1 | Page ACHIEVEMENT REPORT UNDER NEDP PROJECT 2016-17 & 2017-2018 Government of Mizoram Urban Development & Poverty Alleviation Department Aizawl, Mizoram
137

ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

Jul 08, 2018

Download

Documents

vophuc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

1 | P a g e

ACHIEVEMENT REPORT

UNDER

NEDP PROJECT

2016-17

&

2017-2018

Government of Mizoram

Urban Development & Poverty Alleviation Department

Aizawl, Mizoram

Page 2: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

2 | P a g e

FOREWARD

Urban Development and Poverty Alleviation Department is rendering its

effort towards sustainable development and growth of urban city and towns in

Mizoram through various National Schemes and missions and had achieved

remarkable outcome in the state for the welfare of urban societies especially the

weaker sections. Urban development is a big challenge for every city and state

as it invites many challenges and issues, although the state has undertaken

various kinds of actions to improve urban infrastructure and economy of urban

areas in Mizoram, no state owned specific plan, initiatives and action was

recognized in the state before the New Economic Development Policy that was

launched in 30th September 2016.

India has a total population of 1,210.2 million and out of this, 68.84% is

the population of rural areas and the urban areas comprises of 31.16%. As for

the state of Mizoram, rural population is 48.49% to the total population of the

state and the urban population is 51.51% to the total population. Mizoram’s

urban population percentage is very high as compared to the urban population

percentage of India, however; increase in urbanization is a healthy mark of the

State as the contribution of urban economy is highly crucial for the development

of the state economy as well. NEDP addresses the problem of transitional gap

that arise due to urbanization and its effect, such as transition from traditional

farming method into contemporary livelihood method, lack of infrastructure in

rural and urban areas, competition among entrepreneurs etc, all these affect the

state economy and live- ability in the state.

Keeping in mind the above mentioned issues in urban administration, The

department has taken its initiatives to have smart, clean and flourishing city and

urban towns, The Urban Development and Poverty Alleviation Department

plays an active role and is driving all urban development initiatives in Mizoram,

among which NEDP is one of the most important and effective programmes

being implemented by the department.

Page 3: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

3 | P a g e

NEDP ALLOCATION 2016 -2017

Sl.No. Name of Scheme Amount

Rs(In lakhs)

1. Composite Infrastructure Development for

Urban Areas/ Localities schemes 1500.00

2

Urban Development:

(i) Operation and maintenance of existing

infrastructure/ equipments;

(ii) (ii) Provision of e-services/ e-offices

340.51

3 Aizawl Road junction improvement 650.00

(i) Improvement & Widening of Venghlui to

Republic Road – Pangi Junction; 95.74

(ii) Improvement of road junction atBawngkawn 283.63

(iii) Improvement of vaivakawn to Hunthar

Junction 142.20

4 Climate Change Mitigation – Sanitation and

Cleanliness Drive Component 25.00

TOTAL 2515.51

Physical and financial progress is 98%.

Page 4: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

4 | P a g e

NEDP ALLOCATION 2017-2018

Sl.

No. Name of Schemes

Budget Estimate

Amount

Rs(In lakhs)

1 Improvement of Urban Infrastructure in the City/Towns

(UD&PA Components) 7500.00

2 Aizawl City Infrastructure Development 1500.00

3 Operation & Maintenance (Service Level) 500.00

4 Construction of Zodin Multilevel Car Parking 2500.00

5 Improvement of ATI Junction at New Secretariat 140.00

6 Climate Change Mitigation Initiatives 200.00

7 Construction of Mizoram State Convention Centre 5000.00

8 Aizawl City GIS Based Street Zoning and Signage 300.00

9. Additional fund for improvement of various connectivity in

Aizawl city 236.37

TOTAL 17876.37

Page 5: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

5 | P a g e

Approved annual Action Plan for 2017-2018 NEDP

1) Improvement of Urban Infrastructure in the City/Towns -Rs. 7500lakh

(UD&PA Components)

Sl. No. Name of proposal Amount

(in lakh)

1

Composite urban infrastructure within Aizawl:

1) Internal roads

2) Pedestrian footpath

3) Drainage

4) Retaining wall

5) RCC Steps

6) Solid Waste Management

7) Culvert / Bridge

8) Parking

9) Other urban amenities

10) Etc.

2200.00

2

Composite urban infrastructure in city and census

towns:

1) Internal roads

2) Pedestrian footpath

3) Drainage

4) Retaining wall

5) RCC Steps

6) Solid Waste Management

7) Culvert / Bridge

8) Parking

9) Other urban amenities

10) Etc.

1510.00

3 Continuation of Pavilion & Gallery at Rajiv Gandhi

Stadium atMualpui, Aizawl 2350.00

4 Zero Waste Projects at Selected Institutions (PUC,

HATIM, ATC, and AICS) 60.00

5 Providing and laying of Artificial Turf (including

approach road atMeisatla) Siaha 650.00

6 Purchase of Garbage dumping trucks (4 nos.) 72.00

7 Completion of Directorate Office building UD&PA

Department 600.00

8 Completion of Linkages of Road from Ramhlun

South YMA Hall to main road atRamhlun South,

Aizawl

30.00

9 Construction of Road atKhatla South Vengthar

(approach road to Thlanmual via Khatla South

Vengthar Presbyterian Church)

28.00

TOTAL 7500.00

Page 6: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

6 | P a g e

2) AizawlCity Infrastructure Development- Rs. 1500 lakh

Sl. No. Name of proposal Amount

(in lakh)

1

Junctions Improvement 50,000,000.00

i) Dinthar Junction atDawrpuiVengthar 127,87,350.00

ii) Improvement of industry pengatRamhlun North 63,38,000.00

iii) Improvement of Venghlui to Republic road on

upper Republic at Pi Pangi junction 94,05,000.00

iv) Improvement of 3rd

Bn MAP junction atATI veng

and Salem veng border 44,28,200.00

v) Improvement of Armed Veng to Chhingaveng

Junction 42,57,000.00

vi) Improvement of Kawipui junction at Republic

Veng 61,92,450.00

vii) Improvement of Magazine kawn to Armed

Veng South Hall at Armed Veng South, Aizawl 65,92,000.00

2

Construction of elevated road from

HangiLunglentlang connecting to DurtlangLeitan

(Consultancy Works)

138.14

Supply and Installation of Synthetic Athletic Track

atSerchhip Stadium 334.80

Rajiv Gandhi Stadium GST 177.06

3 Re-construction of car parking near Power House at

Electric Veng. 100.00

4 Multi level car parking at College Veng 150.00

5 Improvement & widening of roads and improvement

of traffic island at various locations of the city. 82.00

6. Construction of Pedestrian side walk with Hand

railing along the main road at Bara Bazar, Dawrpui 18

TOTAL 1500.00

Page 7: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

7 | P a g e

3) Operation & Maintenance (Service Level) - Rs. 500lakh

Sl.No Name of proposal Amount

(in lakh)

