet to include rated assembly details Item 12. ED100 Updates to Existing Electrical Panel, refer to plan and Coded Note 1

Updated notes/coordination of Fire Alarm devices

Item 13. E100 Updates/coordination of Existing Electrical Panel, refer to plan and Coded Note 3

REQUESTS FOR INTERPRETATIONS:

Item 14. Q. During construction, how do contractors access the buildings and rooms which are part of the construction area/scope?

A. Before construction begins, Miami will switch out the lock cores to the doors of the rooms which are part of the construction zone with construction key cores.

Item 15. Q. What are the Potential upholstery Fabrics? Where are they going?

A. This section is for reference only, for the University’s use and coordination of furniture.

Item 16. Q. Acoustic Wall Panels (AWP), where are they going? How many and what sizes?

A. These panels will not be included in the project anymore.

Item 17. Q. Decorative Film (DF), where is this going? Not indicated on plans.

A. Refer to A700 Frame Types and Note 113 for location and sizes; and A800 for Decorative Film product details.

Item 18. Q. The projection screen is not shown on the plans. We assume there is only (1) screen since there is only one projector, is this correct? There are (3) types in the specifications (11 52 13), which is required? Is the screen and OFCI item like the short throw projector or CFCI?

A. There will be no projection screens needed for this project, only the short throw projector as shown on the plans (OFCI). Disregard the specification for the projection screens.

Item 19. Q. Is the mechanical contractor responsible for the removal and reinstallation of ceiling tiles and light fixtures in corridor, at new location of 2.5” HWS/R lines run?

A. Yes, mechanical contractor is responsible for the removal and reinstallation of the existing ceiling tiles in the corridor where work will occur for the HWS/HWR.

Item 20. Q. Drawing A102, note 107 refers to a “Wall-Mounted Tackboard,” but the specs (10 11 00 – 2.05) refers to a “Tackwall Surfacing Material.” Please clarify which is to be installed.

Page 3: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

                              Addendum No. 1 Project No-MUX17.43    

             3 

A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product to be a Forbo Bulletin Board, or comparable alternate. Please coordinate the description and trim detail in specifications for this product.

Item 21. Q. Where are the “Sliding Visual Display Unit” located? (10 11 00 – 2.04)

A. This is item is no longer used in this project, please disregard.

Item 22. Q. There are specs for an aluminum storefront (08 41 13), but the only storefront on the drawings is shown to be hollow metal frame (typically steel). Please clarify.

A. Refer to the Hollow Metal Doors and Frames specification (08 11 13) for storefront locations in this project. Please disregard the Aluminum Storefront specification.

Item 23. Q. Where is the “Display Casework” located? (12 35 59)

A. This specification/work will not be used on this project, please disregard.

Item 24. Q. Panel signage is furnished by the owner (10 14 23). Who is installing the signs.

A. Panel signage will be furnished and installed by the University.

ATTACHED:

SPECIFICATIONS: 00 31 26 EXISTING HAZARDOUS MATERIAL INFORMATION 08 71 00 DOOR HARDWARE 12 24 13 ROLLER WINDOW SHADES DRAWINGS: G001, D102, A102, A700, A802, FP100, H100, H200, ED100, E100 MISCELLANEOUS: PRE BID MEETING MINUTES PRE BID MEETING SIGN IN SHEET

END OF ADDENDUM No. 01

Page 4: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

                              Pre-Bid Meeting   

               

        

Date August 26, 2015

Project No. MUX17.43

Project Miami University – Upham Hall: Department Suite Renovation

Meeting Location Miami University, Cole Service Building – Room 137

Participants Miami University Glen Moss Terrance Ponder BHDP Hannah Evwaraye Potential Bidders (See Attached Sign-in Sheets)

Distribution All Participants Miami University BHDP – Hannah Evwaraye, Kevin Denman

Purpose Conduct a Pre-Bid Meeting for the referenced project.

1.0 Provide an attendance sheet for all participants to sign-in.

2.0 Bid date, time and location:

2.1 MUX17.43 | Department Suite Renovation

a. Bid Date: September 1, 20105

b. Bid Time: 2:00 PM

c. Bid Location: Due to Terrance Ponder (Room 181 or 137)

3.0 Document Ordering : Bid Documents (Drawings and Specifications) are available for ordering through the University Contracting Office (Cole Service Building, Room 181)

4.0 Review Responsive Bidder Requirements outlined in the General Conditions. Issues discussed included, but are not limited to;

4.1 Project Funding

4.2 The EDGE participation

4.3 Alternates: The Project contains alternates, and these alternates can be accepted as determined by the University.

5.0 Project Team Information:

5.1 Miami University

a. Glen Moss

5.2 Architect

a. BHDP Architecture

Hannah Evwaraye [email protected]

Page 5: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

                              Pre-Bid Meeting   

               

        

274 Marconi Blvd, Suite 200 Columbus, Ohio 43215 Phone: (614)-486-1960 Fax: (614)-486-1978

5.3 Engineer

a. Prater Engineering Andrew Prater 6150 Wilcox Road Dublin, Ohio 43061 Phone: (614) 766-4896 Fax: (614) 766-2354

b. Metro CD Engineering Eric Anderson 3510 Snouffer Rd. Suite 200 Columbus, OH 43235 Phone: (614) 923-3930 Fax: (614) 543-8308

6.0 Brief overview of the project, as indicated in the Bidding Documents.

6.1 MUX17.43 | Department Suite Renovation

a. Upham Hall, currently houses departments of the College of Arts & Science, this project is located on the second floor, northeast wing. The renovation will update the department suite to current University academic standards. The renovation involves replacing the existing interior finishes of the existing department suite, and providing to doors and hardware sets.. The lighting in each room will be replaced with new LED lighting. Minor modification to the existing HVAC and plumbing systems as indicated.

1.1 The project will be bid as a Single Prime Contract and will include the following:

a. General Trades b. Fire Protection c. HVAC d. Electrical e. Plumbing

7.0 Brief overview of the Project Schedule:

7.1 The start of demolition work will need to be coordinated with the University, and construction will begin mid-September 2015.

7.2 Review Completion Date

a. The target Final Completion date is: December 4, 2015.

Page 6: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

                              Pre-Bid Meeting   

               

        

7.3 Progress Meetings: Will occur on a weekly basis as set by the University and the A/E

8.0 Work Restrictions: Specification Section “01 10 00 – Summary of Work” for working hour’s information and details.

8.1 On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 3:30 p.m., Monday through Friday, unless otherwise indicated. Obtain permission of Owner for work outside normal hours or utility shutdowns. Refer to Supplemental Conditions for additional information.

a. Weekend Hours: 48 hours advance notice to the Owner. b. Early Morning Hours: 48 hours advance notice to the Owner. c. Utility Shutdowns: 72 hours advance notice to the Owner.

9.0 Permitting – Through State (by A/E)

10.0 Refer contractors to the General Drawing Sheets of each project for information pertaining to egress routes; contractor is responsible for maintaining these during construction.

11.0 Project Staging location and limits.

11.1 As discussed in meeting, the University has set up a location east of the project site for dumpster location. Contractor to provide snow fence around area and remediate area after use, coordinate with the University. Coordinate location of existing irrigation heads and lines prior to work, notify University of work to shut off and empty line.

12.0 All State Inspections are to be coordinated, scheduled and obtained by the Contractor.

13.0 Project clean-up is expected and that the construction site is expected to be maintained in an orderly fashion throughout the duration of the project by contractor. Bidders shall refer to the Bid Documents for cleaning requirements.

14.0 All construction waste not indicated to be salvaged for re-installation, or to be turned over to the University, shall be disposed of per the Bid Documents. Nothing may be burned or sold on-site.

15.0 Deliveries must be received at the project site. The University will not accept Contractor deliveries for the project. Large deliveries shall be coordinated with the University so as not to interrupt daily operations.

16.0 RFI (Bid Question) procedure.

16.1 All RFIs (Bid Questions) pertaining to the General Requirements (Front End, Division 0) shall be submitted in writing, via e-mail, and shall be submitted directly to the University;

a. Miami University

Page 7: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

                              Pre-Bid Meeting   

               

        

16.2 All other RFIs (Bid Questions) pertaining to the Bid Documents shall be submitted in writing, via e-mail, and shall be submitted directly to the A/E;

a. BHDP Architecture - Hannah Evwaraye [email protected]

QUESTIONS 

All questions specific to the Bid Documents are subject to review and response through Addenda.  

Responses to questions at Pre‐Bid meeting will be included in the addendum for official records. 

Page 8: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 9: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 10: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 11: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 12: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 13: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 14: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 15: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 16: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 17: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 18: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 19: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 20: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 21: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 22: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 23: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 24: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 25: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 26: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 27: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 28: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 29: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 30: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 31: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 32: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 33: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 34: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 35: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 36: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 37: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 38: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 39: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 40: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 41: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 42: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 43: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 44: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

DOOR HARDWARE 08 71 00 - 1

SECTION 08 71 00 - DOOR HARDWARE

PART 1 - GENERAL

1.01 SUMMARY

A. This Section includes the following: 1. Commercial door hardware. 2. Cylinders for doors specified in other Sections. 3. Electrified door hardware.

1.02 SUBMITTALS

A. Product Data: For each product indicated.

B. Shop Drawings: Include details of electrified door hardware and wiring diagrams.

C. Samples: For each exposed finish.

D. Door Hardware Schedule: Organized into door hardware sets indicating type, style, function, size, label, hand, manufacturer, fasteners, location, and finish of each door hardware item. Include description of each electrified door hardware function, including sequence of operation.

E. Keying Schedule: Detail Owner's final keying instructions for locks.

F. Product certificates.

1.03 QUALITY ASSURANCE

A. Supplier Qualifications: Person who is or employs a qualified DHI Architectural Hardware Consultant.

B. Source Limitations: Obtain electrified door hardware from same manufacturer as mechanical door hardware, unless otherwise indicated. Manufacturers that are listed to perform electrical modifications, by a testing and inspecting agency acceptable to authorities having jurisdiction, are acceptable.

C. Keying Conference: Conduct conference at Project site. Incorporate keying conference decisions into final keying schedule.

D. Pre-Installation Conference: Conduct conference at Project site.

E. Keys: Deliver keys to Owner by registered mail.

F. Templates: Obtain and distribute templates for doors, frames, and other work specified to be factory prepared for installing door hardware.

G. Standards: Comply with BHMA A156 series standards, Grade 1.

Page 45: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

DOOR HARDWARE 08 71 00 - 2

H. Certified Products: Provide door hardware that is listed in BHMA directory of certified products.

1.04 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of door hardware that fails in materials or workmanship within warranty period from date of Substantial Completion. 1. Warranty Period for Manual Closers: 10 years. 2. Warranty Period for Exit Devices: 3 years. 3. Warranty Period for Locks: 7 years. 4. All other hardware one year.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Product: Subject to compliance with requirements, provide the product named for each door hardware item indicated in Door Hardware Sets.

B. Basis-of-Design Product: Product named for each door hardware item indicated in Door Hardware Sets establishes the basis of design. Provide either the named product or a comparable product by one of the manufacturers specified for each type of hardware item.

C. Manufacturers Used in the specification: Products Manufacture Specified Acceptable Equals Hinges Ives Hager, Stanley Locksets Schlage L9000 07A Sargent 8200 LNB Exit Devices Von Duprin 99 Series No substitutions Closers LCN 4041XP MC Sargent 281 x MC Overhead Stops Glynn Johnson Rixson, ABH Flushbolts, Stops Ives Hager, Rockwood Seals National Guard Hager, Pemko Cylinders Best No substitutions

2.02 DOOR HARDWARE

A. Scheduled Door Hardware: Provide door hardware according to Door Hardware Sets at the end of Part 3. Manufacturers' names are abbreviated.

2.03 HINGES

A. General: Except for hinges and pivots to be installed entirely (both leaves) into wood doors and frames, provide only template-produced units.

B. Hinge Base Metal: Unless otherwise indicated, provide the following: 1. Exterior Hinges: Stainless steel, with stainless-steel pin. 2. Interior Hinges: Steel, with steel pin.

Page 46: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

DOOR HARDWARE 08 71 00 - 3

3. Hinges for Fire-Rated Assemblies: Steel, with steel pin.

C. Non-removable Pins: Provide set screw in hinge barrel that prevents removal of pin while door is closed; for out-swinging exterior doors.

D. Screws: Phillips flat-head screws; screw heads finished to match surface of hinges.

E. Metal Doors and Frames: Machine screws (drilled and tapped holes).

2.04 MECHANICAL LOCKS AND LATCHES

A. Mortise Locks: 1. Locks shall be ANSI A156.13, Grade 1 mortise locksets, Manufactured from heavy

gauge steel, containing components of steel with a zinc dichromate plating for corrosion resistance.

2. Locks to have a standard 2-3/4" backset with a full 3/4" throw stainless steel mechanical anti-friction latch bolt. Deadbolt shall be a full 1" throw, constructed of stainless steel.

3. Lever trim shall be cast or forged in the design specified, with 2-1/8" diameter roses. Levers to be thru-bolted to assure proper alignment. Trim shall be applied by threaded bushing "no exposed screws".

2.05 BOLTS

A. Shall have forged bronze faceplate with extruded brass lever wrought brass guide and strike. Flush bolts for hollow metal doors shall be extension rod type door up to 7'6" in height shall have 12" steel or brass rods, manual flush bolts for doors over 7'6" in height shall be increased by 6" for each additional 6" of door height. Wood doors shall have corner-wrap type. Provide dust proof strikes for all bottom bolts.

