    PMR IMPLEMENTATION

    ACCESS - PMR Implementation1. Antenna System Checking c/o SNC

    Determine condition of TX/RX antenna & feeder cable throughsweep testing.

    VSWR value = 1.5

    2. BTS Health Check (re-commissioning) c/o SNC TRX loop testing

    Diversity testing

    Other PIU testing (Duplexer, Multi-coupler, combiner cooling fanetc.)

    Checking of loose connector & cabling

    Antenna Mechanical Tilt = from audit data

    Antenna Orientation = from audit data

  • 8/12/2019 ACCESS Housekeeping

    2/12

    PMR IMPLEMENTATION

    ACCESS - PMR Implementation3. Basic Parameter checking through CDD c/o SNC,

    NSA & Access

    TRX Frequency MBCCH/TCH

    Hopping Parameter MAL list

    GTRX

    GENA

    EGENA

    CDED

    CDEF

    ADCE

  • 8/12/2019 ACCESS Housekeeping

    3/12

    PMR IMPLEMENTATION

    ACCESS - PMR ImplementationBTS KPI

    http://localhost/var/www/apps/conversion/tmp/scratch_7/Eng08-May-2007.xlshttp://localhost/var/www/apps/conversion/tmp/scratch_7/Eng08-May-2007.xls
  • 8/12/2019 ACCESS Housekeeping

    4/12

    PMR IMPLEMENTATION

    ACCESS BSC - PMR ImplementationBSC OVERLOAD PROTECTION:

    0.4 Signalling link load

    80% Ater Utilization (average)

    80% TRX Utilization (average)

    80% CPU Load (average)

    90% Gb link load (average)

    BTS REHOMING CONSIDERATION: Ater utilization of target BSC < 80%

    Paging load of target BSC < 150000 pages (assuming 1

    LAC per BSC) Signaling link load of target BSC < 0.4

    CPU load of target BSC < 80%

    Gb link load of target BSC < 90%

    Gb link license (GPRS/EDGE) must be updated

    VLR of target homing MSC < 85%

  • 8/12/2019 ACCESS Housekeeping

    5/12

    PMR IMPLEMENTATION

    BSC Health Check c/o BSS Opti

    Printing of Alarm History (for the past 24 hrs)

    Printing of Current Alarms

    Checking working states of PIUs

    Checking of TRX Channel

    Interrogate Circuit Checking of Signaling

    Checking of Network Configuration

    Unit diagnostics and HW Switchover

  • 8/12/2019 ACCESS Housekeeping

    6/12

    PMR IMPLEMENTATION

    ACCESS BSC - PMR ImplementationBSC2i Traffic Handling Capacity:

    BSC2i configured with 512 full rate TRXs,circuit switched:

    512 TRXs (64 TRX per BCSU)

    248 BCFs (31 BCFs per BCSU) 512 BTSs (64 BTSs per BCSU)

    6144 SDCCHs (768 SDCCHs per BCSU)

    4096 TCHs (512 TCHs per BCSU)

    3040 Erlangs total traffic handling capacity(max of 26 aters)

    2 x 128 kbps (max signaling link per bcsu)

  • 8/12/2019 ACCESS Housekeeping

    7/12

    PMR IMPLEMENTATION

    ACCESS BSC - PMR ImplementationBSC3i Traffic Handling Capacity:

    BSC3i is configured with 660 full rate TRXs,circuit switched:

    660 TRXs (110 TRX per BCSU)

    660 BCFs (110 BCFs per BCSU) 660 BTSs (110 BTSs per BCSU)

    10560 SDCCHs (1760 SDCCHs per BCSU)

    5280 TCHs (880 TCHs per BCSU)

    3920 Erlangs total traffic handling capacity(max of 33 aters)

    2 x 256 kbps (max signaling link per bcsu)

  • 8/12/2019 ACCESS Housekeeping

    8/12

    PMR IMPLEMENTATION

  • 8/12/2019 ACCESS Housekeeping

    9/12

    PMR IMPLEMENTATION

  • 8/12/2019 ACCESS Housekeeping

    10/12

    PMR IMPLEMENTATION

  • 8/12/2019 ACCESS Housekeeping

    11/12

    PMR IMPLEMENTATION

  • 8/12/2019 ACCESS Housekeeping

    12/12

    PMR IMPLEMENTATION