1 Construction of Public Service Centre for EWS Housing

Complex atDurtlangLeitan 50.00

2 Repairing and maintenance of housing phase II complex at

New Secretariat Complex 30.00

3

Fencing of BSUP Housing Complex

1. Lawipu

2. Edenthar

3. Durtlang

4. Rangvamual

80.00

4 Operation and maintenance of Crematorium atSairang 20.00

5 Acoustic treatment & lighting of Community Hall atSaitual 5.00

6 Construction of Departmental Quarters with fencing

atRamthar, Lunglei 40.00

7 Construction of Departmental quarters with fencing

atKhuangpuilam, Kolasib 40.00

8 Development of Site for Proposed Re-creation Centre

atThenzawl 65.00

9 Fencing of RAY project Site at Falkland 10.00

10 Providing external water connection and external power

connection for Sports Stadium atSerchhip and Champhai 15.00

11 Construction of DUDO office atSerchhip (60 lakhs) and

Mamit (40 lakhs) 100.00

12 Repair and Renovation of Dumping grounds 45.00

TOTAL 500.00

Page 8: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

8 | P a g e

4) Construction of Zodin Multi Level Car Parking - Rs. 2500 lakh

5) Improvement of ATI Junction at New Secretariat Complex -Rs. 140lakh

6) Climate Change Mitigation Initiatives – Sanitation and -Rs. 200lakh

Cleanliness Drive Component

7) Construction of Mizoram State Convention Centre -Rs. 5000lakh

8) Aizawl City GIS Based Street Zoning and Signage -Rs. 300lakh

9) Link Road Armed veng S to Bethlehem VT -Rs 107.43

10) LC Road at armed Veng S -Rs 9.68

11) Approach road to Chaltlang road Lily Vengcemetary -Rs 35.00

12) Reno. & black Topping of Roads between NH 54 and BSNL land at durtlang N –

Rs 39.25

13) Approach Road to SairangSaronveng road - Rs 50.00

14) Enhancement of Armed VengCom.Centre -Rs40.01

Page 9: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

9 | P a g e

ACHIEVEMENT REPORT OF NEDP 2016 – 2017

1. Composite Infrastructure Development for Urban Areas/ Localities schemes

= Rs 1500 lakh.

The Scheme covered Aizawl city and five other District towns

LungleiChamphai, Serchhip,Kolasib and Mamit

Urban infrastructure Components mainly includes:

- Public Amenities and Utilities

- Drainage System improvement

- Improvement of Internal Roads

- RCC Culvert/Bridge

- Protection work(retaining wall)

- Vertical linkage(Masonry/RCC steps)

- Masonry/Cement Concrete Flooring.

The above said infrastructures were constructed based on the needs and

proposals from local authorities and fund was allocated among various localities in

urban areas. Mizoram, being a steep and hilly terrain, there needs to be construction

of various protection works to avoid landslide and possible disaster; moreover,

connectivity and drains in urban areas are also improved with fund received from

composite Infrastructure development fund under NEDP

Following are various works implemented under Composite Infrastructure

development for Urban area / Localities Schemes under NEDP 2016-2017 :

1. Name of Work : Construction of Link Drain near Saithanchhunga’s

house atChanmari West

2. Amount : Rs. 1,00,000.00

3. Location : Chanmari West, Aizawl

4. Status : Completed

Page 10: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

10 | P a g e

1. Name of Work : Laying of chequered tile Near PuH.Lalmuana’s house

atChanmari West.

2. Amount : Rs. 1,00,000.00

3. Location : Chanmari West

4. Status : Completed

1. Name of Work : Laying of Chequered tile near Pu.RunaMualatChanmari

West, Aizawl

2. Amount : Rs. 1,0,000.00

3. Location : Chanmari West

4. Status : Completed

Page 11: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

11 | P a g e

1. Name of Work : RCC Slab Culvert on DamdiaiLuihnaratEdenthar,

Aizawl.

2. Amount : Rs. 1,50,000.00

3. Location : Edenthar

4. Status : Completed

1. Name of Work : Construction of Crash barrier near Chakma House

atHunthar, Aizawl

2. Amount : Rs. 1,00,000.00

3. Location : Hunthar

4. Status : Completed

Page 12: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

12 | P a g e

1. Name of Work : Construction of step with chequered tile near

PuR.Pakunga to Central road T-section atChanmari

West, Aizawl

2. Amount : Rs. 1,50,000.00

3. Location : Chanmari West, Aizawl

4. Status : Completed

1. Name of Work : Construction of drain near Rochungnunga’s house at,

Chanmari

2. Amount : Rs. 1,00,000.00

3. Location : Chanmari, Aizawl

4. Status : Completed

Page 13: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

13 | P a g e

1. Name of Work : Construction of drain near Singhmuaka’s house

atChanmari, Aizawl.

2. Amount : Rs. 1,25,000.00

3. Location : Chanmari

4. Status : Completed

1. Name of Work : Construction of Drain between EdentharTuikhur to

PuHrangliana house atEdenthar

2. Amount : Rs. 1,50,000.00

3. Location : Hunthar

4. Status : Completed

Page 14: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

14 | P a g e

1. Name Of Work : Construction of S/M Step Near PuHrangliantawna

(L) House AtZuangtui

2. Amount : Rs. 1,20,000 /-

3. Location : Zuangtui

4. Status : Completed

1. Name Of Work : Construction of Public Step atZuangtuiVengthar

2. Amount : Rs. 1,50,000 /-

3. Location : Zuangtui

4. Status : Completed

Page 15: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

15 | P a g e

1. Name of Work : Construction of Public TuikhuratZuangtuiVengthar

2. Amount : Rs. 1,00,000 /-

3. Location : Zuangtui

4. Status : Completed

1. Name of Work : Construction of S/M step with railing near

PuLalchungnunga's house atZemabawk North

2. Amount : Rs. 1,50,000 /-

3. Location : Zemabawk North

4. Status : Completed

Page 16: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

16 | P a g e

1. Name of Work : Construction of s/m step with railing near

PuRemliana's house atZemabawkNorth

2. Amount : Rs. 1,50,000 /-

3. Location : Zemabawk North

4. Status : Completed

1. Name of Work : Laying of chequered tile near PuLalrema'sColney

house atZemabawk North - diverted

2. Amount : Rs. 60,000 /-

3. Location : Zemabawk North

4. Status : Completed

Page 17: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

17 | P a g e

1. Name of Work : Construction of S/M step with railing near

PuRodinga's houseatZemabawk North

2. Amount : Rs. 1,50,000 /-

3. Location : Zemabawk North

4. Status : Completed

1. Name of Work : Construction of R/Wall below Zemabawk Cemetery

2. Amount : Rs.2,00,000 /-

3. Location : Zemabawk

4. Status : Completed

Page 18: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

18 | P a g e

1. Name of Work : Construction of S/M R/Wall on parallel road to

Bethel Veng, Zemabawk

2. Amount : Rs.1,00,000 /-

3. Location : Zemabawk

4. Status : Completed

1. Name of Work : Construction of Minor RCC slab Culvert between

Thlanmual& Middle School Mual(Approach to

Supply peng)