2.06 EXIT DEVICES

A. Panic Exit Devices: Listed and labeled for panic protection, based on testing according to UL 305.

B. Fire Exit Devices: Complying with NFPA 80 that are listed and labeled for fire and panic protection, based on testing according to UL 305 and NFPA 252.

C. All lever design shall match mortise or cylindrical lock lever designs.

D. All devices to incorporate a security dead-latching feature. Provide roller strikes for all rim and surface mounted vertical rod devices, ASA strikes for mortise devices, and manufacturer's standard strikes for concealed vertical rod devices.

E. Removable Mullions: BHMA A156.3. 1. Fire-Exit Removable Mullions: Complying with NFPA 80 that are listed and labeled for

fire and panic protection, based on testing according to UL 305 and NFPA 252. Mullions shall be used only with exit devices for which they have been tested.

F. Carry-Open Bars: Provide carry-open bars for inactive leaves of pairs of doors, unless automatic or self-latching bolts are used.

Page 47: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

DOOR HARDWARE 08 71 00 - 4

2.07 CLOSERS

A. Surface-Mounted Closers:

B. Spring power shall be continuously adjustable over the full range of closer sizes, and allow for reduced opening force for the physically handicapped. Hydraulic regulation shall be by tamper-proof, non-critical valves. Closers shall have separate adjustment for latch speed, general speed, and back check.

C. All closers will not be seen on the public side or hallway side of the door. The appropriate drop plate or mounting plates will be used as conditions dictate.

2.08 PROTECTIVE TRIM UNITS

A. Protective Trim Units: Sized 2" inches less than door width on push side and 1" inch less than door width on pull side, by height scheduled or indicated. Fasten with exposed machine or self-tapping screws.

2.09 STOPS AND HOLDERS

A. Stops and Holders: Provide floor stops for doors, unless wall or other type stops are scheduled or indicated. Do not mount floor stops where they will impede traffic. Where floor or wall stops are not appropriate, provide overhead holders.

B. Silencers for Door Frames: Neoprene or rubber; fabricated for drilled-in application to frame.

2.10 DOOR GASKETING AND THRESHOLDS

A. Door Gasketing: Provide continuous weather-strip gasketing on exterior doors and provide smoke, light, or sound gasketing on interior doors where indicated or scheduled. Provide non-corrosive fasteners for exterior applications and elsewhere as indicated.

2.11 CYLINDERS, KEYING, AND STRIKES

A. Cylinders: Tumbler type, constructed from brass or bronze, stainless steel, or nickel silver.

B. Keying System: To existing Best key system

2.12 FABRICATION

A. Base Metals: Furnish metals of a quality equal to or greater than that of specified door hardware units and BHMA A156.18 for finishes. Do not furnish manufacturer's standard materials if different from specified standard.

B. Fasteners: Phillips flat-head screws with finished heads to match surface of door hardware, unless otherwise indicated. Provide steel machine or wood screws or steel through bolts for fire-rated applications.

C. Spacers or Sex Bolts: For through bolting of hollow metal doors.

Page 48: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

DOOR HARDWARE 08 71 00 - 5

D. Fasteners for Wood Doors: Comply with requirements of DHI WDHS.2, "Recommended Fasteners for Wood Doors."

E. Finishes: Comply with BHMA A156.18.

PART 3 - EXECUTION

3.01 INSTALLATION

A. Examine doors and frames for compliance with requirements for installation tolerances, labeled fire door assembly construction, wall and floor construction, and other conditions affecting performance. Examine roughing-in for electrical power systems to verify actual locations of wiring connections before electrified door hardware installation.

B. Steel Door and Frame Preparation: Comply with DHI A115 series. Drill and tap doors and frames for surface-applied hardware according to SDI 107.

C. Wood Door Preparation: Comply with DHI A115-W series.

D. Mounting Heights: Comply with the following requirements, unless otherwise indicated: 1. Standard Steel Doors and Frames: DHI's "Recommended Locations for Architectural

Hardware for Standard Steel Doors and Frames." 2. Custom Steel Doors and Frames: DHI's "Recommended Locations for Builders'

Hardware for Custom Steel Doors and Frames." 3. Wood Doors: DHI WDHS.3, "Recommended Locations for Architectural Hardware for

Wood Flush Doors."

E. Adjust and reinforce attachment substrates as necessary for proper installation and operation. Drill and countersink units that are not factory prepared for anchorage fasteners. Space fasteners and anchors according to industry standards. 1. Thresholds: Set thresholds for exterior and acoustical doors in full bed of sealant

complying with requirements specified in Division 7 Section "Joint Sealants."

F. Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with accessibility requirements. 1. Door Closers: Adjust sweep period so that from an open position of 70 degrees, the door

will take at least three seconds to move to a point 3 inches (75 mm) from the latch, measured to the leading edge of the door.

3.02 FIELD QUALITY CONTROL

A. Inspections: Owner will engage a qualified independent Architectural Hardware Consultant to perform inspections and to prepare inspection reports.

Page 49: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

DOOR HARDWARE 08 71 00 - 6

3.03 DOOR HARDWARE SETS

Hardware Group No. 01

Each To Have: Qty Description Catalog Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 (*)

652 IVE

1 EA PANIC HARDWARE 99-L-996-07 626 VON 1 EA RIM CYLINDER 1E72 626 BES 1 EA SURFACE CLOSER 4040XP REG OR PA AS REQ MC 689 LCN 1 EA KICK PLATE 8400 8" X 2" LDW 630 IVE 1 EA WALL STOP WS406/407CVX 630 IVE

EA NOTE * VERIFY TYPE/SIZE IN FIELD

Hardware Group No. 02

Each To Have: Qty Description Catalog Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 (*)

639 IVE

1 EA PANIC HARDWARE 99-L-07 612 VON 1 EA RIM CYLINDER 1E72 612 BES 1 EA SURFACE CLOSER 4040XP REG OR PA AS REQ MC 691 LCN 1 EA KICK PLATE 8400 8" X 2" LDW 612 IVE 1 EA WALL STOP WS406/407CVX 612 IVE

EA NOTE * VERIFY TYPE/SIZE IN FIELD

Hardware Group No. 03

Each To Have: Qty Description Catalog Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 (*)

639 IVE

1 EA CLASSROOM LOCK L9070L 07A 612 SCH 1 EA MORTISE CYLINDER 1E74 612 BES 1 EA OH STOP 90S 612 GLY 1 EA SURFACE CLOSER 4040XP REG OR PA AS REQ MC 691 LCN 1 EA KICK PLATE 8400 8" X 2" LDW 612 IVE

EA NOTE * VERIFY TYPE/SIZE IN FIELD

Page 50: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

DOOR HARDWARE 08 71 00 - 7

Hardware Group No. 04

Each To Have: Qty Description Catalog Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 (*)

639 IVE

1 EA CLASSROOM LOCK L9070L 07A 612 SCH 1 EA MORTISE CYLINDER 1E74 612 BES 1 EA SURFACE CLOSER 4040XP CUSH MC 689 LCN 1 EA KICK PLATE 8400 8" X 2" LDW 612 IVE

EA NOTE * VERIFY TYPE/SIZE IN FIELD

Hardware Group No. 05

Each To Have: Qty Description Catalog Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA OFFICE/ENTRY LOCK L9050L 07A L583-363 626 SCH 1 EA MORTISE CYLINDER 1E74 626 BES 1 EA WALL STOP WS406/407CVX 630 IVE

Hardware Group No. 06

Each To Have: Qty Description Catalog Number Finish Mfr

EA REUSE EXISTING

Hardware Group No. 07

Each To Have: Qty Description Catalog Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA STOREROOM LOCK L9080L 07A 626 SCH 1 EA MORTISE CYLINDER 1E74 626 BES 1 EA OH STOP & HOLDER 90H 630 GLY

Page 51: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

DOOR HARDWARE 08 71 00 - 8

Hardware Group No. 08

Each To Have: Qty Description Catalog Number Finish Mfr

6 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 SET AUTO FLUSH BOLT FB31P 630 IVE 1 EA DUST PROOF STRIKE DP2 626 IVE 1 EA CLASSROOM LOCK L9070L 07A 626 SCH 1 EA MORTISE CYLINDER 1E74 626 BES 1 EA COORDINATOR COR X FL 628 IVE 2 EA MOUNTING BRACKET MB 689 IVE 2 EA SURFACE CLOSER 4040XP REG OR PA AS REQ MC 689 LCN 2 EA KICK PLATE 8400 8" X 1" LDW 630 IVE 1 SET SEAL 5050 CL NGP 1 ASTRAGAL 9550 CL NGP 2 EA WALL STOP WS406/407CVX 630 IVE

Hardware Group No. 09

Each To Have: Qty Description Catalog Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 639 IVE 1 EA STOREROOM LOCK L9080L 07A 612 SCH 1 EA MORTISE CYLINDER 1E74 612 BES 1 EA WALL STOP WS406/407CVX 612 IVE

Hardware Group No. 10

Each To Have: Qty Description Catalog Number Finish Mfr

3 EA HINGE 5BB1 4.5 X 4.5 639 IVE 1 EA FIRE EXIT HARDWARE 99-L-F-07-SNB 612 VON 1 EA RIM CYLINDER 1E72 612 BES 1 EA OH STOP 100S 612 GLY 1 EA SURFACE CLOSER 4040XP REG OR PA AS REQ MC 691 LCN 1 EA KICK PLATE 8400 8" X 2" LDW 612 IVE 1 SET SEALS 5050CL CLR NGP

END OF SECTION 08 71 00

Page 52: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

ROLLER WINDOW SHADES 12 24 13 - 1

SECTION 12 24 13 - ROLLER WINDOW SHADES

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes: 1. Manually operated roller shades.

B. Related Requirements: 1. Section 06 10 53 "Miscellaneous Rough Carpentry" for wood blocking and grounds for

mounting roller shades and accessories. 2. Section 07 92 00 "Joint Sealants" for sealing the perimeters of installation accessories for

light-blocking shades with a sealant.

1.02 ACTION SUBMITTALS

A. Product Data: For each type of product. 1. Include styles, material descriptions, construction details, dimensions of individual

components and profiles, features, finishes, and operating instructions for roller shades.

B. Shop Drawings: Show fabrication and installation details for roller shades, including shadeband materials, their orientation to rollers, and their seam and batten locations. 1. Motor-Operated Shades: Include details of installation and diagrams for power, signal,

and control wiring.

C. Samples: For each exposed product and for each color and texture specified, 10 inches long.

D. Samples for Initial Selection: For each type and color of shadeband material. 1. Include Samples of accessories involving color selection.

E. Samples for Verification: For each type of roller shade. 1. Shadeband Material: Not less than 10 inches square. Mark inside face of material if

applicable. 2. Roller Shade: Full-size operating unit, not less than 16 inches wide by 36 inches long for

each type of roller shade indicated. 3. Installation Accessories: Full-size unit, not less than 10 inches long.

F. Roller-Shade Schedule: Use same designations indicated on Drawings.

1.03 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer.

B. Product Certificates: For each type of shadeband material, signed by product manufacturer.

C. Product Test Reports: For each type of shadeband material, for tests performed by manufacturer and witnessed by a qualified testing agency.

Page 53: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

ROLLER WINDOW SHADES 12 24 13 - 2

1.04 CLOSEOUT SUBMITTALS

A. Maintenance Data: For roller shades to include in maintenance manuals.

1.05 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Roller Shades: Full-size units equal to 5 percent of quantity installed for each size, color,

and shadeband material indicated, but no fewer than two units.

1.06 QUALITY ASSURANCE

A. Installer Qualifications: Fabricator of products.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Deliver roller shades in factory packages, marked with manufacturer, product name, and location of installation using same designations indicated on Drawings.

1.08 FIELD CONDITIONS

A. Environmental Limitations: Do not install roller shades until construction and finish work in spaces, including painting, is complete and dry and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use.

B. Field Measurements: Where roller shades are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication and indicate measurements on Shop Drawings. Allow clearances for operating hardware of operable glazed units through entire operating range. Notify A/E of installation conditions that vary from Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

PART 2 - PRODUCTS

2.01 MANUFACTURERS A. Basis-of-Design Product: Subject to compliance with requirements, provide Draper Inc;

Flexshade or a comparable product by one of the following: 1. Hunter Douglas Contract. 2. MechoShade Systems, Inc. 3. Springs Window Fashions; SWFcontract. 4. Inside Outfitters

B. Source Limitations: Obtain roller shades from single source from single manufacturer.

2.02 MANUALLY OPERATED SHADES WITH DOUBLE ROLLERS

A. Chain-and-Clutch Operating Mechanisms: With continuous-loop bead chain and clutch that stops shade movement when bead chain is released; permanently adjusted and lubricated. 1. Bead Chains: Stainless steel.

Page 54: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

ROLLER WINDOW SHADES 12 24 13 - 3

a. Loop Length: Full length of roller shade. b. Limit Stops: Provide upper and lower ball stops. c. Chain-Retainer Type: Chain tensioner, jamb mounted.

2. Spring Lift-Assist Mechanisms: Manufacturer's standard for balancing roller-shade weight and lifting heavy roller shades. a. Provide for shadebands that weigh more than 10 lb or for shades as recommended

by manufacturer, whichever criteria are more stringent.

B. Rollers: Corrosion-resistant steel or extruded-aluminum tubes of diameters and wall thicknesses required to accommodate operating mechanisms and weights and widths of shadebands indicated without deflection. Provide with permanently lubricated drive-end assemblies and idle-end assemblies designed to facilitate removal of shadebands for service. 1. Double-Roller Mounting Configuration: Offset, outside roller over and inside roller

under. 2. Inside Roller:

a. Drive-End Location: As indicated on Drawings. b. Direction of Shadeband Roll: Regular, from back of roller.