2. Amount : Rs.95,000 /-

3. Location : Zemabawk

4. Status : Completed

Page 19: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

19 | P a g e

1. Name of Work : Construction of minor RCC slab culvert near

PuLalrinfela's house at Middle School Veng,

Zemabawk(Approach to Supply peng)

2. Amount : Rs.1,08,000 /-

3. Location : Zemabawk

4. Status : Completed

1. Name of Work : Construction of link drain near Primary School at

Bung Bangla

2. Amount : Rs.1,50,000 /-

3. Location : Zemabawk

4. Status : Completed

Page 20: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

20 | P a g e

1. Name of Work : Construction of Culvert near Upper Primary School

atZemabawkBerawLui

2. Amount : Rs.1,50,000 /-

3. Location : Zemabawk

4. Status : Completed

1. Name of Work : Construction of link drain on approach to RC road

near A.Ralmana house atDurtlangLeitanDIVERTED

2. Amount : Rs.150,000 /-

3. Location : DurtlangLeitan

4. Status : Completed

Page 21: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

21 | P a g e

1. Name of Work : Construction of step near PuThanchhunga house

atDurtlangRamthar

2. Amount : Rs.1,30,000 /-

3. Location : DurtlangLeitan

4. Status : Completed

1. Name of Work : Construction Of Slab Culvert Below Pu

Hmangaihzuala House AtDurtlangRamthar

2. Amount : Rs.2,00,000 /-

3. Location : DurtlangLeitan

4. Status : Completed

Page 22: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

22 | P a g e

1. Name of Work : Construction of RCC Step Cover Drain at Shalom

Veng.

2. Amount : Rs.5,00,000/-

3. Location : Bawngkawn

4. Status : Completed

1. Name of Work : Construction of S/M Step atBawngkawn

Thlanmual

2. Amount : Rs.1,50,000 /-

3. Location : Bawngkawn

4. Status : Completed

Page 23: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

23 | P a g e

1. Name of Work : Construction of PCC Flooring with Turning Point

at Salvation Army Church Road atThuampui

West, Aizawl

2. Amount : Rs.2,50,000/-

3. Location : Thuampui

4. Status : Completed

Page 24: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

24 | P a g e

1. Name of Work : Construction Of Retaining Wall Near KT

Lalrikhuma'sHouse atThuampui

2. Amount : Rs.2,00,000 /-

3. Location : Thuampui

4. Status : Completed

Page 25: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

25 | P a g e

1. Name of Work : Construction of Culvert Near Boupena House At

Thuampui

2. Amount : Rs.2,00,000 /-

3. Location : Thuampui

4. Status : Completed

Page 26: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

26 | P a g e

1. Name of Work : Construction Of Steel Hand Railing at Golden

Jubilee Road,ElectricVeng

2. Amount : Rs.1,00,000 /-

3. Location : Electric Veng

4. Status : Completed-

Page 27: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

27 | P a g e

1.Name of Work : Reparing Of Side Drain Near St. Mary Church At

Electric Veng

2. Amount : Rs.1,00,000 /-

3.Location : Electric Veng

4. Status : Completed

Page 28: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

28 | P a g e

1. Name of Work : Repairing of Step at Electric Vengchung To

Presbyterian Churchat Electric Veng -Diverted

2. Amount : Rs.1,00,000 /-

3. Location : Electric Veng

4. Status : Completed

Page 29: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

29 | P a g e

1. Name of Work : Construction of Step Between Pu J.Lungawia

House and PuDosavunga House At Electric Veng

Diverted

2. Amount : Rs.1,50,000 /-

3. Location : Electric Veng

4. Status : Completed

Page 30: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

30 | P a g e

1. Name of Work : Construction Of Steel Hand Railing at

PuVanlalngena (L) House ToLalchungnunga House

At Electric Veng

2. Amount : Rs.1,00,000 /-

3. Location : Electric Veng

4. Status : Completed

Page 31: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

31 | P a g e

1. Name of Work : Construction of Step over Drain between

J.Dengdailova House and K.Lalhmuaka House at

Electric Veng

2. Amount : Rs.3,50,000 /-

3. Location : Electric Veng

4. Status : Completed

Page 32: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

32 | P a g e

1. Name of Work : Construction of Link Road Thlanmual To

Pi R.Zamawii Ram Mawng

2. Amount : Rs.4,00,000 /-

3. Location : Falkland

4. Status : Completed

1. Name Of Work : Construction Of Pavillion For Volleyball Court At

Falkland

2. Amount : Rs.1, 50,000 /-

3. Location : Falkland

4. Status : Completed

Page 33: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

33 | P a g e

1. Name Of Work : Construction of RCC Slab covering of Side Drain

fromZarkawtKawn to PuLalrinawma House

atZarkawt

2. Amount : Rs.1,50,000 /-

3. Location : Zarkawt

4. Status : Completed

Page 34: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

34 | P a g e

1. Name of Work : Construction Of Footpath With Side Drain In Front

ofPuRamhermawia House AtZarkawt

2. Amount : Rs.2,50,000 /-

3. Location : Zarkawt

4. Status : Completed

Page 35: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

35 | P a g e

1. Name of Work : Construction Of Steel Hand Railing From Zarkawt

Kawn to PuZamliana House PwdTlang

2. Amount : Rs.1,30,000 /-

3. Location : Zarkawt

4. Status : Completed

Page 36: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

36 | P a g e

1. Name Of Work : Construction of Drain Cover Near PuZalawma(L)

House atZarkawt

2. Amount : Rs.1,30,000 /-

3. Location : Zarkawt

4. Status : Completed

Page 37: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

37 | P a g e

1. Name Of Work : Laying of Chequered Tile from Ahimsa Hotel to

PuThangchuanga House atZarkawt

2. Amount : Rs.1,00,000 /-

3. Location : Zarkawt

4. Status : Completed

1. Name of Work : Construction of side drain near PuRolawma's house.

2. Amount : Rs 1,50,000.00

3. Location : RamhlunVenglai

4. Status : Completed

Page 38: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

38 | P a g e

1. Name of Work : Construction of step hand railing revelation near Pu LR

Dama's house

2. Amount : Rs 1,20,000.00

3. Location : RamhlunVenglai

4. Status : Completed

1. Name of Work : Construction of side drain near PuLalhmingliana's

house.

2. Amount : Rs 1,50,000.00

3. Location : RamhlunVenglai

4. Status : Completed

Page 39: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

39 | P a g e

1. Name of Work : Construction of R/wall below PuVanlalsangaPachuau

house.

2. Amount : Rs 2,00,000.00

3. Location : Ramhlun Sport Complex.

4. Status : Completed

1. Name of Work : Construction of retaining wall for protection Laipuitlang

landslide at Upper lane

2. Amount : Rs 1,50,000.00

3. Location : Laipuitlang

4. Status : Completed

Page 40: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

40 | P a g e

1. Name of Work : Construction of step between Rev.Zolawma's and Pu

Hrangchhuana's house.

2. Amount : Rs 1,50,000.00

3. Location : AizawlVenglai

4. Status : Completed

1. Name of Work :Construction of PCC florring approach road from

H.BuanaTuikhur to SL Zamveli's house.

2. Amount : Rs 2,00,000.00

3. Location : RamhlunVengthar

4. Status : Completed

BEFORE AFTER

AFTER

Page 41: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

41 | P a g e

1. Name of Work : Repairing of Step and laying of Chequered tile near Pu

Bawichhunga house.

2. Amount : Rs 1,00,000.00

3. Location : RamtharVeng.

4. Status : Completed

1. Name of Work : Construction of hand railing and step on approach to

YMA Hall near PuHrangchhuana's house.

2. Amount : Rs 3,00,000.00

3. Location : AizawlVenglai

4. Status : Completed

Page 42: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

42 | P a g e

1. Name of Work : Repairing of Step and Laying of Chequered tile near

Zirtiri College atAizawlVenglai.

2. Amount : Rs 1,00,000.00

3. Location : AizawlVenglai

4. Status : Completed

BEFORE

AFTER

Page 43: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

43 | P a g e

1. Name of Work : Construction of step near PuChawngzidinga's house.

2. Amount : Rs 1,00,000.00

3. Location : RamhlunVengthar

4. Status : Completed

1. Name of Work : Construction of hand railing between PuSangthanga's

house and PuLaltanpuis's house

2. Amount : Rs 1,00,000.00

3. Location : Ramhlun South

4. Status : Completed

Page 44: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

44 | P a g e

1. Name of Work : Construction of S/M step with laying of chequered tile

and hand railing near Salvation Church.

2. Amount : Rs 1,50,000.00

3. Location : RamtharVeng.

4. Status : Completed

1. Name of Work : Construction of S/M retaining wall & hand railing near

PuChhuanawmatuikhur.

2. Amount : Rs 1,50,000.00

3. Location : Ramhlun South.

4. Status : Completed

Page 45: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

45 | P a g e

1. Name of Work : Construction of R/Wall near Pi Tawii(L) house.

2. Amount : Rs 1,50,000.00

3. Location : Laipuitlang

4. Status : Completed

1. Name of Work : Continuation for construction of drain near Ramhlun

South High School.

2. Amount : Rs 4,00,000.00

3. Location : Ramhlun South.

4. Status : Completed

Page 46: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

46 | P a g e

1. Name of Work : Construction of steel handrailing near Taxi Stand.

2. Amount : Rs 1,00,000.00

3. Location : RamtharVeng

4. Status : Completed

1. Name of Work : Construction of step hand railing near Pu LR Dama's

house.

2. Amount : Rs 1,20,000.00

3. Location : RamhlunVenglai.

4. Status : Completed

Page 47: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

47 | P a g e

1. Name of Work : Construction of footpath near Presbyterian Church.

2. Amount : Rs 3,00,000.00

3. Location : RamtharVeng.

4. Status : Completed

1. Name of Work : Construction of step over drain between PuJ.Zahaua

house to PuR.Thangzuala house.

2. Amount : Rs 3,00,000.00

3. Location : Ramhlun Sport Complex.

4. Status : Completed

Page 48: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

48 | P a g e

1. Name of Work : Construction of side drain from PuT.Remmawia's house

to Rehabilitation Centre.

2. Amount : Rs 1,50,000.00

3. Location : Ramhlun Sport Complex.

4. Status : Completed

1. Name of Work : New construction of step between Dr.Palaia and Pu

V.Vanlawma's house.

2. Amount : Rs 1,00,000.00

3. Location : RamtharVeng.

4. Status : Completed

Page 49: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

49 | P a g e

1. Name of Work : Retaining wall near RamtharTlangveng Taxi Stand.

2. Amount : Rs 1,00,000.00

3. Location : RamtharVeng.

4. Status : Completed

1. Name of Work : Continuation for construction of Tile Pavement on

internal road.

2. Amount : Rs 9,00,000.00

3. Location : Ramhlun South Vengchhak

4. Status : Completed

Page 50: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

50 | P a g e

1. Name of Work : Construction of step with hand railing from PC

Zonunsanga's house to H.BuanaTuikhur.

2. Amount : Rs 2,00,000.00

3. Location : RamhlunVengthar.

4. Status : Completed

Page 51: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

51 | P a g e

1. Name of Work : Re-Construction of drain near PuLalromana’s house.

2. Amount : Rs 1,00,000.00

3. Location : Ramthar North.

4. Status : Completed

BEFORE

Page 52: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

52 | P a g e

1. Name of Work : Laying of chequered tile from PuBiaka's house to

Edenthar area atChaltlangTatkawngveng.

2. Amount : Rs. 2,00,000.00

3. Location : Chaltlang.

4. Status : Completed.

Page 53: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

53 | P a g e

1. Name of Work : Repairing of Chequered tile between Pu

Laldingliana’s House and Ramhlun road at

ChaltlangTatkawngVeng.

2. Amount : Rs 2,50,000.00

3. Location : Chaltlang.

4. Status : Completed.

Page 54: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

54 | P a g e

1. Name of Work : Laying of chequered tile from Adinga's house to

ZotuiatTatkawngVeng.

2. Amount : Rs 1,00,000.00

3. Location : Chaltlang

4. Status : Completed

1. Name of Work : Construction of R/Wall below LalremlianiRalte

house atChaltlang

2. Amount : Rs1,50,000.00

3. Location : Chaltlang

4. Status : Completed

Page 55: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

55 | P a g e

1. Name of Work : RCC balcony for widening of road near

Lalchhanhimi's house atChaltlangVenglai

2. Amount : Rs3,00,000.00

3. Location : Chaltlang

4. Status : Completed

1. Name of Work : Continuation of pedestrian footpath near

Hrangbana Petrol pump atChaltlang Lily Veng

2. Amount : Rs7,00,000.00

3. Location : Chaltlang North

4. Status : Completed

5. S

t

a

t

u

s

:

1.