3. Outside Roller: a. Drive-End Location: Right side of inside face of shade, unless otherwise indicated

on Drawings. b. Direction of Shadeband Roll: Regular, from back of roller.

4. Shadeband-to-Roller Attachment: Removable spline fitting integral channel in tube.

C. Mounting Hardware: Brackets or endcaps, corrosion resistant and compatible with roller mounting configuration, roller assemblies, operating mechanisms, installation accessories, and installation locations and conditions indicated.

D. Inside Shadebands: 1. Shadeband Material: Light-filtering fabric. 2. Shadeband Bottom (Hem) Bar: Steel or extruded aluminum.

a. Type: Enclosed in sealed pocket of shadeband material. b. Color and Finish: As selected by A/E from manufacturer's full range.

E. Outside Shadebands: 1. Shadeband Material: Light-blocking fabric. 2. Shadeband Bottom (Hem) Bar: Steel or extruded aluminum.

a. Type: Exposed with endcaps and integral light seal where bottom (sill) channels are indicated.

b. Color and Finish: As selected by A/E from manufacturer's full range.

F. Installation Accessories: 1. Front Fascia: Aluminum extrusion that conceals front and underside of roller and

operating mechanism and attaches to roller endcaps without exposed fasteners. a. Shape: L-shaped. b. Height: Manufacturer's standard height required to conceal roller and shadeband

when shade is fully open, but not less than 4 inches. 2. Side Channels: With light seals and designed to eliminate light gaps at sides of shades as

shades are drawn down. Provide side channels with shadeband guides or other means of aligning shadebands with channels at tops.

Page 55: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

ROLLER WINDOW SHADES 12 24 13 - 4

3. Bottom (Sill) Channel or Angle: With light seals and designed to eliminate light gaps at bottoms of shades when shades are closed.

4. Installation Accessories Color and Finish: As selected from manufacturer's full range.

2.03 SHADEBAND MATERIALS

A. Shadeband Material Flame-Resistance Rating: Comply with NFPA 701. Testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.

B. Light-Filtering Fabric: Woven fabric, stain and fade resistant. 1. Source: Roller-shade manufacturer. 2. Weave: Mesh. 3. Orientation on Shadeband: Up the bolt. 4. Color: As selected by A/E from manufacturer's full range.

C. Light-Blocking Fabric: Opaque fabric, stain and fade resistant. 1. Source: Roller-shade manufacturer. 2. Orientation on Shadeband: Up the bolt. 3. Features: Washable. 4. Color: As selected by A/E from manufacturer's full range.

2.04 ROLLER-SHADE FABRICATION

A. Product Safety Standard: Fabricate roller shades to comply with WCMA A 100.1, including requirements for flexible, chain-loop devices; lead content of components; and warning labels.

B. Unit Sizes: Fabricate units in sizes to fill window and other openings as follows, measured at 74 deg F: 1. Between (Inside) Jamb Installation: Width equal to jamb-to-jamb dimension of opening

in which shade is installed less 1/4 inch per side or 1/2-inch total, plus or minus 1/8 inch. Length equal to head-to-sill or -floor dimension of opening in which shade is installed less 1/4 inch, plus or minus 1/8 inch.

2. Outside of Jamb Installation: Width and length as indicated, with terminations between shades of end-to-end installations at centerlines of mullion or other defined vertical separations between openings.

C. Shadeband Fabrication: Fabricate shadebands without battens or seams to extent possible except as follows: 1. Vertical Shades: Where width-to-length ratio of shadeband is equal to or greater than 1:4,

provide battens and seams at uniform spacings along shadeband length to ensure shadeband tracking and alignment through its full range of movement without distortion of the material.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, operational clearances, accurate locations of

Page 56: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

Miami University MUX17.43 July 31, 2015 Upham Hall: Department Suite Renovation Issued for Bid Oxford, Ohio

ROLLER WINDOW SHADES 12 24 13 - 5

connections to building electrical system, and other conditions affecting performance of the Work.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.02 ROLLER-SHADE INSTALLATION

A. Install roller shades level, plumb, and aligned with adjacent units according to manufacturer's written instructions. 1. Opaque Shadebands: Located so shadeband is not closer than 2 inches to interior face of

glass. Allow clearances for window operation hardware.

B. Electrical Connections: Connect motor-operated roller shades to building electrical system.

3.03 ADJUSTING

A. Adjust and balance roller shades to operate smoothly, easily, safely, and free from binding or malfunction throughout entire operational range.

3.04 CLEANING AND PROTECTION

A. Clean roller-shade surfaces after installation, according to manufacturer's written instructions.

B. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer, that ensure that roller shades are without damage or deterioration at time of Substantial Completion.

C. Replace damaged roller shades that cannot be repaired, in a manner approved by A/E, before time of Substantial Completion.

3.05 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain motor-operated roller shades.

END OF SECTION 12 24 13

Page 57: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

AC ACOUSTICAL CEILING TILEAL ALUMINUMADJ ADJUSTABLEAFF ABOVE FINISHED FLOORALT ALTERNATEAPPROX. APPROXIMATELYAVG. AVERAGEBLDG BUILDINGCAB CABINETCFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLEDCG CORNER GUARDCJ CONTROL JOINTCL CENTERLINECLG CEILINGCM CONSTRUCTION MANAGERCMU CONCRETE MASONRY UNITCOL COLUMNCONC CONCRETECONT CONTINUOUSCORR CORRIDORNTS NOT TO SCALEOC ON CENTEROD OUTSIDE DIAMETEROFCI OWNER FURNISHED, CONTRACTOR INSTALLEDDIA DIAMETERDIM DIMENSIOND.W. DISHWASHERDWG DRAWINGEA EACHEJ EXPANSION JOISTFE FINISH ENDFEC FIRE EXTINGUISHER CABINETFIN FINISHFIXT FIXTUREFLR FLOORFT FOOT (FEET)GA GAUGEGB GRAB BARGC GENERAL CONTRACTOR

G GLAZINGGYP GYPSUMHDWR HARDWAREHM HOLLOW METALHORIZ HORIZONTALHT HEIGHTEJ EXPANSION JOINTELEC ELECTRICALEMER EMERGENCYEQ EQUALEQUIP EQUIPMENTEWC ELECTRIC WATER COOLEREX'G EXISTING TO REMAINEXT EXTERIORFP FILLER PANELFA FIRE ALARMOPP OPPOSITEPF PREFINISHEDPLAM PLASTIC LAMINATEPT PAINTR RADIUSREF REFERENCEHVAC HEATING/VENTILATION/AIR CONDITIONINGIN INCHINSUL INSULATIONINT INTERIORJAN JANITORJT JOINTLB POUNDLIN LINEARMAS MASONRYMATL MATERIALMAX MAXIMUMMECH MECHANICALMEP MECHANICAL, ELECTRICAL, & PLUMBINGMTL METALMFR MANUFACTURERMIN MINIMUMMISC MISCELLANEOUS

MTD MOUNTEDNOM NOMINALOFOI OWNER FURNISHED OWNER INSTALLEDOPNG OPENINGOPP OPPOSITE HANDPF PREFINISHEDREFR REFRIGERATORREQ'D REQUIREDREV REVISIONRFR REFERRB RUBBER BASERM ROOMRO ROUGH OPENINGSD SOAP DISPENSERSIM SIMILARSPEC SPECIFICATIONSSF SQUARE FOOT OR FEETSQYD SQUARE YARDST STAINSTD STANDARDSTL STEELSTO STORAGESS STAINLESS STEELTB TOWEL BARTEL TELEPHONETEMP TEMPORARYTLT TOILETTPD TOILET PAPER DISPENSERTR TRASH RECEPTACLETV TELEVISIONTYP TYPICALUL UNDERWRITERS LABORATORIESU.N.O. UNLESS NOTED OTHERWISEVCT VINYL COMPOSITION TILEVERT VERTICALVEST VESTIBULEV.I.F. VERIFY IN FIELDWD WOODWT WEIGHT

BUILDING CODE ANALYSIS

PROJECT NAME:PROJECT TYPE:GOVERNING BUILDING CODE:USE GROUP:CONSTRUCTION TYPE:FIRE SUPPRESSION:FIRE ALARM:

UPHAM HALLDEPARTMENT SUITE RENOVATION2011 OBC (BUILDING ORIGINALLY CONSTRUCTED IN APPROX. 1950)B (BUSINESS)ASSUMED IIIBPARTIALLY SPRINKLEREDYES

CODE REFERENCE:

304.1602.2

PROJECT NARRATIVEUpham Hall, built in 1949 and located on Miami University’s Oxford campus, currently houses departments of the College of Arts & Science. The renovation willupdate the second floor department suite to current University academic standards.

The renovation involves replacing the existing interior finishes of the existing department suite, and providing to doors and hardware sets.. The lighting in eachroom will be replaced with new LED lighting. Minor modification to the existing HVAC and plumbing systems as indicated.

FACE BRICK

MASONRY

CONCRETE, CAST STONE

NEW WALLS (PLAN VIEW),

GYPSUM, GROUT, SAND

RIGID INSULATION

PERIMETER INSULATION

CUT STEEL

FINISH WOOD

WOOD BLOCKING (NOM.)

PLYWOOD

METAL DECK

BATT INSULATION

EARTH

GRAVEL, DRAINAGE FILL

CAMPUS MAP

BISHOP CIRCLE

0.00'

NEW COLUMNREFERENCE

INTERIOR PARTITION TYPE,REFER TO PARTITIONSCHEDULE ON SHEET A700

EXISTING COLUMNREFERENCE

SECTION REFERENCE

ELEVATION REFERENCE

INDICATES DRAWING SHEET ONWHICH ELEVATION IS SHOWN

ROOM TAG

MATERIAL KEYNOTE

FURNITURE TAG

DOOR & DOOR NUMBERREFER TO FLOOR PLANSAND SHEET A701

A101A

Room name

101

?

RT:RL:

G1

ROOF TAGROOF TYPEROOF LEVEL

PLAN VIEW: EXISTINGCONSTRUCTION TO BEREMOVED

PLAN VIEW: NEWCONSTRUCTION

PLAN VIEW: EXISTINGCONSTRUCTION TOREMAIN

FINISH TAG, REFER TOFINISH SCHEDULE

WINDOW TAG

CODED NOTE

NEW SPOT ELEVATION

REVISION AND NUMBER

PLAN VIEW: NEW WINDOW

A1011

SIM

DETAIL REFERENCE

1'-0" CEILING HEIGHT TAG A.F.F.1

FLOOR ELEVATION

WS*1i SYSTEM FURNITURE TAG

1i:...

Wall

Floor

Ceiling

Base

A101

00 00 00 X

0.00'

0

1Ref

1 Ref

1 Ref

1Ref

INTERIOR FRAMING TAGX0000

FRAME TAG1-X

A. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE 2011 OHIO BUILDING CODE AND ALL OTHER APPLICABLE FEDERAL,STATE AND LOCAL CODES AND ORDINANCES.

B. TESTING AND INSPECTION SERVICES FOR THE PROJECT SHALL BE PERFORMED BY AN APPROVED TESTING AND INSPECTION AGENCY ASACCEPTABLE TO THE AUTHORITIES HAVING JURISDICTION.

C. INTERIOR WALL AND CEILING FINISHES SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM E84. FINISHES SHALL BE CLASS B (FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450), FINISHES OTHER THAN TEXTILES SHALL BE TESTED IN ACCORDANCE WITH NFPA 286. THESE REQUIREMENTSMEET OR EXCEED THOSE LISTED IN THE BUILDING CODE REFERENCED ABOVE.

D. CONTRACTORS SHALL SCHEDULE AND ARRANGE FOR ALL REQUIRED LEGAL INSPECTIONS.E. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE POSSIBILITY OF HAZARDOUS MATERIALS IN THE PROJECT AREA. IN ADDITION, THE

CONTRACTOR SHALL CHECK FOR THE PRESENCE OF LEAD ON PAINTED SURFACES WHENEVER WORK IS DONE WHICH COULD CREATE APOSSIBLE SOURCE OF LEAD EXPOSURE. IF ANY SUCH MATERIALS ARE ENCOUNTERED, THE OWNER SHALL BE NOTIFIED AND THE WORK SHALLCEASE UNTIL SUCH TIME THAT THE OWNER HAS REMOVED THE HAZARDOUS MATERIAL OR HAS IMPLEMENTED APPROPRIATE ABATEMENTMEASURES. FURTHERMORE, THE CONTRACTOR SHALL NOT INTRODUCE ANYTHING HAZARDOUS TO THE SITE. CONTRACTOR SHALL NOT USE ANYASBESTOS OR LEAD CONTAINING PRODUCTS.

F. REFER TO THE UNIVERSITY PROVIDED HAZARDOUS MATERIAL/ ASBESTOS INSPECTION REPORT FOR FURTHER DETAILS. CONTRACTOR TO NOTEHAZARDOUS MATERIAL PRESENT UNDER THE FLOORING OF STORAGE ROOM 200B.

G. CONTRACTORS SHALL COMPLY WITH ALL CURRENT "HAZARDOUS MATERIALS COMMUNICATIONS" (HAZCOM) REQUIREMENTS. THE CONTRACTORSHALL OBTAIN "MATERIAL SAFETY DATA SHEETS" (MSDS) FOR ALL HAZARDOUS MATERIALS TO BE USED ON THE PROJECT. OBTAIN DATASHEETS FROM THE MANUFACTURERS AND DELIVER TO THE OWNER'S REPRESENTATIVE PRIOR TO USING SUCH SUBSTANCES ON SITE. THECONTRACTOR SHALL ALSO COMPLY WITH LAWS, ORDINANCES, RULES, AND REGULATIONS OF FEDERAL, STATE, REGIONAL, AND LOCALAUTHORITIES REGARDING HANDLING, STORING, TRANSPORTING, AND DISPOSING OF HAZARDOUS MATERIALS. PRIOR TO TRANSPORTING ANYHAZARDOUS WASTES, THE APPROPRIATE SITE ENVIRONMENTAL LEADER MUST BE CONTACTED.