Page 56: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

56 | P a g e

1. Name of Work : Construction of step and side drain near

PuKawlhlira house Lily vengJeepable road to

Thlanmual step(Diverted)

2. Amount : Rs1,00,000.00

3. Location : Chaltlang North

4. Status : Completed

1. Name of Work : Construction of step near PuT.Siama house

atDurtlangMualVeng

2. Amount : Rs1,50,000.00

3. Location : Durtlang

4. Status : Completed

Page 57: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

57 | P a g e

1. Name of Work : Construction of R/Wall near PuV.Manliana house

atDurtlangMualVeng(Diverted)

2. Amount : Rs2,00,000.00

3. Location : Durtlang

4. Status : Completed

Page 58: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

58 | P a g e

1. Name of Work : Construction of step between ChhuahlamTuikhur to

Zuangtui road atSelesih

2. Amount : Rs1,20,000.00

3. Location : Selesih

4. Status : Completed

Page 59: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

59 | P a g e

1. Name of Work : Continuation of chequered tile atZoramthara Road

atSelesih

2. Amount : Rs 1,00,000.00

3. Location : Selesih

4. Status : Completed

1. Name of Work : Laying of chequered tile between Presbyterian

Church to PWD road atSihphirVenghlun

2. Amount : Rs1,50,000.00

3. Location : SihphirVenghlun

4. Status : Completed

Page 60: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

60 | P a g e

1. Name of Work : Construction of S/M Step between M/S -I Arpu to

PuLalramlawma house atSihphir

2. Amount : Rs2,00,000.00

3. Location : Sihphir

4. Status : Completed

Page 61: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

61 | P a g e

1. Name of Work : Repairing of Step & drain near PuC.Liankima (L)

house atBawngkawn 'S'

2. Amount : Rs 3,00,000.00

3. Location : Bawngkawn South.

4. Status : Completed

Page 62: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

62 | P a g e

1. Name of Work : Construction of drain cover near Vety Side Office

atBawngkawn 'S'

2. Amount : Rs50,000.00

3. Location : Bawngkawn South.

4. Status : Completed.

1. Name of Work : Construction of hand railing near Pu

CB.Thanghluta’sHouseatBawngkawn 'S'

(Diverted)

2. Amount : Rs80,000.00

3. Location : Bawngkawn South.

4. Status : Completed.

Page 63: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

63 | P a g e

1. Name of Work : Construction of side drain near PuLalbiakthuama’s

house atBawngkawn 'S'

2. Amount : Rs1,00,000.00

3. Location : Bawngkawn South.

4. Status : Completed

Page 64: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

64 | P a g e

1. Name of Work : Construction of step for approach to Seven day

Church atDurtlang North

2. Amount : Rs1,50,000.00

3. Location : Durtlang North.

4. Status : Completed

1. Name of Work : Construction of R/Wall near Rotlinga's house at

Durtlang North

2. Amount : Rs2,00,000.00

3. Location : Durtlang North.

4. Status : Completed

:

Page 65: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

65 | P a g e

1. Name of Work : Laying of C.Tile between Community Hall and

College Road atRamhlun North.

2. Amount : Rs1,98,000.00

3. Location : Ramhlun North.

4. Status : Completed

1. N

ame

of

Wor

k

:

Con

stru

ctio

n of

Page 66: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

66 | P a g e

footpath with hand railing near Pu John Biakliana's house

at Industry Mual

2. Amount : Rs63,000.00

3. Location : Ramhlun North.

4. Status : Completed

Page 67: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

67 | P a g e

1. Name of Work : Construction of RCC footpath near Damhlia's

house at Basic Mual

2. Amount : Rs1,20,000.00

3. Location : Ramhlun North.

4. Status : Completed

Page 68: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

68 | P a g e

1. Nameof Work : Construction of step with chequered tile near PuSapluta(L)

house at Armed veng

2. Location : Armed veng

3. Amount : Rs 80,000.00

4. Status : Completed

1. Name of Work : Construction of step and R/WallbetweenK.Liankunga

house to Phirthanga house atArmedveng

2. Location : Armed veng

3. Amount : Rs 2,00,000.00

4. Status : Completed

Page 69: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

69 | P a g e

1.Name of Work : Reparing of Footpath and hand railing near Dawrpui

Presbyterian church atDawrpui

2.Location : Dawrpui

3.Amount : Rs 50,000.00

4.Status : Completed

1. Name of Work : Construction of s/m R/Wall from Nazareth English

School to Vengthar main road atChhingaveng

2. Location : Chhingaveng

3. Amount : Rs 1,50,,000.00

4. Status : Completed

Page 70: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

70 | P a g e

1. Name of Work: - Laying of Chequered tile on existing step from Thangveli

house and C.Lalbiakthanga house.

2. Location :SaronVeng, Aizawl.

3. Amount :Rs. 80,000.00

4. Status : Completed.

1. Name of Work: - Repairing of Steps and side drain at P&E transformer to Pi

Sangzuali’s house.

2. Location :ChiteVeng, Aizawl.

3. Amount :Rs. 1,00,000.00

4. Status : Completed.

1. Name of Work: Construction of

R/Wall for Chhuanliana BVT road.

2. Location : Bethlehem Vengthlang, Aizawl.

Page 71: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

71 | P a g e

3. Amount :Rs. 2,50,000.00

4. Status : Completed.

5. Name of Work : Construction of Step near JH.Rokamlova’s house.

6. Location : Tuithiang, Aizawl.

7. Amount : Rs. 1,50,000.00

8. Status : Completed.

Page 72: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

72 | P a g e

1. Name of Work : Construction of step from VenglaiTuikhur to Upa

Vanlalsiama’s house.

2. Location :Tuithiang, Aizawl.

3. Amount : Rs. 2,00,000.00

4. Status : Completed.

1. Name of Work : Repairing andrenovate of tennis court bus stand at

Tuikualsouth

2.Amount : Rs 1,50,000.00

3.Location : Khatla East, Aizawl

4.Status : Complete

Page 73: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

73 | P a g e

1.Nameof Work : Renovation of Tuichhunchhuah waiting shed at Tu8ikual

South

2.Amount : Rs 50,000.00

3.Location : Tuikual South, Aizawl

4.Status : Complete

1.Nameof Work : Re-Construction of SakhisihTuikhurat model veng, aizawl

2.Amount : Rs 2,50,000.00

3.Location : model veng, Aizawl

4.Status : Complete

Page 74: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

74 | P a g e

1.Nameof Work : Construction off motor turning point approach to

Thlanmualatmaubawk

2.Amount : Rs 2,50,000.00

3.Location : Maubawk, Aizawl

4.Status : Complete

1.Nameof Work : Construction off R/Wall and Hand railing below CP road

near Thlanmualattuikual ‘S’

2.Amount : Rs 1,00,000.00

3.Location : Tuikual ‘S’, Aizawl

4.Status : Complete

Page 75: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

75 | P a g e

1.Nameof Work : Re-Construction of public step near Pu Joseph L.Ralte

house atchawnpui

2.Amount : Rs 9,00,000.00

3.Location : Chawnpui, Aizawl

4.Status : Complete

1.Nameof Work : Construction of hand railing between Gosenpeng to YMA

run at Tlangnuam VT

2.Amount : Rs 1,50,000.00

3.Location : TlangnuamVt, Aizawl

4.Status : Complete

Page 76: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

76 | P a g e

1.Nameof Work : Construction ofPCCFlooringat Rangvamual

Sairangkawnghlui near Prresbyteerian church

2.Amount : Rs 1,00,000.00

3.Location : Rangvamual, Aizawl

4.Status : Complete

1.Nameof Work : Continuation of cement concrete flooring for approach to

hlimen H/S vengchungat

2.Amount : Rs 2,50,000.00

3.Location : HLIMEN, Aizawl

4.Status : Complete

Page 77: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

77 | P a g e

1.Name of Work : Construction of RCC slab between primary school to

middle school road atlawipu

2.Amount : Rs 1,50,000.00

3.Location : Lawipu, Aizawl

4.Status : complete

1.Nameof Work : Construction of side Drain near Zonuam Police outpost at

Zonuam

2.Amount :Rs 1,00,000.00

3.Location : Zonuam, Aizawl

4.Status : Complete

Page 78: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

78 | P a g e

1.Nameof Work : Construction of Step below Rotuaki house atkulikawn

2.Amount : Rs 2,00,000.00

3.Location : Kulikawn, Aizawl

4.Status : Complete

1.Nameof Work : Construction of culvert with hand railing below

PuVanlawma’s house atKhatla ‘E’