H. CONTRACTORS SHALL NOTE THAT THE OWNER WILL OCCUPY ADJACENT AREAS FOR PERFORMANCE OF NORMAL BUSINESS ACTIVITIES DURINGCONSTRUCTION. CONTRACTORS SHALL TAKE ALL PRECAUTIONS NECESSARY TO PROTECT ADJACENT SPACES, EQUIPMENT, SERVICES, ETC.,FROM DAMAGE DURING THE WORK. COORDINATE DEMOLITION AND CONSTRUCTION WORK TO ALLOW ADJACENT AREAS TO REMAINOPERATIONAL AND SECURED. MAKE PROVISIONS TO PREVENT MIGRATION OF DEMOLITION OR CONSTRUCTION CONTAMINANTS INTO THEOCCUPIED AREAS. EMERGENCY EXIT PATHS SHALL BE MAINTAINED AT ALL TIMES.

I. THE USE OF "POWDER ACTIVATED TOOLS" IS FORBIDDEN BY THE OWNER. ALTERNATIVE ANCHORING AND FASTENING METHODS SHALL BE USEDWHICH PROVIDE EQUAL OR GREATER FASTENING STRENGTH, INCLUDING PULL-OUT AND SHEAR CAPABILITIES.

J. PENETRATIONS THROUGH STRUCTURAL MEMBERS, ROOF ASSEMBLY AND FLOOR SLABS, NOT INDICATED ON THE DRAWINGS, SHALL REQUIREAPPROVAL BY THE ARCHITECT AND OWNER PRIOR TO PERFORMING THE WORK. SEAL CONDUITS, PIPES, AND SYSTEMS WHICH PENETRATEFIRE-RATED WALLS AND PARTITIONS WITH CLASSIFIED SYSTEMS BY UNDERWRITERS LABORATORIES, INC.

K. EXACT SIZE AND LOCATIONS OF ALL MECHANICAL AND ELECTRICAL ROOF AND FLOOR OPENINGS SHOWN ON THE ARCHITECTURAL PLANS ARE TOBE VERIFIED WITH THE MECHANICAL AND ELECTRICAL CONSTRUCTION.

L. THE CONTRACTOR SHALL EXAMINE THE SITE AND PORTIONS THEREOF WHICH AFFECT THE WORK AND SHALL VERIFY ALL EXISTING DIMENSIONSAND CONDITIONS. NO ADDITIONAL EXPENSE SHALL BE ALLOWED WHICH RESULTS FROM THE FAILURE TO PERFORM THIS EXAMINATION.

M. CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING M.E.P. ITEMS AND COORDINATE THE DISCONNECTING, CAPPING, PLUGGING,ETC. WITH BOTH OWNER'S REPRESENTATIVE AND MECHANICAL, ELECTRICAL, AND PLUMBING CONTRACTORS PRIOR TO STARTING DEMOLITIONWORK. MAINTAIN CONTINUITY OF ALL SERVICES, CIRCUITS AND EQUIPMENT NOT SCHEDULED FOR DEMOLITION OR REWORK. MAINTAIN ALL FIREPROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. PROVIDE TEMPORARY LIGHTING FIXTURES AS REQUIRED FOR THESAFETY, SECURITY AND PERFORMANCE OF WORK BY ALL TRADES.

N. EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE SALVAGED AND REINSTALLED, OR OTHERWISE INDICATED TO REMAIN, DEMOLISHEDMATERIALS SHALL BECOME CONTRACTOR'S PROPERTY AND SHALL BE IMMEDIATELY REMOVED FROM THE PROJECT SITE AND PROPERLYDISPOSED OF.

O. ALL MATERIALS, FIXTURES AND EQUIPMENT INDICATED IN THE CONSTRUCTION DOCUMENTS SHALL BE NEW, AND AS SPECIFIED, UNLESSIDENTIFIED OTHERWISE, AND APPROVED BY ARCHITECT.

P. DIMENSIONS INDICATED ON PLANS ARE TO FACE OF PARTITIONS OR COLUMN CENTERLINE UNLESS NOTED OTHERWISE.Q. EXISTING COLUMN LINE DIMENSIONS ARE TAKEN FROM THE EXISTING BUILDING PLANS AND SHALL BE VERIFIED BY THE CONTRACTOR IN THE

FIELD.R. DO NOT SCALE FROM THE DRAWINGS. THE ARCHITECT SHALL BE NOTIFIED OF ANY CONFLICTS IN DIMENSIONING.S. DOOR OPENINGS NOT LOCATED BY DIMENSION SHALL BE 4" FROM THE FACE OF FINISHED WALL TO FACE OF DOOR FRAME JAMB AT HINGE SIDE OR

CENTERED BETWEEN PERPENDICULAR PARTITIONS.T. ALL NEW / EXIST. FINISHED AND PATCHED SURFACES SHALL BE SMOOTH, CONTINUOUSLY FREE OF IMPERFECTIONS AND IN PROPER CONDITION

TO RECEIVE THE SPECIFIED FINISH. PATCHED AREAS SHALL MATCH THE ADJACENT MATERIALS CONSTRUCTION AND FINISH.U. NEW CONSTRUCTION ABUTTING EXISTING CONSTRUCTION IN THE SAME PLANE SHALL BE FLUSH UNLESS NOTED OTHERWISE.V. PATCH AND REPAIR AREAS WITHIN THE SCOPE OF THE PROJECT AND ADJACENT TO THE PROJECT LIMITS WHICH HAVE BEEN AFFECTED BY

WORK.W. PROVIDE ALL REQUIRED BLOCKING, FURRING AND BACKING FOR ANY WALL MOUNTED FIXTURES, SHELVING AND ACCESSORIES.X. PROVIDE BACKER ROD AND SEALANT AT ALL DISSIMILAR MATERIALS.Y. ALL FLOORS ON EITHER SIDE OF DOORWAY OR OPENING SHALL BE LEVEL AND HAVE A MAXIMUM ELEVATION DIFFERENCE OR THRESHOLD HEIGHT

OF 1/4".Z. ALL EXISTING CONCRETE FLOORS SHALL BE LEVELED TO WITHIN 1/8" OVER 10'-0" AND MEET ALL FLOORING MANUFACTURER'S REQUIREMENTS

FOR PATCHING, LEVELING AND INSTALLATION BEFORE FINISH FLOORING IS APPLIED.AA. WHERE NEW WALL CONSTRUCTION OR WALL REPAIR OR INFILL WORK REQUIRES THE WALL TO BE REPAINTED, PAINT ENTIRE WALL FROM

CORNER TO CORNER.

BUSINESS2,849 SF / 29

ACCESSORYSTORAGE / MECHANICAL

56 SF / 1

1

EXISTING EXIT TOGROUND FLOOR

203

200C

200D

200E

200F200G200H

200A

203A

202

200

202B

299G

299A

200B

FE

EXISTING 1-HOURCORRIDOR FIRE RATING

EXIT LOADEXIT CAPACITY

FIREEXTINGUISHER

FIREEXTINGUISHERCABINET

PATH OF EGRESSTRAVEL

1

AREA / OCCUPANT LOADAREA FUNCTION

CODED NOTE

GENERAL FUNCTIONSPECIFIC FUNCTION

C01

100 SF / 1160130

EXISTING: AREA NOTIN SCOPE OF WORK

EXISTINGEXIT EXISTING

BUILDING EXIT

TABLE 1016.1: EXIT ACCESS TRAVEL DISTANCE

B: 200 FT (WITHOUT SPRINKLER) 300 FT (WITH SPRINKLER)

1014.3: COMMON PATH OF EGRESS TRAVEL

B: 75 FT (WITHOUT SPRINKLER) 100 FT (WITH SPRINKLER)

1018.2: CORRIDOR WIDTH

OCCUPANT LOAD x .2" PER OCCUPANT44" MINIMUM GREATER THAN OR EQUAL TO 50 OCCUPANTS36" MINIMUM LESS THAN 50 OCCUPANTS

TABLE 1018.1: CORRIDOR FIRE-RESISTANCE RATING

1HR (WITHOUT SPRINKLER) 0 (WITH SPRINKLER)

TABLE 1015.1: SPACES WITH ONE EXIT OR EXIT ACCESS DOORWAY

B: ALLOWABLE WITH LESS THAN OR EQUAL TO 49 OCCUPANTS

1005.1: MINIMUM REQUIRED EGRESS WIDTH

OCCUPANT LOAD x .3" PER OCCUPANT (STAIRWAYS)OCCUPANT LOAD x .2" PER OCCUPANT (OTHER COMPONENTS)

TABLE 3412.7: SUMMARY SHEET - BUILDING CODE

EXISTING OCCUPANCY: B (BUSINESS)PROPOSED OCCUPANCY: B (BUSINESS)YEAR BUILDING WAS CONSTRUCTED: APPROX. 1950NUMBER OF STORIES: 3TYPE OF CONSTRUCTION: ASSUME IIIBCORRIDOR WALL RATING: 1HR UNSUPPRESSED 0HR SUPPRESSEDCOMPLETELY SUPPRESSED: NOREQUIRED DOOR CLOSES: YES ON RATED DOORS ONLYCOMPARTMENTATION: TBDFIRE-RESISTANCE RATING OF VERTICAL OPENING: 1HRTYPE OF HVAC SYSTEM: HW RADIATOR HEAT, CW FAN COIL A/CSERVING: ALL FLOORSAUTOMATIC FIRE DETECTION: YESFIRE ALARM SYSTEM: YESSMOKE CONTROL: N/AADEQUATE EXIT ROUTES: YESDEAD ENDS: YESMAX EXIT ACCESS TRAVEL DIST: (SEE SEPARATE BREAKDOWN)ELEVATOR CONTROLS: YESMEANS OF EGRESS EMERGENCY LIGHTING: YESMIXED OCCUPANCY: NO

1018.4: DEAD ENDS

B: 20 FT (WITHOUT SPRINKLER) 50 FT (WITH SPRINKLER)

3412.2.4: ALTERATIONS AND REPAIRS

AN EXISTING BUILDING OR PORTION THEREOF, WHICH DOES NOTCOMPLY WITH THE REQUIREMENTS OF THIS CODE FOR NEWCONSTRUCTION, SHALL NOT BE ALTERED OR REPAIRED IN SUCH AMANNER THAT RESULTS IN THE BUILDING BEING LESS SAFE OR SANITARYTHAN SUCH BUILDING IS CURRENTLY. IF, IN THE ALTERATION ORREPAIR, THE CURRENT LEVEL OF SAFETY OR SANITATION IS TO BEREDUCED, THE PORTION ALTERED OR REPAIRED SHALL CONFORM TOTHE REQUIREMENTS OF CHAPTERS 2 THROUGH 12 AND CHAPTERS 14THROUGH 33.

203/ 203A

200C

200D

200E

200F

200G

200

200A

200H

202

PHO

NE

919

.683

.10 8

4

150

FAYE

TTEV

ILLE

STR

EET

RALE

IGH

, N

C 27

601

SUIT

E 82

0

RALE

IGH

PHO

NE

614

.486

.19 6

0

274

MA R

CONI B

LVD

COLU

MBU

S, O

H 4

3 215

SUIT

E 20

0

COL U

MBU

S

PHO

NE

513

.271

.16 3

4

302

WES

T 3R

D ST

R EET

CIN

CIN

NAT

I, O

H 4

5 202

SUIT

E 50

0

CINC I

NNAT

I

web

sit e

ww

w.b

hdp.

com

Thi

s do

cum

ent

is th

e pr

odu

ct a

nd

pro

pert

y of

Bax

ter

Hod

ell D

onn

elly

Pre

ston

, Inc

.N

eith

er

the

docu

me

nt n

or th

e in

form

atio

n it

con

tain

s m

ay b

e c

opi

ed

or

use

d fo

r ot

her

tha

n th

e sp

eci

ficp

roje

ct fo

r w

hic

h it

was

pre

pare

d w

ithou

t th

e w

ritte

n c

onse

nt o

f Bax

ter

Hod

ell D

onne

lly P

rest

on, I

nc.

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17

B

A

9

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 179

Drawn

Project Manager

Checked

Contract Drawing Date

Project Number

Q

P

N

M

L

K

J

H

G

F

E

D

C

B

A

18 19

18 19

Q

P

N

M

L

K

J

H

G

F

E

D

C

B

ARCHITECTS / INTERIOR DESIGNERS

6130

WIL

CO

X R

OA

DD

UB

LIN

, OH

430

1661

4-76

6-48

96

C:\Users\hevwaraye\Documents\MUX1743_15_Central_HEvwaraye.rvt 8/26/2015 11:58:41 AM

H. EVWARAYE

K. DENMAN

K. DENMAN

07/31/2015

MUX17.43

G001

COVE

R SH

EET

& LIF

E SA

FETY

PLA

N

UPHA

M H A

LL: D

EPA R

TME N

T SU

ITE

R ENO

V ATI

O N

MIAMI UNIVERSITYUPHAM HALL: DEPARTMENT SUITE RENOVATION

100 BISHOP CIRCLE

MIA M

I UN I

VER S

ITY

PRAT

ER E

NGIN

EERI

NG

ABBREVIATIONS

MATERIAL SYMBOLS

SYMBOL LEGEND GENERAL PROJECT NOTES

DRAWING INDEXG001 COVER SHEET & LIFE SAFETY PLAN B 08/26/2015 ADDENDUM 01

D102 SECOND FLOOR DEMOLITION PLANS B 08/26/2015 ADDENDUM 01

A102 SECOND FLOOR PLANS AND DETAILS B 08/26/2015 ADDENDUM 01A600 ELEVATIONS & DETAILS A 07/31/2015 BID & PERMIT DOCUMENTSA700 DOOR, FRAME AND PARTITION DETAILS B 08/26/2015 ADDENDUM 01A802 SECOND FLOOR FINISH AND FURNITURE PLANS B 08/26/2015 ADDENDUM 01

274 MARCONI BLVD. SUITE 200BHDP ARCHITECTURE

COLUMBUS, OH 43215

6130 WILCOX ROADMECHANICAL AND PLUMBINGENGINEERS

PRATER ENGINEERING

DUBLIN, OH 43016614-766-4896

OXFORD, OH 45056-1879

VICINITY MAP

PROJECT LOCATION: 100 BISHOP CIRCLE OXFORD, OH 45056-3414

PROJECT LOCATION: 100 BISHOP CIRCLE OXFORD, OH 45056-3414

3510 SNOUFFER ROADELECTRICAL ANDCOMMUNICATIONS ENGINEERS

METRO CD ENGINEERING

SUITE 200COLUMBUS, OH 43235

N

1/8" = 1'-0"G001

A11

SECOND FLOOR LIFE SAFETY PLAN

FP100 SECOND FLOOR FIRE PROTECTION PLAN

H100 SECOND FLOOR HVAC PLANH200 HVAC DETAILS

P100 SECOND FLOOR PLUMBING PLAN

ED100 SECOND FLOOR ELECTRICAL DEMOLITION PLANE100 SECOND FLOOR LIGHTING AND POWER PLANSE200 ELECTRICAL SCHEDULES AND DETAILS

B 08/20/2015 ADDENDUM 01

B 08/20/2015 ADDENDUM 01B 08/20/2015 ADDENDUM 01

A 07/31/2015 BID & PERMIT DOCUMENTS

B 08/20/2015 ADDENDUM 01B 08/20/2015 ADDENDUM 01A 07/31/2015 BID & PERMIT DOCUMENTS

LIFE SAFETY LEGEND

OCCUPANCY SCHEDULE

USE GROUPGENERALFUNCTION SPECIFIC FUNCTION AREA OCC RATE OCC LOAD

BUSINESS ACCESSORY STORAGE / MECHANICAL 56 SF 300 1BUSINESS BUSINESS 2,849 SF 100 29

2,905 SF 30

EXIT ACCESS TRAVEL DISTANCES

MARK EGRESS EXIT ROUTEEGRESS PATH

DISTANCEALLOWABLE

DISTANCE TYPE1 NORTH EXIT EGRESS PATH 101'-0" 200' - 0" EXIT ACCESS TRAVEL

DISTANCE

CODE REVIEW NOTES

(UNCHANGED)(UNCHANGED)(UNCHANGED)

KEY PLAN

No.

Issu

e/R

evis

ion/

Sub

mis

sion

Dat

eA

BID

& P

ER

MIT

DO

CU

ME

NT

S07

/31/

2015

BA

DD

EN

DU

M 0

108

/26/

2015

PAUL D. ORBAN, LICENSE #13276EXPIRATION DATE: 12/31/2015

B

Page 58: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

002

002

002002

002

002

002

001

003003

003

003

003

003

003

008

008

014014

014

008

008

020

010

010

010

009

021

021021

021

3

4

CDEF

TYP.025 TYP.

025

TYP.025

TYP.025

TYP.025

TYP.025

001

015015

006

023

012

012

027

008 008

008

023

024

CODED NOTE

EXISTING TO REMAIN

EXISTING TO BE REMOVED

AREA NOT IN CONTRACT

?001

REFER TO INDEX SHEET FOR ADDITIONAL NOTES.1. SOLID LINES ON FLOOR PLANS REPRESENT BUILDING ELEMENTS TO REMAIN.

DASHED LINES REPRESENT BUILDING ELEMENTS TO BE DEMOLISHED ORRELOCATED. ALL AREAS DENOTED ON THE ROOM FINISH SCHEDULE TORECEIVE NEW FINISHES WILL REQUIRE THE DEMOLITION OF EXISTING FLOORFINISHES AND CEILING SYSTEMS, U.N.O.

2. REMOVE ALL PLUMBING, MECHANICAL AND ELECTRICAL WORK CONTAINED INOR ATTACHED TO WALLS WHICH ARE TO BE REMOVED. REFER TO PLUMBING,MECHANICAL, AND ELECTRICAL DRAWINGS FOR FURTHER DEMOLITIONREQUIREMENTS.

3. CUTTING OF EXISTING BEAMS AND STRUCTURAL ELEMENTS IS PROHIBITED,UNLESS NOTED OTHERWISE.

4. PROVIDE FLOOR SUBSTRATE SURFACES SMOOTH AND FLUSH WITH EXISTINGFLOOR SURFACES, FREE OF RIDGES, RIPPLES, DEPRESSIONS, AND OTHERDEFECTS. CHECK FLOOR SURFACES WITH A TEN FOOT LONG METALSTRAIGHTEDGE AND USING APPROPRIATE MATERIALS, FILL TROUGHS ANDDEFLECTIONS OF FLOOR SURFACES, CLEAN AND PREPARE SUBFLOORSURFACES TO RECEIVE NEW FINISH FLOORING MATERIALS AFTER REMOVALOF EXISTING FLOORING MATERIALS. REMOVE EXISTING ADHESIVES ANDSURFACE IRREGULARITIES WHICH WOULD TELEGRAPH THROUGH THE NEWFLOOR SURFACE. GRIND RIDGES AND RAISED AREAS. FILL DEPRESSIONSAND REPAIR CRACKS. SUBFLOOR SURFACES SHALL BE CLEAN, SMOOTH,LEVEL WITH NO APPARENT VARIATION AND SUITABLE TO RECEIVE NEW FINISHFLOOR MATERIALS.

5. REMOVE EXISTING RESILIENT TILE AND BASE, CARPET BASE, FINISHCARPENTRY, CERAMIC FLOOR AND WALL TILE, VINYL WALL FABRIC AND OTHEREXISTING FINISH MATERIALS FROM SURFACES RECEIVING NEW FINISHES,PREPARE SURFACES TO RECEIVE NEW FINISHES IN ACCORDANCE WITH ROOMFINISH SCHEDULE.

6. CONTRACTOR SHALL BRACE ALL EXISTING STRUCTURAL ELEMENTS ASNECESSARY DURING DEMOLITION.

7. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE INTEGRITY OFFIRE RATED ASSEMBLIES AT ALL EDGES AND PENETRATIONS. EXISTINGFIREPROOFING OR FIRE ASSEMBLIES WHICH ARE DAMAGED DURINGDEMOLITION SHALL BE REPAIRED TO CONFORM TO FIRE PROTECTIONREQUIREMENTS.

8. PATCH WALLS AT OWNER-REMOVED EQUIPMENT AND PREPARE FOR NEWFINISHES.

9. THE OWNER SHALL REMOVE ALL NON-FIXED SALVAGE ITEMS PRIOR TODEMOLITION. CONTRACTOR SHALL COORDINATE WITH OWNER PRIOR TODEMOLITION REGARDING FIXED ITEMS TO BE TURNED OVER TO THE OWNER ASSALVAGED ITEMS.

10. ACCESS FOR HVAC, PLUMBING AND ELECTRICAL WORK SHALL BECOORDINATED WITH OWNER'S REPRESENTATIVE IN ADVANCE OF PLANNINGWORK AT AREAS ABOVE AND BELOW PLANNED WORK.

11. REMOVE EXISTING WINDOW TREATMENT IN ITS ENTIRETY WITHIN SCOPE OFWORK. PATCH AND REPAIR SURFACES FOR NEW WORK.

3

4

CDEF

022

022

022

022

022

022 022

022

016

007

007

026

B

CEILING HEIGHT TAG

RECESSED LOW VOLTAGE CAN LIGHT FIXTURE

RECESSED CAN LIGHT FIXTURE

2'-0" X 2'-0" CEILING GRID & ACOUSTICAL PANELS. REFER TOFINISH SCHEDULE.

SUSPENDED LINEAR LIGHT FIXTURE

RECESSED 2'-0" X 4'-0" LIGHT FIXTURE

RECESSED WALL WASH CAN LIGHT FIXTURE

RECESSED 2'-0" X 2'-0" LIGHT FIXTURE

SUSPENDED PENDANT LIGHT FIXTURE

BATTERY OPERATED EMERGENCY LIGHT

MECHANICAL SUPPLY DIFFUSER

MECHANICAL RETURN DIFFUSER

PROJECTION SCREEN

1'-0"

ACCESS PANEL

GYPSUM BOARD

2'-0" X 4'-0" CEILING GRID & ACOUSTICAL PANELS. REFER TOFINISH SCHEDULE.

203/ 203A

200C

200D

200E

200F

200G

200

200A

200H

202

PHO

NE

919

.683

.10 8

4

150

FAYE

TTEV

ILLE

STR

EET

RALE

IGH

, N

C 27

601

SUIT

E 82

0

RALE

IGH

PHO

NE

614

.486

.19 6

0

274

MA R

CONI B

LVD

COLU

MBU

S, O

H 4

3 215

SUIT

E 20

0

COL U

MBU

S

PHO

NE

513

.271

.16 3

4

302

WES

T 3R

D ST

R EET

CIN

CIN

NAT

I, O

H 4

5 202

SUIT

E 50

0

CINC I

NNAT

I

web

sit e

ww

w.b

hdp.

com

Thi

s do

cum

ent

is th

e pr

odu

ct a

nd

pro

pert

y of

Bax

ter

Hod

ell D

onn

elly

Pre

ston

, Inc

.N

eith

er

the

docu

me

nt n

or th

e in

form

atio

n it

con

tain

s m

ay b

e c

opi

ed

or

use

d fo

r ot

her

tha

n th

e sp

eci

ficp

roje

ct fo

r w

hic

h it

was

pre

pare

d w

ithou

t th

e w

ritte

n c

onse

nt o

f Bax

ter

Hod

ell D

onne

lly P

rest

on, I

nc.

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17

B

A

9

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 179

Drawn

Project Manager

Checked

Contract Drawing Date

Project Number

Q

P

N

M

L

K

J

H

G

F

E

D

C

B

A

18 19

18 19

Q

P

N

M

L

K

J

H

G

F

E

D

C

B

6130

WIL

CO

X R

OA

DD

UB

LIN

, OH

430

1661

4-76

6-48

96

C:\Users\hevwaraye\Documents\MUX1743_15_Central_HEvwaraye.rvt 8/26/2015 11:58:34 AM

H. EVWARAYE

K. DENMAN

K. DENMAN

07/31/2015

MUX17.43

D102

SECO

ND F

LOOR

DEM

OLIT

ION

PLAN

S

UPHA

M H A

LL: D

EPA R

TME N

T SU

ITE

R ENO

V ATI

O NMI

A MI U

N IVE

R SIT

Y

PRAT

ER E

NGIN

EERI

NG

N

1/8" = 1'-0"D102

A9 SECOND FLOOR DEMOLITION PLAN

DEMOLITION PLAN LEGEND

GENERAL DEMOLITION NOTES

N

1/8" = 1'-0"D102

A1 SECOND FLOOR DEMO RCP

REFLECTED CEILING PLAN LEGEND

KEY PLAN

CODED NOTES001 REMOVE EXISTING PARTITION AS INDICATED. COORDINATE DEVICE REMOVAL WITH

MEP.

002 REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN ITS ENTIRETY.003 REMOVE FLOOR FINISHES IN THEIR ENTIRETY, INCLUDING ADHESIVES. PREPARE

FLOOR FOR NEW FINISHES.

006 REMOVE AND SALVAGE EXISTING FIRE EXTINGUISHER; REFER TO NEW WORK PLAN.007 REMOVE EXISTING GYPSUM CEILING SYSTEM.008 OWNER TO REMOVE ALL ITEMS AND EQUIPMENT FROM ROOM PRIOR TO

CONSTRUCTION

009 REMOVE EXISTING DOOR AND HARDWARE. FRAME TO REMAIN, PROTECT DURINGCONSTRUCTION.

010 REMOVE EXISTING MILLWORK BASE CABINETS AND COUNTERTOP IN ITS ENTIRETY.012 REMOVE EXISTING DOOR HARDWARE. EXISTING DOOR AND FRAME TO REMAIN;

REFER TO DOOR SCHEDULE.

014 REMOVE EXISTING MILLWORK BASE CABINETS, WALL CABINETS, COUNTERTOP ANDSINK. REFER TO PLUMBING DRAWINGS.

015 REMOVE EXISTING STORAGE CABINETS. COORDINATE WITH OWNER.016 REMOVE AND SALVAGE EXISTING SHORT THROW PROJECTOR. COORDINATE WITH

NEW PLANS FOR LOCATION.

020 REMOVE EXISTING WINDOW IN ITS ENTIRETY.021 REMOVE AND SALVAGE EXISTING WHITEBOARD. COORDINATE WITH OWNER AND

NEW WORK PLAN.

022 REMOVE EXISTING CEILING SYSTEM, INCLUDING ALL HANGERS AND SUPPORTSYSTEMS. REMOVE ALL LIGHT FIXTURES, AIR FIXTURES AND OTHER CEILINGMOUNTED DEVICES.