2.Amount : Rs 3,00,000.00

3.Location : Khatla ‘E’, Aizawl

4.Status : Complete

Page 79: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

79 | P a g e

1.Nameof Work : Laying of Chequered tile near Presbyterian church at

vaivakawn

2.Amount : Rs 1,00,000.00

3.Location : Vaivakawn, Aizawl

4.Status : Complete

1.Nameof Work : Construction of step from anganwadicentre to health

centreatTuikhuahtlang

2.Amount : Rs 2,00,000.00

3.Location : Tuikhuahtlang, Aizawl

4.Status : Complete

Page 80: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

80 | P a g e

1.Nameof Work : Construction of RCC flooring between kangthelhkawn to

H.Lalruata house atchawnpui

2.Amount : Rs 1,00,000.00

3.Location : Chawnpui, Aizawl

4.Status : Complete

1.Nameof Work : Laying of Chequered tile near chawnpuivengthlang

Presbyterian church atchawnpui

2.Amount : Rs 1,00,000.00

3.Location : Chawnpui, Aizawl

4.Status : Complete

Page 81: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

81 | P a g e

2 . Infrastructure development (Operation and Maintenance) = Rs 340.51 lakh

(i) Improvement of service level in city and Towns-Rs 285.51 lakh

(ii) Provision of e-Office/e Service-Rs 40 lakh

(iii) Furnishing of AIST Accomodation- Rs 15.00 lakh

Under Infrastucture Development ( Operation and Maintenance) various urban

infrastructures were maintained and developed, Community assets were created,

maintained, renovated and requirements were met through fund from NEDP by the

Department, with developing urban economy, transformation and increase in

population , various challenges arise in urban towns and city in Mizoram, such as

issues on urban economy, issues on urban sanitation, issues on urban poverty and

transportation etc and the Department is giving its effort to meet the needs of

urbanites and its welfare through this State Flagship programme NEDP.

Photographs of various Works implemented under Infrastructure development

(Operation and Maintenance) NEDP are as follows:

(i) Improvement of service level in city and Towns-Rs 285.51 lakh

Repair and renovation of Dumping ground atKhawzawlRs 5 lakh

Page 82: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

82 | P a g e

Re construction of retaining wall above National Highway atPenielVeng,

Hnahthial

Page 83: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

83 | P a g e

Improvement of Community Hall atsaitual town:

Page 84: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

84 | P a g e

Improvement of Community Hall atElectric Veng, Hnahthialtown:

Page 85: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

85 | P a g e

Improvement of bazaar Hall atSerchhipRs 12 lakh

Page 86: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

86 | P a g e

Improvement of internal link Road from rev Vanlalauva’s House to Mission for

Christ Junction atdurtlangLeitan South Rs 35 lakh

Page 87: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

87 | P a g e

Improvement of RCC elevated Public Road near PlaygroudatTlangnuam,

Aizawl (Phase –I& 1I) diversion Rs 35 lakh(2016-2017)+ Rs 35 lakh

(2017-2018) = Total Rs 70 lakh

Page 88: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

88 | P a g e

Construction of RCC Ramp for Aizawl civil hospital ataizawlRs 18 lakh

Page 89: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

89 | P a g e

Improvement of Approach road to BSUP site atlawipuRs 25 lakh

Page 90: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

90 | P a g e

Improvement of Saron Road atChandmari,Aizawl Rs 12.41lakh

Page 91: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

91 | P a g e

(iii) Provision of e-Office/e Service-Rs 40 lakh :

e-service facility and inaugurated by PuZodintluanga, Hon’ble Minister, UD&PA

on15th November, 2016. e- office was introduced in the office of Directorate of UD & PA department under operation and

maintenance, NEDP 2016-2017, The e- office is expected to benefit the department in better service

delivery, efficiency & cost reduction, besides, modern technology such as mobile apps which has

developed during the last five years has become very essential and benefits the government servants

in implementation of various National and state Missions/Schemes in a faster and effective manner.

3. Aizawl Road Junction improvement = Rs 650 lakh

Page 92: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

92 | P a g e

Urbanization has led to an increase in business centers, various urban

constructions and moveable assets like public and private vehicles, without proper

planning and traffic management, a city become congested and cause difficultiesin

movement within the city, to resolve the issues encountered byAizawl city,

Aizawl city junction improvement project was initiated in the year 2016-2017

under NEDP.This is the pet project of hon’ble minister UD & PA department, and

the project was headed by UD & PA department, various departments such as

public Works department, Public Health Engineering Department and Service

Provider like BSNL etc are coordinating enthusiastically for the success of this

project. This project has benefitted public by resolving various traffic problems

that has emerged inaforementioned junctions.

1. Name of Work : Improvement & Widening of Venghlui to

Republic Road – Pangi Junction;

1. Amount : Rs. 95.74 lakh

2. Location : Republic veng

3. Status : Completed

Page 93: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

93 | P a g e

1. Name of Work : Improvement of Bawngkawn Junction

2. Amount : Rs. 283.63 lakh

3. Location : Bawngkawnveng

4. Status : completed

Page 94: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

94 | P a g e

1. Name of Work : Improvement of Vaivakawn to Hunthar junction

2. Amount : Rs. 142.20 lakh

3. Location : Huntharveng

4. Status : completed

Page 95: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

95 | P a g e

4. Climate Change Mitigation – Sanitation and Cleanliness Drive Component -Rs

25lakh

Enormous increase in population,

urbanization and lack of awareness among

public results in an increase in urban waste,

these, without proper management and

treatment can hamper the urban health,

environment and can become very harmful for

environment and an obstacle for the growth of

the city and for future generations. This

requires an infrastructure, scientific treatment

of waste as well as an awareness among the

urbanites as cleanliness can only be achieved

through people’s participation and is a contribution everyone has to make, to tackle

this issues of major environmental concern, the department is initiating projects for

solid waste management through SBM Mission and funding from various sources and

as a means of convergence mission, Urban development and poverty alleviation

Department had instigated Sanitation and Cleanliness drive in all covered Urban

towns and Districts. Through this motive under NEDP 2016-2017, many urbanites

were educated and were made aware of environmental conservation.