023 REMOVE AND SALVAGE EXISTING TACKBOARD; PATCH AND REPAIR ASNECESSARY, PREPARE FOR NEW FINISHES. COORDINATE WITH OWNER.

024 EXISTING ELECTRICAL PANEL TO REMAIN. REFER TO MEP DRAWINGS AND NEWWORK PLAN.

025 RADIANT HEATING SYSTEM TO REMAIN. REFER TO MEP DRAWINGS FOR FURTHERCOORDINATION AND PORTIONS OF REWORK. PATCH AND REPAIR WALL AND FLOORTO PREPARE SURFACE FOR NEW FINISHES.

026 EXISTING CEILING TO REMAIN; REMOVE EXISTING LIGHT FIXTURES; COORDINATEWITH MEP DRAWINGS.

027 EXISTING FLOORING MATERIAL TO REMAIN IN THIS AREA. REFER TO ANDCOORDINATE HAZARDOUS MATERIAL REPORT.

No.

Issu

e/R

evis

ion/

Sub

mis

sion

Dat

eA

BID

& P

ER

MIT

DO

CU

ME

NT

S07

/31/

2015

BA

DD

EN

DU

M 0

108

/26/

2015

B

B

B

B

B

Page 59: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

1. SEE SHEET G001 FOR PROJECT GENERAL NOTES AND LIFE SAFETY INFO.2. CONTRACTOR TO PROVIDE BLOCKING IN PARTITIONS FOR PARTITION MOUNTED

ITEMS AS INDICATED. CONTRACTOR ALSO TO COORDINATE QUANTITY ANDLOCATIONS WITH THE OWNER FOR OWNER FURNISHED / CONTRACTORINSTALLED ITEMS.

3. PARTITIONS ARE TYPE G3: A0-S UNLESS NOTES OTHERWISE.4. SEE SHEET A700 FOR PARTITION TYPES, DOOR AND FRAME DETAILS.5. PATCH AND REPAIR EXISTING WALLS WHERE EXISTING DEVICES, RADIANT

HEATING SYSTEMS, AND OTHER ITEMS WERE REMOVED.

3

4

CDEF

200

200B

BREAK

202 MECHANICAL

202B

ADMIN.

203A

DEPARTMENTSUITE

200

DEPT. CHAIR

203

OFFICE

200C

VISITINGOFFICE

200D

OFFICE

200E

OFFICE

200F

OFFICE

200H

CONFERENCE

200A

STOR.

200B

4' - 10" 15' - 6"

A600 D1

VISITINGOFFICE

200G

7' - 6" 5' - 11"

V.I.F.

A600D5

10" 6' - 0"11' - 4"

13' -

8"

5' - 5

"

13

' - 10

1/2"

2' - 8"

5' - 8

"

203

200C

200D

200E

200F

200G200H

200A

F4:A0-S

F2:A0-S102 104

129

129

129129

102

102

107

STAIR

299A

CORRIDOR

299G

3-2

4-2

202B

129

108

107

110

F2:A0--

104

G3:S0-S

102

105

5' - 6

"

101101

G8:A0--

V.I.F

3

4

CDEF

J1

A102

202

202B

203A

200

203

200C

200D

200E

200F200H

200A200B

200G

12' - 0"

TYP.

9' - 0"EQ6'

- 0"

EQ

1' - 4"

J8

A102

J13

A102

J1

A102

SIM.

10' - 6"

404

12' - 0"

12' - 0" WT1TYP.

WT1TYP.

WT1TYP.

TYP.2' - 0"

TYP.

2' - 0

"

TYP.

2' - 0

"

416

CEILING HEIGHT TAG

RECESSED LOW VOLTAGE CAN LIGHT FIXTURE

RECESSED CAN LIGHT FIXTURE

2'-0" X 2'-0" CEILING GRID & ACOUSTICAL PANELS. REFER TOFINISH SCHEDULE.

SUSPENDED LINEAR LIGHT FIXTURE

RECESSED 2'-0" X 4'-0" LIGHT FIXTURE

RECESSED WALL WASH CAN LIGHT FIXTURE

RECESSED 2'-0" X 2'-0" LIGHT FIXTURE

SUSPENDED PENDANT LIGHT FIXTURE

BATTERY OPERATED EMERGENCY LIGHT

MECHANICAL SUPPLY DIFFUSER

MECHANICAL RETURN DIFFUSER

PROJECTION SCREEN

1'-0"

ACCESS PANEL

GYPSUM BOARD

2'-0" X 4'-0" CEILING GRID & ACOUSTICAL PANELS. REFER TOFINISH SCHEDULE.

203/ 203A

200C

200D

200E

200F

200G

200

200A

200H

202

4"1"

BOTTOM OF CLG.

SEE RCP

BOTTOM OF CLG.

SEE RCP

ALIGN

5/8" GYPSUMWALLBOARD, PAINTED.REFER TO FINISHPLANS FOR LEGEND.

EXISTING EXTERIOR WALL

CROSS BRACING ASREQUIRED3 5/8" METAL STUDFRAMING. ANCHOR TOSTRUCTURE ABOVE.

HANGER WIRE.ANCHOR TOSTRUCTURE ABOVE.

ACOUSTICAL CEILINGTILE SYSTEM. SEERCP AND SCHEDULEFOR FINISHES.

ROLLER TUBE AND SHADEASSEMBLY WITH BRACKET ANDFASCIA PIECE. SEE LEGEND,VERIFY SIZES IN FIELD.

REFER TO RCP

PROVIDE ACCESS PANEL ASNEEDED FOR COORDINATIONOF EXISTING ITEMS WITHINGWB SOFFIT; COORDINATEWITH A/E.

1. ALL CEILING HEIGHTS TO BE AT 10'-0" ABOVE FINISHED FLOOR UNLESS NOTEDOTHERWISE, REFER TO PLANS.

2. REFER TO PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS FORLOCATIONS OF EXIT SIGNS AND ADDITIONAL CEILING MOUNTED DEVICES,SIZES, AND TYPES. NOTE: NOT ALL CEILING MOUNTED DEVICES ARE SHOWN ONTHIS PLAN.

3. THESE DRAWINGS SHALL BE USED FOR LAYOUT OF ALL CEILING DEVICES.CONSULT WITH ARCHITECT IF A CONFLICT ARISES WITH PLUMBING,MECHANICAL, AND ELECTRICAL DRAWINGS. ALL FIXTURES ARE DIMENSIONEDTO CENTERLINE OF FIXTURE.

4. PROVIDE ACCESS PANELS IN GYPSUM BOARD CEILINGS WHERE NECESSARYFOR ACCESS TO EQUIPMENT AND CONTROLS. REVIEW LOCATION WITHARCHITECT PRIOR TO INSTALLATION.

5. ALL LAY-IN CEILING GRID SHALL BE EQUAL FROM OPPOSING EDGES OF ROOMUNLESS NOTED OTHERWISE. AVOID CUT SIZES SMALLER THAN 3 INCHES.

6. REFER TO FINISH LEGEND FOR ACOUSTICAL CEILING PANEL TYPE AND SOFFITPAINT COLORS.

7. ALL VERTICAL FACES OF SOFFIT TO BE FINISHED TO MATCH ADJACENTSURFACE MATERIALS. THE HORIZONTAL SURFACE TO BE PAINTED CEILINGWHITE.

8. PATCH AND REPAIR TO MATCH EXISTING CONDITIONS WHERE REQUIRED TOREMOVE EXISTING CEILING ELEMENTS.

5/8" GYPSUM BOARD ON3 5/8" METAL STUDS

3 5/8" METAL STUDKICKER AT 4'-0" ONCENTER

SUSPENDED CEILING. SEERCP & FINISH SCHEDULE.

SEE RCP

FOR HEIGHT

HANGER WIRE -ANCHOR TOSTRUCTURE ABOVE

SEE RCP

FOR HEIGHT

SUSPENDED CEILING.SEE RCP & FINISHSCHEDULE.4"

1"4"

SUSPENDED CEILING.REFER TO RCP &FINISH SCHEDULE.

5/8" GYPSUM BOARDON 3 5/8" METALSTUDS @ 16" O.C.

SEE RCP

FOR HEIGHT

CORNER BEAD

ANGLE MOLD

3 5/8" STUDS -ANCHOR TOSTRUCTURE ABOVE

RECESSED LINEARFIXTURE - SEE ELECDWGS

SEE PLANSFOR PARTITIONTYPE

REFER TO RCP

4"

SEE RCP

FOR HEIGHT

PHO

NE

919

.683

.10 8

4

150

FAYE

TTEV

ILLE

STR

EET

RALE

IGH

, N

C 27

601

SUIT

E 82

0

RALE

IGH

PHO

NE

614

.486

.19 6

0

274

MA R

CONI B

LVD

COLU

MBU

S, O

H 4

3 215

SUIT

E 20

0

COL U

MBU

S

PHO

NE

513

.271

.16 3

4

302

WES

T 3R

D ST

R EET

CIN

CIN

NAT

I, O

H 4

5 202

SUIT

E 50

0

CINC I

NNAT

I

web

sit e

ww

w.b

hdp.

com

Thi

s do

cum

ent

is th

e pr

odu

ct a

nd

pro

pert

y of

Bax

ter

Hod

ell D

onn

elly

Pre

ston

, Inc

.N

eith

er

the

docu

me

nt n

or th

e in

form

atio

n it

con

tain

s m

ay b

e c

opi

ed

or

use

d fo

r ot

her

tha

n th

e sp

eci

ficp

roje

ct fo

r w

hic

h it

was

pre

pare

d w

ithou

t th

e w

ritte

n c

onse

nt o

f Bax

ter

Hod

ell D

onne

lly P

rest

on, I

nc.

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17

B

A

9

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 179

Drawn

Project Manager

Checked

Contract Drawing Date

Project Number

Q

P

N

M

L

K

J

H

G

F

E

D

C

B

A

18 19

18 19

Q

P

N

M

L

K

J

H

G

F

E

D

C

B

6130

WIL

CO

X R

OA

DD

UB

LIN

, OH

430

1661

4-76

6-48

96

C:\Users\hevwaraye\Documents\MUX1743_15_Central_HEvwaraye.rvt 8/26/2015 11:58:03 AM

H. EVWARAYE

K. DENMAN

K. DENMAN

07/31/2015

MUX17.43

A102

SECO

ND F

LOOR

PLA

NS A

ND D

ETAI

LS

UPHA

M H A

LL: D

EPA R

TME N

T SU

ITE

R ENO

V ATI

O NMI

A MI U

N IVE

R SIT

Y

PRAT

ER E

NGIN

EERI

NG

GENERAL ARCHITECTURAL NOTES

N

1/8" = 1'-0"A102

A9 SECOND FLOOR PLANN

1/8" = 1'-0"A102

A1 SECOND FLOOR RCP

REFLECTED CEILING PLAN LEGEND

KEY PLAN

1 1/2" = 1'-0"A102

J1 EXTERIOR SOFFIT DETAIL

GENERAL RCP NOTES

CODED NOTES101 ALIGN102 ALIGN NEW PARTITION TO EXISTING WALL; PATCH AND REPAIR AS NEEDED FOR

FLAT, SMOOTH SURFACE, EACH SIDE.

104 ALIGN NEW PARTITION FLUSH AGAINST TO EXISTING WALL.105 EXISTING ELECTRIC PANEL, SEE ELECTRICAL DRAWINGS.107 8'-0"W X 4'-0"H WALL MOUNTED TACKBOARD, MOUNTED 36" AFF. REFER TO

SPECIFICATIONS; COORDINATE FINISH WITH ARCHITECT.

108 RELOCATED, EXISTING WALL MOUNTED MARKERBOARD, MOUNTED 36" AFF.110 RELOCATED, EXISTING FIRE EXTINGUISHER.129 ALIGN PARTITION WITH OUTSIDE EXISTING WINDOW MULLION.404 SHORT-THROW, PROJECTOR LOCATION; OFCI. COORDINATE LOCATION WITH

UNIVERSITY. REFER TO MEP DRAWINGS FOR FURTHER DETAILS.

416 EXISTING CEILING TO REMAIN; PROVIDE NEW LIGHT FIXTURES; REFER TO MEP.PATCH AND REPAIR AS REQUIRED.

1 1/2" = 1'-0"A102

J8 ACT-ACT BULKHEAD-GYP. 1 1/2" = 1'-0"A102

J13 GYP SOFFIT-ACT @ WALL

No.

Issu

e/R

evis

ion/

Sub

mis

sion

Dat

eA

BID

& P

ER

MIT

DO

CU

ME

NT

S07

/31/

2015

BA

DD

EN

DU

M 0

108

/26/

2015

B

B

B

B

Page 60: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

1. SEE SHEET G001 FOR PROJECT GENERAL NOTES AND LIFE SAFETY INFO.2. CONTRACTOR TO PROVIDE BLOCKING IN PARTITIONS FOR PARTITION MOUNTED

ITEMS AS INDICATED. CONTRACTOR ALSO TO COORDINATE QUANTITY ANDLOCATIONS WITH THE OWNER FOR OWNER FURNISHED / CONTRACTORINSTALLED ITEMS.

3. PARTITIONS ARE TYPE G3: A0-S UNLESS NOTES OTHERWISE.4. SEE SHEET A700 FOR PARTITION TYPES, DOOR AND FRAME DETAILS.5. PATCH AND REPAIR EXISTING WALLS WHERE EXISTING DEVICES, RADIANT

HEATING SYSTEMS, AND OTHER ITEMS WERE REMOVED.

1 2-X

FRAME NOTESF = FRAME WIDTHX = SEE DOOR SCHEDULE FOR WIDTH2" AT HOLLOW METAL FRAMES

F WIDTH FF

HEIG

HT

HEIG

HTF

F WIDTH F X" F

K4 TYP.

700

TYP.

700

G4TYP.

700

G7

K7TYP.

700

N4TYP.

700

TYP.

700

N7TYP.

G1

113

4"6'

- 8"

F NLHG

HEIG

HT

WIDTH WIDTH WIDTH

6"HE

IGHT

HEIG

HT

3' - 6

"

6"2'

- 1"

6" 5"

HG2 = 2 LEAF

AL = ALUMINUMEX = EXISTINGF = FLUSHFG = FULL GLASSFIN = FINISHHG = HALF GLASSHM = HOLLOW METALMATL = MATERIALNL = NARROW LITE

OH = OVERHEAD COILING DOORPF = PRE-FINISHEDPL = PLASTIC LAMINATEPT = PAINTST = STAINED (FIN)ST = STEEL (MATL)VG = VISION GLASSWD = WOOD

1. ALL HARDWARE TO BE PROVIDED BY DOOR MANUFACTURER.2. EXISTING DOOR AND FRAME TO REMAIN; PROVIDE NEW HARDWARE AND PAINT DOOR AND

FRAME TO MATCH ADJACENT WALL FINISH. REFER TO FINISH PLAN/LEGEND.3. ALL NEW WOOD DOORS TO BE SPECIES/FINISH TO MATCH EXISTING BUILDING STANDARDS.4. EXISTING FRAME TO REMAIN; PROVIDE NEW DOOR AND HARDWARE PER SCHEDULE. DOOR

TO MEET THE REQUIREMENTS OF UL1784. PATCH, REPAIR, AND PAINT FRAME TO MATCHADJACENT WALL FINISH. REFER TO FINISH PLAN/LEGEND.

5. OFFICE DOOR TO INCLUDE GARMENT HOOK, MOUNTED BEHIND DOOR AT 48" A.F.F. BASIS OFDESIGN: BOBRICK B-233.

6. EXISTING DOOR, FRAME AND HARDWARE TO REMAIN; PAINT DOOR AND FRAME TO MATCHADJACENT WALL FINISH. REFER TO FINISH PLAN/LEGEND.

PARTITION HEIGHT:C = TO CEILINGA = ABOVE CEILINGS = TO STRUCTUREP = PARTIAL HEIGHT

FIRE RATING: 0, .5, 1, 2, 3 OR 4 HOUR

ANCILLARY DESIGNATION:- = NONES = SOUND INSULATIONT = THERMAL INSULATION

O0:O0OO

PARTITION TYPE(REFER TO FLOOR PLANS)

RATED ASSEMBLY TYPE:- = NOT A RATED ASSEMBLYA = SMOKE PARTITIONB = FIRE PARTITIONC = FIRE BARRIERD = FIRE & SMOKE BARRIERE = RATED STRUCTUREF = RATED STRUCTURE & SMOKE BARRIERG = FIRE WALL

CEILINGLINE

FLOOR LINE

UNDERSIDEOF DECK

GYPSUMPARTITION

3 5/8" 1 5/8" 6"

G8:C---

G8:A---

G8:S---

F2:C---

F2:A---

F2:S---

F4:C---

F4:A---

F4:S---

8 1/2"2 1/4"4 1/4"

4" T

YPIC

AL

3 5/8"

G3:C---

G3:A---

G3:S---

4 7/8"

FURRED GYPSUMPARTITIONS

STC = 39 (43)

( 1 HR. RATED - U.L. DESIGN U465 )

GYPSUM PARTITION = ONE LAYER OF 5/8" GWB, BOTH SIDESONE LAYER OF 5/8" GWB, ONE SIDE

WHERE INDICATED

GYPSUM PARTITION = TWO LAYERS OF 5/8" GWB, BOTH SIDES

SEE PLANS FOR PARTITION TYPE

METAL STUD HEADER PER PARTITIONHEADER SCHEDULE

SEALANT AT BOTH SIDES

HOLLOW METAL FRAME - PAINTED

METAL STOP

GROUT FRAME SOLID

2"

GLAZING - SEE SCHEDULE

ACOUSTICAL INSULATION - SEE PLANSFOR LOCATIONS

HOLLOW METAL FRAME - PAINTED

DOOR - SEE SCHEDULE

GROUT FRAME SOLID

2"

SEE PLANS FOR PARTITION TYPE

METAL STUD HEADER PER PARTITIONHEADER SCHEDULE

SEALANT AT BOTH SIDES

ACOUSTICAL INSULATION - SEE PLANSFOR LOCATIONS

4" MIN.

WALL LINE

SEE PLANS FOR PARTITION TYPE

DOUBLE STUD AT JAMB

SEALANT AT BOTH SIDES

JAMB ANCHOR

HOLLOW METAL FRAME - PAINTED

GLAZING - SEE SCHEDULE

GROUT FRAME SOLID

METAL STOP

ACOUSTICAL INSULATION - SEE PLANSFOR LOCATIONS

2" 4" MIN.

WALL LINE

SEE PLANS FOR PARTITION TYPE

DOUBLE STUD AT JAMB

SEALANT AT BOTH SIDES

JAMB ANCHOR

HOLLOW METAL FRAME - PAINTED

DOOR - SEE SCHEDULE

GROUT FRAME SOLID

ACOUSTICAL INSULATION - SEE PLANSFOR LOCATIONS

2"

GLAZING AS SCHEDULED

METAL STOP

HOLLOW METAL FRAME - PAINTED

DOOR - SEE SCHEDULE

GROUT FRAME SOLID

2" GLAZING AS SCHEDULED

METAL STOP

HOLLOW METAL FRAME - PAINTED

GROUT FRAME SOLID

CONTINUOUS SEALANT AND BACKERROD4"

LIMITED STEEL FRAMING HEIGHTS -INTERIOR PARTITIONS

FR

AM

ING

GA

UG

E

ST

UD

SP

AC

ING

ALL

OW

AB

LED

EF

LEC

TIO

N

FU

RR

ING

:1

LAY

ER

GW

B,

1 S

IDE

PA

RT

ITIO

N:

1 LA

YE

R G

WB

,E

AC

H S

IDE

PA

RT

ITIO

N:

2 LA

YE

RS

GW

B,

EA

CH

SID

E

FR

AM

ING

DE

PT

H

5/8" 25 (0.0179") 16" L/240 8'-3" 9'-6" 10'-6"16" L/360 7'-3" 8'-3" 9'-0"24" L/240 7'-3" 8'-3" 8'-9"24" L/360 6'-3" 7'-3" 8'-0"

2-1/2" 25 (0.0179") 16" L/240 11'-0" 12'-6" 13'-6"16" L/360 9'-9" 10'-9" 11'-9"24" L/240 9'-9" 10'-9" 11'-3"24" L/360 8'-6" 9'-6" 10'-3"

2-1/2" 22 (0.0270") 16" L/240 12'-0" 13'-0" 14'-0"16" L/360 11'-6" 12'-0" 12'-3"24" L/240 10'-6" 11'-6" 12'-3"24" L/360 9'-3" 10'-0" 10'-6"

2-1/2" 20 (0.0312") 16" L/240 13'-0" 13'-10" 16'-1"16" L/360 11'-6" 12'-0" 14'-0"24" L/240 11'-6" 12'-0" 13'-5"24" L/360 10'-0" 10'-6" 12'-4"

3-5/8" 25 (0.0179") 16" L/240 14'-6" 16'-0" 16'-9"16" L/360 12'-9" 14'-0" 14'-9"24" L/240 12'-9" 13'-6" 13'-6"24" L/360 11'-0" 12'-3" 13'-0"

3-5/8" 22 (0.0270") 16" L/240 16'-0" 17'-3" 18'-0"16" L/360 14'-0" 15'-0" 15'-9"24" L/240 14'-0" 15'-0" 15'-9"24" L/360 12'-3" 13'-0" 13'-9"

3-5/8" 20 (0.0312") 16" L/240 20'-0" 17'-11" 20'-2"16" L/360 18'-9" 15'-7" 17'-8"24" L/240 15'-0" 15'-7" 17'-8"24" L/360 15'-0" 13'-8" 15'-6"

= 1/4" CLEAR, LAMINATED GLASS

= 20 MIN. RATED CLEAR GLASS

G1

G2

HOLLOW METAL FRAME -PAINTED

GLAZING - SEE SCHEDULE

*CORNER TO BE INCLUDEDIN HOLLOW METAL SYSTEM

METAL STOP

DOOR - SEE SCHEDULE

GROUT PER MFG.REQUIREMENTS

9' - 0

"

4'-0" MAX.EQ

4'-0" MAX.EQ

G1 G1

G1 TYP.

700

TYP.

700

G4

K4TYP.

700

N4

700

N7

SEE PLAN

3A TYP.

113 113

1' - 6

"6'

- 0"

9' - 0

"

K4 TYP.

700

TYP.

700

G4TYP.

700

G7

G1TYP.

700

N4TYP.

700

700

N7TYP.

G1

SEE PLAN 3' - 6"

113

1' - 6

"6'

- 0"

4

INTERIOR OF ROOM

LIGHT SWITCHES - GANG ALLSWITCHES WHERE POSSIBLE

DOOR SHOWN INOPEN POSITION.

ADA COMPLIANT FIRESTROBE ALARM

NOTE: LOCATIONS SHOWN ARE TYPICAL FORALL DOORS WHETHER DOOR RECEIVES ALLITEMS LISTED OR NOT. CONSULT ARCHITECTFIELD REP. FOR NON-TYPICAL CONDITIONSWHERE OBSTACLES/DIMENSIONS MAKETYPICAL INSTALLATION VOID.

THERMOSTAT/CO2/RELATIVE HUMIDITY SENSORS

6' - 8

"8"

3' - 6

"1'

- 6"

C LC L

CL

C LC L

6' - 8

"

3' - 6

"1'

- 6"

8"4 1/4"

LOCATIONS FOR DOORSW/O SIDE LITES

ADA COMPLIANT FIRESTROBE ALARM

THERMOSTAT/ CO2/RELATIVE HEATSENSORS

PROJ. SCREEN SWITCH

LIGHT SWITCHES-GANGALL SWITCH WHEREPOSSIBLE

8"

CL

NOTE: LOCATIONS SHOWNARE TYPICAL FOR ALLDOORS WHETHER DOORRECEIVES ALL ITEMSLISTED OR NOT. CONSULTARCHITECT FIELD REP.FOR NON-TYPICALCONDITIONS WHEREOBSTACLES/ DIMENSIONSMAKE TYPICALINSTALLATION VOID.

HARDWARE SET 05Qty Desc. Catalog Number Finish Mfr3EA HINGE 5BB1 4.5 X 4.5 652 IVE1EA OFFICE/ENTRY LOCK L9050L 07A L583-363 626 SCH1EA MORTISE CYLINDER 1E74 626 BES1EA WALL STOP WS406/407CVX 630 IVE

HARDWARE SET 06Qty Description Catalog Number Finish Mfr

EA EXISTING TO REMAIN

HARDWARE SET 07Qty Description Catalog Number Finish Mfr3EA HINGE 5BB1 4.5 X 4.5 652 IVE1EA STOREROOM LOCK L9080L 07A 626 SCH1EA MORTISE CYLINDER 1E74 626 BES1EA OH STOP & HOLDER 90H 630 GLY

HARDWARE SET 08Qty Description Catalog Number Finish Mfr6EA HINGE 5BB1 4.5 X 4.5 652 IVE1SET AUTO FLUSH BOLT FB31P 630 IVE1EA DUST PROOF STRIKE DP2 626 IVE1EA CLASSROOM LOCK L9070L 07A 626 SCH1EA MORTISE CYLINDER 1E74 626 BES1EA COORDINATOR COR X FL 628 IVE2EA MOUNTING BRACKET MB 689 IVE2EA SURFACE CLOSER 4040XP REG OR PA AS REQ MC 689 LCN2EA KICK PLATE 8400 8" X 1" LDW 630 IVE1SET SEAL 5050 CL NGP1 ASTRAGAL 9550 CL NGP2EA WALL STOP WS406/407CVX 630 IVE

PHO

NE

919

.683

.10 8

4

150

FAYE

TTEV

ILLE

STR

EET

RALE

IGH

, N

C 27

601

SUIT

E 82

0

RALE

IGH

PHO

NE

614

.486

.19 6

0

274

MA R

CONI B

LVD

COLU

MBU

S, O

H 4

3 215

SUIT

E 20

0

COL U

MBU

S

PHO

NE

513

.271

.16 3

4

302

WES

T 3R

D ST

R EET

CIN

CIN

NAT

I, O

H 4

5 202

SUIT

E 50

0

CINC I

NNAT

I

web

sit e

ww

w.b

hdp.

com

Thi

s do

cum

ent

is th

e pr

odu

ct a

nd

pro

pert

y of

Bax

ter

Hod

ell D

onn

elly

Pre

ston

, Inc

.N

eith

er

the

docu

me

nt n

or th

e in

form

atio

n it

con

tain

s m

ay b

e c

opi

ed

or

use

d fo

r ot

her

tha

n th

e sp

eci

ficp

roje

ct fo

r w

hic

h it

was

pre

pare

d w

ithou

t th

e w

ritte

n c

onse

nt o

f Bax

ter

Hod

ell D

onne

lly P

rest

on, I

nc.