Pic: Activities of Sanitation & Cleanliness drive in urban city and Towns

Page 96: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

96 | P a g e

Permanent Hoarding displayed at various places in district headquarters/ towns :

Page 97: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

97 | P a g e

Cleaning of Drains atChamphai and Aizawl District:

Page 98: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

98 | P a g e

Cleaning of side drains, streams and rivers atChamphai, Lunglei and Aizawl

Districts.

Page 99: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

99 | P a g e

Cleaning of side drains, streams and rivers atLungleiTown.

Page 100: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

100 | P a g e

BEFORE

AFTER

ACHIEVEMENT OF NEDP 2017-2018

1. Improvement of urban Infrastructure in the city/towns (UD&PAComponents)

Rs 7500

Composite Urban Infrastructure within AizawlRs 2200 lakh

Composite urban Infrastructure in City and towns Rs 1510 lakh

Following are various developmental works and construction of basic

necessities such as Internal roads, Pediastrian footpath, Drainage, retaining wall, RCC

steps, Culverts and other Urban amenities undertaken in Urban areas in the year 2017-

2018,NEDP.

1. Name of work : Laying of chequered tile and construction of hand railing

near Primary School –I.

2. Location : Armed Veng South, Aizawl.

3. Amount : Rs 2,39,700.00

4. Status : Completed

1. Name of work : Construction of Culvert near PuBiakthanga’s

house .

2. Location : Armed Veng South, Aizawl.

3. Amount : Rs 56,000.00

4. Status : Completed

Page 101: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

101 | P a g e

BEFORE AFTER

1. Name of work : Construction of Step with hand railing near Pu

Dangpuia’s house.

2. Location : Armed Veng South, Aizawl.

3. Amount : Rs 1,71,700.00

4. Status : Completed

AFTER

1. Name of work : Construction of rigid pavement near Pu

Laldailova’s house.

2. Location : Armed Veng South, Aizawl.

3. Amount : Rs 4,39,000.00

4. Status : Completed

BEFORE AFTER

Page 102: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

102 | P a g e

1. Name of work : Laying Chequered tile flooring near Pi Saibulliani’s

house to PuDawltea’s house.

2. Location : Armed Veng South, Aizawl.

3. Amount : Rs 1,92,300.00

4. Status : Completed

BEFORE AFTER

BEFORE (Contd.) AFTER (Contd.)

Page 103: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

103 | P a g e

1. Name of work : Construction of PCC pavement from Hnam Ro

Chawisang Pawl Building to PuK.Zothantluanga

(L) house - Block I.

2. Location : Dawrpui, Aizawl.

3. Amount : Rs1,27,300.00

4. Status : Completed

BEFORE AFTER

1. Name of work : Construction of PCC pavement from Hnam Ro

Chawisang Pawl Building to PuK.Zothantluanga

(L) house - Block II .

2. Location : Dawrpui, Aizawl.

3. Amount : Rs 54,300.00

4. Status : Completed.

Page 104: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

104 | P a g e

BEFORE AFTER

1. Name of work : Construction of side drain cover for widening of

road from Pi Manliani (L) house to PuDingluaia’s

house.

2. Location : Dawrpui West, Aizawl.

3. Amount : Rs 2,24,600.00

4. Status : Completed.

BEFOREAFTER ( Drain)

AFTER (Drain cover)

Page 105: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

105 | P a g e

1. Name of work : Laying of Chequered tile near UpaRokamlova’s

house (Church street).

2. Location : Dawrpui, Aizawl.

3. Amount : Rs 48,100.00

4. Status : Completed.

BEFORE AFTER

1. Name of work : Laying of Chequered tile & construction of steel hand

railing near PuV.Thanga (L) house.

2. Location : Dawrpui, Aizawl.

3. Amount : Rs 3,34,500.00

4. Status : Completed.

Page 106: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

106 | P a g e

BEFORE AFTER

1. Name of work : Laying of Chequered tile on existing step from Pu

Johana’s house to TuikualSairang Road.

2. Location : Dawrpui West, Aizawl.

3. Amount : Rs 1,20,300.00

4. Status : Completed.

BEFORE AFTER

1. Name of work : Construction of R/Wall near PuHrangliana’s house

2. Location : Armed Veng, Aizawl.

3. Amount : Rs1,31,400.00

4. Status : Completed

Page 107: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

107 | P a g e

Name of Work : Construction of R/Wall near UPS School.

Location : Chite, Aizawl.

Amount : Rs. 2,54,700.00

Status : Completed.

AFTER

BEFORE

Page 108: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

108 | P a g e

1. Name of Work : Construction of Drain with cover from

PuBawihlawra (L) house to Lamhnaituikhur.

2. Location : Venghlui, Aizawl.

3. Amount : Rs. 2,00,000.00

4. Status : Completed.

AFTER

BEFORE

Page 109: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

109 | P a g e

1. Name of Work : Construction of PCC Pavement near PuHanga

Colony road.

2. Location : Venghlui, Aizawl.

3. Amount : Rs. 2,00,000.00

4. Status : Completed.

BEFORE

AFTER

Page 110: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

110 | P a g e

1. Name of Work : Construction of RCC Footpath with hand railing

near PuRobina house.

2. Location : Venghlui, Aizawl.

3. Amount : Rs. 2,00,000.00

4. Status : Completed.

BEFORE

Page 111: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

111 | P a g e

1. Name of Work : Construction of Hand railing from Venghlui main

road to PuK.Lalhuma house to PuBawilawra(L)

house.

2. Location : Venghlui, Aizawl.

3. Amount : Rs. 50,000.00

4. Status : Completed.

BEFORE

BEFORE

Page 112: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

112 | P a g e

1. Name of Work: Construction of RCC Drain near PuBiakzuala and

PuLalengkima house.

2. Location :Venghlui, Aizawl.

3. Amount :Rs. 1,50,000.00

4. Status : Completed.

AFTER

AFTER

BEFORE

Page 113: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

113 | P a g e

1. Name of Work: Laying of Chequered tile between Vanlalhlana house to

Aizawl Central Hall.

2. Location :Venghlui, Aizawl.

3. Amount :Rs. 50,000.00

4. Status : completed

Page 114: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

114 | P a g e

5. Name of Work: Construction of PCC Pavement BELOW PuLaldingliana

house.