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17

B

A

9

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 179

Drawn

Project Manager

Checked

Contract Drawing Date

Project Number

Q

P

N

M

L

K

J

H

G

F

E

D

C

B

A

18 19

18 19

Q

P

N

M

L

K

J

H

G

F

E

D

C

B

6130

WIL

CO

X R

OA

DD

UB

LIN

, OH

430

1661

4-76

6-48

96

C:\Users\hevwaraye\Documents\MUX1743_15_Central_HEvwaraye.rvt 8/26/2015 11:58:12 AM

H. EVWARAYE

K. DENMAN

K. DENMAN

07/31/2015

MUX17.43

A700

DOOR

, FRA

ME A

ND P

ARTI

TION

DET

AILS

UPHA

M H A

LL: D

EPA R

TME N

T SU

ITE

R ENO

V ATI

O NMI

A MI U

N IVE

R SIT

Y

PRAT

ER E

NGIN

EERI

NG

DOOR AND HARDWARE SCHEDULE

MARKFIRE

RATING

OPENING FRAME DETAILS

HA

RD

WA

RE

SE

T

SC

HE

DU

LE

NO

TE

S

WID

TH

HE

IGH

T

TY

PE

MA

TL

FIN

GL

AS

S

TY

PE

MA

TL

FIN

GL

AS

S

HEAD JAMB SILL200 20 MIN. 5' - 0" 7' - 0" HG2 WD ST G2 EX HM PT -- -- -- -- 08 3, 4

200A - - 3' - 0" 8' - 10" F WD ST -- 4 HM PT G1 G7/A700 K7/A700 N7/A700 05 3200B EX 3' - 0" 7' - 0" EX WD ST -- EX HM PT -- -- -- -- 07 2200C - - 3' - 0" 7' - 0" F WD ST -- 2-24 HM PT G1 G7/A700 K7/A700 N7/A700 05 5200D - - 3' - 0" 7' - 0" F WD ST -- 2-24 HM PT G1 G7/A700 K7/A700 N7/A700 05 5200E - - 3' - 0" 7' - 0" F WD ST -- 2-24 HM PT G1 G7/A700 K7/A700 N7/A700 05 5200F - - 3' - 0" 7' - 0" NL WD ST G1 1 HM PT -- G7/A700 K7/A700 -- 05 5200G - - 3' - 0" 7' - 0" F WD ST -- 2-24 HM PT G1 G7/A700 K7/A700 N7/A700 05 5200H - - 3' - 0" 7' - 0" F WD ST -- 2-24 HM PT G1 G7/A700 K7/A700 N7/A700 05 5202B EX 3' - 0" 7' - 0" EX WD ST -- EX HM PT -- -- -- -- 06 6

203 - - 3' - 0" 7' - 0" F WD ST -- 2-24 HM PT G1 G7/A700 K7/A700 N7/A700 05 5

GENERAL ARCHITECTURAL NOTES

FRAME TYPES

DOOR TYPES

DOOR SCHEDULE LEGEND

DOOR SCHEDULE NOTES

PARTITION SYMBOL KEY

PARTITION TYPE LEGEND

3" = 1'-0"A700

G4 HOLLOW METAL SIDELITE HEAD 3" = 1'-0"A700

G7 TYP. HOLLOW METAL HEAD DETAIL

3" = 1'-0"A700

K4 HOLLOW METAL SIDE LIGHT JAMB 3" = 1'-0"A700

K7 TYP. HOLLOW METAL JAMB

3" = 1'-0"A700

N4 HOLLOW METAL JAMB W/ SIDE LIGHT 3" = 1'-0"A700

N7 HM SIDE LIGHT SILL DETIAL

CODED NOTES113 APPLIED DECORATIVE PRIVACY FILM (DF1) DIMENSIONED AS SHOWN. REFER TO

FINISH LEGEND.GLASS TYPE LEGEND

3" = 1'-0"A700

G1 HOLLOW METAL SIDELITE CORNER

OPEN DOOR CONTROLSINSIDE DOOR CONTROLS

No.

Issu

e/R

evis

ion/

Sub

mis

sion

Dat

eA

BID

& P

ER

MIT

DO

CU

ME

NT

S07

/31/

2015

BA

DD

EN

DU

M 0

108

/26/

2015

B

HARDWARE SETSB

B

- - -

- - -

- - -

B

B

Page 61: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product

202B

200B

P*

C1

AC1

B1

P*

C1

AC1

B1

P*

C1

AC1/GYP

B1

P*

C1

AC1/GYP

B1

P*

C1

AC1/GYP

B1

P*

C1

AC1/GYP

B1

P*

C1

AC1/GYP

B1

P*

C1

AC1/GYP

B1

P*

C1

AC1/GYP

B1

P*

RF1

AC1/GYP

B1

202

202B

203A

200

203

200C

200D

200E

200F

200H

200A

200G

P*

C1

AC1/GYP

B1

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P2

P2

P3

RF1 C1

P1

RF1

EX

B1

802

P2

P2

P2

P2

P2P2P2

804

FINISH TAG

ROOM FINISHES TAGWall

Floor

Ceiling

Base

P1

FINISH & MATERIAL ABBREVIATIONS

* = INDICATES MORE THAN ONE FINISH. REFERTO GENERAL FINISH NOTES

- = NO FINISHAC = ACOUSTICAL CEILING TILEB = WALL BASEC = CARPETCN = CONCRETECT = CERAMIC/PORCELAIN TILEETR = EXISTING TO REMAINGB = GYPSUM WALLBOARD - PAINTEDGL = GLAZINGL = PLASTIC LAMINATENC = NO CEILING, PAINT EXPOSED STRUCTUREP = PAINTRF = RESILIENT FLOORING (VCT, LINOLEUM,

CORK, RUBBER)SP = REFER TO SPECIFICATIONS FOR FINISHSS = SOLID SURFACETB = TACKBOARDTP = TOILET PARTITIONSWD = WOODWT = WINDOW TREATMENTS

A. CONTRACTOR TO PROVIDE ALL LEVELING MATERIAL AS REQUIRED TO ENSUREAN ADEQUATE LEVEL SUBSTRATE FOR FINISH MATERIAL INSTALLATION.

B. AT DOOR OPENINGS THE TRANSITION BETWEEN DISSIMILAR MATERIALS IS TOOCCUR DIRECTLY AT THE CENTERLINE OF THE DOOR IN THE CLOSED POSITION.

C. AT CASED OPENINGS THE TRANSITION BETWEEN DISSIMILAR MATERIALS IS TOOCCUR DIRECTLY AT THE CENTERLINE OF THE OPENING.

D. COLOR CHANGES ON WALLS ARE TO OCCUR AT INSIDE AND OUTSIDECORNERS. ALL DISCREPANCIES ARE TO BE REVIEWED WITH THE ARCHITECT.

E. CONTRACTOR TO PROVIDE ALL NECESSARY TRANSITION STRIPS BETWEENDISSIMILAR MATERIALS. TRANSITION STRIP MATERIALS ARE TO BE SUBMITTEDFOR APPROVAL.

F. REFER TO REFLECTED CEILING PLANS FOR CEILING TYPES AND FINISHES.G. ALL GYPSUM BOARD WALLS TO BE PAINTED P1 UNLESS NOTED OTHERWISE.

REVIEW ALL DISCREPANCIES WITH THE ARCHITECT.H. ALL DOOR FRAMES TO MATCH ADJACENT WALL FINISH. CONSULT THE

ARCHITECT FOR DISCREPANCIES.I. FURNITURE TO PROVIDED AND INSTALLED BY THE UNIVERSITY.

FINISH LEGEND

C1 MFG:PATTERN:COLOR:SIZE:INSTALLATION:

INTERFACECUBIC6395 CONSTRUCTION50CM X 50CMNON DIRECTIONAL

PAINT (P)

P1 MFG:COLOR:

PITTSBURGH PAINTS513-1 MOTHER OF PEARL

P2 MFG:COLOR:

PITTSBURGH PAINTS415-4 SUMMER SUEDE

P3 MFG:COLOR:

PITTSBURGH PAINTS454-4 MOUNTAIN STREAM

CARPET (C)

BASE (B)

B1 MFR:TYPE:COLOR:SIZE:

JOHNSONITERUBBER COVE BASE195 ASH4" HIGH

LAMINATE (L)

L1 MFR:COLOR:

FORMICAPLANKED DELUXE PEAR

AC1 MFG:STYLE:SIZE:COLOR:GRID:

ACOUSTIC CEILING TILE (AC)

ARMSTRONGOPTIMA, SQUARE LAY-IN, FINE TEXTURE24" X 24"WHITESUPRAFINE 15/16" SUSPENSION SYSTEM

WT1MFG:STYLE:COLOR:OPERATION:

MECHOSHADEEURO TWILL REVERSIBLE WEAVE SHADECLOTH 60006004 SANDMANUAL

WINDOW SHADES (WT)

SS1 MFG:COLOR:

CORIANSAHARA

SOLID SURFACE (SS)

RF1MFG:TYPE:STYLE:SIZE:COLOR:

ARMSTRONGVCTRAFFIA12" X 24"55804 SMOKE

RESILIENT FLOOR (RF)

UF1MFG:PATTERN:COLOR:USE:

DESIGNTEXMODERNE3415-801 SHALELOUNGE CHAIRS

POTENTIAL UPHOLSTRY FABRIC (UF)

UF2MFG:PATTERN:COLOR:USE:

MAYER FABRICSLONGHORNLO-027 PARCHMENTLOUNGE CHAIRS

UF3MFG:PATTERN:COLOR:USE:

CARNEGIEPEBBLE 607656OFFICE TASK CHAIR

UF4MFG:PATTERN:COLOR:USE:

MAHARAMSEQUENCE 466179001 DRIFTWOODOFFICE SIDE CHAIR

AWP1 MFG:PATTERN:COLOR:USE:

MAHARAMTEK-WALL CHANNEL 399385002 SERENEUPHOLSTERED WALL PANEL

ACOUSTICAL WALL PANEL FABRIC (AWP)

DF1 MFG:STYLE:COLOR:

3M SCOTCHCALELECTROCUT GRAPHIC FILMDUSTED CRYSTAL/ 7725SE-314

DECORATIVE FILM (DF)

*COORDINATE WITH UNIVERSITY AND FURNITURE PLAN FOR REFERENCE

202 202B

203A

200

203

200C

200D

200E

200F200H

200A200B

200G

203/ 203A

200C

200D

200E

200F

200G

200

200A

200H

202

PHO

NE

919

.683

.10 8

4

150

FAYE

TTEV

ILLE

STR

EET

RALE

IGH

, N

C 27

601

SUIT

E 82

0

RALE

IGH

PHO

NE

614

.486

.19 6

0

274

MA R

CONI B

LVD

COLU

MBU

S, O

H 4

3 215

SUIT

E 20

0

COL U

MBU

S

PHO

NE

513

.271

.16 3

4

302

WES

T 3R

D ST

R EET

CIN

CIN

NAT

I, O

H 4

5 202

SUIT

E 50

0

CINC I

NNAT

I

web

sit e

ww

w.b

hdp.

com

Thi

s do

cum

ent

is th

e pr

odu

ct a

nd

pro

pert

y of

Bax

ter

Hod

ell D

onn

elly

Pre

ston

, Inc

.N

eith

er

the

docu

me

nt n

or th

e in

form

atio

n it

con

tain

s m

ay b

e c

opi

ed

or

use

d fo

r ot

her

tha

n th

e sp

eci

ficp

roje

ct fo

r w

hic

h it

was

pre

pare

d w

ithou

t th

e w

ritte

n c

onse

nt o

f Bax

ter

Hod

ell D

onne

lly P

rest

on, I

nc.

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17

B

A

9

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 179

Drawn

Project Manager

Checked

Contract Drawing Date

Project Number

Q

P

N

M

L

K

J

H

G

F

E

D

C

B

A

18 19

18 19

Q

P

N

M

L

K

J

H

G

F

E

D

C

B

6130

WIL

CO

X R

OA

DD

UB

LIN

, OH

430

1661

4-76

6-48

96

C:\Users\hevwaraye\Documents\MUX1743_15_Central_HEvwaraye.rvt 8/26/2015 11:58:25 AM

E. POLAND

K. DENMAN

K. DENMAN

07/31/2015

MUX17.43

A802

SECO

ND F

LOOR

FIN

ISH

AND

FURN

ITUR

E PL

ANS

UPHA

M H A

LL: D

EPA R

TME N

T SU

ITE

R ENO

V ATI

O NMI

A MI U

N IVE

R SIT

Y

PRAT

ER E

NGIN

EERI

NG

N

1/8" = 1'-0"A802

A9 SECOND FLOOR FINISH PLAN

FINISH LEGEND

CODED NOTES802 EXISTING GLAZED BLOCK TO REMAIN AS IS; PAINT REMAINING SURFACES.804 PAINT EXISTING ELECTRICAL PANEL TO MATCH ASSOCIATED WALL FINISH.

GENERAL FINISH PLAN NOTES

N

1/8" = 1'-0"A802

A1 SECOND FLOOR FURNITURE PLAN OPTION

KEY PLAN

<FOR REFERENCE ONLY>

No.

Issu

e/R

evis

ion/

Sub

mis

sion

Dat

eA

BID

& P

ER

MIT

DO

CU

ME

NT

S07

/31/

2015

BA

DD

EN

DU

M 0

108

/26/

2015

B

B

B

B

B

BB

B

B

Page 62: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 63: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 64: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 65: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product
Page 66: Addendum No. 1 Project No-MUX17 - Miami University Hall...Addendum No. 1 Project No-MUX17.43 3 A. Per the specification, 10 11 00 – 2.05-A-1, describes the basis of design product