6. Location :Venghlui, Aizawl.

7. Amount :Rs. 1,50,000.00

8. Status : Completed.

AFTER

BEFORE

Page 115: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

115 | P a g e

1. Name of Work : Construction of Chequered tile near Pi Zoliani

house to Pi Vanlalsawmmi house atTuikual N’

2. Amount : ~ 60,000.00

3. Location : Tuikual N’

4. Status : Completed

Page 116: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

116 | P a g e

1. Name of Work : Construction of side drain near PuArona

house to Pi Sangliani house atTuikual N’

(2017-2018)

2. Amount : ~ 40,000.00

3. Location : Tuikual N’

4. Status : Completed

Page 117: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

117 | P a g e

1. Name of Work : Construction of Chequered tile near IKK (Var)

Church atTuikual N

2. Amount : ~ 40,000.00

3. Location : Tuikual N’

4. Status : Completed

Page 118: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

118 | P a g e

1. Name of Work : Construction of Pcc Flooring from HV

Lalhmachhuana house at Salem Veng

2. Amount : ~2,00,000.00

3. Location : Salem Veng

4. Status : Completed

\

1. Name of Work : Construction of step below PuLallungmuana

house for approach to Zoremsiami house at

DawrpuiVengthar

2. Amount : ~2,00,000.00

3. Location : DawrpuiVengthar

4. Status : Completed

Page 119: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

119 | P a g e

1. Name of Work : Construction of step and hand railing on

approach to MaipawlTuikhuratDawrpui

Vengthar

2. Amount : ~1,00,000.00

3. Location : DawrpuiVengthar

4. Status : Completed

1. Name of Work : Construction of hand railing near Zamliana house

at Mission Vengthlang (2017-2018)

2. Amount : ~1,00,000.00

3. Location : Mission Vengthlang

4. Status : Completed

Page 120: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

120 | P a g e

1. Name of Work : Construction of PCC flooring from Lalkima

house to Huliana house at Salem Veng

2. Amount : ~2,00,000.00

3. Location : Salem Veng

4. Status : Completed

Page 121: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

121 | P a g e

1. Name Of Work : Construction Of Hand Railing Approach To

Basketball Court Atzemabawk

2. Amount : Rs100,000/-

3. Location : Zemabawk North

4. Status : Completed

Page 122: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

122 | P a g e

1. Name Of Work : Pcc Flooring And Construction Of Retaining Wall

Athmangaihnaveng Road Below High School Road

AtZemabawk

2. Amount : Rs500,000/-

3. Location : Zemabawk

4. Status : Completed

1. Name Of Work : Construction Of R/Wall Above Lily Veng

GraveyardAtChaltlang North

2. Amount : Rs500,000/-

3. Location : Chaltlang North

4. Status : Completed

Page 123: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

123 | P a g e

1. Name Of Work : Construction And Repairing Of Existing

Step Between Biakdailova And

PuLalthanhawla’s House AtZarkawt

2. Amount : Rs300,000/-

3. Location : Zarkawt

4. Status : Completed

\

1. Name Of Work : Construction Of R/W Approach To

Hebraiveng, Falkland

2. Amount : Rs100,000/-

3. Location : Falkland

4. Status : Completed

Page 124: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

124 | P a g e

5. Name Of Work : Pcc Flooring Of Internal Road Water Bank Road

6. To Thlanmual Road At Falkland

7. Amount : Rs500,000/-

8. Location : Falkland

9. Status : Completed

1. Name Of Work : Construction Of Side Drain From Pukawlsailova

House To Puchalmawii House, Galilee Veng,

Zemabawk

2. Amount : Rs150,000/-

3. Location : Zemabawk

4. Status : Completed

Page 125: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

125 | P a g e

Continuation of Pavilion & Gallery at Rajiv Gandhi Stadium atMualpui,AizawlRs

2350.00 lakh:

In pursuance of commitment made by the Hon’ble Chief Minister to enhance

seating capacity of Rajiv Gandhi Stadium at Mualpui, The Department had pursued

the work by utilizing the service of Great Sport Infra Co. which is the leading sport

infrastructure company, the seating capacity has now wnhanced with 14570 seats

from NEDP 2016-2017.

Page 126: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

126 | P a g e

Completion of Directorate Building UD & PA Deptt -Rs 600 lakh:

Page 127: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

127 | P a g e

Completion of Linkages of Road from Ramhlun south YMA Hall to

main road atRamhlun South, AizawlRs 30 lakh

Page 128: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

128 | P a g e

Construction of Road atKhatla South Vengthar (approach road to

Thlanmual via Khatla South Vengthar Presbyterian Church) Rs 28 lakh

Page 129: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

129 | P a g e

2. Aizawl city Infrastructure Development:

Junction improvement atDinthar Junction atdawrpuivengthar

Page 130: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

130 | P a g e

Supply and Installation of Synthetic Athletic track atSerchhip stadium-

Rs 334.80 lakh:

Page 131: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

131 | P a g e

3. Operation and Maintenance ( Service Level) Rs 500 Lakh

Operation and Maintenanceof Crematorium atSairangRs 20 l akh

Construction of Chowkidar Quarters aand Housing for DG set

Page 132: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

132 | P a g e

Quarters with Fencing atKhuangpuilam,Kolasib

Rs 40 lakh.

Page 133: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

133 | P a g e

Fencing of RAY project Site at Falkland -Rs 10 lakh

Page 134: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

134 | P a g e

3. Improvement of ATI Junction at New Secretariat Complex Rs 140lakh

Page 135: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

135 | P a g e

5.Climate Change Mitigation Initiatives-sanitation and Cleanliness Drive

Component Rs 200 lakh

Urban Development & Poverty Alleviation Department has been working on

Cleanliness and sanitation since its existence, Under National flagship Mission

i.eSwachh Bharat Mission, which was launched in 2014, various cleanliness activities

and targets were achieved by the Department, all 23 urban towns in Mizoram were

declared ODF status and out of which 21 were certified ODF status by Quality control

of India after spot verification, the remaining two are soon to be declared too, besides,

all 23 towns were participated in SwachhSurvekshan 2018, awareness were created

through Information, education and communication activities in all the covered towns,

all missions and projects under the department were converged wherever possible for

the benefit of the people , and hence, as a means of convergence and one of

sustainable development initiatives for public welfare, the Department had purchased

public bins under NEDP 2017-2018 for district towns;this is expected to serve as

useful means for cleanliness of public places in towns.

Purchase and Installation of Public Community binsRs 100 lakh

Page 136: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

136 | P a g e

6.Aizawl City GIS based Street zoning and signage Rs 300 lakh This project was undertaken to benefit urbanites and tourists visiting

Aizawl city as it is expected to help in identification and direction of

locality/streets and important landmarks in the city, also, it will help in

smooth functioning and movement of traffic in the city.

Name of Contractor - INNOVATIONS, N.Delhi

Project Cost (in lakh) - Rs. 300

Date of start - 5.9.2017

Scheduled date of completion - May 2018

Physical Progress - 30 %

Financial Progress - 64.30%

Page 137: ACHIEVEMENT REPORT UNDER NEDP PROJECTudpamizoram.nic.in/Documents/Others/Final NEDP... · Sl. No. Name of proposal Amount (in lakh ... Providing external water connection and external

137 | P a g e

Major infrastructure works such as Mizoram State Convention Centre, Zodin

Multi level Car Parking etc have also been included in NEDP 2017-2018, the work is

at initial stage of implementation and the department is thriving for fast and successful

progress of the works.